Home > Notice of Letting

June 13, 2025 Letting 12:00 PM
Notice of Letting
Volume 028, No. 019

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-46658 Active 05/02/2025 1 / 1 4 7 Various Replacing guardrail reflectors and linear delineation panels on various routes throughout District 7.
01X-68E44 Active 04/28/2025 3 / 1 3 4 Peoria, Tazewell Painting, deck replacement, and repairs to the westbound McClugage Bridge (SN 090-0115) carrying US 150 over the Illinois River and painting, deck replacement, and repairs to SN 02-0168 carrying westbound US 150 over IL29/ NE Adams St. 1.29 miles gross length.
002-61L34 Active 04/22/2025 1 1 Cook Add bike lanes on Church Street from Linder Avenue to McCormick Boulevard in Skokie. Includes PCC base course widening, curb and gutter, sidewalks, and traffic signal modifications.
02X-64C24 Active 05/02/2025 2 2 Winnebago 2.09 miles of reconstruction of I-39/US 20 from 0.3 mile east of Mulford Rd to 0.2 mile north of Harrison Ave.
003-61L50 Active 04/22/2025 1 1 McHenry HMA resurfacing on Johnsburg Road from Fairview Avenue to the north city limits of Johnsburg. Includes aggregate shoulders.
004-61L51 Active 04/22/2025 1 1 McHenry Resurfacing Nish Road from Barreville Road to IL 176 in Prairie Grove.
005-61L52 Active 04/22/2025 1 1 Lake Construction of an HMA Bike Path in Round Lake. Includes sidewalk removal, storm sewer, pavement markings, and parkway restoration.
006-61L53 Active 04/22/2025 1 1 Cook Resurfacing Glenview Road from Milwaukee Avenue to Shermer Road in Glenview.
007-61L59 Active 04/22/2025 1 1 Kane HMA resurfacing on State Street from Hampshire Creek to Allen Road in Hampshire. Includes pavement patching, curb and gutter, and drainage structure adjustments.
008-61L60 Active 04/22/2025 1 1 Kane HMA resurfacing on South Elgin Boulevard from East Main Street to the north village limits of South Elgin. Includes curb and gutter, drainage structures, and parkway restoration.
009-61L62 Active 04/22/2025 1 1 Cook Resurfacing Beckwith Road from Shermer Road to Austin Avenue in Morton Grove.
010-61L63 Active 04/22/2025 1 1 Cook Resurfacing Gross Point Road from Main Street to Oakton Street in Morton Grove.
011-61L64 Active 04/22/2025 1 1 Cook Resurfacing Central Avenue from Golf Road to Dempster Street in Morton Grove.
012-61L65 Active 04/22/2025 1 1 Cook Resurfacing Shermer Road from Gold Road to Harlem Avenue in Morton Grove.
013-62P93 Active 04/22/2025 1 1 Cook This is a (ADA) improvements project including combination curb and gutter removal and replacement, sidewalk removal and replacement, installation of detectable warnings, drainage structure adjustments, minor traffic signal improvements (accessible pedestrian signals), thermoplastic pavement marking. Location: Various Routes, Various Locations within Norwood Park and Leyden Townships (Villages of Norridge, Park Ridge, River Grove and Elmwood Park).
014-62T95 Active 04/22/2025 1 1 Cook (1,082.40-Ft) The improvement includes earth excavation, non-special waste disposal, erosion control and protection, temporary drainage, traffic control and protection. The project is located along the east side of the NB Mannheim Ramp between Mannheim Road and the CN Railroad tracks and I-190 and Willow Creek.
015-62W90 Active 04/22/2025 1 1 Various Replacement of old controllers, replace fiber optic cable, network switches, PTZ cameras, and controllers among other equipment to allow for remote access and monitoring capabilities, complete the ATMS system in Lake County allowing for fully remote access to all intersection. There are one hundred fifteen locations proposed on this project located in mainly in Lake County with fewer location in Cook and McHenry Counties.
016-62X02 Active 04/22/2025 1 1 Cook (420.25-Ft) HMA Pavement Patching and resurfacing, storm sewer installation, drainage structure installation, bridge deck overlay, superstructure repairs, substructure repairs. This project is in the City of Chicago and Village of Riverdale, Cook County, on IL 1 (Halsted Street, FAU 3730) over Little Calumet River.
017-62X33 Active 04/22/2025 2 / 1 1 1 Kane (6.70-Mile) Design overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Rte. FAP 567, IL 38, from Dekalb County Line to IL 47 (Main Street) within the Village of Elburn in Kane County.
018-62X34 Active 04/22/2025 1 1 Will (2.88-Mile) Designed overlay and pedestrian ramp (ADA) project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings. The improvement is in the Cities of Braidwood and Wilmington in Will County.
019-62X61 Active 04/22/2025 1 1 Kane (2,955-Ft) Design Overlay and ADA improvements consist of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Project is located in the Cities of Highwood and Highland Park, Lake County.
020-62X62 Active 04/22/2025 1 1 Cook (1466-Ft) Pavement patching, hot-mix asphalt surface removal, resurfacing with hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Evanston Township and in the City of Evanston.
021-62X64 Active 04/22/2025 1 1 Cook (4,602-Ft) Smart Overlay improvements include curb and gutter spot repairs (remove and replace), hot-mix asphalt (HMA) surface removal and replacement with (cold milling and inlay), full-depth patches (Class D), thermoplastic pavement markings, raised reflective pavement markers, detector loops. Located on I-55 North Frontage Road from County Line Road to Commonwealth Drive within the Village of Burr Ridge.
022-62X70 Active 04/22/2025 1 1 Cook 0.48-mile) Standard Overlay, ADA Improvements includes curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps (ADA), hot-mix asphalt surface removal and replacements (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: Niles Center Road, from south of Main Street to IL 58 (Dempster Street) within the Village of Skokie.
023-62X71 Active 04/22/2025 1 1 Cook (1.08-Mile) Standard Overlay project consists of asphalt surface removal, mix asphalt resurfacing, sidewalk removal, placement of thermoplastic pavement markings, combination curb and gutter removal and replacement, installation of concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp improvements. Located on Pershing Road from 56th Court to ILL 50 (Cicero Avenue) within the Village of Stickney and the Town of Cicero in Cook County.
024-62X74 Active 04/22/2025 1 1 Cook This improvement consists of repairing bridge drainage system as shown on the plans and any incidental collateral work necessary to complete the improvements Located in the Cities of Chicago and Blue Island and Village of Hillside in Cook County.
025-62X99 Active 04/22/2025 1 1 Will The work consists of building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any structure above and below the ground, main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees, grading and seeding. Located in the City of Joliet, in the vicinity of FAI Route 80 (Interstate 80) and Des Plaines River in Will County.
