001-60M74
|
Executed
|
07/26/2018
|
|
|
1
|
1
|
DuPage
|
|
Repair bridge SN 022-0147 carrying IL 19 over Salt Creek, 0.3 mile west of West Dale Road in the village of Wood Dale.
|
002-60M88
|
Executed
|
07/11/2018
|
4 / 4 |
1 |
1
|
1
|
Will
|
|
Repair bridge SN 099-0035 carrying I-55 Frontage Road over the I and M Canal, 1.1 miles south of I-80 in Channahon.
|
003-60W53
|
Executed
|
07/11/2018
|
|
|
1
|
1
|
Cook
|
|
Removal of asphalt overlay and placement of 5" concrete overlay on SN 016-2009 carrying Wolf Road over Weller's Ditch in Des Plaines. Includes stair removal and ADA ramp construction.
|
004-60Y39
|
Executed
|
07/27/2018
|
8 / 7 |
1 |
1
|
1
|
Cook
|
|
Resurfacing, electrical and construction of retaining walls on I-90.
|
005-60Y40
|
Executed
|
07/12/2018
|
10 / 10 |
1 |
1
|
1
|
Cook
|
|
Construction of noise walls, installation of signing, grading and drainage improvements along I-90 from Cumberland Avenue to Harlem Avenue.
|
006-62B61
|
Executed
|
07/11/2018
|
1 / 1 |
|
1
|
1
|
Lake
|
|
Channelization on IL 53, from Long Grove Drive to Middlesax Drive in the village of Long Grove.
|
007-62C35
|
Rejected
|
06/27/2018
|
|
|
1
|
1
|
Cook, McHenry
|
|
Light tower removal and replacement, and installation of new light towers at various locations.
|
008-62C74
|
Executed
|
07/24/2018
|
|
1 |
1
|
1
|
Lake
|
|
3.632 miles of resurfacing and pedestrain ramp improvments on IL 132 in Gurnee and Waukegan.
|
009-62C84
|
Executed
|
07/24/2018
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
Resurfacing and pedestrian improvements on IL 23 in the City of Marengo.
|
010-62D12
|
Executed
|
07/27/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing (3P) and milled rumble strip on US 20 through the city of Elgin and villages of Streamwood, Hanover Park and Bartlett.
|
011-62D16
|
Executed
|
07/16/2018
|
4 / 4 |
1 |
1
|
1
|
DuPage
|
|
Resurfacing of IL 38 through the cities of Oakbrook Terrace and ELmhurst, and the village of Oak Brook.
|
012-62D41
|
Executed
|
07/11/2018
|
|
1 |
1
|
1
|
Cook
|
|
Repair bridge 016-0239 carrying Busse Highway over Prairie Creek, 0.4 miles southeast of US 14 in Des Plaines.
|
013-62D64
|
Executed
|
07/16/2018
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Resurfacing (3P) with ADA ramp improvements on Roosevelt Road in the villages of Hillside, estchester, Broadview, Maywood and Forest Park.
|
014-62D65
|
Executed
|
07/11/2018
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Resurfacing on IL 171 wihtin the city of Chicago and village of Norridge.
|
015-62F32
|
Rejected
|
06/27/2018
|
|
|
1
|
1
|
Cook
|
|
Replacemnt of I-80/I-94 monotube structure at IL 83 including new traffic signal heads, cable and TCandP.
|
016-62F58
|
Executed
|
07/16/2018
|
|
1 |
1
|
1
|
Cook
|
|
3P resurfacing and pedestrian ramps on LaGrange Road through the city of Countryside and villages of Willow Springs, Justice, Hodgkins, LaGrange and LaGrange Park.
|
017-62F74
|
Executed
|
07/11/2018
|
|
1 |
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramp improvements on Cermak Road in the city of Berwyn and the town of Cicero.
|
018-62F76
|
Executed
|
07/16/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing on Cottage Grove in the villages of Dolton and South Holland.
|
019-62F81
|
Executed
|
07/16/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on Gregory Street in the city of Blue Island.
|
020-62F82
|
Executed
|
07/11/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on Hibbard Road in the villages of Wilmette and Northfield.
|
021-62F83
|
Executed
|
07/11/2018
|
|
1 |
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on Howard Street through the villages of Skokie and Niles.
|
022-62F92
|
Executed
|
08/16/2018
|
|
1 |
1
|
1
|
Cook
|
|
Culvert repairs and storm sewer replacement on US 14 through the village of Palatine.
|
023-62G08
|
Executed
|
07/20/2018
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Bridge repair on SN 016-0977, 0980, 0978, and 0982 carrying IL 53 from I-90 to IL 72 in Schaumburg and Rolling Meadows.
|
024-62G12
|
Executed
|
07/11/2018
|
|
|
1
|
1
|
Cook, Kane
|
|
Trombone mast arm replacement at various locations.
|
025-62G16
|
Executed
|
07/11/2018
|
|
1 |
1
|
1
|
Cook
|
|
bridge repairs on 19 structures on I-90/I-94 in the city of Chicago.
|
026-62G24
|
Executed
|
07/11/2018
|
|
1 |
1
|
1
|
Will
|
|
Repair culvert 099-0922 under US 52 between Doyle Road and Wallingford Trail.
|
027-64H07
|
Executed
|
07/11/2018
|
|
|
2
|
2
|
Boone
|
|
Removal and replacement of concrete box culverts 004-1020 and 004-1021 carrying IL 173 over drainage ditches, 0.4 and 0.2 miles east of Caledonia Road.
|
028-64K06
|
Executed
|
07/17/2018
|
|
|
2
|
2
|
Rock Island
|
|
Reconstruction of roadway shoulders and slopes along IL 84 from 0.1 mile north to 0.1 mile south of Quarry Road in Port Byron.
|
029-64L90
|
Executed
|
07/11/2018
|
|
|
2
|
2
|
Winnebago
|
|
Additional westbound thru-lane on Business Route US 20 (East State Street) from Bell School Road to the I-90 exit ramp in Rockford.
|
030-64M67
|
Executed
|
07/16/2018
|
|
1 |
2
|
2
|
Various
|
|
Wash ten bridges at various locations in District 2. SN 043-0043, 071-0040, 089-0042, 0045, 0081, 0082, 098-0051, 0052, 0100, and 101-6133.
|
031-64M68
|
Executed
|
07/16/2018
|
|
|
2
|
2
|
Rock Island
|
|
Wash ten bridges and ramp structures on I-74 in Rock Island County. SN 081-0099, 0100, 0111, 0112, 0113, 0114, 0115, 0116, 0142 and 081-0143.
|
032-64M72
|
Executed
|
07/16/2018
|
|
|
2
|
2
|
Rock Island, Whiteside
|
|
Wash eight bridges on various routes over the Rock River. SN 081-0047, 0067, 0068, 0153, 098-0034, 0079, 0080, and 098-0115.
