001-46942
|
Active
|
01/22/2025
|
|
|
5
|
9
|
Jefferson
|
|
Oil and chip, drainage and other improvements to the roads and parking lots near and within Rend Lake State Fish and Wildlife Area.
|
002-46946
|
Active
|
01/22/2025
|
1 / 0 |
|
5
|
9
|
Saline
|
|
Oil and chip, drainage and other improvements to the roads, Carrier Mills Township Road and parking lots near and within Sahara Woods State Fish and Wildlife Area.
|
003-61L01
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Cook
|
|
Resurfacing 171st Street from Dixie Highway to Wood Street in Hazel Crest.
|
004-61L09
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Cook
|
|
Traffic signal modernization at the intersection of Wolf Road and Palmer Avenue in Northlake.
|
005-61L10
|
Active
|
01/15/2025
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
PCC Sidewalk with segmental concrete block retaining wall from Freeport Drive to DuJardin Elementary Shcool. Additional work includes curb and gutter, pavement patching, storm sewer, steel railing, and fencing.
|
006-61L12
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Cook
|
|
Resurface Main Street from US 30 to 216th Street in Matteson.
|
007-61L13
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Will
|
|
HMA resurfacing on Highpoint Drive from Discovery Park to Weber Road in Romeoville. Additional work includes Class D patches, PCC driveways, sidewalks, drainage and utility structures, and pavement markings.
|
008-61L14
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing on Center Street from 175th Street to 171st Street in East Hazel Crest. Additional work includes Patching, HMA shoulders, Driveways, Sidewalks, an HMA Multi-use Path, Lighting, Drainage Structures, and Pavement Markings.
|
009-61L15
|
Active
|
01/15/2025
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Resurface 207th Street from IL 50 to Crawford Avenue in Matteson.
|
010-61L16
|
Active
|
01/15/2025
|
1 / 1 |
|
1
|
1
|
Lake
|
|
Sidewalk improvements at various intersections in Lake Forest.
|
011-61L17
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Lake
|
|
Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake
|
012-61L20
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Taft Drive from east of Union Avneu to Canal Street in South Holland.
|
013-61L23
|
Active
|
01/15/2025
|
|
1 |
1
|
1
|
Cook
|
|
HMA Resurfacing on Hassell Road from Fairway Cout to Rosedale Lane in Hoffman Estates. Additional work includes patching, ADA Ramp, Sidewalks, Driveways, Pavement Markings, and Signage.
|
014-61L26
|
Active
|
01/15/2025
|
1 / 0 |
|
1
|
1
|
Kane
|
|
Resurfacing on Prairie Street from Randall Road to South 13th Street in St. Charles.
|
015-62G55
|
Active
|
01/15/2025
|
1 / 1 |
|
1
|
1
|
Will
|
|
The Standard Overlay consists of pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course, drainage structures adjustment and cleaning, grading and shaping ditches, placement of pavement markings. Located on Illinois Route 171 (Archer Ave.) begins at Boula Ave. and extends in a northeasterly direction for 4,542.2 feet (0.86 mile ) to approximately 0.1 miles southwest of I-355. The improvement is in the City of Lockport, in Will County.
|
016-62L58
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Cook
|
|
(1.426-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers. Located in the Villages of Lincolnwood and City of Chicago in Cook County.
|
017-62N91
|
Active
|
01/15/2025
|
13 / 12 |
|
1
|
1
|
Cook
|
|
(3.86-Mile) Bridge Rehabilitation and Roadway Improvement along Il 53 in Cook County.
|
018-62P43
|
Active
|
01/15/2025
|
7 / 6 |
|
1
|
1
|
Cook
|
|
(533-Ft), Bridge Superstructure replacement, bridge abutment replacement, approach slab replacement, pier repairs, lighting, ADA improvements and traffic signal Modernization. This project is located on Leavitt Street over Interstate 290 (I-290) between the intersections of Congress Parkway and Van Buren Street.
|
019-62R58
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Cook, DuPage
|
|
This project is located along IL 19 (Irving Park Road) from East of Wise Road to Roselle Road. The scope of work includes designed overlay, new shoulders, and ADA improvements. The gross and net length is 14,175 feet (2 .68 miles). It is located in the Villages of Roselle and Schaumburg, and unincorporated Bloomingdale and Schaumburg Townships in Cook and DuPage Counties.
|
020-62R73
|
Active
|
01/15/2025
|
1 / 1 |
|
1
|
1
|
Cook
|
|
The proposed improvement consists of culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement and resurfacing located on IL 68 (Dundee Road) over E. Branch of Salt Creek in the Village of Palatine, Cook County. Gross and Net length: 2430 Ft (0.46 Mile)
|
021-62R96
|
Active
|
01/15/2025
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
(3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township.
|
022-62T31
|
Active
|
01/15/2025
|
|
|
1
|
1
|
DuPage
|
|
Gross and Net Length = 3,713 feet (0.703 miles) and 341 feet (0.065 miles). Bridge Preservation Project: Deck Overlay, Joint Replacement / Repair at IL 53 over Ginko Way (Morton Arboretum) and over East Branch DuPage River. This project is located in Unincorporated DuPage County.
|
023-62T48
|
Active
|
01/15/2025
|
|
|
1
|
1
|
Cook
|
|
(1,119-Ft) Bridge preservation project: deck overlay, joints replacement/ repair. Improvement includes hydro scarification, latex modified concrete overlay, deck slab repair, structural repair of concrete, sawcut grooving, join replacement, approach slab repair, concrete sealer, HMA approach butt joints, median replacement and curb and gutter replacement. Location of Work: Western venue at Thorn Creek (approx. 0.2-miles South of Sauk Trail) in the Village of Park Forest.
