Home > Notice of Letting

January 21, 2022 Letting 12:00 PM
Notice of Letting
Volume 024, No. 050

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-62D49 Executed 02/25/2022 2 / 2 3 1 1 Will Scope of work consists of bridge replacement of the structure that carries IL lover Deer Creek with a two-cell cast-in-place culvert. Also included are sheet-pile wingwall installation, concrete curb and gutter.
002-62H49 Executed 02/22/2022 16 / 16 4 1 1 Cook (0.989-Mile) Bridge new deck, widening, bridge repair scour mitigation and lighting in the City of Countryside and the Villages of Willow Springs, Justice and Hodgkins.
003-62K99 Executed 02/25/2022 1 / 1 3 1 1 DuPage (1,562-Ft) Intersection improvement and signal installation project including HMA surface removal, pavement widening, pavement resurfacing, and traffic signal installation in the City of West Chicago.
004-62L19 Deleted 12/01/2021 1 1 Cook (1.987-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements etc. Loc.: FAU 2714: 25th Ave, I-290 (Eisenhower Expwy) to 26th St in the Villages of Broadview and Forest Park. , (1.987-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements etc. Loc.: FAU 2714: 25th Ave, I-290 (Eisenhower Expwy) to 26th St in the Villages of Broadview and Forest Park.
005-62M54 Executed 02/25/2022 1 / 1 2 1 1 Cook (1,334-Ft) Bridge rehabilitation project on the four bridges that carry I-57 over I-80. The work includes deck overlay with latex concrete, substructure repair and reconstruction and patching of bridge approaches located within the City of Country Club Hills.
006-62N18 Executed 04/26/2022 1 1 Various Expressway mowing south.
007-62N28 Executed 02/22/2022 1 / 1 2 1 1 Will (1,000-Ft) Culvert replacement located on US 52 (Cedar Road) over Ditch N of Forked Creek (2 .9 Ml S of Hoff Roda) in the unincorporated Wilton Township.
008-62P18 Executed 02/22/2022 2 1 1 Cook Designed Overlay project on IL 43 (Harlem Ave.) at 26th Street and continues northerly direction for (4.49 mile) to south of IL 64 North Ave located in the City of Berwyn and the Villages of Forest Park, North Riverside, Oak Park, River Forest, and Riverside.
009-62P23 Executed 02/22/2022 1 1 Cook (378.5-Ft) Cleaning and painting designated steel surfaces of bridge structure carrying Ashland Ave over Calumet Sag Channel in the City of Blue Island and Village of Calumet Park. Calumet Township, SN 016-0 294.
010-62P28 Executed 02/23/2022 1 1 Various This project is located on various routes at 12 weigh stations through District One within Cook, Dupage, Lake, McHenry and Will Counties. The scope of work includes weigh station scale pit cleaning and various vegetation maintenance work.
011-62P29 Executed 02/25/2022 3 / 3 2 1 1 Cook (813-Ft) Bridge Preservation Project including partial bridge deck patching, approach slab scarification and overlay, expansion joints replacement, substructure repairs and underpass lighting replacement located on the bridge carrying 127th St over I-57 in the City of Calumet Park.
012-62P35 Withdrawn 01/11/2022 1 / 1 1 1 1 Will This project is located at various locations along US Rte. 6, US Rte. 30, US Rte. 52 and IL Rte. 7 in the City of Joliet in Will County. The ADA improvement includes sidewalk removal, combination concrete curb and gutter removal and replacement and installation of concrete sidewalk.
013-62P85 Executed 02/23/2022 1 1 Cook Improvement consists of pigeon abatement on existing steel structures at 2 locations along 1-90/94 (Kennedy Expressway) at IL-19 (Irving Park Road) in the City of Chicago in Cook County. SN 016-0115, SN 016-0116.
014-64J63 Executed 03/25/2022 1 2 2 Stephenson Removal and replacement of two (2) concrete box culverts carrying IL 75 over drainage ditches: SN 089-1047 located 0.2 mile East of Tower Road, and SN 089- 1048 located 0.4 mile East of Tower Road.