|
033-66428
|
Deleted
|
05/04/2018
|
|
|
2
|
3
|
Kankakee
|
|
6.502 miles of 3P milling and resurfacing on IL 1, from IL 17 to the northern city limits of St. Anne.
|
034-66D75
|
Executed
|
07/11/2018
|
|
|
2
|
3
|
LaSalle
|
|
9.518 miles of 3P milling and resurfacing on IL 23, from south of McKinley Road to north of Richards Road near Streator.
|
035-66E52
|
Executed
|
07/11/2018
|
|
1 |
2
|
3
|
Kendall
|
|
8,997 feet of 3P milling and resurfacing on IL 31, including sideroads, entrances and ADA work, 0.9 miles south of the Kane county line to US 34 in Oswego.
|
036-66H61
|
Executed
|
07/11/2018
|
|
|
2
|
3
|
LaSalle
|
|
7,541 feet of milling and resurfacing, mailbox turnouts and entrances on IL 71 south of I-80 overpass to 0.2 mile north of US 6.
|
037-66H71
|
Executed
|
07/16/2018
|
|
|
2
|
3
|
Kankakee
|
|
2 miles of shoulder widening and rumble strips on IL 50 fr 0.45 mile north of 6000N Road to 0.11 mile north of 2000E Road.
|
038-66H73
|
Executed
|
07/23/2018
|
|
|
2
|
3
|
Ford
|
|
4.67 miles of shoulder widening and rumble strips on IL 9 from N 2300E Road to N 2800E Road.
|
039-66J21
|
Executed
|
07/16/2018
|
|
|
2
|
3
|
Kankakee
|
|
7.51 miles of intermittent resurfacing on I-57, from 0.7 mile north of Iroquois County line to south of the Kankakee River bridge.
|
040-68E02
|
Executed
|
07/11/2018
|
|
|
3
|
4
|
Tazewell
|
|
Paint 5 bridges in Tazewell County; SN 090-0104, 0105, 0106, 0107 and 090-0141.
|
041-70620
|
Executed
|
07/19/2018
|
1 / 1 |
1 |
3
|
5
|
Champaign
|
|
Replace 3 culverts carrying US 150 over a ditch southeast of Mahomet and northeast of Champaign. Total length of 116.89 feet.
|
042-70786
|
Executed
|
07/16/2018
|
3 / 3 |
1 |
3
|
5
|
Douglas
|
|
9.12 miles of 3P resurfacing on US 45, from US 36 at Tuscola to the Coles County line.
|
043-70D21
|
Executed
|
07/11/2018
|
|
|
3
|
5
|
McLean
|
|
5,290 feet of 3P resurfacing and ADA improvements on I-55B and IL 9, from 0.1 mile north of E. Washington St. to Clearwater Avenue, and Service Dr. to Prospect Rd.
|
044-72C29
|
Withdrawn
|
05/23/2018
|
|
|
4
|
6
|
Adams
|
|
4.4 miles of resurfacing, patching, shoulders, ADA improvements, bridge repair, bridge deck overlay, curlvert repair and riprap on IL 96 from Bear Creek to the Hancock County line (SN 001-0052, 0074, 7039, 7037)
|
045-72H54
|
Executed
|
07/17/2018
|
|
|
4
|
6
|
Schuyler
|
|
9 miles of resurfacing, ADA upgrades, drainage improvements and bridge deck repairs on IL 100 from just east of US 67 to Dutchman's Creek at the east edge of Browing.
|
046-72J54
|
Executed
|
07/11/2018
|
|
|
4
|
6
|
Hancock
|
|
0.12 mile of resurfacing and sidewalk ramp improvements on US 136, from west of Fayette Street to east of Marion Street in Carthage.
|
047-72K53
|
Executed
|
07/20/2018
|
|
|
4
|
6
|
Adams
|
|
Paint portion of bridge SN 001-0008 on IL 96 and SN 001-0024 on IL 104.
|
048-72K54
|
Executed
|
07/11/2018
|
|
|
4
|
6
|
Pike
|
|
Deck and substructure repairs on 3 bridges: 1) SN 075-0089 carrying IL 96 over I-72 at the Hull interchange; 2) Sn 075-0103 carrying CH 4 over I-72 at the Barry interchange; 3) SN 075-0112 carrying IL 107 over I-72 north of Pittsfield.
|
049-72K56
|
Executed
|
07/11/2018
|
3 / 3 |
1 |
4
|
6
|
Various
|
|
Removing and replacing non-compliant guardrail end terminals and related guardrail improvements at various locations in western District 6.
|
050-72K57
|
Executed
|
07/11/2018
|
3 / 3 |
1 |
4
|
6
|
Various
|
|
Removing and replacing non-compliant guardrail end terminals and related guardrail improvements at various locations in eastern District 6.
|
051-72K59
|
Executed
|
07/17/2018
|
|
|
4
|
6
|
Adams
|
|
1.8 miles of resurfacing on IL 104 from east of Quincy Regional Airfield to east of Columbus Road.
|
052-72K62
|
Executed
|
08/06/2018
|
|
1 |
4
|
6
|
Morgan, Sangamon
|
|
Install fiber optic cable runs at various locatins in Springfield and Jacksonville.
|
053-72K63
|
Executed
|
07/17/2018
|
|
|
4
|
6
|
Sangamon
|
|
Tree removal at the corner of Cockrell Lane and Mathers Road, Adjacent to I-72.
|
054-74819
|
Executed
|
08/01/2018
|
|
|
4
|
7
|
Effingham, Fayette
|
|
Seal 95 bridge decks on various routes.
|
055-74834
|
Withdrawn
|
05/21/2018
|
|
|
4
|
7
|
Lawrence
|
|
Bridge repairs to SN 051-0053 carrying US 50 over the Embarras River east of Lawrence.
|
056-74837
|
Executed
|
07/12/2018
|
|
|
4
|
7
|
Fayette
|
|
Class A pavement patching on I-70 eastbound, at the Brownstown weigh station.
|
057-74839
|
Executed
|
07/30/2018
|
|
|
4
|
7
|
Effingham
|
|
D7 Ash Borer control 2018-2.
|
058-74840
|
Executed
|
07/17/2018
|
|
|
4
|
7
|
Coles, Effingham
|
|
Remove and replace light towers and poles, rewiring light poles and towers, removal and replacement of tower and pole foundations at three locations; 1) NB Green Creek Rest Area; 2) I-57/US 45 interchange; 3) I-57/IL 16 interchange.
|
059-74845
|
Executed
|
07/11/2018
|
|
|
4
|
7
|
Moultrie
|
|
Pavement patching, milling, and HMA resurfacing on IL 32 from 0.5 mile north of Lake Shelbyville to 0.5 mile south of Lake Shelbyville.
|
060-74850
|
Executed
|
07/11/2018
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems in various counties in District 7.
|
061-74851
|
Executed
|
07/11/2018
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems in various counties in District 7.
|
062-74852
|
Executed
|
07/25/2018
|
|
|
4
|
7
|
Wayne
|
|
10.6 miles of HMS safety shoulders on IL 15 from Sunrise Drive in Fairfield to the Edwards County line.