026-62Y02 Active 04/22/2025 1 1 Cook, Kane (0.01-Mile) This is a bridge painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 045-0037 and SN 047-0029) 1) Galena Blvd over IL-56 in the Village of Sugar Grove. 2) US 30 over Blackberry Creek in the Village of Montgomery.
027-62Y04 Active 04/22/2025 1 1 Cook (349- FT) Scope of work consist of bridge substructure repairs to the SN 016-0511 (EB) and SN 016-0512 (WB) Structures of I-190 over Des Plaines River Road. Improvement is located in the Village of Rosemont in Cook County.
028-62Y07 Active 04/22/2025 1 1 Cook (0.01-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 016-2665 and SN 016-0537) 1) US 12/ 20/ 45 (LaGrange Rd) over I-55, in the City of Countryside and Village of Hodgkins;2) Willow Springs Rd over I-55 in the City of Countryside.
029-62Y08 Active 04/22/2025 1 1 Various Repair and replacement work order contract for Impact Attenuators, Sand Barrels and Miscellaneous Traffic Control in coordination with MCHD to enhance roadway safety and manage traffic flow effectively. Location on various State maintained expressway and arterial routes within the counties of Cook, DuPage, Will, Lake, McHenry and Kane.
030-64L27 Deleted 05/08/2025 2 2 Stephenson Reconstruction of the intersection of US Route 20 and Illinois Route 73 including grade changes, replacing across road culverts, adding turn lanes, and installing traffic signals. The project includes Jointed PCC Pavement and Tied-Shoulders, 9", Hot-Mix Asphalt (HMA) surface removal and replacement 2-3/4", HMA Shoulders, 8", PCC and HMA Driveway Pavement, Pipe and Box Culverts pavement markings, tree removal, pavement removal, temporary pavement, intersection lighting, highway signage, earthwork, erosion control, permanent landscaping, fence, and all other items to complete the project.
031-64M38 Active 04/22/2025 2 2 Winnebago 2.184 mi Designed Overlay, patching, milling, retaining wall repair, and ADA Improvements from Snow Ave in Loves Park to Whitman St in Rockford and Forest Hills Rd from Landstrom Rd to IL 251.
032-64M76 Active 04/22/2025 2 2 Lee Remove and replace culvert over a drainage way 0.3 mile south of US 30, north of Amboy on US 52.
033-64R15 Active 04/22/2025 2 2 Boone, Winnebago 1.05 miles of HMA resurfacing (SMART overlay) from 0.3 miles east of Kishwaukee River to 0.4 miles west of Wheeler Rd on US 20.
034-64R16 Active 04/22/2025 2 2 Rock Island 5.39 miles of milling and resurfacing on I-74: I-280/US 6 Interchange to Henry County Line and I-280: Milan Beltway to the I-74/US 6 Interchange.
035-64S28 Active 04/22/2025 2 2 Whiteside Bridge deck overlay, joint replacement and miscellaneous repairs on SN 098-0055 carrying Cordova Rd over I-88, 2.5 miles west of Erie.
036-64S51 Active 04/22/2025 2 2 Winnebago 2.98 miles of pavement patching, cold milling, HMA resurfacing, ADA improvement, and traffic signal modifications on IL 251 from Windsor Rd in Loves Park to 0.3 miles south of Il 173 in Machesney Park.
037-64T30 Active 04/22/2025 2 2 Ogle, Winnebago Crack joint sealing on US 20 from 0.2 mi W of Falconer Rd to Simpson Rd and US BUS 20 from US 20 to Weldon Rd SW of Rockford. US 64 from 0.1 mi E of US 52 to ILL 26. IL 70 from Pecatonica River to 0.1 mi W of Safford Rd in Rockford. 4.91 miles gross length.
038-64T31 Active 04/22/2025 2 2 Lee Crack joint sealing on US 52 from Water St in Amboy to north of Henkel Rd and on IL 2 from Page Dr in Dixon to US 52/IL 26. 4,227 ft gross length.
039-64T32 Active 04/22/2025 2 2 Henry 1.82 miles of crack joint sealing on IL 81 from Galva-Atkinson Rd to WestSt in Kewanee and from US 150 to 0.4 miles west of I-74.
040-64T33 Active 04/22/2025 2 2 Whiteside 2.85 miles of crack joint sealing on IL 84 from US 30 to south of 12th Ave in Albany and on US 30 from IandM Feeder Canal 0.3 miles east of ILL 40 in Rock Falls to Lee County Line.
041-64T74 Active 04/22/2025 2 2 Winnebago 0.725 miles advanced tree removal along US 20 from Mill Rd to 0.3 miles east of Kishwaukee River.
042-64T97 Active 04/22/2025 2 2 Ogle Bridge deck repairs, joint replacement, and miscellaneous repairs on SN 071-0064, carrying Ritchie Rd over I-39, 0.5 miles south of I-88.
043-64T98 Active 04/22/2025 2 2 Stephenson Bridge deck repairs, joint replacement and miscellaneous repairs on SN 089-0068 carrying IL 73 over tributary of Yellow Creek, 0.50 miles south of US 20.
044-64T99 Active 04/22/2025 2 2 Stephenson Bridge deck repairs, joint replacement and miscellaneous repairs on SN 089-0072, carrying IL 26 over drainage ditch, 0.40 miles south of McConnell Rd.
045-64U00 Active 04/22/2025 2 2 Winnebago Bridge deck repairs, joint replacement and miscellaneous repairs on SN 101-0046, carrying US 20 WB over US 20 BR EB, 3 miles west of Rockford.
046-64U22 Active 04/22/2025 2 2 Ogle 9.33 miles of patching, milling, and resurfacing on IL 26 from south of Willow St. in Forreston to Hillside Dr. north of Polo on FAP_316.
047-64U24 Active 04/22/2025 2 2 Stephenson 4.06 miles of designed overlay, milling, and patching from Brush Creek to Cedar Creek at NCL of Cedarville on IL 26.
048-64U26 Active 04/22/2025 2 2 Winnebago 4.96 miles of HMA pavement overlay on FAP 734 from 0.8 miles north of Roscoe Rd to Prairie Hill Rd in South Beloit.
049-64U41 Active 04/22/2025 2 2 Lee .3 miles of longitudinal joint repair along IL 38 in Franklin Grove.
050-64U51 Active 04/22/2025 2 2 Winnebago 1.48 miles of bridge fabrication on I-39 from 0.3 miles east of Mulford Rd to 0.2 miles north of Harrison Ave.
051-64U53 Active 04/22/2025 2 2 Whiteside 0.5 miles of partial depth patching from Base St to 350' east of Milnes Dr in Morrison.
052-66B58 Active 04/22/2025 2 3 Ford Spot improvement, drainage ditch approximately 3.7 miles south of IL 116 on IL 115.
053-66F94 Active 04/22/2025 2 3 Iroquois Bridge Deck Replacement for SN 038-0048 carrying IL 54 over I 57 at the interchange in Onarga.
