001-64P93
|
Deleted
|
01/23/2023
|
|
|
2
|
2
|
Whiteside
|
|
Intersection Reconstruction of IL 40 at Science Ridge Road North of Sterling into a modern roundabout.
|
002-64P59
|
Deleted
|
01/23/2023
|
|
|
2
|
2
|
Rock Island
|
|
ADA Improvements from 2nd Avenue to 5th Avenue in Rock Island.
|
003-64S12
|
Active
|
01/17/2023
|
|
|
2
|
2
|
Whiteside
|
|
Bridge painting on SN's 098-0059 and 098-0060.
|
004-64S13
|
Withdrawn
|
02/15/2023
|
|
|
2
|
2
|
Rock Island
|
|
Bridge painting on SN's 081-0121, 081-0007 and 081-0008.
|
005-64S15
|
Active
|
01/17/2023
|
|
|
2
|
2
|
Rock Island
|
|
Bridge deck overlay, misc bridge repairs on carrying SN 081-0131 over I-88.
|
006-64S21
|
Active
|
01/17/2023
|
|
|
2
|
2
|
Rock Island
|
|
Milling and resurfacing the Silvis Maintenance Yard.
|
007-64S22
|
Active
|
01/17/2023
|
3 / 3 |
|
2
|
2
|
Lee
|
|
Milling and resurfacing the Amboy Maintenance yard.
|
008-64S24
|
Active
|
01/17/2023
|
|
|
2
|
2
|
Rock Island
|
|
Bridge joint repair, misc bridge repairs carrying SN 081-0125 over I-88.
|
009-66N07
|
Active
|
01/17/2023
|
|
|
2
|
3
|
Bureau
|
|
The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Great Sauk Trail Rest Area grounds on Eastbound and Westbound I-80 in Bureau County at approximately mile marker 51.
|
010-66N08
|
Active
|
01/17/2023
|
|
|
2
|
3
|
Livingston
|
|
The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Limestone Rest Area grounds on Northbound and Southbound I-55 in Livingston County at approximately mile marker 193/194.
|
011-66N09
|
Active
|
01/17/2023
|
|
|
2
|
3
|
Iroquois
|
|
This project is located at the Main Line Station Rest Area grounds on NB and SB I-57 in Iroquois County at approximately mile marker 269. The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control.
|
012-70541
|
Active
|
01/17/2023
|
2 / 1 |
1 |
3
|
5
|
McLean
|
|
Bridge Superstructure Replacement at Kickapoo Creek 1 Mile North of US 136.
|
013-70E85
|
Active
|
01/17/2023
|
3 / 3 |
|
3
|
5
|
DeWitt
|
|
4.910 miles SMART overlay on US 150 from the McLean_County Line to the Piatt County Line.
|
014-70G07
|
Active
|
01/17/2023
|
|
1 |
3
|
5
|
Vermilion
|
|
Pier repair/ Bridge deck repairs SN 092-0101 carrying IL 49 over UP RR 1.8 mi. N of US 136.
|
015-70G17
|
Active
|
01/17/2023
|
2 / 2 |
|
3
|
5
|
Piatt
|
|
Bridge Repair S.N. 074-0005 Over Madden Creek 0.5 Ml E of Lodge.
|
016-70G28
|
Active
|
01/17/2023
|
|
|
3
|
5
|
DeWitt
|
|
Bridge Joint Repair/Repair Miscellaneous Over US-150 and Norfolk S. RR and FAS 2495 North of Farmer City.
|
017-72106
|
Active
|
01/17/2023
|
|
|
4
|
6
|
Adams
|
|
Patching on IL 104, approximately 0.8 miles west of the Quincy Regional Airport entrance (eastbound lanes only).
|
018-72110
|
Active
|
01/17/2023
|
|
|
4
|
6
|
Sangamon
|
|
Painting SN 084-0162 carrying County Highway 33 over I-72 at the Illiopolis interchange.
|
019-72111
|
Deleted
|
03/14/2023
|
|
|
4
|
6
|
Sangamon
|
|
Painting SN 084-0143 carrying Link Road over I-72, 1.2 miles east of the New Berlin interchange.
|
020-72121
|
Active
|
01/17/2023
|
|
|
4
|
6
|
Sangamon
|
|
Concrete repairs at SN 084-0152 carrying westbound I-72 over the Sangamon River, east of Springfield.
|
021-72136
|
Active
|
01/13/2023
|
|
|
4
|
6
|
Scott
|
|
Bridge deck microsilica overlay on 4 structures on I-72 east of the Illinois River (SN 086-0040, 086-0041, 086-0042 and 086-0043).
|
022-72631
|
Active
|
01/17/2023
|
|
|
4
|
6
|
Sangamon
|
|
1 mile of crack and joint sealing on IL 29 from Ridge Avenue to Linden Avenue in Springfield.
|
023-72704
|
Active
|
01/17/2023
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6.