|
063-74853
|
Executed
|
07/11/2018
|
2 / 2 |
|
4
|
7
|
Clark, Crawford, Jasper
|
|
Replacing existing non-crashworthy traffic barrier end-sections and steel plate beam guardrail at various locations.
|
064-74855
|
Executed
|
07/16/2018
|
1 / 1 |
|
4
|
7
|
Wayne
|
|
25 miles of milling in new shoulder rumble strips over the existing rolled-in rumble strips on I-64 from the Jefferson County line to the White County line.
|
065-76H01
|
Executed
|
07/30/2018
|
3 / 3 |
|
5
|
8
|
St. Clair
|
|
Resurfacing along IL 161 from the east junction of IL 158 to 0.4 miles east of IL 4 and resurfacing along onld IL 158 from IL 161 south of Scott Air Force Base entrance.
|
066-76H45
|
Executed
|
07/30/2018
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
4.1 miles of resurfacing on IL 161 from 0.2 miles east of Dutch Hollow Road to 0.1 mile east of IL 159.
|
067-76H46
|
Executed
|
07/19/2018
|
3 / 3 |
|
5
|
8
|
St. Clair
|
|
2.1 miles of resurfacing on US 50 from 0.1 mile west of Reider Road to IL 4.
|
068-76J29
|
Executed
|
07/19/2018
|
|
|
5
|
8
|
Monroe, St. Clair
|
|
6.5 miles of shoulder resurfacting and rumble strips on I-255 from the Mississippi River to IL 3 in Dupo.
|
069-76J98
|
Executed
|
07/17/2018
|
|
1 |
5
|
8
|
Madison
|
|
2.9 miles of resurfacing on US 40 from 0.2 mil east of Bethany Lane to 0.1 mile east of IL 4. Includes bridge deck overlay and waterproofing on SN 060-0230 carrying US 40 over the East Fork Silver Creek.
|
070-76K18
|
Executed
|
07/19/2018
|
|
|
5
|
8
|
St. Clair
|
|
1.7 miles of resurfacing and patching on IL 15 from 0.4 mil west of IL 163 to 0.5 mile east of I-255 in Alorton.
|
071-76K35
|
Executed
|
07/20/2018
|
2 / 2 |
1 |
5
|
8
|
Jersey
|
|
2.7 miles of resurfacing on IL 111/IL 267 from the Macoupin County line to the Madison County Line.
|
072-76K41
|
Executed
|
07/24/2018
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
2.6 miles of resurfacing on IL 4 from 0.4 mile north of I-64 to 0.2 mile south of IL 161.
|
073-76K94
|
Executed
|
07/25/2018
|
|
|
5
|
8
|
Madison
|
|
Bridge deck sealing at various locations throughout Madison County.
|
074-76K95
|
Executed
|
07/25/2018
|
|
|
5
|
8
|
St. Clair
|
|
Bridge deck sealing at various locations throughout St. Clair County.
|
075-76K96
|
Executed
|
07/25/2018
|
|
|
5
|
8
|
Various
|
|
Bridge deck sealing at various locations in Bond, Clinton, Marion and Washington Counties.
|
076-76L50
|
Executed
|
07/18/2018
|
|
|
5
|
8
|
Various
|
|
Guardrail and cable rail repair at various locations throughout District 8.
|
077-76L51
|
Executed
|
07/25/2018
|
|
|
5
|
8
|
Various
|
|
Maintain and service all ITS equipment throughout District 8.
|
078-76L52
|
Executed
|
07/17/2018
|
|
|
5
|
8
|
Various
|
|
Provide labor, equipment, materials, and supplies to deliver, setup, maintain, and pickup various traffic control devices at various locations throughout District 8.
|
079-76L53
|
Executed
|
07/25/2018
|
|
|
5
|
8
|
Various
|
|
Repair and maintain highway lighting and traffic signals throughout District 8.
|
080-76L57
|
Executed
|
08/09/2018
|
|
|
5
|
8
|
Various
|
|
Patching at various locations in District 8.
|
081-76L58
|
Executed
|
07/19/2018
|
|
1 |
5
|
8
|
Madison
|
|
11 miles of patching on IL 3 from New Poag Road to Broadway in Venice.
|
082-76L59
|
Executed
|
07/12/2018
|
|
|
5
|
8
|
Madison
|
|
11.7 miles of full depth or partial depth patching on IL 4 from I-55 to I-70.
|
083-76L60
|
Executed
|
08/08/2018
|
|
1 |
5
|
8
|
St. Clair
|
|
5.5 miles of patching on IL 3 from 8th Street to I-255.
|
084-76L61
|
Executed
|
07/16/2018
|
|
|
5
|
8
|
Madison
|
|
2.4 miles of resurfacing the northbound driving lane of IL 3 from New Poag Road to I-270.
|
085-76L62
|
Executed
|
07/17/2018
|
|
|
5
|
8
|
Greene
|
|
0.5 miles of concrete gutter removal and replacement on IL 108 just east of Eldred.
|
086-76L65
|
Executed
|
07/18/2018
|
1 / 1 |
|
5
|
8
|
Clinton
|
|
Patching on US 50 from the St. Clair County line to the Marion County line.
|
087-76L66
|
Executed
|
07/12/2018
|
1 / 1 |
|
5
|
8
|
Various
|
|
Tree removal and mitigation at various locations throughout District 8.
|
088-76L81
|
Executed
|
07/18/2018
|
|
|
5
|
8
|
Marion
|
|
Patching on I-57.
|
089-78295
|
Executed
|
07/11/2018
|
1 / 1 |
1 |
5
|
9
|
Jackson
|
|
Bridge replacements, bridge widening, pavement widening and a multi-use path on IL 13 from just east of Giant City Road to just west of Reed Station Road in Carbondale. (SN 039-0062, 0061, 0019, 7105, 0021)
|
090-78326
|
Executed
|
07/11/2018
|
1 / 1 |
|
5
|
9
|
Jefferson
|
|
Replace SN 041-0093 carrying IL 37 over a creek north of Ina with a double 10'x 9' box culvert.
|
091-78390
|
Executed
|
07/11/2018
|
2 / 2 |
1 |
5
|
9
|
White
|
|
Remove and replace SN 097-7047 with a box culvert on IL 1 over an unnamed creek in Crossville.
|
092-78522
|
Executed
|
07/11/2018
|
|
|
5
|
9
|
Union
|
|
Replace 2, three span bridges with 2 three span integral abutment bridges on I-57 over Shake Rag Road near Dongola.
|
093-78572
|
Executed
|
07/24/2018
|
1 / 1 |
|
5
|
9
|
Massac
|
|
Reconstructing ADA ramps along US 45 from Metropolis Street to Yasoda Street in Metropolis.
|
094-78627
|
Executed
|
07/24/2018
|
|
|
5
|
9
|
Jackson
|
|
Intersection improvement at IL 13 and Reed Station Road to include Pavement removal, aggregate base course, PCC pavment and shoulders, HMA pavement and shoulders, a multi-use path, storm sewers, lighting and traffic signals.