054-66H59 Active 04/22/2025 2 3 Iroquois 7.7 gross miles of HMA milling and resurfacing, pavement patching, structure repairs, rest area repairs including: ADA ramps, curb and gutter repairs, pavement joint repairs, pavement marking, and raised reflectors on I-57 from the Buckley Interchange to the Ford County Line.
055-66K63 Active 04/22/2025 2 3 DeKalb 1370 ft of Superstructure Replacement (SN 019-0030) over Owens Creek, 1.3 miles west of Kirkland.
056-66K71 Active 04/22/2025 2 3 Bureau Bridge replacement of SN 006-0089 and interchange lighting at IL-40 (overhead), 3.4 miles north of Buda.
057-66M23 Active 04/22/2025 2 3 Iroquois Bridge replacements of SN 038-0151 and SN 038-0152 on FAI 57(I-57) over Louis Creek, 0.7 miles north of Buckley interchange.
058-66N05 Active 04/22/2025 1 / 0 2 3 LaSalle Cleaning and painting all structural steel of two structures, Location 1: SN 050-0195 carrying US 6 over I-39, 2.7 mi. east of IL 351 near LaSalle; Location 2: SN 053-0181 carrying CH 19 (F.A.S. 270) over I-39, 2.3 mi. north of US 52.
059-66N36 Active 04/22/2025 2 3 LaSalle Latex Overlay, Expansion Joints, and Deck Repairs to SN 050-0177/-0178 on I-39 at SN 050-0177/0178 carrying I-39 over I-80, 2.6 miles west of IL 178.
060-66P52 Active 04/22/2025 2 3 Grundy Bridge Repairs TR 110 (SN 032-0077) over I-55 0.3 MI N of the Livingston County Line.
061-66P53 Active 04/22/2025 2 3 LaSalle Bridge deck repairs,bridge deck latex overlay, pavement patching, and pavement marking replacement_on IL 23 in Ottawa.
062-66R18 Active 04/22/2025 2 3 Kankakee Centerline joint sealing, microsurfacing, shoulder widening and rumble strips on IL Route 17 at two locations, 1: beginning at the east approach of SN 046-0027 and ending 0.5 mi. east of 19000W Rd; 2: beginning 0.01 mi. west of 12000W Rd. and ending 0.11 mi. east of 5000W Rd.
063-66R32 Active 04/22/2025 2 3 Bureau Staged construction of 13.54 miles of 2" milling and stone matrix asphalt surface paving on the I-80 driving and passing lanes between Princeton and Ladd.
064-66R42 Active 04/22/2025 2 3 Kankakee Traffic Signal Mast Arm Replacement at the intersections of US 45/US 52 and River Road and at US 45/ US 52 and South Tec Drive.
065-66R45 Active 04/22/2025 2 3 Various Installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems completed on a work order basis for repairs and maintenance activities.
066-66R47 Active 04/22/2025 2 3 LaSalle Class A Pavement Patching and Cross Stitching on I-39 at US-52 interchange ramps.
067-66R51 Active 04/22/2025 2 3 Bureau Pollinator project will include herbicide, seeding, landscaping, and maintenance at the Great Sauk Trail Rest Area EB and WB on I-80 near mm 51.
068-66R52 Active 04/22/2025 2 3 Iroquois Class B pavement patching and other related construction work on Il Route 1 at the intersection of IL Route 1 and US Route 24 near Watseka and ending at the Vermilion County Line.
069-66R53 Active 04/22/2025 2 3 Ford Class B pavement patching and other related construction work on IL Route 47 beginning at the Champaign County Line to the intersection of IL Route 9/54 in Gibson City. 4.02 miles gross length.
070-66R54 Active 04/22/2025 2 3 Ford 6.43 gross miles of Class A pavement patching and other related construction work on FAI 57 (I-57) beginning at the Champaign County Line to the Iroquois County Line.
071-66R57 Active 04/22/2025 2 3 Ford 5.51 gross miles of Class B pavement patching and other related construction work on FAP 71A (IL 54) beginning at the Champaign County Line to the Intersection of IL Route 9/47.
072-66R71 Active 04/22/2025 2 3 Various One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3.
073-68D49 Active 04/22/2025 3 4 Stark Resurfacing on Esceola Spur for 2.33 miles from East Osceola Rd to IL 93 in Stark County.
074-68H96 Active 04/22/2025 3 4 Henderson 200' of slope stabilization with rip-rap north of 2600N on IL 94 in Henderson County.
075-68J39 Active 04/22/2025 3 4 Tazewell 1.4 miles of PCC Class B patching on Il Route 8 in Tazewell County.
076-68J42 Active 04/22/2025 3 4 Tazewell Bridge joints and bearing repairs SN 090-0043 over Mud Creek east of Morton, IL.
077-68J44 Active 04/22/2025 3 4 Fulton Cleaning of woody debris around SN 029-0025 carrying IL Route 95 over Spoon River in Fulton County.
078-68J63 Active 04/22/2025 3 4 Tazewell Standard overlay and ADA ramp improvements on BUS 24/Peoria St/Walnut St from west of Wood St to east centerline of Washington in Tazewell County. 5,231 gross feet.
079-68J79 Active 04/22/2025 3 4 Tazewell Removal and replacement of traffic signal mast arm on US 24 (Main St) at Wesley Rd in Creve Coeur.
080-68J80 Active 04/22/2025 3 4 Peoria Removal and replacement of traffic signal mast arms at US 150 (War Memorial Drive) and Allen Rd/Charter Oak Rd in Peoria.
081-68J81 Active 04/22/2025 3 4 Marshall Removal of existing high mast light towers and installation of new lighting system along Interstate 39 at the Illinois Route 17 interchange in Marshall County.
082-68K10 Active 04/22/2025 3 4 Various 70.6 gross miles of added aggregate surface to shoulders along various routes in District 4.
083-70024 Active 04/22/2025 3 5 Piatt Remove and construct superstructures on SN 074-0069 (EB) and SN 074-0070 (WB) carrying FAI 72 over the Norfolk Southern Railway to rehabilitate the structures and replace approach pavements.
084-70E30 Active 04/22/2025 3 5 Edgar Parking improvement at Paris D5 Headquarters.
085-70H64 Active 04/22/2025 3 5 Various On-call lighting repairs in the District West field areas consisting of DeWitt, McLean, and Piatt Counties.
086-70H65 Active 04/22/2025 3 5 Various East Field area lighting repairs in Champaign, Vermilion, Edgar, and Douglas Counties.
087-70H67 Active 04/22/2025 3 5 Various District-wide on-call tree removal.
088-72263 Active 04/22/2025 1 / 0 4 6 Morgan 6.7 miles of HMA resurfacing and concrete median replacement on US 67 / IL 100 from the Cass County line to the IL 104 Junction; US 67 / IL 100 / IL 104 from the IL 104 Junction to the IL 100 Junction; US 67 / IL 104 from the IL 100 Junction to 2.2 miles east; and IL 100 from the US 67 / IL 104 Junction to 0.3 miles south.