|
024-72705
|
Active
|
01/17/2023
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6.
|
025-74B16
|
Active
|
01/17/2023
|
|
|
4
|
7
|
Macon
|
|
Bridge bearing replacement on SN058-0084 and SN 058-0085 on IL 48 approximately 2.5 miles east of Forsyth.
|
026-76R27
|
Deleted
|
02/03/2023
|
|
|
5
|
8
|
Madison
|
|
Lighting upgrades on I-55 at IL 140.
|
027-76R42
|
Active
|
02/09/2023
|
|
|
5
|
8
|
Marion
|
|
7.2 miles of crack and joint sealing on US 50 from 0.1 miles west of Metcalf Road to the Clay County line.
|
028-76R81
|
Active
|
01/17/2023
|
|
|
5
|
8
|
Madison
|
|
Bridge painting on SN 060-0210 carrying IL 4 over US 40 and a railroad, approximately 1.5 miles west of St. Jacob.
|
029-78902
|
Active
|
01/17/2023
|
|
|
5
|
9
|
Union
|
|
Earth excavation for backslope repair along IL 127 just north of Rhine Road, south of Alto Pass.
|
030-78964
|
Deleted
|
02/03/2023
|
|
|
5
|
9
|
|
|
|
031-78974
|
Active
|
01/17/2023
|
1 / 1 |
1 |
5
|
9
|
White
|
|
0.6 miles of patching, surface removal and HMA surfacing on IL 1 under I-64 near Grayville, including the radius returns for the entrance and exit ramps to the existing joint for eastbound and westbound I-64.
|
032-64M40
|
Active
|
01/17/2023
|
5 / 5 |
1 |
2
|
2
|
Winnebago
|
|
2.7 miles of Cold Milling and Hot Mix Asphalt Resurfacing on US 20 from Rock River to 0.7 miles West of Alpine Rd in Rockford.
|
033-66M37
|
Active
|
01/17/2023
|
|
|
2
|
3
|
Livingston
|
|
5.52 miles of shoulder widening and rumble strip installation on IL 17 from IL 170 (N 1500E Rd) to N 2100E Rd in Livingston County.
|
034-68G38
|
Withdrawn
|
03/20/2023
|
3 / 3 |
1 |
3
|
4
|
Stark
|
|
Bridge deck overlay to 088-0021 and 088-0022-0022 carrying IL 93 over West and East Fork Spoon River west of Bradford.
|
035-72G06
|
Withdrawn
|
03/20/2023
|
2 / 2 |
|
4
|
6
|
Christian
|
|
Bridge replacement on IL 29 over a drainage ditch approximately 1.8 miles northwest of Pana (SN 011-0013).
|
036-74547
|
Active
|
01/17/2023
|
|
1 |
4
|
7
|
Richland
|
|
3.6 miles of patching, milling and design overlay on US 50 from 0.6 miles west of St. Marie Road to 4 miles west of the Lawrence County line.
|
037-76R48
|
Active
|
01/17/2023
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
4.7 miles of patching along I-64 from 0.5 miles west of IL 159 in Fairview Heights to 0.5 miles east of Greenmount Road in O-Fallon.
|
038-78610
|
Active
|
01/17/2023
|
2 / 2 |
|
5
|
9
|
Alexander
|
|
Replacement of SN 002-0010 carrying Old IL 3 over Miller Creek, approximately 1 mile north of Thebes.
|
039-78905
|
Active
|
01/17/2023
|
1 / 1 |
|
5
|
9
|
Jackson, Perry
|
|
Intersection widening and resurfacing at 3 locations: IL 154 at Water Street in Pinckneyville, IL 127/149 at North 4th Street in Murphysboro and IL 13/127/149 at North Street in Murphysboro.
|
040-66M64
|
Active
|
01/17/2023
|
|
|
2
|
3
|
Livingston
|
|
1.55 mi. Ditch grading and shaping, CMP culvert removal, concrete slope wall removal, installing Precast Concrete Box Culverts, Precast Box Culvert End Sections, earthwork, seeding. Beginning at the Intersection of IL 116 and Deerfield Rd and ending at approximately 192 feet east of SN 053-0066.
|
041-66N01
|
Active
|
01/17/2023
|
|
|
2
|
3
|
Bureau
|
|
Removal of existing light structures and construction of new light poles and electrical control unit.
|
042-68G40
|
Active
|
01/17/2023
|
|
|
3
|
4
|
Peoria
|
|
The project includes bridge deck overlay and scour mitigation to SN 072-0162 carrying IL 8 over Walnut Creek, East of IL 78. The project improvement length is 0.058 miles.
|
043-70907
|
Active
|
01/17/2023
|
|
1 |
3
|
5
|
McLean
|
|
Culvert replacement on US 51B over ditch 0.1 mile North of RAAB Rd, in Normal,
|
044-70G18
|
Active
|
01/17/2023
|
|
|
3
|
5
|
McLean
|
|
2.5 miles of longitudinal joint repair from Colton Ave. to Carnahan Dr. in Bloomington.