|
024-62T50
|
Active
|
01/15/2025
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(292-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County.
|
025-62T83
|
Active
|
01/15/2025
|
|
|
1
|
1
|
McHenry
|
|
(1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard.
|
026-62U89
|
Active
|
01/15/2025
|
2 / 2 |
|
1
|
1
|
Will
|
|
The proposed scope of work consists of the building demolition at various locations. Each building removal will include removal any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalk and_driveways, utilities and trees within the parcels limits. The project is in Will County.
|
027-62U91
|
Active
|
01/15/2025
|
1 / 1 |
|
1
|
1
|
Lake
|
|
(1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County.
|
028-62X36
|
Active
|
01/15/2025
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
This is a milled rumble strip project. This project begins at the south of the intersection of IL Route 31 (Richmond Road) and Pioneer Drive and proceeds in a northernly direction for 5.204 miles to south of the intersection of IL 31 Tryon Grove Road and U.S. Route 12. The project is located within the Villages of Ringwood and Richmond and the Townships of Richmond and McHenry in McHenry County.
|
029-64N01
|
Active
|
01/15/2025
|
2 / 1 |
|
2
|
2
|
Whiteside
|
|
8.25 miles of patching, milling and resurfacing on I-88 from Elkhorn Creek to US 30. Expansion joint replacement, deck patching, concrete overlay, and miscellaneous other bridge repairs to SN's: 098-0073, 098-0074, 098-0075, 098-0076, 098-0087, and 098-0088. Demolition and removal of SN's 098-0089 and 098-0090.
|
030-64R02
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Lee
|
|
Reconstruction of sidewalk ramps for those with disabilities at ramps deemed uncompliant, patching, milling, and resurfacing along various state routes in Dixon, Illinois. Gross Length 4,163 ft.
|
031-64S33
|
Active
|
01/15/2025
|
1 / 1 |
|
2
|
2
|
Stephenson
|
|
Bridge repairs and joint replacement on SN 089-0030, carrying IL 73 over Indian Creek in Winslow.
|
032-64S87
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Rock Island
|
|
Traffic signals upgrade at Barstow Rd 0.6 mile northeast of IL 92 interchange in Carbon Cliff.
|
033-64T20
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Henry
|
|
Bridge repairs and approach and deck overlay on SN 037-0143, carrying US 6 over Mosquito Creek, 0.3 miles west of I-280.
|
034-64T81
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Whiteside
|
|
0.5 miles of resurfacing on US 30 from IL 78 to Garden Plain Rd in Morrison
|
035-64T91
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Whiteside
|
|
Full bridge cleaning and painting at SN 098-0033 carrying US 30 over Elkhorn Creek 0.6 mile west of Como Rd.
|
036-64U07
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Rock Island
|
|
Bridge washing of 11 structures along I-74 in Rock Island County.
|
037-64U08
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Winnebago
|
|
Bridge washing of SN 101-0133 and 101-0134 over the Kishwaukee River in Winnebago County.
|
038-64U09
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Boone, Winnebago
|
|
Bridge washing of 9 structures in Boone and Winnebago Counties.
|
039-64U10
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Various
|
|
Bridge washing of 9 structures in Boone and Winnebago Counties.
|
040-64U11
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Various
|
|
Bridge washing of 12 structures in various counties.
|
041-64U25
|
Active
|
01/15/2025
|
1 / 0 |
|
2
|
2
|
Ogle
|
|
7.931 miles of HMA milling and resurfacing on IL 64 from Chana Rd to Il 251.
|
042-64U27
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Winnebago
|
|
7.54 Miles Hot-Mix Asphalt pavement overlay, 0.2 Mi W of Pecatonica Rd_to 0.2 mile W of Falconer Rd.
|
043-64U29
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Henry
|
|
Standard overlay on IL 82 from 700N south of Cambridge to IL 17. Approximately 5.87 miles.
|
044-64U30
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Stephenson
|
|
4.63 miles of HMA milling and resurfacing on US 20 from Rees Rd to 0.4 mile west of Flansburg Rd.
|
045-64U31
|
Withdrawn
|
02/19/2025
|
|
|
2
|
2
|
Carroll
|
|
7.6 miles of patching, milling and resurfacing on IL 40 from Marion Ave. in Chadwick to IL 78.
|
046-64U33
|
Active
|
01/15/2025
|
1 / 1 |
1 |
2
|
2
|
Whiteside
|
|
15.3 miles of milling and resurfacing on Moline Rd. from East St. in Erie to IL 78 and 3rd Ave. in Lyndon to US 30.
|
047-66K70
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Bureau
|
|
350 ft of Bridge Repairs (SN 006-0097) over Green River, 1.4 MI W OF IL 40.
|
048-66N41
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Putnam
|
|
Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at Structure No. 078-0047 carrying IL Route 89 over the Illinois River approximately 0.91 mile south of US Route 6.
|
049-66N42
|
Active
|
01/15/2025
|
|
|
2
|
3
|
LaSalle
|
|
Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at various structures over the Illinois River in LaSalle County.
|
050-66P13
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Ford
|
|
Class B pavement patching on F.A.P. Route 796 (IL 115) beginning at Pine Street (1450E Rd.) in Piper City and ending at the Intersection of IL 115/116. Approximately 8.5 miles gross length.