089-72316 Active 04/22/2025 4 6 Logan 1.6 miles of resurfacing on Kickapoo Street from south of I-55 BUS, north of Lincoln, to north of IL 10/121 in Lincoln.
090-72343 Active 04/22/2025 4 6 Hancock Expansion joint removal and deck/approach patching on SN 034-0067 carrying IL 96 over Crystal Creek, 3.1 miles south of US 136 near Hamilton.
091-72344 Active 04/22/2025 4 6 Hancock Bridge deck and approach repairs on SN 034-0066 carrying US 136 EB over the Lamoine River, 6.8 miles east of IL 94 in Carthage and on SN 034-0070 carrying IL 94 over South Branch of Lamoine River, 0.6 miles north of IL 9 near LaHarpe.
092-72346 Active 04/22/2025 4 6 Adams Bridge deck patching on SN 001-0082 and SN 001-0083 carrying IL 336 over Rock Creek, 2.1 miles north of US 24.
093-72623 Active 04/22/2025 4 6 Pike Shoulder repairs on I-72 from the Trumpet Interchange to 0.8 miles east of IL 96, east of Hull. , Cured-in-place liner and pipe culvert removal and replacement on IL 4 / Veterans Parkway in Springfield.
094-72634 Active 04/22/2025 4 6 Sangamon
095-72942 Active 04/22/2025 4 6 Various Minor bridge abutment repairs on 25 bridges on various routes in various counties of District 6.
096-72973 Active 04/22/2025 4 6 Menard Expansion joint replacement and microsilica overlay on SN 065-0501 carrying IL 29 over Salt Creek at the Mason and Menard County line.
097-72A58 Active 04/22/2025 4 6 Morgan, Scott 6.7 miles of resurfacing, patching and bridge repair on I-72 from 1.5 miles east of Old US 36 to 0.7 miles west of US 67. (SN 086-0023, 086-0024, 086-0028, 069-0053 and 069-0054)
098-72C26 Active 04/22/2025 4 6 Sangamon Building removal at 3701 6th Street Frontage Road West in Springfield.
099-72E33 Deleted 05/01/2025 4 6 Macoupin Tree removal, excavation, patching, pavement replacement, PCC widening, concrete curb and gutter, HMA overlay, pipe culverts and storm sewers on IL 108 in Carlinville approximately 0.2 miles west of Hurricane Creek to east of Taylor Street and 2 miles to 2.3 miles east of IL 111.
100-72F42 Active 04/22/2025 4 6 Sangamon 2.8 miles of resurfacing and ADA improvements on Wabash Ave from west of Robbins Road to Macarthur Boulevard, Stanford Avenue from Macarthur Boulevard to 0.1 miles east of Macarthur Boulevard, and Macarthur Boulevard from 0.1 miles north to 0.1 miles south of Wabash Avenue.
101-72G90 Deleted 05/01/2025 4 6 Christian 1.8 miles of resurfacing, patching, ADA curb ramps, storm sewer, pipe culverts and lighting on IL 29 in Pana.
102-72M61 Active 04/22/2025 4 6 Adams, Pike 11 miles of resurfacing with widening, gutter, guardrail and culvert replacement on IL 104 from 1.8 miles west of the Pike County line to IL 107.
103-74164 Active 04/22/2025 4 7 Lawrence Complete structure replacement of SN 051-0004 carrying IL 1 over the Embarras River Overflow approximately 1 mile north of US 50.
104-74564 Active 04/22/2025 4 7 Coles Complete superstructure and substructure replacement of SN 015-0068 which carries 900N over Riley Creek, 0.3 mile west of Charleston. Includes; guardrail and resurfacing done under a full road closure.
105-74648 Active 04/22/2025 4 7 Wayne Removal and replacement of a triple barrel box culvert on IL 15 over a stream located 0.5 miles east of CR 1225 E.
106-74654 Active 04/22/2025 4 7 Clay Bridge superstructure replacement on SN 013-0037 carrying Old US 50 over Raccoon Creek, 2.5 miles west of the US 45 North Junction.
107-74893 Withdrawn 05/09/2025 4 7 Effingham Reconstruction of the I-70 and IL 128 interchange at Altamont including HMA surface removal, resurfacing, underdrains, earth and borrow excavation, shoulders, guardrail, box culvert extension, removal of 4 bridges and construction of 2 bridges.
108-74B63 Active 04/22/2025 4 7 Effingham 4.7 miles of safety shoulder on US 45 from the Shelby County line to 0.2 miles north of Rickleman Avenue in Effingham.
109-74C83 Active 04/22/2025 4 7 Macon Cleaning and repairing bridge drains and drainpipes on SN 058-0120 carrying IL 121 (North 22nd Street) over Norfolk Southern Railroad in Decatur.
110-74C97 Active 04/22/2025 4 7 Macon Lighting improvements at 3 locations: 1) I-72: IL 36 exit to Harristown Boulevard; 2) US 36: I-72 to 0.2 miles west of Harristown Boulevard; 3) US 51: I-72 to Cantrell Road.
111-74D29 Active 04/22/2025 4 7 Effingham 1.3 miles of patching on IL 32 / Keller Drive from West Evergreen to 0.1 miles south of Grove Avenue.
112-74D32 Active 04/22/2025 4 7 Coles Line existing corrugated metal pipe culverts with polyethylene solid wall or profile wall smooth interior pipe at various locations on IL 16 between Mattoon and Charleston.
113-74D40 Active 04/22/2025 4 7 Clark Tree removal on US 40 from 0.4 miles west of N 450th Street to 0.75 miles east of Livingston Road.
114-74D43 Active 04/22/2025 4 7 Fayette 1 mile of patching at the Brownstown Weigh Station on I-70.
115-74D45 Active 04/22/2025 4 7 Coles 7.3 miles of longitudinal joint repair on I-57 from 0.4 miles southwest of US to 1 mile north of IL 16.
116-74D49 Active 04/22/2025 4 7 Various Repair of guardrail at various locations and on call repair of guardrail damage throughout District 7.
117-76A46 Deleted 04/24/2025 5 8 Madison Intersection improvements with signals and bridge replacement on IL 162/IL 157 in Glen Carbon.
118-76F82 Active 04/22/2025 5 8 Madison, St. Clair Force main cleaning at the Missouri Avenue pump station in East St. Louis, the 25th Street pump station in East St. Louis and the Venice pump station in Venice.
119-76K06 Active 04/22/2025 5 8 St. Clair 1.1 mile of patching on Lebanon Road from West Main Street in Belleville to IL 161 in Fairview Heights.
120-76K74 Active 04/22/2025 5 8 St. Clair 3.00 miles of widening, resurfacing, interchange improvements, and new drainage system on I-64 from west of Green Mount Road to 1.1 miles west of IL 158.