|
045-70G44
|
Active
|
01/17/2023
|
|
|
3
|
5
|
Various
|
|
District wide SMART Work Zone Technology.
|
046-76M53
|
Active
|
01/17/2023
|
|
|
5
|
8
|
St. Clair
|
|
0.9 miles of resurfacing and ADA upgrades on IL 159 from Alexa Drive to 0.1 miles south of Douglas in Belleville.
|
047-66N04
|
Active
|
01/17/2023
|
|
|
2
|
3
|
Grundy
|
|
Bridge Painting: 032-0005 NB, 032-0006 SB over the Mazon River, 4.0 mi. south of Reed Rd.; 032-0007 NB, 032-0008 SB over the Union Pacific Railroad, 3.2 mi. south of Reed Rd.
|
048-66N13
|
Active
|
01/17/2023
|
|
|
2
|
3
|
Livingston
|
|
Milling, resurfacing and drainage work at the Pontiac Traffic Facility at 401 S. Ladd St. in Pontiac.
|
049-68G41
|
Active
|
01/17/2023
|
1 / 1 |
|
3
|
4
|
Henderson
|
|
The project includes bridge repairs and bridge deck overlays to S.N. 036-0044 over Camp Creek and S.N. 036-0045 over Weaver Creek, including bridge joint replacement on S.N. 036-0045. Project length is 0.106 mile.
|
050-68H00
|
Active
|
01/17/2023
|
|
|
3
|
4
|
Peoria
|
|
I-74 in the City of Peoria.
|
051-68H21
|
Active
|
01/17/2023
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
Crack and joint sealing at various locations along 1-74 and 1-474 in Peoria and Tazewell Counties.
|
052-68H02
|
Active
|
01/17/2023
|
|
|
3
|
4
|
Various
|
|
District-wide pavement markings.
|
053-68H16
|
Active
|
01/17/2023
|
|
|
3
|
4
|
Tazewell
|
|
Replace expansion joints and partial depth deck patching to S.N. 090-0063 carrying IL 9 over Mackinaw River.
|
054-68H56
|
Active
|
01/17/2023
|
|
|
3
|
4
|
Peoria
|
|
Replace traffic signal mast arm at IL 8/ IL 116 (MacArthur Hwy.) and Washington St. in Peoria.
|
055-76R51
|
Active
|
01/17/2023
|
2 / 2 |
|
5
|
8
|
St. Clair
|
|
Mixer replacement at the Bowman Pump Station on Exchange Avenue in East St. Louis.
|
056-62K03
|
Active
|
01/17/2023
|
7 / 7 |
3 |
1
|
1
|
Cook
|
|
(3032-Ft) Installation of permanent traffic signals, proposed left lane addition on both legs of central avenue, as well as left turn lane storage extension on 183rd Street, widening existing shoulders, raising the profile 2.5 foot at the intersection, thermoplastic pavement markings, raised reflective pavement marker installation within the Village of Tinley Park in Cook County.
|
057-62N80
|
Active
|
01/17/2023
|
4 / 4 |
2 |
1
|
1
|
Cook
|
|
(2.89-Mile) 3P SMART overlay project on Willow Rd from Landwehr Rd to west of IL 43. Located in the Villages of Glenview and Northbrook in Cook County.
|
058-62R68
|
Active
|
01/17/2023
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
(575-Ft) Improvements consist of bridge joint replace/repairs of structure carrying Arsenal Road (SN 099-3392) over BNSF Railroad and Jackson Creek in the Village of Elwood, Will County.
|
059-68H59
|
Active
|
01/17/2023
|
|
|
3
|
4
|
Various
|
|
Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting and ITS facilities).
|
060-74B45
|
Active
|
01/17/2023
|
|
|
4
|
7
|
Fayette
|
|
1.5 miles of patching on US 51, US 40, IL 185 from Imco Drive to the Kaskaskia River in Vandalia.
|
061-76R62
|
Active
|
01/17/2023
|
1 / 1 |
1 |
5
|
8
|
Marion
|
|
Resurfacing ramps at the I-57 and US 50 interchange.
|
062-78953
|
Active
|
01/17/2023
|
2 / 0 |
|
5
|
9
|
Franklin, Hamilton
|
|
Scour repair on SN 028-0040 carrying IL 149 over Tilley Creek, 3.4 miles west of IL 34; and scour repair on SN 033-0016 carrying IL 142 over Bear Creek, 1.8 miles south of IL 14.
|
063-62J30
|
Active
|
01/17/2023
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
The project consists of Intersection widening, drainage, traffic signal modernization, lighting and sidewalk. The project is in the Village of Schaumburg and Hanover Park in Schaumburg Township. The total length of this project is 1338 ft.