|
095-78632
|
Executed
|
07/11/2018
|
14 / 13 |
1 |
5
|
9
|
Various
|
|
Replacement of outdated guardrail end sections throughout District 9.
|
096-78668
|
Executed
|
07/18/2018
|
|
1 |
5
|
9
|
Jefferson
|
|
7.3 miles of excavation and grading shoulders, safety shoulders and rumble strips on IL 37 from the Marion County line to Oakton Road.
|
097-78669
|
Executed
|
07/19/2018
|
|
|
5
|
9
|
Massac, Pulaski
|
|
HMA safety shoulders, rumble strips, grading and seeding on IL 169 from IL 37 to IL 169.
|
098-46490
|
Executed
|
07/11/2018
|
|
|
2
|
3
|
Bureau, LaSalle
|
|
Remove and replace Raised Reflective pavement markers and reflectors on various routes in District 3.
|
099-46491
|
Executed
|
07/17/2018
|
|
|
2
|
3
|
DeKalb, Kendall, LaSalle
|
|
Remove and replace raised reflective pavement markers and reflectors on various routes in District 3.
|
100-46499
|
Executed
|
07/17/2018
|
|
|
4
|
7
|
Various
|
|
Repairing or replacing damaged or deteriorated overhead sign structures, components and supports at various locations throughout District 7.
|
101-46501
|
Rejected
|
06/27/2018
|
|
|
2
|
3
|
Ford, Iroquois, Livingston
|
|
Remove and replace raised reflective pavement markers and reflectors on various routes in District 3
|
102-60T01
|
Executed
|
07/11/2018
|
4 / 4 |
1 |
1
|
1
|
McHenry
|
|
Convert intersection of US 20 and Harmony Road to a roundabout.
|
103-62G31
|
Executed
|
07/16/2018
|
|
1 |
1
|
1
|
Various
|
|
Dead tree removal along expressway and arterial routes.
|
104-62G33
|
Executed
|
08/06/2018
|
|
|
1
|
1
|
Will
|
|
Resurfacing on I-80, from Will County line to the Des Plaines River, and on I-55 from the Des Plaines River to Weber Road.
|
105-64M66
|
Executed
|
07/17/2018
|
|
1 |
2
|
2
|
Winnebago
|
|
Repair bridge SN 101-0151 carrying Alpine Road over US 20.
|
106-64M70
|
Executed
|
07/16/2018
|
|
|
2
|
2
|
Various
|
|
Wash six bridges at various locations. SN 037-0021, 0022, 0128, 0149, 052-0063, 071-0088.
|
107-64M74
|
Executed
|
07/11/2018
|
2 / 2 |
1 |
2
|
2
|
Winnebago
|
|
Repair concrete parapet walls on SN 101-0133 and 0134 carrying I-39 over the Kishwaukee River.
|
108-66838
|
Executed
|
07/11/2018
|
|
|
2
|
3
|
Kendall
|
|
14,902 feet of milling and resurfacing on IL 25 from Kane County line to Waubon see Creek in Oswego. Includes mailbox turnouts, entrances, ADA improvements, and incidental HMA.
|
109-66B64
|
Executed
|
07/16/2018
|
4 / 4 |
2 |
2
|
3
|
Livingston
|
|
6.01 miles of rubblization, pavement reconstruction and structure repairs on I-55 from 1.7 miles south of IL 116 to 0.6 mile north of IL 23 at Pontiac.
|
110-66H25
|
Executed
|
07/11/2018
|
|
|
2
|
3
|
Grundy
|
|
Repair SN 032-0082 and 0083 carrying I-55 over Gooseberry Creek, 1 mile east of IL 47.
|
111-66H28
|
Executed
|
07/17/2018
|
|
|
2
|
3
|
Livingston
|
|
Repair SN 053-0120 and 0121 carrying I-55 over Rooks Creek, 1.1 miles north of the McLean County Line.
|
112-66H67
|
Executed
|
08/07/2018
|
|
|
2
|
3
|
Various
|
|
One year contract to furnish all labor, equipment and materials necessary to repair damaged guardrail, fence, attenuators, high tension cable median barriers, and other incidentals on work order basis throughout District 3.
|
113-66H68
|
Rejected
|
06/28/2018
|
|
|
2
|
3
|
DeKalb, Kendall
|
|
Guardrail end section replacement on various routes in DeKalb and Kendall Counties.
|
114-66J02
|
Executed
|
07/17/2018
|
|
|
2
|
3
|
Livingston
|
|
Various repairs to SN 053-0066 carrying IL 116 over Turdey Creek, 1.1 miles east of I-55.
|
115-66J05
|
Executed
|
07/12/2018
|
|
|
2
|
3
|
Bureau
|
|
Installation of 5.82 miles of high tension cable median barrier on I-80, from the 2750E Road overpass to the IL 89 overpass.
|
116-66J06
|
Executed
|
07/12/2018
|
|
|
2
|
3
|
Kankakee
|
|
Installation of 4.05 miles of high tension cable median barrier on I-57 from just north of Minnie Creek to 0.2 miles north of River Road.
|
117-66J17
|
Executed
|
07/11/2018
|
|
|
2
|
3
|
LaSalle
|
|
Intermittent milling and resurfacing in various locations in LaSalle County.
|
118-66J29
|
Executed
|
07/12/2018
|
|
|
2
|
3
|
Bureau, Grundy, LaSalle
|
|
Class A and Class B pavement patching and pavement marking on I-80 from the Henry/Bureau County line to the Grundy/Will County line.
|
119-66J30
|
Executed
|
07/17/2018
|
|
|
2
|
3
|
LaSalle
|
|
Class A pavement patching and pavement marking on I-39 from the Marshall/LaSalle County line to south of the Illinois River.
|
120-66J31
|
Executed
|
07/17/2018
|
|
|
2
|
3
|
Grundy, Livingston
|
|
Class A pavement patching and pavement marking from the McLean/Livingston County line to the Grundy/Will County line.
|
121-66J32
|
Executed
|
07/17/2018
|
1 / 1 |
1 |
2
|
3
|
Iroquois, Kankakee
|
|
Class A, B and C pavement patching and pavement marking on I-57 from the Ford/Iroquois County line to the Kankakee/Will County line.
|
122-68663
|
Executed
|
07/20/2018
|
2 / 2 |
1 |
3
|
4
|
Mercer
|
|
Remove and replace SN 066-0006 carrying IL 17 over the Edwards River.
|
123-68825
|
Executed
|
07/17/2018
|
1 / 1 |
|
3
|
4
|
McDonough
|
|
12.1 miles of partial pavement patching, cold milling, resurfacing, guardrail replacement and ADA ramp construction on IL 9 from the Hancock County line to US 67.
|
124-68C97
|
Deleted
|
05/09/2018
|
|
|
3
|
4
|
Tazewell, Woodford
|
|
Resurfacing on Bus 24 from east of Lynn Street in Washington to US 24 west of Eureka.