121-76M52 Deleted 04/24/2025 5 8 St. Clair 0.9 miles of resurfacing and ADA improvements on IL 159 from Washington Street to 0.2 miles south of IL 38/158 in Belleville.
122-76R11 Active 04/22/2025 5 8 Various Guardrail and cable median repair at various locations throughout District 8.
123-76R28 Active 04/22/2025 5 8 Various Highway lighting, traffic signal repair and maintenance at various locations throughout District 8.
124-76R61 Active 04/22/2025 5 8 Various Maintenance and service of all ITS equipment at various locations throughout District 8.
125-76T70 Active 04/22/2025 5 8 St. Clair Pump station cleaning at the Missouri Avenue Pump Station in East St. Louis.
126-76T74 Active 04/22/2025 5 8 Various Lighting upgrades on I-255 at I-55/70, on I-255 at Collinsville Road and on I-55/70 at Black Lane in Collinsville.
127-76T77 Active 04/22/2025 5 8 Madison Traffic signal replacement at the intersection of IL 111/140 at Thelma Avenue / Franklin Avenue in Cottage Hills.
128-76U24 Active 04/22/2025 5 8 St. Clair Bridge joint replacement on SN 082-0322 carrying I-70 ramp over I-55, I-64 and KCS Railroad in East St. Louis.
129-76U25 Active 04/22/2025 5 8 Clinton, Madison, St. Clair Traffic signal modernization at various locations throughout District 8.
130-76U34 Active 04/22/2025 5 8 St. Clair Well repairs at the 25th Street Pump Station south of I-64.
131-76U37 Active 04/22/2025 5 8 Madison, Marion, St. Clair Pump repairs at the Bowman Pump Station in East St. Louis, Grey's Pump Station in Pontoon Beach, Venice Pump Station in Venice, 9th Street Pump Station in East St. Louis and Centralia Pump Station in Centralia.
132-76U39 Active 04/22/2025 5 8 Bond 12.4 miles of chip seal on IL 143 from the Madison County line to IL 127.
133-76U99 Active 04/22/2025 5 8 Various Tree removal in various locations throughout District 8.
134-78399 Active 04/22/2025 5 9 Saline Replacement of 3 structures: 1) SN 083-7000 carrying IL 34 over a creek 1.5 miles east of Franklin County; 2) SN 083-7001 carrying IL 34 over a creek 2.4 miles east of Franklin County; 3) SN 083-7022 carrying IL 145/34 over a creek 3.2 miles south of US 45.
135-78831 Active 04/22/2025 5 9 Williamson Replacement of SN 100-0053 carrying Stiritz Road (TR 23) over I-57, approximately 0.6 miles west of IL 37.
136-78878 Deleted 05/01/2025 5 9 Jefferson Replacing SN 041-0089 and 041-0090 carrying I-64 over Casey Fork and UP Railroad, 0.2 miles east of IL 37.
137-78916 Active 04/22/2025 5 9 Williamson Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boyton Street in Marion.
138-78943 Active 04/23/2025 5 9 Franklin 10.5 miles of milling, patching and resurfacing on IL 14 from IL 37 in Benton to west of Happy Row Road in Macedonia.
139-78985 Active 04/22/2025 1 / 1 5 9 Jackson Voluntary Slope repair on SN 039-0075 carrying IL 13 over the Big Muddy River, east of IL 127 in Murphysboro.
140-78A15 Active 04/22/2025 5 9 Union Culvert replacement (SN 091-7057) on Old US 51 west of Locust Street in Cobden.
141-78A25 Active 04/22/2025 5 9 Johnson 0.6 miles of pavement patching, HMA resurfacing and ADA ramp improvements on IL 146 from 0.1 miles west of 11th Street to US 45 in Vienna.
142-78A33 Active 04/22/2025 5 9 Williamson Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 13 and Halfway Road in Marion.
143-78A39 Active 04/22/2025 5 9 Gallatin, White Intersection reconstruction at the intersection of IL 1 and IL 141 near Omaha.
144-78A72 Active 04/22/2025 5 9 Jefferson 9.2 miles of patching and resurfacing on IL 15 from the Washington County line to 0.4 miles west of the Mt. Vernon west city limits.
145-78A78 Active 04/22/2025 5 9 Jackson, Union Joint reconstruction with strip seal and modular seal on SN 039-0048 carrying IL3 over a railroad in Jackson County and joint reconstruction with strip seals on SN 091-0031carrying IL3 over the Big Muddy River in Union County.
146-78A92 Active 04/22/2025 5 9 Union Earth and furnished excavation and placement of stone riprap to repair existing slopes along Old US 51, 0.7 miles northwest of Coben.
147-78A96 Active 04/22/2025 5 9 Johnson Bridge joint repair on SN 044-0033 carrying Eagle Point Road over I-24.
148-78A97 Active 04/22/2025 5 9 Jackson Aggregate shoulders, earth and furnished excavation, stone riprap, pipe underdrains and erosion control blanket to repair existing slopes along IL 149 at SN 039-7036, 0.4 miles west of the Williamson County line west of Hurst.
149-78B03 Active 04/22/2025 5 9 Jackson Replacing 615' of pavement and shoulders on westbound IL 13 at Watson Road.
150-78B04 Active 04/22/2025 5 9 Jackson Patching on US 51 in Carbondale from Willow Street to Grand Avenue and on Mill Street from South Normal Avenue to South Illinois Avenue.
151-78B05 Active 04/22/2025 5 9 Jackson Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale.
152-78B06 Active 04/22/2025 5 9 Saline Signal replacement at the intersection of US 45 and Poplar Street in Harrisburg.
153-78B13 Active 04/22/2025 2 / 2 5 9 White 12.3 miles of resurfacing on US 45 from IL 14 to the Wayne County line as well as ADA upgrades in Enfield and Mill Shoals.
154-78B21 Active 04/22/2025 5 9 Pulaski, Union 9.3 miles of tree removal on I-57 from the IL 146 interchange to the Perks Road overpass.
155-78B22 Active 04/22/2025 5 9 Jackson 0.85 miles of overlay and pavement patching on Airport Road from IL 13 to 1 mile north of IL 13, northwest of Carbondale.
156-78B31 Active 04/22/2025 5 9 Williamson 1.1miles of pavement patching and resurfacing on IL 37 from 0.1 miles north of 18th Street to south of 4th Street in Johnston City.
157-78B32 Active 04/22/2025 5 9 Alexander 3.25 miles of pavement patching and partial structure removal on US 51 beginning 0.29 miles south of New Cross Street and proceeding south for 3.25 miles.
158-78B40 Active 04/22/2025 5 9 Various Electrical repair and/or maintenance on various routes throughout District 9.
159-87855 Active 04/22/2025 2 3 Bureau HMA resurfacing with aggregate shoulders on CH 24 from US 34 to CH 9.
160-87858 Active 04/22/2025 2 3 Iroquois HMA Resurfacing with aggregate shoulders on CH 4 from the west village limits of Clifton to CH 24.