|
064-62N85
|
Active
|
01/17/2023
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(1.1-mile) Intersection improvement, traffic signal modernization project along IL50/IL 83 (Cicero Ave) at Midlothian Turnpike, 135th St and Cal Sag Rd located in the Village of Crestwood in Cook County.
|
065-62R54
|
Active
|
01/17/2023
|
|
1 |
1
|
1
|
Cook
|
|
(3592 FEET), Design overlay and ADA improvements, Belmont Ave (25th Ave to 225 feet West of Elm St) in the village of Franklin Park in the township of Leyden in Cook County.
|
066-62T97
|
Active
|
01/17/2023
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of substructure and sidewalk repairs of the structure (016-2033) carrying 123rd Street over I-57 in the Village of Calumet Park in Cook County.
|
067-62U60
|
Active
|
01/17/2023
|
|
|
1
|
1
|
Cook, DuPage
|
|
This contract consists of debris and litter cleaning along I-290 and I-290 Extension from IL-83 (Kingery Hwy) to Austin Blvd.
|
068-62U65
|
Active
|
01/17/2023
|
|
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-57 from I-90/94 to I-80.
|
069-62U66
|
Active
|
01/17/2023
|
|
|
1
|
1
|
Cook, Lake
|
|
This contract consists of debris and litter cleaning along I-94/US-41 (Edens Expressway) from I-90 (Kennedy Expressway) to Clavey Road.
|
070-64N66
|
Active
|
01/17/2023
|
|
|
2
|
2
|
Rock Island
|
|
2.61 Miles - Cold Milling, Pavement Patching, and HMA Resurfacing - US 150 from US 6 to East 3rd Street in Coal Valley.
|
071-64S20
|
Active
|
01/17/2023
|
|
|
2
|
2
|
Winnebago
|
|
1.07 mile, Standard Overlay from Charles St to Harrison Ave.
|
072-76M44
|
Active
|
01/17/2023
|
1 / 1 |
|
5
|
8
|
Clinton
|
|
Culvert replacement on Old US 50, 0.5 miles west of IL 160. (SN 014-2435)
|
073-76N43
|
Deleted
|
01/23/2023
|
|
|
5
|
8
|
Madison
|
|
Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City.
|
074-76R87
|
Active
|
01/17/2023
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Dynamic message sign replacement at various locations in Madison and St. Clair Counties.
|
075-74B71
|
Active
|
01/17/2023
|
|
|
4
|
7
|
Effingham
|
|
0.2 miles of weed control and landscaping on IL 32/33 from Marguerite Lane to 0.1 miles northwest of Woodland Drive in Effingham.
|
076-62U14
|
Active
|
01/17/2023
|
|
1 |
1
|
1
|
Cook
|
|
The improvement consists of cleaning and painting existing steel on the structures No. 1: 127th Street West of Homan Ave.; No. 2: IL-7, 86th Ave. Over L-7 SW Hwy, in Village Village of Palos Park and in City of Blue Island, in Cook County. , The improvement consists of cleaning and painting existing steel on the structures No. 1: 127th Street West of Homan Ave.; No. 2: IL-7, 86th Ave. over IL-7 SW Hwy, in Village of Palos Park and in City of Blue Island, in Cook County.
|
077-61H23
|
Active
|
01/20/2023
|
|
|
1
|
1
|
Cook
|
|
Roadway reconstruction and traffic signal installation on Gross Point Road from Old Orchard Road to Gold Road in Skokie.
|
078-61H59
|
Active
|
01/20/2023
|
|
1 |
1
|
1
|
Cook
|
|
Reconstruct the intersection of Touhy Avenue and Gross Point Road to include roadway widening, sidewalk replacement, multi-use path, curb and gutter, storm sewer, roadway lighting, traffic signals and pavment markings in Niles.
|
079-61H65
|
Active
|
01/20/2023
|
|
|
1
|
1
|
Cook
|
|
Resurface National Parkway from Woodfield Road to Higgins Road in Schaumburg.
|
080-61H78
|
Active
|
01/20/2023
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Construct an aggregate and PCC shared-use path, inlcudes curb and gutter, traffic signal enhancements, pavement markings and signing on the west side of East River Road at the intersection with Bryn Mawr Avenue to Devon Avenue in Chicago and Park Ridge.
|
081-61H80
|
Active
|
01/20/2023
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
Reconstruct Souwanas Trail from Oceola Street to Sanbloom Road, and the reconstruction of Schuett Street from Scott Street to Hubbard Street in Algonquin.
|
082-61J06
|
Active
|
01/20/2023
|
2 / 2 |
1 |
1
|
1
|
Lake
|
|
HMA Resurfacing, PCC sidewalk with ADA improvements, patching, drainage improvements, and pavement markings along Deer Park Boulevard in Deer Park.
|
083-61J07
|
Active
|
01/20/2023
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
HMA Resurfacing, curb and gutter, and pavment markings on 76th Avenue in Palos Heights.