|
125-68D09
|
Executed
|
07/24/2018
|
|
1 |
3
|
4
|
Tazewell
|
|
Intersection reconstruction at US 24 and Spring Creek Road.
|
126-68D61
|
Executed
|
07/12/2018
|
|
|
3
|
4
|
Tazewell
|
|
550 feet of riprap slope repair and culvert lining along IL 116 from Mariner's Way to 0.5 mile south, in East Peoria.
|
127-68E00
|
Executed
|
07/12/2018
|
|
|
3
|
4
|
Tazewell
|
|
Building demolition at 500 West Pearl Street in Tremont.
|
128-68E03
|
Executed
|
07/16/2018
|
2 / 2 |
2 |
3
|
4
|
Peoria
|
|
Installation of traffic signals and an eastbound left-turn lane at the intersection of US 24 and Cameron Lane (IL 9).
|
129-68E10
|
Rejected
|
06/28/2018
|
|
|
3
|
4
|
Tazewell, Woodford
|
|
Patching on US 24 from the McClugage Bridge to Cummings Lane, and on IL 116 from the Upper Spring Bay to Lourdes (CH 19).
|
130-68E15
|
Rejected
|
06/28/2018
|
|
|
3
|
4
|
Peoria
|
|
2.7 miles of shoulder restoration along IL 6 from IL 40 to IL 29.
|
131-68E19
|
Executed
|
07/12/2018
|
|
|
3
|
4
|
Marshall, Woodford
|
|
28.4 miles of Class A pavement patching on I-39, from the McClean County line north to 2.1 miles south of IL 17.
|
132-68E38
|
Executed
|
07/12/2018
|
|
|
3
|
4
|
Various
|
|
Milling centerline and edgeline rumble strips, and replacing pavement markings on various routes throughout District 4.
|
133-68E39
|
Executed
|
07/12/2018
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations.
|
134-68E40
|
Executed
|
07/12/2018
|
|
|
3
|
4
|
Warren
|
|
0.6 mile of partial width resurfacing and longitudinal joint repair on US 34 from 160th Ave. to 0.4 mile east of 165th Ave. near Kirkwood.
|
135-70533
|
Executed
|
07/19/2018
|
1 / 1 |
|
3
|
5
|
McLean
|
|
600 feet of Bridge removal (demo) and replacement on Old US 66 over a stream just north of Lexington.
|
136-70D30
|
Executed
|
07/20/2018
|
|
|
3
|
5
|
Champaign
|
|
Paint bridge SN 010-0105 carrying 1200 N (W Old Church Rd.) over I-57, 2.5 miles west of Savoy.
|
137-70D31
|
Executed
|
07/12/2018
|
2 / 2 |
1 |
3
|
5
|
Champaign, Piatt
|
|
Guardrail improvements at 62 locations on various routes in Champaign and Piatt Counties.
|
138-72J96
|
Rejected
|
06/27/2018
|
|
|
4
|
6
|
Various
|
|
On-call repair of guardrail, cable median barrier, impact attenuators and fence at locations throughout District 6.
|
139-72K25
|
Executed
|
07/25/2018
|
|
|
4
|
6
|
Sangamon
|
|
Pipe culvert removal and replacement, and patching a various locations on Old US 54/36 and Old US 66.
|
140-72K48
|
Executed
|
07/25/2018
|
1 / 1 |
1 |
4
|
6
|
Christian, Logan, Sangamon
|
|
Installation of signs to designate pollinator habitat on various routes throughout District 6.
|
141-72K52
|
Executed
|
07/12/2018
|
1 / 1 |
1 |
4
|
6
|
Hancock
|
|
Bridge deck patching on 3 structures: 10 SN 034-0009 carrying IL 96/IL 9 over Spillman Creek, 2.5 miles west of Dallas City; 2) SN 034-0018 carrying IL 96 over the Riley Creek Branch, 3.8 miles east of Nauvoo; 3) SN 034-0030 carrying IL 96 over Chaney Creek, at the north edge of Hamilton.
|
142-72K58
|
Executed
|
07/25/2018
|
|
|
4
|
6
|
Sangamon
|
|
Tree removal at the Wabash Avenue/I-72 interchange, and on Business 55 from Carter Brothers to north of the Sherman overhead.
|
143-72K60
|
Executed
|
07/17/2018
|
|
|
4
|
6
|
Sangamon
|
|
Bituminous surface treatment at various locations in Sangamon County.
|
144-78644
|
Executed
|
07/12/2018
|
|
|
5
|
9
|
Jackson, Williamson
|
|
Centerline crack routing and sealing on IL 13 from Lewis Lane to Greenbriar Road.
|
145-78648
|
Executed
|
07/23/2018
|
|
1 |
5
|
9
|
Various
|
|
Crack sealing in various counties throughout District 9.
|
146-78654
|
Executed
|
07/12/2018
|
|
|
5
|
9
|
Various
|
|
Repair and replace damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. // ;
|
147-78655
|
Executed
|
07/17/2018
|
|
|
5
|
9
|
Various
|
|
Electrical repair and/or replacement at various locations throughout District 9
|
148-78670
|
Executed
|
07/12/2018
|
1 / 1 |
|
5
|
9
|
Franklin, Massac, Union
|
|
Tree removal on I-57 southbound in Franklin County, at the I-57 northbound Trial of Tears Rest Area in Union County, and at the I-24 Fort Massac Rest Area in Massac County.
|
149-46455
|
Executed
|
07/17/2018
|
|
|
5
|
9
|
Various
|
|
Repairing various widths of thermoplastic, preformed plastic, hot spray, urethane and polyurea pavement marking lines, letters and symbols and the removal of existing pavment markings on a work order basis throughuot District 9.
|
150-46492
|
Executed
|
07/17/2018
|
|
|
3
|
5
|
Champaign, Douglas
|
|
Restriping edge lines and at ramps on I-57 in Douglas and Champaign Counties. Includes some pavement grooving prior to striping.
|
151-46493
|
Executed
|
07/17/2018
|
|
|
3
|
5
|
Various
|
|
Restriping edge lines, railroad crossings and turn arrows at intersections on various routes in Champaign, Douglas, Edgar and Vermilion Counties. Includes some pavement grooving prior to striping.
|
152-60V55
|
Executed
|
07/19/2018
|
4 / 4 |
|
1
|
1
|
Lake
|
|
Widening, resurfacing and traffic signal modernization in the Village of Lindenhurst.
|
153-62D40
|
Executed
|
07/19/2018
|
|
1 |
1
|
1
|
Cook
|
|
Removal and replacement of the existing culverts on Kean Avenue in Palos Township.
|
154-66J16
|
Executed
|
07/12/2018
|
|
|
2
|
3
|
Bureau
|
|
6.16 miles of CL microsurfacing joint repair located 1.0 mile west of IL 26 to 0.6 mile east of I-80.