161-87860 Active 04/22/2025 2 3 Kankakee Resurfacing CH 41 from the Will County line to South Street.
162-87863 Active 04/22/2025 2 3 DeKalb Asphalt resurfacing of Barber Green Road, and four (4) multi-use trails at various locations in DeKalb County. Includes aggregate shoulders and PCC sidewalk.
163-87882 Active 04/22/2025 2 3 LaSalle Construction of a single-span PPC deck beam bridge to carry River Road over a drainage ditch, 0.7 miles west of IL 170 in Seneca.
164-87883 Active 04/22/2025 2 3 Kankakee Construction of shared-use paths at various location in Bradley.
165-87884 Active 04/22/2025 2 3 Livingston Sidewalk construction at various locations in Dwight.
166-87885 Active 04/22/2025 2 3 DeKalb HMA resurfacing with 3' HMA safety shoulds on Somonauk Road from Chicago Road to US 30.
167-89806 Active 04/22/2025 3 4 Knox Cold-in-place recycling and HMA surfacing on CH 25 and CH 26 from the south corporate limits of Galesburg to CH 26.
168-89859 Active 04/22/2025 1 / 0 3 4 Tazewell Pavement reconstruction, sidewalk replacement, curb and gutter replacement, storm sewer, traffic signals and lighting on Court Street from 8th Street to 10th Street in Pekin.
169-89866 Active 04/22/2025 3 4 Knox Construction of PCC Sidewalk with ADA Ramps along East Fifer Street from Willard Street to Morton Avenue in Galesburg.
170-89869 Active 04/22/2025 3 4 Peoria Resurfacing on Cloverdale Road from west of White Clover Drive to IL 29 in Chillicothe.
171-91631 Active 04/22/2025 3 5 Edgar Construction of a three-span steel beam structure with concrete deck to carry CH 16 over Flemington Tributary in Edgar County. Includes HMA approach pavement and traffic barrier terminals.
172-93828 Active 04/22/2025 4 6 Macoupin Replace the bridge carrying CH 34 over Solomon Creet, 0.3 mile east of Bethal Road
173-93831 Active 04/22/2025 4 6 Christian Sidewalk replacement at various locations in Taylorville. Includes HMA resurfacing, driveway replacement, drainage improvements, ADA improvements, and Seeding.
174-93832 Active 04/22/2025 4 6 Sangamon Sidewalk replacement at various locations in Auburn.
175-93836 Active 04/22/2025 1 / 1 4 6 Hancock Construct a single-span PPC IL36N-Beam Bridge to carry CH 3 over Deer Creek, 0.6 mile north of Burnside.
176-93837 Active 04/22/2025 4 6 Christian Resurfacing East 6 Street from Spruce Street to Minnesota Street in Pana.
177-97771 Active 04/22/2025 5 8 St. Clair Patching of failed concrete pavement joints along Old Collinsville Road from Lebanon Avenue to Ashland Avenue in St. Clair County. Includes raised reflective pavement markers.
178-97859 Active 04/22/2025 1 / 0 5 8 St. Clair Resurfacing Martin Luther King Drive from Collinsville Avenue to 8th Street in East St. Louis.
179-97864 Active 04/22/2025 5 8 Monroe HMA resurfacing on CH 12 from Meyer Avenue in Valmeyer to Bluff Road North.
180-99747 Active 04/22/2025 5 9 Franklin Construction of stamped Concrete Sidewalk, street lighting system, Curb and gutter on IL 149 in West Frankfort.
181-99750 Active 04/30/2025 5 9 Saline Construction of a Roundabout at Small Street and Veterans Drive in Harrisburg. Includes PCC pavement, sidewalks, drainage, signing and lighting.
182-99751 Active 04/30/2025 5 9 Alexander Resurfacing on Ullin Road from IL 127 to the Pulaski County line.
183-99752 Active 04/23/2025 5 9 Perry Replace the bridge carrying White Walnut Road over White Walnut Creek, 1.7 miles north of IL 154.
184-99753 Active 04/22/2025 5 9 Gallatin Resurfacing on Pounds Hallow Road from IL 1 to the Hardin County Line.
185-99754 Active 04/22/2025 5 9 Pope HMA overlay with aggregate shoulds on Bay City Road from west of Climer Road to Jones Orchard Road.
186-99756 Active 04/22/2025 5 9 Williamson HMA Overlay with Aggregate Wedge Shoulders on Power Plant Road from County Club Road to McKinny Chapel Road.
187-46661 Active 05/02/2025 2 2 Various Removing existing guardrail delineators and barrier wall delineators and installing new guardrail delineators and barrier wall delineators within the limits of each individual work order.
188-46664 Active 05/02/2025 3 4 Various Repairing various widths of preformed plastic, epoxy, modified urethane pavement marking lines, letters and symbols and removal of existing pavement markings within the limits specified on each individual Work Order, and related collateral work necessary to complete the project on various routes throughout District 4.
189-60R76 Active 04/30/2025 1 1 Will (1225-Ft) Bridge Deck Replacement consists of construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert extension located on I-57 at Pauling Road (Overhead) in Will County.
190-61L40 Active 04/30/2025 1 1 Kane Resurfacing and the construction of a multi-use path on Sleepy Hollow Road from Huntley Road to IL-72 in West Dendee.
191-61L49 Active 04/30/2025 1 1 McHenry Construction of a triple-cell 12'X 5' box culvert to carry Oakwood Drive over Boone Creek in McHenry. Includes, HMA roadway, sidewalks, curb and gutter, storm sewer and utility adjustments.
192-62D34 Active 04/30/2025 1 1 Cook (430-Ft) The proposed improvement consists of the removal and replacement of the existing bridge, traffic signal modernization and ADA improvement, milling and resurfacing of existing HMA pavement, drainage work, landscaping. Located on Touhy Avenue over the North Branch Chicago River located in the Village of Niles in Cook County.
193-62G52 Active 04/30/2025 1 1 Will (1.716-Mile) Designed Overlay improvements include: Curb and gutter spot repair , asphalt surface removal and replacement with new binder and surface (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers, detector loops replacement. Location: IL 53 (Independence Boulevard), from Joliet Road to Belmont Drive within the Village of Romeoville.
194-62L61 Active 04/30/2025 1 1 McHenry (10,700-Ft) Designed Overlay and Shoulder Reconstruction, project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full depth (HMA) shoulder, pavement markings, raised reflective pavement markers. Located along IL 47 (Eastwood Drive) from North of IL 176 (North Junction) to South of US 14 in the City of Woodstock.
195-62N39 Active 04/30/2025 1 1 Cook, DuPage (9.38-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization, and ADA Improvements. Located along 22nd St / Cermak Rd from York Rd to IL 50 (Cicero Ave.) in the Village of Oak Brook in DuPage County, and in the Villages of Hillside, Westchester, Broadview North Riverside, Forest Park, the City of Berwyn, and the Town of Cicero,in Cook County.