015-64N03 Executed 02/22/2022 1 2 2 Stephenson Removal and replacement of concrete bridge deck on the structure (SN 089-0043) carrying IL 26 over Cedar Creek North of Cedarville.
016-64N48 Executed 04/15/2022 1 2 2 Boone Replace existing ESN 004-1022 box culvert with a double, cast-in-place double 10'x5' box culvert (PSN 004-1030) including a patch. The roadway template will accommodate a future reconstruction of the IL 173 at IL 76 intersection.
017-64P16 Executed 02/22/2022 1 2 2 Jo Daviess Cold-milling, pavement patching, hot-mix asphalt resurfacing, removing and replacing damaged curb and gutter, and removing and replacing damaged inlet lids.
018-64P84 Executed 02/22/2022 7 / 7 2 2 2 Winnebago Bridge deck overlay I-39/US 51 over the Kishwaukee River (SN 101-0133 and 101-0134).
019-64P88 Executed 02/22/2022 11 / 10 3 2 2 Ogle Bridge deck overlay, deck repairs and joint repairs on structure carrying IL 64 over I-39/US 51 (SN 071-0055).
020-64R31 Executed 02/22/2022 1 / 1 1 2 2 Rock Island Bridge expansion joints and steel repairs on SN's 081-0007 and 081-0008 carrying I-74/280 over Shaeffer Creek.
021-66L94 Deleted 12/08/2021 2 3 LaSalle This project is located at the Interchange of I-39 and I-80 in LaSalle County. This project Consists of removing existing asphalt shoulders, excavating and grading existing shoulders, placement of Hot-Mix Asphalt Shoulders, pavement striping, delineators and other related construction items on the North "Inner Loops" of the interchange.
022-66L98 Executed 02/25/2022 1 2 3 LaSalle This project is located at Structure No. 050-0215 carrying FAP 653 (IL 18) over FAI 39 (I-39) approximately 1.05 miles North of the Marshall County Line.
023-68G59 Executed 02/22/2022 1 3 4 Peoria Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River.
024-68G75 Executed 02/22/2022 3 4 Peoria, Tazewell Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County.
025-70755 Executed 02/22/2022 1 / 1 3 5 Piatt Culvert replacements of SN 074-8052 and SN 074-8054 on FAS 1517 (US 150) at 1.7 and 2.6 miles E of Dewitt Co. Line. Gross Length=Net Length= 0.014 miles 71.5ft.
026-70D64 Rejected 02/04/2022 1 / 1 1 3 5 McLean Bridge deck overlay on I-55 from N of Lexington to Livingston Co. line for a gross length of 9.96 miles.
027-70D89 Executed 03/07/2022 3 / 3 3 5 Vermilion Guardrail improvements at 30 Locations on Various Routes in Vermilion County.
028-70E48 Executed 02/22/2022 5 / 5 2 3 5 Champaign Bridge Deck repairs S.N. 010-0027, 0028, 0029, 0030.
029-70E74 Executed 02/22/2022 3 5 McLean Bridge painting at 10 structure locations on FAI-74 and FAI-39 in McLean County.
030-70F40 Executed 02/28/2022 1 3 5 Champaign, Douglas 9.194 Miles of Smart Resurfacing from Madison Street in Philo to NCL of Villa Grove.
031-72A26 Active 11/16/2021 1 / 1 1 4 6 Christian Bridge deck replacement on SN 011-0010 and full bridge replacement of SN 011-0011, both located on IL 29 southeast of Taylorville.
032-72F99 Executed 02/22/2022 1 / 1 2 4 6 Hancock 5 miles of resurfacing, parking lanes, guardrail and ADA improvements on IL 61 from IL 101 in Augusta through Plymouth to the McDonough County line.
033-72L55 Executed 02/22/2022 1 4 6 Macoupin 6.8 miles of cold in-place recycling standard overlay on IL 138 from IL 159 to Sawyerville Hills Road, 0.9 miles east of Wilsonville.