|
155-66J22
|
Executed
|
07/19/2018
|
|
|
2
|
3
|
Bureau
|
|
8,606.4 feet of milling resurfacing and paving existing shoulders on IL 40 from I-80 to US 34/US 6.
|
156-66J25
|
Executed
|
07/17/2018
|
|
|
2
|
3
|
Kankakee
|
|
Removal of 150 large trees and ground restoration along I-57.
|
157-66J26
|
Executed
|
07/17/2018
|
|
|
2
|
3
|
Bureau, DeKalb
|
|
Removal of 22 medium trees and 56 large trees, and ground restoration along I-80, IL 92, US 6, IL 72 and US 30.
|
158-68088
|
Rejected
|
06/27/2018
|
|
|
3
|
4
|
Tazewell
|
|
Scour mitigation to SN 090-0112 carrying Illinois Route 29 over Lost Creek, 1.5 miles south of Pekin.
|
159-68B59
|
Executed
|
08/07/2018
|
2 / 2 |
|
3
|
4
|
Knox, Peoria
|
|
Guardrail removal and culvert extensions at various locations on IL 8 and US 150, culvert replacement at Location 18 on US 150.
|
160-72K61
|
Executed
|
07/12/2018
|
|
|
4
|
6
|
Sangamon
|
|
Bituminous surface treatment on I-55 West Frontage Road south of Toronto Road.
|
161-76K44
|
Deleted
|
05/09/2018
|
|
|
5
|
8
|
Washington
|
|
4.7 miles of resurfacing and guardrail upgrade on IL 127 from Conservation Lake Road to the Perry County line.
|
162-76K88
|
Deleted
|
04/26/2018
|
|
|
5
|
8
|
Madison
|
|
5.7 miles of resurfacing plus 3' shoulders on IL 160 from the Madison/Clinton County line to Highland Road/Broadway in Highland.
|
163-64M60
|
Executed
|
07/17/2018
|
|
|
2
|
2
|
Henry, Rock Island
|
|
Wash eleven bridges in various locations: SN 037-0003, 0004, 0031, 0032, and 37-0100 in Henry County. SN 081-0089, 0125, 0159, 0160, 0161 and 081-0162 in Rock Island County.
|
164-64M93
|
Executed
|
07/17/2018
|
|
|
2
|
2
|
Various
|
|
Removal of dead trees along state maintained routes in District 2.
|
165-76G39
|
Executed
|
07/31/2018
|
2 / 2 |
1 |
5
|
8
|
St. Clair
|
|
Replacement, resurfacing, repair and painting of MLK bridge ramps over I-55/64 westbound, Missouri Avenue and railroad, 0.7 mile east of the Mississippi River (SN 082-6003, 6006, 0013, 0014, 0023, 0135, 0287, 0288, 0374 and 082-0315.
|
166-60M93
|
Executed
|
07/26/2018
|
|
1 |
1
|
1
|
Cook
|
|
Bridge work on SN 016-0276 carrying US 30 over Deer Creek. Work includes median removal and replacement, deck slab repair scarification and overlay.
|
167-60R73
|
Executed
|
07/26/2018
|
|
1 |
1
|
1
|
Cook
|
|
Bridge repair on SN 016-0702 carrying IL 171 (First Avenue) over Salt Creek in the Village of Lyons. Work includes deck overlay, slab and joint repair.
|
168-62F67
|
Executed
|
07/19/2018
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
3P resurfacing on I-55 East Frontage Road in the cities of Wilmington and Briadwood.
|
169-62G25
|
Executed
|
07/17/2018
|
|
|
1
|
1
|
Cook
|
|
Structural steel repairs on SN 06-0315 and 016-0991 carrying IL 43 over the sanitary and ship canal in the villages of Forest View and Lyons.
|
170-61E12
|
Executed
|
08/20/2018
|
|
1 |
1
|
1
|
DuPage
|
|
Sidewalk work on Covington Drive from Schick Road to Brighton Drive, and on Brighton Drive from Covington Drive to Army Trial Drive in the Village of Bloomingdale.
|
171-61E46
|
Executed
|
07/25/2018
|
|
1 |
1
|
1
|
Cook
|
|
Resurfacing, sidewalks, and curb and gutter on FAU Route 1596 (135th Steet) from Kostner Avenue to Claire Boulevard in the Village of Robbins.
|
172-61E56
|
Executed
|
08/31/2018
|
|
1 |
1
|
1
|
Cook
|
|
Sidewalk improvement and pedestrian signal maodifications on Sauk Trail from Karlov Avenue to Richton Square Road, on Governors Highway from Poplar Avenue to Sauk Trail, and on Richton Road from Sauk Trail to Poplar Avenue in the Village of Richton Park.
|
173-61E64
|
Executed
|
07/20/2018
|
|
|
1
|
1
|
Kane
|
|
Resurfacing Fau Route 2319 (Brier Hill Road) from North village limits to Big Timber Road in the Village of Hampshire.
|
174-61E75
|
Rejected
|
06/28/2018
|
|
1 |
1
|
1
|
Kane
|
|
Intersection improvement and channelization at the intersection of Kirk Road and Pine Street in the City of Batavia.
|
175-61E76
|
Executed
|
07/19/2018
|
|
1 |
1
|
1
|
Lake
|
|
Resurfacing, sidewalk replacement, curb and gutter replacement on FAU Rute 2758 (Moffett Road) from Sheridan Road to Center Avenue in the Village of Lake Bluff .
|
176-61E77
|
Executed
|
07/23/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing 223rd Street from Cornell Avenue to Torrence Avenue and Cornell Avenue from Sauk Trail to 223rd Street in the Village of Sauk Village.
|
177-61E79
|
Executed
|
07/25/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfcing FAU Route 1419 (Madison Street) from First Avenue to the Des Plaines River in the Village of Maywood.
|
178-61E81
|
Executed
|
07/17/2018
|
|
2 |
1
|
1
|
Lake
|
|
Sidewalk construction at various locations in the Village of Lake Zurich.
|
179-61E82
|
Executed
|
07/17/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Sherwood Road from LaGrange Road to Harding Avenue in the Village of LaGrange Park.
|
180-61E83
|
Executed
|
07/12/2018
|
|
1 |
1
|
1
|
Lake
|
|
Resurfacing Volo Village Road from Belvidere Road (IL 12) to Rand Road (US 12) in the Village of Volo
|
181-85668
|
Executed
|
07/25/2018
|
|
|
2
|
2
|
Rock Island
|
|
Resurfacing FAU Route 5771 (18th Avenue) from 17th Street to 46th Street in the City of Rock Island.
|
182-85669
|
Executed
|
08/09/2018
|
|
|
2
|
2
|
Stephenson
|
|
Sidewalk construction on Lena Street from West of Division Street to east of North Freedom Street in the Village of Lena.
|
183-85671
|
Rejected
|
06/27/2018
|
|
|
2
|
2
|
Rock Island
|
|
Concrete restoration of Knoxville Road from 78th Avenue to 134th Avenue.