|
084-61J16
|
Active
|
01/20/2023
|
|
1 |
1
|
1
|
Cook
|
|
Traffic signal modernization, HMA resurfacing, Pedestrian safety enhancements, storm sewers, landscaping, and pavement markings at the intersection of US 41 and Lake Avenue in Wilmette.
|
085-61J26
|
Active
|
01/20/2023
|
|
|
1
|
1
|
Cook
|
|
Install bike shelter, bike racks, repair stations, and sidewalk replacement at the Van Buren Street Parking Lot and at the northwest corner of Harlem Avenue and Harrison Street in Forest Park.
|
086-61J29
|
Active
|
01/20/2023
|
|
|
1
|
1
|
McHenry
|
|
HMA surface removal and resurfacing, pavement patching, aggregate shoulders, and pavement markings along Pingree Road in Lake in the Hills.
|
087-61J31
|
Active
|
01/20/2023
|
|
|
1
|
1
|
DuPage
|
|
HMA removal and resurfacing, Sidewalk ADA ramp upgrades, curb and gutter, and pavement markings algon various routes in Lisle.
|
088-61J32
|
Active
|
01/20/2023
|
|
|
1
|
1
|
DuPage
|
|
HMA resurfacing, pavement markings, sidewalk ADA ramps, curb and gutter along Technology Boulevard in West Chicago.
|
089-61J36
|
Active
|
01/20/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Bike shelter installation, bike lane pavement, markings and signage at various location in Northbrook.
|
090-66M72
|
Active
|
01/20/2023
|
|
|
2
|
3
|
Kendall
|
|
This project is located on FAU 2503 68 (IL 25) and FAP 860 (IL 31).
|
091-68G35
|
Active
|
01/20/2023
|
1 / 1 |
|
3
|
4
|
Stark
|
|
Microsurfacing (1-Pass) on IL 91 from IL 93 to IL 17.
|
092-68H01
|
Active
|
01/20/2023
|
|
|
3
|
4
|
Various
|
|
Removal and replacement of guardrail damaged by motorists throughout District 4.
|
093-70B05
|
Active
|
01/20/2023
|
1 / 1 |
1 |
3
|
5
|
Vermilion
|
|
2.54 Mi, Standard Overlay, ILL 1 to Bowman Ave.
|
094-72H41
|
Active
|
01/20/2023
|
|
|
4
|
6
|
Macoupin
|
|
5.7 miles of overlay, bridge deck overlay, drainage improvements, guardrail replacement and patching on IL 4 from Allen Road to Haig Road, north of Carlinville.
|
095-74B58
|
Active
|
02/02/2023
|
|
|
4
|
7
|
Macon
|
|
4.3 miles of partial width resurfacing at various locations on Old US 51 from US 36 (Eldorado) to IL 121 (Pershing) in Decatur.
|
096-76N16
|
Deleted
|
01/23/2023
|
|
|
5
|
8
|
Madison
|
|
Bridge repairs, flood wall work and pavement reconstruction on IL 111 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270.
|
097-76R45
|
Active
|
01/20/2023
|
|
|
5
|
8
|
Jersey
|
|
Crack and joint sealing on IL 3 from 0.1 miles north of Grafton Hills Drive in Grafton to IL 109.
|
098-76R88
|
Active
|
01/20/2023
|
|
|
5
|
8
|
Various
|
|
Highway lighting and traffic signal repair and maintenance at various locations throughout District 8.
|
099-85733
|
Active
|
01/20/2023
|
1 / 1 |
|
2
|
2
|
Ogle
|
|
Resurfacing on Lowell Park Road from Pines Road to the Lee County Line
|
100-85735
|
Active
|
01/20/2023
|
|
|
2
|
2
|
Stephenson
|
|
Cold in Place recycling with HMA overlay on Red Oak Road from the east city limits of Red Oak City to the west city limits of Cedarville, and on Scioto Mills Road from 0.1 mile west of Iris Hill Road to IL 26.
|
101-85736
|
Active
|
01/20/2023
|
|
|
2
|
2
|
Henry
|
|
Cold in Place recycling with seal coat overlay on CH 14 from CH 5 to IL 78.
|
102-85737
|
Active
|
01/20/2023
|
|
|
2
|
2
|
Whiteside
|
|
4 inch Cold in Place recycling and HMA resurfacing on Albany Road from Sand Road to Burns Road and on Cordova Road from I-88 to 6th Avenue.
|
103-85738
|
Active
|
01/20/2023
|
|
|
2
|
2
|
Rock Island
|
|
HMA resurfacing with patching, curb and sidewalk repair on Avenue of the Cities from 24th Street to 41st Street in Moline.
|
104-87772
|
Active
|
01/20/2023
|
2 / 2 |
|
2
|
3
|
DeKalb
|
|
HMA resurfacing on Somonauk Road from North Avenue to IL 38 in Cortland.
|
105-87804
|
Active
|
01/20/2023
|
|
|
2
|
3
|
DeKalb
|
|
HMA resurfacing with ADA Ramps, sidewalks, curb and gutter on DeKalb Avenue from Center Cross Street to West Elm Street, and on West Elm Street to South Main Street in Sycamore.