|
051-66P49
|
Active
|
01/15/2025
|
1 / 0 |
|
2
|
3
|
DeKalb
|
|
HMA milling and resurfacing patching, pavement marking and reflective markers on FAP 307 (IL 64), from 0.2 mile east of Airport Rd to Kane County Line in DeKalb County. Approximately 2.946 miles gross length.
|
052-66P51
|
Active
|
01/16/2025
|
|
|
2
|
3
|
Grundy
|
|
Milling and resurfacing 1.15 miles of OR 129 from Main St. to Carbon Hill Rd. in Gardner, along with the replacement of 3 culverts within the Project Bounds.
|
053-66P78
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Various
|
|
Weed spraying to aid in weed control along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties.
|
054-66P84
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Kankakee
|
|
Cleaning and painting all steel components of structure 046-0114 carrying I-57 over Minnie Creek, 4.3 miles north of the Chebanse interchange.
|
055-66P95
|
Active
|
01/15/2025
|
|
|
2
|
3
|
LaSalle
|
|
HMA milling and resurfacing on the frontage road, parallel to IL 23 on the north side of Streator, and is approximately 0.22 mile long.
|
056-66R00
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Various
|
|
Litter removal from the interstate highways at interchanges and rest areas throughout District 3.
|
057-66R05
|
Active
|
01/15/2025
|
|
|
2
|
3
|
LaSalle
|
|
Replacing the 6" centerline pavement marking with 9" contrast pavement marking tape and replacing the 8" lane lines at interchange ramps on I-39 from north of Oglesby Interchange at M.M. 54 to M.M. 76.4.
|
058-66R06
|
Active
|
01/15/2025
|
|
|
2
|
3
|
LaSalle, Livingston
|
|
Contrast pavement marking of the 8" lane lines on IL 23 at Richards Rd in LaSalle County and ending at Adams St in Livingston County and also on IL 18 beginning at Second Ave and ending at Wasson St in LaSalle County.
|
059-66R29
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Bureau
|
|
2.3 miles HMA milling and resurfacing, patching, pavement marking, and reflective markers on SBI 7C (2775E RD), from US 6 to IL 29 in Bureau County.
|
060-66R30
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Bureau
|
|
HMA milling and resurfacing, patching, pavement marking and reflective markers on SBI 88 (NEW BEDFORD RD), from Main St in New Bedford to IL 40 in Bureau County. 1.74 mile gross length.
|
061-66R34
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Iroquois
|
|
HMA milling and resurfacing 2" (SMART) of the mainline, shoulder work, pavement marking, and raised reflectors on FAI 57 from 0.5 mile north of IL 116 to 1.6 miles north of CH4. 4.88 miles gross.
|
062-68E50
|
Active
|
01/15/2025
|
1 / 1 |
|
3
|
4
|
Knox
|
|
Widening and resurfacing, culvert replacements, culvert repairs, drainage improvements, and guardrail upgrades on IL 180 from IL 167 to US 150 in Knox County. Approximately 10.48 miles.
|
063-68F90
|
Active
|
01/15/2025
|
1 / 1 |
1 |
3
|
4
|
Putnam
|
|
5.91 miles of resurfacing (PPP) project extends from 1.4 miles east of the I-180/IL 26 interchange to IL 89.
|
064-68H31
|
Active
|
01/15/2025
|
|
|
3
|
4
|
Tazewell
|
|
Bridge deck sealing at various locations in Tazewell County.
|
065-68J17
|
Active
|
01/15/2025
|
|
|
3
|
4
|
McDonough
|
|
12 miles of Cape Seal on IL 9 from the Hancock County Line to US 67 in Good Hope in McDonough County.
|
066-68J21
|
Deleted
|
01/30/2025
|
|
|
3
|
4
|
Warren
|
|
PPP designed overlay on US 67 from north of 40th Ave and south end of BUS 67; SMART overlay on Roseville Bypass and north end of BUS 67, including IL 116 from 0.2 mile west to 0.2 mile east of US 67 west of Roseville. Approximately 6.65 miles gross length.
|
067-68J27
|
Active
|
01/15/2025
|
|
|
3
|
4
|
Various
|
|
Installation of ITS and traffic signal equipment at various locations in District 4.
|
068-68J33
|
Active
|
01/15/2025
|
|
|
3
|
4
|
Various
|
|
Districtwide weed spraying.
|
069-68J40
|
Active
|
01/15/2025
|
|
|
3
|
4
|
Henderson
|
|
Bridge repair to SN 036-0040 including replacing expansion joints, epoxy crack injection, and patching.
|
070-68J86
|
Active
|
01/15/2025
|
|
|
3
|
4
|
Various
|
|
Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting, and ITS facilities).
|
071-70D55
|
Active
|
01/15/2025
|
5 / 0 |
|
3
|
5
|
McLean
|
|
10.76 miles of pavement rehab - Designed Overlay Resurfacing (INT-3rd), underdrains, patching, paving and low speed weigh in motion scale from 0.3 mile west of TR 90 (725 E Rd) south of Carlock to I-55 north of Normal (including ramps and Carlock weigh stations).
|
072-70G42
|
Active
|
01/15/2025
|
|
|
3
|
5
|
DeWitt, Piatt, Vermilion
|
|
Constructing push walls and slabs at the IDOT Maintenance Facilities of Clinton, Monticello, and Fithian within Dewitt, Vermilion, and Piatt Counties.
|
073-70G76
|
Active
|
01/15/2025
|
|
|
3
|
5
|
Various
|
|
Bridge deck sealing of 109 structures in DeWitt, Piatt, and McLean Counties.