196-62P73 Active 04/30/2025 1 1 Lake The projects consist of US RTE 12 (10.39 miles) - SMART Overlay, shoulders, shoulder rumble strips, channelization, and pavement markings and IL RTE 176 (0.71 miles) - shoulder and centerline rumble strips and pavement markings. Project located in Villages of Fox Lake, Volo, Lakemoor, Wauconda and Mundelein
197-62T22 Active 04/30/2025 1 1 Cook (405-Ft) Bridge Deck Overlay on SN 016-1005 and SN 016-1006 and associated bridge rehabilitation consists of bridge and approach slab scarification, replacement of joints at abutments and piers with strip seals, cleaning/ adjusting shoulder drains, concrete sealer of deck and parapets, HMA overlay on bridge approaches, slope wall repair and replacement, maintenance of traffic control, pavement marking. Located along IL-171 at Joliet Road and BNSF Railroad Spur in the Village of McCook, Cook County, Illinois.
198-62U39 Active 04/30/2025 1 1 Will Project consists of removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavement improvements necessary for this replacement. Located on FAI 80 (I-80) at Francis Road, Will County, IL.
199-62V14 Active 04/30/2025 1 1 Cook (1.472-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. Located along Sacramento Blvd in the City of Chicago in Cook County.
200-62V52 Active 04/30/2025 1 1 McHenry (9,601-Ft) SMART Overlay and Standard Overlay, ADA sidewalk ramp improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, sidewalk ramp improvements. Project located on IL 176 (State Road) in the Village of Island Lake.
201-62V57 Active 04/30/2025 1 1 McHenry (2.62-Mile) Designed overlay and new (HMA) shoulder reconstruction project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full-depth (HMA) shoulder, pavement markings, raised reflective pavement markers, shoulder and centerline rumble strips. Located along IL Route 176 from East of Haligus Road to West of US 14 (Virginia Street) in the City of Crystal Lake.
202-62V58 Active 04/30/2025 1 1 Lake (2.02-Mile) SMART Overlay, Shoulder Repair and ADA Improvements consists (HMA) removal, earth excavation, pavement patching, resurfacing with (HMA) asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, traffic signals, detector loops. Project located on IL 131 (Green Bay Road) from IL 173 (Rosecrans Road) to Russell Road in the City of Zion.
203-62V88 Active 04/30/2025 1 1 DuPage (3,848-Ft) Designed Overlay, ADA Improvements, New Shoulders consists of curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphalt pavement milling, patches (Class D), replace existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, longitudinal joint sealing, resurfacing (inlay) with HMA binder and surface course, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Located on IL 53, from South of Bemis Road to Harding Avenue / Nicoll Way within the Village of Glen Ellyn.
204-62X29 Active 04/30/2025 1 1 Cook (900-Ft) Bridge joint repair and replacement, and bridge approach pavement improvement consists of joint sealing, concrete removal, concrete superstructure, wing wall modifications, approach slab repair, structural repair of concrete, HMA surface removal, butt joints, PCC surface removal, HMA surface course, full depth HMA Class D patches, guardrail removal, guardrail, pavement markings, Class SI concrete, tree removal, This project is located in the Village of Thornton, in Cook County.
205-62X35 Active 04/30/2025 1 1 McHenry (2.68-Mile) This project consists of pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Dorr Township and in the City of Woodstock in McHenry County.
206-62X42 Active 04/30/2025 1 1 Cook This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals located in various locations in District 1.
207-62X59 Active 04/30/2025 1 1 Kane (1.12-Mile) Designed Overlay, Traffic Signal Modernization, ADA Improvement consists asphalt surface removal, pavement patching, (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, traffic signal modernization, accessible pedestrian signal improvements, detector loop replacement, raised reflective pavement markers, pavement marking. Located within the City of Elgin in Kane County.
208-62X66 Active 04/30/2025 1 1 McHenry (2.93-Mile) Standard Overlay consists of pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, thermoplastic and hot spray pavement markings, grading and shaping ditches. This project located in Coral Township, in McHenry County.
209-62X67 Active 04/30/2025 1 1 Kane SMART Overlay and Standard Overlay improvement project consists of asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings. The project is located in the villages of Hampshire and Pingree Grove within Kane County.
210-62X68 Active 04/30/2025 1 1 McHenry (1.06-Mile) Standard Overlay and Pedestrian Ramp (ADA) project consists of (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface course and binder course, thermoplastic and hot spray pavement marking, combination concrete curb and gutter removal and replacement. Project is in the City of Marengo in Marengo, Seneca, and Coral Townships in McHenry County.
211-62X69 Active 04/30/2025 1 1 Kane (1.79-Mile) SMART and Designed Overlay, ADA Improvements, New Shoulders Improvements include curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), (HMA) surface removal and replacement, (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement marking, pedestrian signals (APS) improvements and detector loops. Location: IL 56 (Butterfield Road), from East of IL 25 River Road to West of Church Road in the Village of North Aurora and the City of Aurora.
212-62Y10 Active 04/30/2025 1 1 Various This project consists of pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic control on a work basis. Located in District One (counties of Cook, DuPage, Kane, Lake, McHenry, and Will).
213-64J66 Active 04/30/2025 2 2 Winnebago 1.21 miles ADA sidewalk ramps, HMA patching, RTL widening, video detection systems, and sign replacement from Fairview Ave to Rockford College Dr.
214-64P13 Active 04/30/2025 2 2 Ogle Hot-Mix Asphalt resurfacing south of IL-72 (W) to south of Willow St and ADA improvements on IL-72. 4.51 gross miles.
215-64R26 Active 04/30/2025 2 2 Jo Daviess Bridge deck patching on SN 043-0043, carrying US 20/IL 84 over Galena River and ICG RR in Galena.
216-64S25 Active 04/30/2025 2 2 Winnebago Deck repair, joint replacement, deck overlay, and other miscellaneous repairs carrying SN 101-0145 over Baxter Road, 1 mile north of Ogle County Line.
217-64U19 Active 04/30/2025 2 2 Ogle 7.92 miles of HMA milling and resurfacing on IL 72 from IL 26 in Forreston to 0.3 mi E of Mt. Morris Rd E of Leaf River.
218-64U52 Active 04/30/2025 2 2 Winnebago 4.3 miles of pavement patching, widening, and fence repairs on I-39 from 0.8 mi north_of Blackhawk Rd to 0.4 mi north of Harrison Ave (including interchange ramps) and US 20 from 0.6 miles west of Mulford Rd to I-39.
219-64U55 Active 04/30/2025 2 2 Various Tree removal along various routes throughout District 2.
220-66P54 Active 04/30/2025 2 3 LaSalle Milling and resurfacing designed overlay of Il 251 including 4' safety shoulders, shoulder rumble strips, and centerline rumble strips from US 52 to the north limit. 10.99 miles gross.