|
106-87812
|
Active
|
01/20/2023
|
1 / 1 |
1 |
2
|
3
|
Kankakee
|
|
Construct an HMA Shared-Use Path with earth shoulders, storm sewers and ADA ramps along Esson Farm Road from east of Griffin Street to North Main Street in Grant Park.
|
107-93778
|
Active
|
01/20/2023
|
|
|
4
|
6
|
Montgomery
|
|
Replace the bridge carrying CH 9 over Shoal Creek, 3 miles south of Coffeen. , Replace the bridge carrying CH 9 at East Fork over Shoal Creek, 3 miles south of Coffeen.
|
108-93797
|
Active
|
01/20/2023
|
|
|
4
|
6
|
Logan
|
|
Resurfacing CH 1 from 200th Street to the Sangamon County Line.
|
109-93799
|
Active
|
01/20/2023
|
|
|
4
|
6
|
Sangamon
|
|
Replace the existing structure carrying North 8th Street over Spring Creek with a 3-span PPC deck beam bridge, curb and gutter, and guardrail in Springfield.
|
110-62R50
|
Active
|
01/23/2023
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
(345-Ft) Proposed improvement consists of removal and replacement of culvert culvert at US 14 over Ditch (3 Miles South of State Line) located in the unincorporated Chemung Township in McHenry County.
|
111-62R70
|
Active
|
01/23/2023
|
|
1 |
1
|
1
|
Cook
|
|
(2,203-Ft) Pavement Rehabilitation (Standard Overlay), ADA Improvements. Location: Old Arlington Heights Road from Arlington Heights Road to IL 68 (Dundee Road) in the Villages of Buffalo Grove and Arlington Heights.
|
112-62U38
|
Active
|
01/23/2023
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of bridge deck sealing of structures along IL 171 just North and South of I-55 (Stevenson Expressway) in the Villages of McCook, Summit and Lyons, Cook County. Net length 8448 feet (1.6 miles).
|
113-62U57
|
Active
|
01/23/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-190/90/94 (Kennedy Expressway) from US-12/45 (Mannheim Road) to Congress Parkway.
|
114-72A75
|
Active
|
01/23/2023
|
2 / 2 |
2 |
4
|
6
|
Sangamon
|
|
5.1 miles of overlay on I-55 from 0.5 miles north of I-72 (Clearlake Avenue) to 0.5 miles north of Sangamon Avenue and 1.2 miles of resurfacing on IL 54 (Sangamon Avenue) from 0.3 miles west of I-55 to 0.1 miles east of Colt Road in Springfield.
|
115-72M76
|
Active
|
01/23/2023
|
|
|
4
|
6
|
Various
|
|
Bridge deck sealing on various routes in various counties of District 6.
|
116-74976
|
Active
|
01/23/2023
|
|
|
4
|
7
|
Macon
|
|
Milling, resurfacing and aggregate shoulders on IL 105 from 0.3 miles east of Bender Drive to the Piatt County line.
|
117-74B21
|
Active
|
01/23/2023
|
|
|
4
|
7
|
Various
|
|
Sealing the bridge decks of 127 structures on various routes in various counties of District 7.
|
118-74B37
|
Withdrawn
|
03/08/2023
|
|
|
4
|
7
|
Wabash
|
|
Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel.
|
119-74B49
|
Active
|
01/23/2023
|
|
|
4
|
7
|
Effingham
|
|
Patching at various locations: I-57 from the Clay County line to mile marker 153; West Fayette Avenue from Outerbelt West to 0.1 miles west of Raney Street in Effingham; US 40/Henrietta Street from 0.1 miles south of Grove Avenue to Grove Avenue in Effingham.
|
120-60Y72
|
Active
|
01/27/2023
|
19 / 19 |
1 |
1
|
1
|
Cook
|
|
(2.21-Mile) Roadway reconstruction, traffic signal modernization, drainage improvement, stormwater detention storage, construction of new sidewalk and multi-use path, new roadway lighting and signage, and aesthetic landscaping to Wood Street from 161st Street to Thornton Road, located in the City of Harvey and Village of Dixmoor, Cook County.
|
121-61J05
|
Active
|
01/27/2023
|
|
|
1
|
1
|
Lake
|
|
Resurfacing Telegraph Road from the north village limits to North Avenue, and placement of a bike path/sidewalk south of IL 22 in Bannockburn.
|
122-61J15
|
Active
|
01/27/2023
|
3 / 3 |
2 |
1
|
1
|
Lake
|
|
HMA resurfacing and widening at the Lakeview Parkway and Hawthorn Parkway intersection and at the Lakeview Parkway and IL 60 intersection. Includes PCC path, ADA ramps, storm sewers, traffic signals and lighting modifications in Vernon Hills.