|
074-70H32
|
Active
|
01/15/2025
|
2 / 2 |
|
3
|
5
|
Vermilion
|
|
1.14 miles of SMART overlay on US 136 from 0.1 mile west of Lynch Spur in Danville to Indiana State Line.
|
075-70H33
|
Active
|
01/15/2025
|
|
|
3
|
5
|
Champaign
|
|
6.15 miles of microsurfacing 2 pass, 0.8 mile south of Washington St in Urbana to Madison St in Philo.
|
076-70H45
|
Active
|
01/15/2025
|
|
|
3
|
5
|
McLean
|
|
Bridge deck repairs to SN's 057-0127, 057-0132, and 057-0161 in McLean County.
|
077-70H52
|
Active
|
01/15/2025
|
|
|
3
|
5
|
Piatt
|
|
2.756 miles of Crack and Joint Sealing from Dewitt/Piatt Co Line to 1 mile E of 900E Rd W of Mansfield.
|
078-70H53
|
Active
|
01/15/2025
|
|
|
3
|
5
|
DeWitt
|
|
3.069 miles of Smart Resurfacing on US 51 from Tributary Long Point Creek to south of Main Street north of Clinton and north of Heritage Rd to north of Texas Church Rd south of Clinton.
|
079-70H55
|
Active
|
01/15/2025
|
|
|
3
|
5
|
Champaign
|
|
0.063 mile PCC pavement patching under ICRR in Rantoul.
|
080-72220
|
Deleted
|
01/22/2025
|
|
|
4
|
6
|
Logan
|
|
Bridge deck replacement on SN 054-0050 and 054-0051 carrying I-155 northbound over I-55 southbound and I-155 southbound ramp over I-155 northbound, northwest of Lincoln (I-55/I-155 Interchange).
|
081-72255
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Sangamon
|
|
6 miles of resurfacing with drainage improvements on IL 123 from 0.4 miles east of IL 29, east of Athens, to West Outer Road, 0.3 miles west of I-55.
|
082-72321
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Sangamon
|
|
3 miles of resurfacing on IL 4 (Veterans Parkway) from 0.2 miles north of Greenbriar Drive to 0.1 miles south of Prairie Crossing Drive in Springfield.
|
083-72322
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Various
|
|
Bridge deck sealing on various routes in District 6.
|
084-72590
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks, and all peripheral equipment throughout District 6.
|
085-72602
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6.
|
086-72603
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6.
|
087-72608
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Scott
|
|
Bridge deck patching, joint repairs, and approach repairs on SN 086-0016 and SN 086-0019 carrying Hillview Road over Sandy Creek and Little Sandy Creek in southern Scott County.
|
088-72651
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Sangamon
|
|
Bridge painting on SN 084-0145 carrying Farmingdale Road over I-72, 2.6 miles west of Wabash Avenue, west of Springfield.
|
089-72652
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Adams
|
|
Bridge painting on SN 001-0069 carrying OR 79 over I-172, 2.2 miles south of IL 57.
|
090-72736
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Pike
|
|
Installation of a virtual weigh-in-motion system on eastbound I-72 from 0.6 miles west of CH 3 and proceeding for 300- to the east.
|
091-72748
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Logan
|
|
Bridge deck patching on SN 054-0031 carrying IL-54 over Lake Fork Creek in southern Logan County.
|
092-72749
|
Active
|
01/15/2025
|
1 / 0 |
|
4
|
6
|
Christian
|
|
Bridge deck patching on four bridges carrying IL 104 over Lake Sangchris west of Kinkaid. (SN 011-0019, 011-0020, 011-0021, and 011-0022)
|
093-72759
|
Active
|
01/15/2025
|
2 / 2 |
|
4
|
6
|
Sangamon
|
|
0.3 miles of pavement reconstruction, ADA improvements and traffic signal upgrades on 5th Street (Business I-55) from Spruce Street to Ash Street in Springfield.
|
094-72831
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Macoupin
|
|
Resurfacing on IL 16 from east of Rose Lane in Shipman to 0.3 miles west of IL 159.
|
095-72832
|
Active
|
01/15/2025
|
5 / 4 |
|
4
|
6
|
Menard
|
|
4.7 miles of resurfacing on IL 97 from 0.2 miles northwest of Waring Street to the CandIM Railroad, partial width resurfacing on IL 97 from the CandIM Railroad to north of Jefferson Street and partial width resurfacing on IL 97 from the IL 97 / IL 123 Junction to 0.1 miles east of the junction.
|
096-72D99
|
Active
|
01/15/2025
|
|
|
4
|
6
|
Sangamon
|
|
4.9 miles of resurfacing on Old US 36 from 0.2 miles west of Loami Bates Road to 0.7 miles south of I-72.
|
097-72G18
|
Active
|
01/15/2025
|
2 / 1 |
|
4
|
6
|
Adams
|
|
Bridge replacement of SN 001-0016 carrying IL 57 over Harkness Creek at Bluff Hall.
|
098-74327
|
Active
|
01/15/2025
|
|
|
4
|
7
|
Fayette
|
|
Replacement of SN 026-0068 carrying IL 185 over Lone Grove Branch just east of County Road 2300E, approximately 1 mile east of St. Peter.
|
099-74A28
|
Active
|
01/15/2025
|
|
|
4
|
7
|
Lawrence
|
|
Bridge superstructure replacement on SN 051-0033 carrying US 50 frontage road over Allison Ditch, 2 miles east of the Airport Road interchange.
|
100-74C45
|
Active
|
01/15/2025
|
1 / 1 |
1 |
4
|
7
|
Lawrence
|
|
10.2 miles of resurfacing on US 50 from 0.2 miles east of IL 250 to the Embarras River and on US 50 BUS from US 50 to IL 250/US 50 BUS in Lawrenceville.