|
184-99583
|
Executed
|
07/17/2018
|
1 / 0 |
|
5
|
9
|
Hardin
|
|
Replace the bridge carrying Basset School Road over Hosick Creek, 1.0 mile northeast of Elizabethtown.
|
185-99604
|
Executed
|
07/31/2018
|
3 / 1 |
1 |
5
|
9
|
Gallatin
|
|
Replace the bridge carrying CH 11 over North Fork Cypress Creek, 4.3 miles North of IL 13.
|
186-66D24
|
Executed
|
07/19/2018
|
4 / 4 |
1 |
2
|
3
|
Kendall
|
|
Reconstruct IL 71 to 4 lanes with a 22' median from IL 47 to IL 126 (1.7 miles) includes replacement of all drainage structures, installation of traffic signals and relocation of water main and sanitary sewer.
|
187-87690
|
Executed
|
08/08/2018
|
|
|
2
|
3
|
Bureau
|
|
Crack filling on various routes in Bureau County.
|
188-87701
|
Executed
|
07/19/2018
|
|
|
2
|
3
|
LaSalle
|
|
Widening and resurfacing CH32 from 0.25 mile west of East 27th Street Road to 0.25 mile east of East 27th Road.
|
189-89663
|
Executed
|
07/17/2018
|
|
|
3
|
4
|
Woodford
|
|
Resurfacing IL 117 from Eureka Avenue to Reagan Drive in the City of Eureka.
|
190-91560
|
Executed
|
08/02/2018
|
1 / 1 |
1 |
3
|
5
|
McLean
|
|
Resurfacing CH 5 from Lincoln Street in Saybrook to IL 54 in Bellflower.
|
191-93716
|
Executed
|
07/31/2018
|
2 / 2 |
2 |
4
|
6
|
Christian
|
|
Resurfacing, sidewalk, curb and gutter replacement on Walnut Street from Adams Street to Pleasant Street in the city of Taylorville.
|
192-95832
|
Executed
|
07/12/2018
|
2 / 0 |
|
4
|
7
|
Macon
|
|
Guardrail upgrade at various routes within Macon County.
|
193-46502
|
Rejected
|
06/27/2018
|
|
|
2
|
2
|
Various
|
|
Removing and Replacing Reflectors, removing and replacing damaged raised reflective pavement marker casting wihtin the limits shown.
|
194-74864
|
Executed
|
07/12/2018
|
|
|
4
|
7
|
Moultrie
|
|
Pavement patching, milling and HMA resurfacing on IL 121 from 04 miles east of the West Okaw River to 04 miles west of the West Okaw River.
|
195-85670
|
Executed
|
08/06/2018
|
|
|
2
|
2
|
Rock Island
|
|
Cold-in-place recycling and resurfacing on FAU Route 5851 (7th Street) from 26th Avenue to Avenue of the Cities in the City of East Moline.
|
196-87646
|
Executed
|
08/01/2018
|
|
|
2
|
3
|
Ford
|
|
Resurfacing FAS Route 1346 (CH 5) from 1200 E. Road to US 45.
|
197-91544
|
Executed
|
07/31/2018
|
1 / 0 |
|
3
|
5
|
Vermilion
|
|
Bridge replacement on TR 222 over Fayette Creek, 4.5 miles southwest of Catlin.
|
198-91553
|
Executed
|
07/19/2018
|
|
|
3
|
5
|
Champaign
|
|
Resurfacing FAS Route 523 (CH 13) from CH 15 to the Champaign County line.
|
199-93713
|
Executed
|
07/25/2018
|
|
|
4
|
6
|
Cass
|
|
Resurfacing, curb and gutter, sidewalk, and ADA improvements on FAU Route 7778 (Wall Street) from 4th Street to 15th Street in the city of Beardstown.
|
200-93715
|
Executed
|
07/17/2018
|
|
|
4
|
6
|
Adams
|
|
HMA surface removal and overlay on FAS Route 1592/FAU Route 7825 (CH 21) from Nieders Lane to Ghost Hollow Road and from Payson Road to Nieders Lane.
|
201-95834
|
Executed
|
08/02/2018
|
1 / 0 |
|
4
|
7
|
Shelby
|
|
Repalce the bridge carrying TR 312 over an unnamed stream, 3.6 miles west of Strasburg.
|
202-95835
|
Executed
|
07/25/2018
|
3 / 1 |
|
4
|
7
|
Cumberland
|
|
Guardrail improvements at various locations in Cumberland County.
|
203-95836
|
Executed
|
07/24/2018
|
2 / 1 |
|
4
|
7
|
Macon
|
|
Bridge replacement and approach work on FAS Route 546 (CH 21) at South Fork Creek, 3 miles northwest of Warrensburg
|
204-95837
|
Executed
|
07/19/2018
|
|
|
4
|
7
|
Effingham
|
|
Resurfacing CH 19 from East State Street to IL 33.
|
205-95838
|
Executed
|
07/24/2018
|
2 / 0 |
|
4
|
7
|
Macon
|
|
Bridge replacement and approach work on FAU Route 7455 (Kruse Road) at Big Creek, 1.5 miles northeast of Mt. Zion.
|
206-95839
|
Rejected
|
06/28/2018
|
1 / 0 |
|
4
|
7
|
Crawford
|
|
replace the bridge carrying TR 193 over Dogwood Creek, 2.0 miles southeast of Oblong.
|
207-97673
|
Executed
|
07/19/2018
|
|
|
5
|
8
|
Monroe
|
|
Resurfacing FAS Route 857 (Ames Road) from Old Il Route 3 to VV Road.
|
208-99576
|
Executed
|
07/12/2018
|
1 / 0 |
|
5
|
9
|
Saline
|
|
Replace the bridge carrying Garner Road over Brush Creek, 3.5 miles northeast of Eldorado.
|
209-99597
|
Executed
|
07/25/2018
|
|
1 |
5
|
9
|
Franklin
|
|
Resurfacing and crushed stone shoulders on FAS Route 874 (Logan Road) from IL 34 to IL 149.
|
210-76K77
|
Executed
|
07/31/2018
|
|
|
5
|
8
|
St. Clair
|
|
2.3 miles of resurfacing and ADA upgrades on IL 157 from Petroff Drive in Caseyville to Conrail Bridge.
|
211-76L05
|
Executed
|
07/12/2018
|
3 / 3 |
1 |
5
|
8
|
Various
|
|
Replace steel plate beam guardrail and terminal end sections at various locations.
|
212-61E53
|
Executed
|
07/25/2018
|
8 / 7 |
1 |
1
|
1
|
McHenry
|
|
Pavement widening, reconstruction and resurfacing, storm sewers, ADA sidewalks, curb and gutter, box culvert construction, pedestrian underpass and path, retaining walls, traffic signal installation and modernization, lighting, and pavement markings on FAP 336 (Randall Road) from Harnish Drive to north of Polaris Drive/Alcorn Lane and on Algonquin Road from Harvest Gate/Talaga Drive easterly to east of Crystal Lake Avenue. Project is located in the villages of Lake in the Hills and Algonquin.