|
123-62M65
|
Active
|
01/27/2023
|
|
|
1
|
1
|
Cook, Lake
|
|
Location 1: (9,353-Ft) Designed overlay improvement on Barrington Rd in the villages of Inverness, Barrington, South Barrington and Barrington Hills in Cook County. Location 2: (366-Ft) Drainage improvement on Lake Cook Rd in the village of Deer Park.
|
124-62R55
|
Active
|
01/27/2023
|
7 / 7 |
2 |
1
|
1
|
Will
|
|
(980-Ft) project which includes replacement and widening of the bridge carrying Briggs Street over FAI 80 in Joliet Township within Will County.
|
125-62U35
|
Active
|
01/27/2023
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of bridge joint sealing, bridge deck concrete sealer upon the entire top surface of the bridge decks, in the city of Chicago, Cook County.
|
126-62U51
|
Active
|
01/27/2023
|
|
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-94 (Bishop Ford Expwy) from I-90/94 (Dan Ryan Expwy) to 1-80, Stony Island Ave from I-94 to US-12 (95th SO, and 103rd St from Cottage Groove to Stony Island.
|
127-62U58
|
Active
|
01/27/2023
|
|
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-90/94 (Dan Ryan Expressway) from Congress Pkwy to I-57/I-94 (Bishop Ford Expwy).
|
128-62U59
|
Active
|
01/27/2023
|
|
|
1
|
1
|
Cook
|
|
This contract consists of debris and litter cleaning along I-290 and IL-110 (Eisenhower Expwy) from Austing Blvd to Wells Street.
|
129-62U67
|
Active
|
01/27/2023
|
|
|
1
|
1
|
Cook, DuPage
|
|
This contract consists of debris and litter cleaning along I-290/IL-53 from Lake Cook Road to IL-83.
|
130-64P63
|
Withdrawn
|
02/23/2023
|
|
|
2
|
2
|
Whiteside
|
|
Expansion joint replacement, deck patching and concrete overlay, and other miscellaneous repairs on SN 098-0095 and 098-0096.
|
131-68H30
|
Active
|
01/27/2023
|
2 / 2 |
|
3
|
4
|
Various
|
|
Bridge Washing of 10 Bridges In District 4.
|
132-70E84
|
Active
|
01/27/2023
|
1 / 1 |
1 |
3
|
5
|
Champaign
|
|
1.956 Mi, Standard Overlay, ILL 130(S) to I-74.
|
133-70G25
|
Active
|
01/27/2023
|
|
|
3
|
5
|
Various
|
|
Bridge Deck Sealing 117 structures in Douglas(5O), Edgar(14) and Vermilion(53) Counties.
|
134-87796
|
Active
|
01/27/2023
|
|
|
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 268 over Gosseberry Creek, 0.9 mile south of E 2700 Road North.
|
135-87803
|
Active
|
01/27/2023
|
|
|
2
|
3
|
Livingston
|
|
Resurfacing CH 6 from CH 8 to Cherry Street and CH 8 from CH 10 to CH 6.
|
136-87808
|
Active
|
01/27/2023
|
|
|
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 129 over Broughton Creet, 0.3 mile west of North 3300.
|
137-87813
|
Active
|
01/27/2023
|
|
|
2
|
3
|
LaSalle
|
|
Remove and replace sidewalks along various streets in the Kimes Elementary School area of Streator.
|
138-91604
|
Active
|
01/27/2023
|
2 / 2 |
1 |
3
|
5
|
DeWitt
|
|
PCC Pavement, HMA and aggregate shoulders, curb and gutter, and driveway replacement along Revere Road from US Business 51 East for 0.27 mile and from IL 10 South for 0.23 miles.
|
139-97799
|
Active
|
01/27/2023
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Replace existing structure carrying Simmons Road over Ogle Creek with a single span, PPC deck beam bridge with bituminous waterproofing system, HMA wearing surface and approach, and traffic barrier terminals in O'Fallon.
|
140-99690
|
Active
|
01/27/2023
|
|
|
5
|
9
|
Franklin
|
|
Resurfacing Log Cabin Road from the Jefferson County Line to Ewing Road.
|
141-99697
|
Active
|
01/27/2023
|
|
|
5
|
9
|
Alexander
|
|
Resurfacing CH 4 from Tamms-Olivebranch Road to IL 127, and from Sexton Creek to Tamms-Olivebranch Road.
|
142-46611
|
Active
|
01/27/2023
|
|
|
2
|
2
|
Various
|
|
Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order.
|
143-46612
|
Active
|
01/27/2023
|
|
|
2
|
2
|
Various
|
|
Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order.
|
144-46614
|
Active
|
01/27/2023
|
|
|
4
|
6
|
Various
|
|
Removing and replacing damaged raised reflective pavement markers or lenses at various locations within District 6.
|
145-72M49
|
Active
|
01/27/2023
|
|
|
4
|
6
|
Cass
|
|
Concrete microsilica overlay, bridge joint replacement and bridge repair on IL 125 over the BNSF Railroad in Beardstown.