|
101-74C96
|
Active
|
01/15/2025
|
1 / 1 |
|
4
|
7
|
Effingham
|
|
Patching, bridge deck overlay, bridge joint repair/replacement, bridge deck repairs on SN 026-2004 on US 45 (Banker Street) at CSXT Railroad (overhead), 0.2 miles south of US 40.
|
102-74D01
|
Active
|
01/15/2025
|
2 / 2 |
|
4
|
7
|
Fayette
|
|
Bridge painting at 4 locations in Fayette County. , Cleaning and painting 4 structures in Fayette County.
|
103-74D03
|
Active
|
01/15/2025
|
1 / 1 |
|
4
|
7
|
Macon
|
|
Painting of 2 bridge structures: SN 058-0087 carrying Kirby Road over I-72 northeast of Decatur and SN 058-0127 carrying US 36 over IL 48 in Decatur.
|
104-74D05
|
Active
|
01/15/2025
|
|
|
4
|
7
|
Various
|
|
Bridge deck sealing of 93 bridge decks on various routes in Macon, Moultrie and Shelby Counties.
|
105-74D33
|
Active
|
01/15/2025
|
|
|
4
|
7
|
Fayette
|
|
Stiffener connection repairs on SN 026-0102 and SN 026-0103 carrying I-70 over IL 140 and the CSXT Railroad, 0.8 miles east of the Bond County line.
|
106-74D38
|
Active
|
01/15/2025
|
|
|
4
|
7
|
Wabash
|
|
Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel.
|
107-76L49
|
Active
|
01/15/2025
|
|
|
5
|
8
|
St. Clair
|
|
0.6 miles of chip seal / fog seal on Summerfield Road / Main Street from Old US 50 to Casad Street in Summerfield.
|
108-76R99
|
Active
|
01/15/2025
|
17 / 8 |
|
5
|
8
|
St. Clair
|
|
7 miles of resurfacing with bridge and ramp repairs on I-64 from 0.2 miles west of IL 157 to 0.3 miles west of Greenmount Road.
|
109-76T06
|
Active
|
01/15/2025
|
|
|
5
|
8
|
St. Clair
|
|
Bridge painting on SN 082-0192 and 082-0193 carrying I-64 over IL 161 in New Baden.
|
110-76T83
|
Active
|
01/15/2025
|
2 / 1 |
|
5
|
8
|
Monroe
|
|
3.51 miles of Slurry Seal on IL 3 from just north of Market Street to just north of Vandebrook Drive in Waterloo.
|
111-76T84
|
Active
|
01/15/2025
|
1 / 1 |
|
5
|
8
|
Randolph
|
|
4 miles of microsurfacing on IL 4 from 0.2 miles south of IL 13 to 0.1 miles north of VFW Drive in Sparta.
|
112-76T85
|
Active
|
01/15/2025
|
|
|
5
|
8
|
St. Clair
|
|
5 miles of longitudinal partial depth patching on I-64 from 0.1 miles west of 15th Street to 0.2 miles west of IL 157.
|
113-76T97
|
Active
|
01/15/2025
|
|
|
5
|
8
|
Various
|
|
Pavement patching at various locations throughout District 8.
|
114-76U15
|
Active
|
01/15/2025
|
|
|
5
|
8
|
Madison
|
|
0.8 miles of patching and resurfacing on IL 162 from 0.4 miles west of I-255 to 0.4 miles east of I-255.
|
115-76U17
|
Active
|
01/15/2025
|
|
|
5
|
8
|
St. Clair
|
|
Bridge deck repairs on 5 structures carrying I-64 over various routes and railroads.
|
116-76U20
|
Active
|
01/15/2025
|
|
|
5
|
8
|
Madison
|
|
0.7 miles of chip seal on West Delmar Avenue from State Street in Alton to IL 3 in Godfrey.
|
117-76U28
|
Active
|
01/15/2025
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing on CH 42 (Foley Drive) from IL 157 in Cahokia Heights to 0.1 miles west of Gerold Lane in Belleville.
|
118-76U29
|
Active
|
01/15/2025
|
1 / 1 |
|
5
|
8
|
Washington
|
|
8 miles of patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line.
|
120-78A38
|
Active
|
01/15/2025
|
6 / 6 |
|
5
|
9
|
White
|
|
Reconstruction of IL 1 and US 45 intersection in Norris City with improved turning radii and island crosswalks.
|
121-78A90
|
Active
|
01/15/2025
|
5 / 5 |
|
5
|
9
|
Johnson
|
|
9.7 miles of resurfacing on IL 146 from Old Metropolis Road to the Pope County line.
|
122-78A91
|
Active
|
01/15/2025
|
|
|
5
|
9
|
Union
|
|
Installing PCC shoulders, curb and gutter, earth and furnished excavation, and riprap for slope repairs on US 51 near SN 091-2001, 3.8 miles north of Anna.
|
123-78B01
|
Active
|
01/15/2025
|
1 / 1 |
|
5
|
9
|
White
|
|
667' of pavement removal, installation of 10- PCC pavement and ADA ramp reconstruction on IL 1 from South Street to Mill Street in Grayville.
|
124-85768
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Ogle
|
|
HMA Overlay with HMA Shoulders on Tower Road from Water Road to Montague Road north of Byron.
|
125-85775
|
Active
|
01/15/2025
|
|
|
2
|
2
|
Lee
|
|
Surface Profile Milling, Cold-in-Place Recycling, and HMA Resurfacing on Perry Road from IL 251 to the BNSF Railroad in Steward.
