003-62H64
|
Executed
|
05/27/2020
|
|
|
1
|
1
|
Cook
|
|
Culvert headwall repair in the Village of Schiller Park.
|
034-66J73
|
Rejected
|
05/06/2020
|
1 / 1 |
|
2
|
3
|
DeKalb
|
|
3P milling and resurfacing (Standard Overlay) on SBI 23 from Coltonville Rd to Highland Dr in Sycamore.
|
059-72L60
|
Executed
|
06/02/2020
|
|
|
4
|
6
|
Morgan, Scott
|
|
Culvert replacement on Old US 36 from east of the Scott / Morgan County line to east of Jacksonville.
|
060-72L61
|
Executed
|
06/02/2020
|
|
|
4
|
6
|
Brown, Pike
|
|
Culvert replacement from 1.8 miles north of the Brown / Pike County line to 0.5 miles south of the Brown / Pike County line.
|
085-76N25
|
Executed
|
06/02/2020
|
|
|
5
|
8
|
Monroe
|
|
0.1 miles of resurfacing along IL 156 bridge approach pavements at Prairie Du Long Creek Road (SN 067-0039).
|
086-76N28
|
Executed
|
06/08/2020
|
|
|
5
|
8
|
Madison
|
|
0.5 miles of resurfacing on IL 160 from 0.1 miles south of Trestle Road to US 40 in the City of Highland.
|
122-76N35
|
Executed
|
06/08/2020
|
|
|
5
|
8
|
Various
|
|
Weed spraying along I-64, I-55, I-55/70, I-255 and IL 255 in District 8.
|
201-76N24
|
Executed
|
06/15/2020
|
|
|
5
|
8
|
St. Clair
|
|
2.4 miles of patching on 6th Street from IL 177 to IL 161.
|
202-62K36
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook, DuPage
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway. 200 miles in length.
|
203-62K39
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook, Lake
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length.
|
204-62K40
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy. 185 miles in length.
|
205-62K41
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy). 360 miles in length.
|
206-62K42
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80. 275 miles in length.
|
207-62K43
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. 175 miles in length.
|
208-62K44
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Cook, Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355. 325 miles in length.
|
209-62K45
|
Rejected
|
07/02/2020
|
|
|
1
|
1
|
Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line. 240 miles in length.
|