221-68510 Active 04/30/2025 3 4 Henry Bridge replacement: SN's 037-0019, 037-0049, 037-0020, and 037-0053 carrying Interstate 74 over IL Route 17 west of Woodhull.
222-68A86 Active 04/30/2025 1 / 0 3 4 Fulton 5.3 miles of resurfacing on IL 78 from 0.1 mile south of North Clark Rd to US 136 and on US 136 from west of the IL 78 Junction Wye to east of the IL 78 Junction Wye.
223-68B70 Active 04/30/2025 3 4 Peoria 0.19 mile ramp widening for an additional left turn lane, traffic signal installation to replace temporary traffic signals, mill and overlay, drainage improvements at IL 40 (Knoxville Ave) and IL 6, Ramp D in Peoria.
224-70F21 Active 04/30/2025 3 5 McLean 3P Policy, Designed Overlay, ADA improvements, curb and gutter, and traffic signal replacement on IL 9 from west of Towanda Ave to Carnahan Dr east of Bloomington; and on Hershey Rd from Lamon Dr to Castleton Dr in Bloomington. Gross length of 2.189 mi.
225-78786 Active 04/30/2025 5 9 Franklin 2.3 miles of resurfacing on IL 154 from IL 37 to Fitzgerrell Park Road. Also includes replacement of SN 028-0052 over Rend Lake and construction of a multi-use path.
226-87874 Active 04/30/2025 2 / 2 2 3 Kankakee Streetscaping improvements at various locations in Grank Park.
227-91657 Active 04/30/2025 3 5 DeWitt Guardrail improvements at various locations in DeWitt County
228-91756 Active 04/30/2025 3 5 McLean Roadway reconstruction and new multi-use path on West College Avenue from West of the Norfolk Southern Railroad to White Oak Street in Normal.
229-93826 Deleted 05/07/2025 4 6 Logan Reconstruction, Widening, and Resurfacing Fifth Street Road from I-55 to Lincoln Parkway in Lincoln.
230-97834 Active 04/30/2025 1 / 0 5 8 St. Clair Resurfacing on West Washington Street from Centreville Avenue to South Illinois Street in Belleville.
231-97860 Active 04/30/2025 5 8 St. Clair Reconstruct the northwest corner of IL 3 at Monsanto Avenue, and resurface Monsanto Avenue from IL 3 east for 0.04 miles in Sauget.
232-46937 Active 05/02/2025 1 / 0 2 3 LaSalle Roadway improvements (HMA resurfacing, A3 oil and chip, drainage improvements and other work) within Illini State Park (IDNR) in LaSalle County, IL. 1.6 miles gross length.
233-46941 Active 05/02/2025 2 3 LaSalle PCC concrete patching of the parking lot at the lodge at Starved Rock State Park (IDNR) in LaSalle County, IL.
234-62V39 Active 05/02/2025 1 1 Lake (1.91-Mile) Project consists of resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplastic pavement markings. This project is located along US 45 in the Village of Antioch and the Township of Antioch in Lake County.
235-62W15 Active 05/02/2025 1 1 Will (1.59-Mile) Replace light towers with poles, LED luminaries, foundations, conduits/cables, restorations. Project located in the Villages of Mokena, Orland Park, and Tinley Park in Will County, at I-80 and US-45 interchange.
236-62X60 Active 05/02/2025 1 1 DuPage (2,909-Ft) Improvement consists of Designed overlay, ADA improvements, and collateral work necessary to complete the project. Located on Gary-s Mill Road from IL. 38 to IL. 59 in the City of West Chicago.
237-64B40 Active 05/02/2025 2 2 Jo Daviess 4.07 miles of reconstruction of US 20 from 0.2 mile west of Logemann Rd to Rush St in Stockton.
238-97870 Active 05/07/2025 5 8 Madison Construction of an HMA multi-use path on a lime-modified subgrade adjacent to US 40 from South Main Street to Creekside Drive in Troy.
239-64P28 Active 05/02/2025 2 2 Winnebago 0.78 mile of patching, resurfacing, ADA and signals on IL 70 from Safford Rd to Glenwood Ave in Rockford.
240-66295 Active 05/02/2025 2 3 Grundy Railroad Separation Structure Replacement at (SN 032-9906) and Bridge Repair at (SN 032-0065) in Kendall and Grundy Counties.
241-61J86 Active 05/07/2025 1 1 Lake Construction of new pavement to extend Hook Drive from Nicole Lane to Orchard Lane, and the construction of Nicole Lane from Hook Drive to Rollins Road in Round Lake Beach. Includes; Excavation, Aggregate base and sub-base, HMA Pavement, Sidewalk, curb and gutter, storm and sanitary sewer, water main, landscaping, lighting foundations and conduit.
242-61K96 Active 05/07/2025 1 1 Lake HMA resurfacing and shoulder widening on Saunders Road from Duffy Lane to Riverwoods Road in Riverwoods.
243-62W56 Active 05/07/2025 1 1 Various The work under Full Expressway Nighttime Cleaning Cycle and Supplement Sweeping includes the pickup, removal, and proper disposal of debris such as limbs, sticks, leaves, sand, stones, dirt, weeds, deceased animal carcasses, refuse, litter. This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, and Will.
244-66P96 Active 05/07/2025 2 3 Grundy Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Grundy County.
245-72940 Active 05/07/2025 4 6 Various Bridge approach dip corrections on 11 structures on various routes in District 6.
246-76U20 Active 05/07/2025 5 8 Madison 0.7 miles of chip seal on West Delmar Avenue from State Street in Alton to IL 3 in Godfrey.
247-97848 Active 05/07/2025 5 8 St. Clair Pavement widening on Maple Street from Main Street to Shiloh Heights Drive, and the construction of a right-turn lane from Maple Street onto northbound Main Street in Shiloh.
01A-MR026 Active 05/06/2025 2 3 Grundy Construct Crosswind Runway 7/25
02A-DE085 Active 05/06/2025 4 7 Macon Rehabilitate Runway 12/30 Pavement
03A-DE086 Active 05/06/2025 4 7 Macon Reconstruct Runway 12/30 Lighting
04A-DU095 Active 05/06/2025 1 1 DuPage Rehabilitate Taxiway C, Phase 1
05A-PA067 Active 05/06/2025 1 1 Cook Reconfigure Taxiway E
06A-BL073 Active 05/06/2025 3 5 McLean Rehabilitate Runway 11/29: Phase 1 Construction
07A-DE087 Active 05/06/2025 4 7 Macon Reconstruct North Aircraft T-Hangar Access Pavements
08A-KA054 Active 05/06/2025 2 3 Kankakee Rehabilitate Taxiway A, Phase 1
09A-WA082 Active 05/06/2025 1 1 Lake Rehabilitate Taxiway D
10A-WA076 Active 05/13/2025 1 1 Lake Construct Wildlife Fencing - Phase 5 (Northwest Area)
No More Data