|
126-87738
|
Active
|
01/15/2025
|
1 / 1 |
1 |
2
|
3
|
Bureau
|
|
Construct a single span PPC deck beam bridge to carrying 600 Avenue North over Silver Creek.
|
127-87769
|
Active
|
01/15/2025
|
|
|
2
|
3
|
Iroquois
|
|
Replace the bridge carrying 100 East Road over a tributary to Little Mud Creek, 3 miles northwest of Cissna Park.
|
128-87850
|
Active
|
01/15/2025
|
1 / 0 |
|
2
|
3
|
Iroquois
|
|
Removal of the existing sub-structure, and construction of a new concrete stub abutments, bearing and joint replacement, and reconstruction of the approaches to the bridge carrying CH 31 over the Iroquois River, one mile north of Watseka.
|
129-87853
|
Active
|
01/15/2025
|
2 / 2 |
1 |
2
|
3
|
LaSalle
|
|
Replace the bridge carrying Kelly Street over Prairie Creek, north of Bluff Street.
|
130-87877
|
Active
|
01/15/2025
|
|
|
2
|
3
|
LaSalle
|
|
Resurfacing and Shoulder Widening on CH 4 from CH 15 to the Grundy County Line.
|
131-89860
|
Active
|
01/15/2025
|
|
|
3
|
4
|
Fulton
|
|
Bituminous Surface Treatment Class A-1 on various county highways in Fulton County
|
132-91640
|
Active
|
01/15/2025
|
|
|
3
|
5
|
McLean
|
|
Construction of an 3.9 mile Shared-use Path and parking lot along US 66 in the Village of McLean.
|
133-91644
|
Active
|
01/15/2025
|
|
1 |
3
|
5
|
McLean
|
|
HMA Resurfacing, Widening, Curb and Gutter, and Shoulder Rumble Strips on PJ Keller Highway (CH 8) from lake Bloomington Spillway to I-55 Overpass.
|
134-93826
|
Active
|
01/15/2025
|
6 / 6 |
|
4
|
6
|
Logan
|
|
Reconstruction, Widening, and Resurfacing Fifth Street Road from I-55 to Lincoln Parkway in Lincoln.
|
135-97793
|
Active
|
01/15/2025
|
|
|
5
|
8
|
Madison
|
|
Reconstruction of the IL 159 and Glen Carbon Road Intersection in Glen Carbon to create North and East Bound Right Turn Lanes.
|
136-97842
|
Active
|
01/15/2025
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Resurface Sullivan Drive from Huntwood Drive to IL 161.
|
137-76A46
|
Deleted
|
01/23/2025
|
|
|
5
|
8
|
Madison
|
|
Intersection improvements with signals and bridge replacement on IL 162/IL 157 in Glen Carbon.
|
139-64T82
|
Active
|
01/22/2025
|
|
|
2
|
2
|
Rock Island
|
|
Standard overlay on Airport Rd from 0.56 mile to 0.86 mile east of Rock Island - Milan Parkway. 0.6 mile gross length.
|
140-66P83
|
Active
|
01/22/2025
|
|
|
2
|
3
|
Livingston
|
|
Cleaning and painting all structural steel of SN 053-0160 carrying IL 17 over Prairie Creek, 1.0 mile east of IL 23.
|
141-66R07
|
Active
|
01/22/2025
|
|
|
2
|
3
|
Various
|
|
Removal and replacement of damaged or deteriorated sand module impact attenuators on various interstate routes in various counties in District 3.
|
142-68J19
|
Active
|
01/22/2025
|
|
|
3
|
4
|
Marshall, Peoria, Woodford
|
|
Crack and joint sealing at various locations in Peoria, Marshall, and Woodford Counties.
|
143-70F98
|
Active
|
01/22/2025
|
|
|
3
|
5
|
Edgar
|
|
HMA surface removal and resurfacing at various locations along US 150 mainline and shoulder pavement from 125' west of Lower Terre Haute Rd in Paris ,IL to a point approximately 0.3 mile west of CNRL Railroad including the Sulphur Springs Rd and Court St intersection. 2.531 miles gross length.
|
144-78844
|
Active
|
01/23/2025
|
1 / 1 |
|
5
|
9
|
Hardin
|
|
Box culvert replacement on IL 34 over Tributary of Pinhook Creek, about 0.7 miles south of the Pope County line and on IL 34 over a Ditch located 1.5 miles north of IL 146 and approximately 0.5 miles south of Eichorn.
|
145-62W55
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Various
|
|
Various Expressway Routes (Daytime Sweeping) This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, Lake and Will.
|
146-62X91
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Various
|
|
The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish. Location is on various State maintained arterial routes located within Kane and McHenry Counties.
|
147-76K02
|
Active
|
01/23/2025
|
3 / 3 |
|
5
|
8
|
St. Clair
|
|
Bridge repair, approach roadway and painting on SN 082-0017 carrying I-55/70 over the CSX, KCS, NS, and TRRA Railroads and two private access roads, just east of the I-55/64/70 Tri-Level Interchange near the City of East St. Louis.
|
148-62W60
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Cook, DuPage
|
|
This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals with ADA compliant ramps at various locations in District 1.
|
149-62W61
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Various
|
|
This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals. installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals, ADA ramp improvements, connection to KDOT and LCDOT centralized traffic signal systems at various locations in District 1.