|
146-74574
|
Active
|
01/27/2023
|
2 / 2 |
2 |
4
|
7
|
Wayne
|
|
Patching, milling, resurfacing, designed overlay, ADA improvements and traffic signals on US 45 / IL 15 in Fairfield, eastbound from SW 7th to SE 9th and westbound from SE 9th to 0.1 miles west of Market Street.
|
147-74212
|
Active
|
01/30/2023
|
2 / 2 |
|
4
|
7
|
Effingham
|
|
PCC pavement, pavement removal, earthwork, curb and gutter, storm sewer, traffic signals, highway lighting and sidewalks on US 40 and IL 33 from west of Raney Street to East of Walnut Street in Effingham.
|
148-74739
|
Active
|
01/30/2023
|
1 / 1 |
1 |
4
|
7
|
Macon
|
|
4.1 miles of patching, resurfacing, median and curb repairs, traffic signal upgrades and ADA upgrades on IL 121 from US 36 in Decatur to the southern corporate limits of Mt. Zion.
|
149-76N83
|
Active
|
01/30/2023
|
2 / 2 |
|
5
|
8
|
Madison
|
|
0.59 miles of standard overlay and ADA improvements on IL 140 from Monument Avenue to Terra Drive in Alton.
|
150-87795
|
Active
|
01/30/2023
|
2 / 2 |
|
2
|
3
|
Kendall
|
|
Replace existing box culvert with a triple-barrel box culvert with approaches to Schlapp Road and Walker Road at East Aux Sable Creek, 2 miles south of IL 126.
|
151-87800
|
Active
|
01/30/2023
|
9 / 9 |
|
2
|
3
|
Kendall
|
|
Extend Collins Road on a new alignment from Miknles Road to Grove Road, and the construction of Minkler Road from IL 71 to collins Road, in Oswego.
|
152-89752
|
Active
|
01/30/2023
|
3 / 3 |
1 |
3
|
4
|
Stark
|
|
Replace existing structure carrying North Valley Road over Camp Run Creek with a 3-span flange beam bridge with HMA approaches, 0.3 mile southeast of Wyoming.
|
153-95915
|
Active
|
01/30/2023
|
|
|
4
|
7
|
Macon
|
|
Sidewalk removal, new PCC sidewalks, pipe culverts, pavement markings at various locations in Warrensburg.
|
154-97788
|
Active
|
01/30/2023
|
|
|
5
|
8
|
St. Clair
|
|
Reconstruction of Frank Scott Parkway West to establish left turn lanes.
|
155-99699
|
Active
|
01/30/2023
|
|
|
5
|
9
|
White
|
|
HMA resurfacing with rumble strips, aggregate shoulders, pavement markings and raised reflective markers on Epworth Road from 1300 N to 1100 N.
|
156-62R17
|
Active
|
01/31/2023
|
|
1 |
1
|
1
|
Cook
|
|
Loc 1: (1.63-Mile); Loc 2: (3,578-Ft); Loc 3: (372-ft); Standard Overlay, HMA Shoulders, ADA Improvements. Loc 1: Algonquin Rd (IL 83 to Wolf Street); Loc 2 Algonquin Rd (I-294 to Sibley St); Loc 3: IL 83 (Main St) (US 14 to Evergreen Ave) in the Cities of Des Plaines and Park Ridge and the Village of Mount Prospect in Cook County.
|
157-62U18
|
Deleted
|
02/01/2023
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of a full bridge painting of span 2 of the structure (016-1110) carrying 1-90/94 over 15th to 16th Streets in the City of Chicago in Cook County.
|
158-62U45
|
Active
|
01/31/2023
|
|
|
1
|
1
|
Cook
|
|
This contract consists, of debris and litter cleaning along I-55 (Stevenson Expwy) from Lake Shore Dr to IL-43 (Harlem Ave).
|
159-66N10
|
Active
|
02/02/2023
|
|
|
2
|
3
|
Various
|
|
This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. The work consists of weed spraying to aid in weed control.
|
160-76P99
|
Active
|
02/03/2023
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Chemical treatment of deep wells at various locations in East St. Louis and Venice.
|
161-87807
|
Active
|
02/03/2023
|
|
|
2
|
3
|
LaSalle
|
|
Resurface Chartres Street from 24th Street to Pershing Road in LaSalle.
|
01A-MA033
|
Active
|
12/21/2022
|
|
|
3
|
4
|
Marshall
|
|
Rehabilitate Aircraft Hangar Pavement and Automobile Parking Lot
|
02A-TR013
|
Rejected
|
03/21/2023
|
|
1 |
2
|
2
|
Carroll
|
|
Modify Aircraft Hangar Area Drainage
|
03A-PA064
|
Active
|
01/27/2023
|
|
|
1
|
1
|
Cook
|
|
Rehabilitate Access Road at NW Quadrant Hangars
|