|
213-61E80
|
Executed
|
07/25/2018
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing, traffic signals, and sidewalk installation and/or replacement on Benedictine Avenue from Abbeywood Drive to Maple Avenue in the village of Lisle.
|
214-64M71
|
Executed
|
07/17/2018
|
|
|
2
|
2
|
Rock Island, Whiteside
|
|
Washing three bridges over the Mississippi River. SN 081-0106, 081-9905 and 098-6003.
|
215-87654
|
Executed
|
08/27/2018
|
|
|
2
|
3
|
Bureau
|
|
Roadway reconstruction on FAU Route 5647 (Euclid Avenue) from Elm Place to Central Avenue in the city of Princeton.
|
216-99599
|
Executed
|
07/25/2018
|
|
|
5
|
9
|
Williamson
|
|
Resurfacing with HMA shoulders and pavment marking on FAS Route 903 (Corinth Road) from the Johnston City limits to Paulton Road.
|
217-62F40
|
Executed
|
07/31/2018
|
|
1 |
1
|
1
|
Cook
|
|
Replace the existing Programmable Logic Controllers for the Kennedy Expressway Reversible Lane Control system.
|
218-62F70
|
Withdrawn
|
05/21/2018
|
|
|
1
|
1
|
Cook
|
|
Pavement grooving of existing PCC pavement on Kennedy Expressway from south of Kimball Avenue to north of Addison Street in the city of Chicago.
|
219-74436
|
Executed
|
07/25/2018
|
|
|
4
|
7
|
Moultrie
|
|
Patching, riprap, earthwork, removal of a one span bridge and replacing with a box culvert on IL 133, 2.5 miles east of Lovington (SN 070-0027)
|
220-87681
|
Executed
|
07/12/2018
|
|
|
2
|
3
|
Livingston
|
|
Painting and tuckpointing at the historic Train Depot in the Village of Dwight.
|
221-60P55
|
Executed
|
07/31/2018
|
5 / 3 |
|
1
|
1
|
Will
|
Mandatory
|
Local centralized control and operation of the six movable bridges from Ruby Street to Brandon Road in the City of Joliet
|
222-46467
|
Executed
|
08/07/2018
|
|
|
2
|
2
|
Various
|
|
Replacing reflectorized guardrail markers, prismatic curb reflectors, barrier wall markers, and placing linear delineator panels as specified by indivisual work orders.
|
223-46495
|
Executed
|
07/12/2018
|
|
|
3
|
4
|
Various
|
|
Replacing damaged raised reflective pavement markers on various highways throughout Districts 4 and as directed by the Engineer.
|
224-64H61
|
Executed
|
07/19/2018
|
|
|
2
|
2
|
Ogle
|
|
HMA resurfacing on IL 251 from the Winnebago county line to 0.3 mile north of Flagg Road.
|
225-64K24
|
Executed
|
07/27/2018
|
1 / 1 |
1 |
2
|
2
|
Jo Daviess
|
|
HMA resurfacing on IL 84 from US 20 to Duke Creek north of Hanover.
|
226-66A21
|
Executed
|
07/19/2018
|
|
|
2
|
3
|
Bureau
|
|
Remove structure SN 006-0106 and replace with a 70' 3-span structure to carry IL 89 over Brush Creek, 1.2 miles south of Arlington.
|
227-68D69
|
Executed
|
07/19/2018
|
|
1 |
3
|
4
|
Tazewell
|
|
0.97 mile of patching, milling and resurfacing on US 24/IL 29 from Margaret Drive to north of Lasalle Boulevard in Creve Coeur.
|
228-70C99
|
Executed
|
07/12/2018
|
|
|
3
|
5
|
McLean
|
|
Bridge joint repair on various structures along I-55/I-74 in Bloomington/Normal.
|
229-74801
|
Executed
|
07/12/2018
|
|
|
4
|
7
|
Various
|
|
Repair or replace existing guardrail and traffic barrier terminals in District 7 on a work order basis.
|
230-78590
|
Withdrawn
|
05/15/2018
|
|
|
5
|
9
|
Saline
|
|
16.3 miles of tree pruning along US 34 and US 45.
|
231-95765
|
Executed
|
07/25/2018
|
2 / 1 |
1 |
4
|
7
|
Macon
|
|
Construction of a multi-use path along Baltimore Avenue from East Lost Bridge Road to Harryland Road in Decatur.
|
232-97671
|
Executed
|
07/31/2018
|
|
|
5
|
8
|
Madison
|
|
Resurfacing Berkshire Boulevard from 0.05 mile west of Tomlinson Street to 0.04 mile east of Valley Drive in the City of East Alton.
|
01A-SD059
|
Executed
|
10/22/2018
|
2 / 2 |
1 |
5
|
8
|
St. Clair
|
|
Reconstruct Access Road (Curtiss Steinberg Drive)
|
02A-RC007
|
Executed
|
09/05/2018
|
|
|
2
|
2
|
Ogle
|
|
Reconstruct the Existing Ramp Area Designated R/2
|
03A-RA016
|
Executed
|
11/21/2018
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
Reconstruct and realign Taxiway E at the west end of the intersection with Runway 9-27
|
05A-FR041
|
Rejected
|
07/10/2018
|
|
|
2
|
2
|
Stephenson
|
|
Construction of New Electrical Vault
|
06A-SH028
|
Executed
|
10/19/2018
|
|
|
1
|
1
|
Cook, DuPage
|
|
Construct PCC T-Hangar Headers and PCC Drainage Swales on T-hangar Taxiways
|
07A-PE002
|
Executed
|
09/20/2018
|
|
|
3
|
4
|
Peoria
|
|
Rehabilitate Hanna City T-Hangar Taxiway Pavements
|
08A-MP009
|
Executed
|
09/04/2018
|
|
|
5
|
9
|
Massac
|
|
Replace the existing Class E fence in the Terminal Area
|
09A-CS006
|
Executed
|
09/20/2018
|
|
|
4
|
7
|
Clark
|
|
Rehabilitate West Apron and T-Hangar Pavement
|
10A-SP025
|
Rejected
|
08/21/2018
|
|
1 |
5
|
8
|
Randolph
|
|
Mill and Overlay T-Hangar Taxilanes; Construct Pavement Surrounding the New T-Hangar Building; Construct New 7-Unit T-Hangar
|
11A-SD060
|
Executed
|
10/03/2018
|
|
|
5
|
8
|
St. Clair
|
|
Update Pavement Marking Configurations at Runway Holding Positions on Taxiways
|
12A-VE053
|
Executed
|
09/20/2018
|
|
|
3
|
5
|
Vermilion
|
|
Rehabilitate Taxiway D between Runway 3 and 34
|
1LR-M1713
|
Active
|
05/08/2018
|
|
|
0
|
0
|
Christian
|
Voluntary
|
Reclamation of the Peabody No. 10 Phase III abandoned mine site by the Department of Natural Resources using federal Abandoned Mined Lands Funds.
|