|
150-62W69
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Kane
|
|
(3.37-Mile) This is a standard overlay and ADA improvement. This project consists of pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and replacement, ADA pedestrian ramp improvements, thermoplastic pavement marking, sidewalk removal and replacement. This improvement is on FAU 2503: IL-25, US 30 (Aurora Avenue) within the City of Aurora in Kane County.
|
151-62W73
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Cook
|
|
(2.89-Mile) Standard and Designed Overlay with ADA improvements on Green Bay Road from Scott Avenue to Kenilworth Avenue located in the Villages of Kenilworth, Winnetka and Glencoe within Cook County.
|
152-62W87
|
Active
|
01/22/2025
|
14 / 14 |
1 |
1
|
1
|
Cook
|
|
(9.76-Mile) Standard Overlay, Bridge Deck Overlay, Bridge Repair, Bridge Superstructure Replacement, Sign Structures, Lighting, and ITS. Location of Work: I-94 (Bishop Ford Freeway) from West of Martin Luther King Dr to US 6 (159th St) within the Cities of Chicago and Calumet and the Villages of Burnham Riverdale, South Holland and Dolton.
|
153-62X21
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Cook, Lake
|
|
This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815.
|
154-62X76
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Cook, DuPage, Will
|
|
The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties.
|
155-62X77
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Cook, Will
|
|
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island.
|
156-62X79
|
Active
|
01/22/2025
|
|
|
1
|
1
|
Cook, Lake
|
|
The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties.
|
157-61G79
|
Deleted
|
01/28/2025
|
|
|
1
|
1
|
DuPage
|
|
Widening of the North Aurora Road underpass, and construction of railroad bridges to carry the Wisconsin Central, Burlington Northern, and Santa Fe Railways in Naperville.
|
158-61L02
|
Active
|
01/24/2025
|
|
|
1
|
1
|
Will
|
|
Construct an HMA Multi-Use Path in Home Glen, from Coachman Lane to Heatherwood Drive. Includes HMA Pavement removal, sidewalks, ADA ramps, and signage.
|
159-61L25
|
Active
|
01/24/2025
|
|
|
1
|
1
|
Cook
|
|
Roadway, pedestrian, and street improvements on Sterling Avenue from Central Drive to Flossmoor Road in Flossmoor.
|
160-61L27
|
Active
|
01/24/2025
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing of Stroy Avenue from 186th Street to Thornton-Lansing Road in Lansing. Includes patching, driveways, curb and gutter, sidewalks, drainage improvements, pavement markings, and signage.
|
161-62N33
|
Active
|
01/24/2025
|
4 / 3 |
|
1
|
1
|
DuPage
|
|
(16.7-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 64 (North Avenue) from Smith / Kautz Rd to York St in the Cities of St. Charles West Chicago, and Elmhurst, and in the Villages of Carol Stream, Glendale Heights, Lombard, Addison, and Villa Park in DuPage County.
|
162-62X95
|
Active
|
01/24/2025
|
|
|
1
|
1
|
Various
|
|
Weed Spraying within various areas in District 1 and IDOT District 1 maintenance yards: Alsip, Oakbrook, Gurnee, and Northbrook.
|
163-64R26
|
Deleted
|
01/28/2025
|
|
|
2
|
2
|
Jo Daviess
|
|
632' of bridge deck patching on SN 043-0043, carrying US 20/IL 84 over Galena River and ICG RR in Galena.
|
164-68F43
|
Deleted
|
01/30/2025
|
|
|
3
|
4
|
Warren
|
|
Designed overlay on US 34 from 0.1 mile west of 20th St to east of US 67 in Monmouth in Warren County. 7.09 miles gross.
|
165-87861
|
Active
|
01/24/2025
|
|
|
2
|
3
|
LaSalle
|
|
HMA resurfacing wiht HMA and Aggregate shoulders on County Highway 51 from Old Chicago Road to the City of Marseilles.
|
166-87875
|
Active
|
01/24/2025
|
|
|
2
|
3
|
DeKalb
|
|
Reconstruction of Main Street between BNSF Railroad and Knights Road in Sandwich. Work includes fulldepth pavement reclamation, PCC and HMA Pavement, sidewalks, curb and gutter, and storm sewers.
|
167-87878
|
Active
|
01/24/2025
|
|
|
2
|
3
|
LaSalle
|
|
Resurfacing and shoulder widening on CH 4 from IL 71 to CH 15.
|
168-87879
|
Active
|
01/24/2025
|
|
|
2
|
3
|
LaSalle
|
|
HMA resurfacing of Iowa Avenue, Proter Street, and Bronson Street from Main Street to Johnson Street in Streator. Inlcudes Curb and Gutter, sidewalks, and storm sewers.
|
169-89818
|
Active
|
01/24/2025
|
9 / 8 |
|
3
|
4
|
Tazewell
|
|
Reconstruction of Camp Street and Riverside Drive intersection in East Peoria. Work includes PCC pavement, HMA overlay, asphalt shoulders, curb and gutter, storm sewer, and traffic signals.
|
170-91628
|
Active
|
01/24/2025
|
2 / 2 |
|
3
|
5
|
McLean
|
|
Sidewalk construction and replacement, traffic improvements at various locations in Colfax.
|
171-95971
|
Active
|
01/24/2025
|
4 / 4 |
1 |
4
|
7
|
Fayette
|
|
Reconstruction of Randolph Street from west of Shelby Avenue to Sunset Drive in Vandalia.
|
172-97854
|
Active
|
01/24/2025
|
2 / 1 |
|
5
|
8
|
Jersey
|
|
HMA resurfacing with HMA shoulders on Otterville Road from Main Street in Otterville to IL 3 in Jersey County. Includes rumble strips, drainage improvements, and signage.
|
173-97855
|
Active
|
01/24/2025
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing Kingsbury Drive from North 17th Street to Kenwood Drive, Kenwood Drive to Gilbert Street, and Gilbert Street from Kenwood to Kinsella Avenue in Swansea.
|
174-97856
|
Active
|
01/24/2025
|
|
|
5
|
8
|
Madison
|
|
Construction of a Shared-Use Path along Glen Carbon Road from Lakewood Drive to Oakdale Lake Drive in Glen Carbon.
|
175-61J84
|
Active
|
01/28/2025
|
6 / 3 |
|
1
|
1
|
Kane
|
|
Reconstruct IL 38 from Fox River Bridge to Kirk Road in Geneva.
|
176-61K89
|
Active
|
01/30/2025
|
4 / 4 |
|
1
|
1
|
Cook
|
|
Roadway Reconstruction at the intersection of John Humphrey Drive and 143rd Street in Orland Park. Includes drainage improvements, installation of a pile supported embankment system, replacement of the wearing surface on the existing dry land bridge, traffic signal modernization and interconnection, and lighting improvements.
|
177-61L05
|
Active
|
01/28/2025
|
|
|
1
|
1
|
Lake
|
|
Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest.
|
178-62X90
|
Active
|
01/28/2025
|
|
|
1
|
1
|
Lake
|
|
The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish located on various State maintained arterial routes located within the county of Lake.
|
179-66M57
|
Active
|
01/28/2025
|
4 / 3 |
1 |
2
|
3
|
DeKalb
|
|
HMA milling and resurfacing (designed overlay), culvert replacement, pavement marking, ditch cleaning and raised reflective markers on IL 72 beginning at IL-23 (N) and ends at Kane County Line; HMA milling and resurfacing (standard overlay), pavement marking, and raised reflective markers on IL 23 beginning at IL 72 and ends at the McHenry County line. 7.183 miles gross length.
|
180-66P96
|
Active
|
01/28/2025
|
|
|
2
|
3
|
Grundy
|
|
Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Grundy County.
|
181-66P99
|
Active
|
01/28/2025
|
|
|
2
|
3
|
Kankakee
|
|
Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Kankakee County.
|
182-66R09
|
Active
|
01/28/2025
|
|
|
2
|
3
|
Livingston
|
|
Excavating and grading existing shoulders and placing aggregate shoulders on OR 66 from IL Route 116 to E. 1600 Road.
|
183-70991
|
Withdrawn
|
02/06/2025
|
|
|
3
|
5
|
Champaign
|
|
3.038 miles of standard overlay with ADA improvements and traffic signal modernization from Springfield Ave in Champaign to Curtis Rd in Savoy.
|
184-85765
|
Active
|
01/28/2025
|
|
|
2
|
2
|
Rock Island
|
|
Construction of a PCC shared-use path with curb and gutter, earth shoulders, drainage structures, storm sewer, and more along 10th Street from Avenue of the Cities to Crosstown Avenue in Silvis.
|
185-87866
|
Active
|
01/28/2025
|
|
|
2
|
3
|
DeKalb
|
|
Reconstrut the intersection of Glidden Road and Baseline Road.
|
186-87876
|
Active
|
01/28/2025
|
1 / 0 |
|
2
|
3
|
LaSalle
|
|
Construct a PCC Shared-use path with a pedestrian bridge over Il 125. This project is located south of Wenzel Road in the City of Peru.
|
187-62W63
|
Active
|
01/28/2025
|
1 / 1 |
|
1
|
1
|
Cook
|
|
This is a parking lot resurfacing improvement includes pavement removal, drainage structure adjustment, placement of subbase material, HMA binder course HMA surface course, Portland cement concrete, thermoplastic pavement markings. Located in the IDOT Hillside Maintenance Yard at, 4160 May St., Hillside, IL.
|
188-87852
|
Active
|
01/28/2025
|
|
|
2
|
3
|
LaSalle
|
|
Rehabiliate the bridge carrying Walnut Street over the IC Railroad, 0.9 miles east of IL 71.
|
01A-SH030
|
Active
|
01/28/2025
|
|
|
1
|
1
|
Cook, DuPage
|
|
Airfield Lighting Rehabilitation: MIRLs, PAPIs, REILs
|
02A-UN065
|
Active
|
01/28/2025
|
|
1 |
3
|
5
|
Champaign
|
Voluntary
|
Rehabilitate General Aviation Aprons
|
03A-SO085
|
Active
|
01/28/2025
|
2 / 1 |
|
5
|
9
|
Jackson
|
|
Expand Southeast Aircraft Parking Apron
|
04A-SO086
|
Active
|
01/28/2025
|
1 / 0 |
|
5
|
9
|
Jackson
|
|
T-Hangar Taxilanes Pavement Maintenance
|
05A-IL035
|
Active
|
01/28/2025
|
|
|
2
|
3
|
LaSalle
|
|
Rehabilitate Runway 7/25 (Patching)
|
06A-ED022
|
Active
|
01/28/2025
|
|
|
3
|
5
|
Edgar
|
|
Install Primary Windcone on Airfield and Supplemental Windcones on Each Runway End
|
07A-VA024
|
Active
|
01/28/2025
|
|
1 |
4
|
7
|
Fayette
|
|
Airfield Pavement Maintenance
|
08A-IL034
|
Active
|
01/28/2025
|
|
|
2
|
3
|
LaSalle
|
|
Rehabilitate General Aviation T-Hangar Pavement
|