034-72L59 Executed 03/07/2022 2 4 6 Montgomery Patching and resurfacing on I-55 West Frontage Road from Waggoner Avenue, east of Waggoner, to 0.1 miles south of Macoupin Creek, south of Farmersville.
035-72M19 Executed 02/22/2022 4 / 4 1 4 6 Adams 6.5 miles of pavement preservation with cape seal and fog sealing shoulders on IL 110/336 from US 24 to just north of IL 61.
036-72M20 Executed 02/22/2022 2 / 2 1 4 6 Hancock 8.3 miles of micro-surfacing, cape seal of pavement and fog seal of shoulders on IL 10 from 3 miles east of Carthage to the McDonough County line.
037-72M27 Executed 02/23/2022 1 / 1 2 4 6 Pike Bridge deck overlay on IL 96 over Two Mile Creek, 1.6 miles south of US 54, and on IL 96 over Six Mile Creek, 1 mile northwest of Pleasant Hill. (SN 075-0075 and SN 075-0045)
038-72M65 Executed 02/23/2022 2 4 6 Scott Bridge joint repair and replacement with a microsilica deck overlay on IL 100 over Wolf Creek, 1 mile south of Norfolk Southern in Bluffs; Microsilica deck overlay on IL 100 over Eagle Run Creek, 1.4 miles south of the Morgan County line. (SN 086-0006 and 086-0046)
039-72M67 Executed 02/22/2022 1 / 1 4 6 Cass Bridge joint repair and replacement with a microsilica deck overlay on IL 100 / US 67 over Indian Creek, 3.9 miles north of the Morgan County line. (SN 009- 012)
040-72M87 Executed 03/02/2022 4 6 Various Weed spraying along I-55 and I-72 in various counties.
041-72N06 Executed 02/22/2022 4 6 Logan Bridge painting on SN 054-0059 carrying County Highway 2 over I-55, 3.1 miles east of I-155.
042-72N10 Executed 02/23/2022 1 4 6 Sangamon 3.9 miles of longitudinal joint repair, partial width resurfacing and patching on Wabash Avenue from west of Robbins Road to MacArthur Boulevard and on MacArthur Boulevard from Wabash Avenue to South Grand Avenue.
043-74440 Executed 03/07/2022 1 / 1 2 4 7 Lawrence Bridge deck replacement on US 50 over State Street in Lawrenceville. (SN 051-0010)
044-74596 Executed 02/22/2022 8 / 8 2 4 7 Macon Complete replacement of bridge decks, abutments, steel girders and approach slabs, using cross-overs, on IL 105 over Lake Decatur. (SN 058-0047 and 058-0048)
045-74860 Executed 02/22/2022 4 7 Lawrence Replacing the structure carrying IL 1 over Big Slough, 5 miles south of Lawrenceville, with a triple barrel box. (SN 051-0008)
046-74905 Executed 02/23/2022 1 4 7 Moultrie, Shelby Patching, overlay, ditch cleaning and upgrading two field entrance culverts on IL 128 from Bruce/Findlay Road to the Bethany Blacktop.
047-74966 Executed 02/22/2022 1 4 7 Clark 1.5 miles of designed overlay on US 40 from the Cumberland County line to west of IL 49.
048-74A74 Executed 02/22/2022 4 7 Coles, Effingham Lighting upgrades to LED on I-57 at US 45 and at IL 16 in Mattoon and at the northbound Green Creek Rest Area.
049-76P18 Executed 03/04/2022 5 8 Madison 7.9 miles of crack and joint sealing on IL 157 from IL 140 to IL 143.
050-76P20 Executed 02/22/2022 5 8 Clinton Crack and joint sealing on Slant Road from IL 161 to IL 127.
051-76P21 Executed 03/04/2022 5 8 Bond 7.5 miles of crack and joint sealing on IL 127 from Sale Barn Avenue to 0.6 miles north of the Clinton County line.
052-76P34 Executed 02/22/2022 5 8 St. Clair Traffic signal modernization, flashing yellow arrows, on IL 161 from IL 159 to the YMCA and SWIC entrances.
053-76P37 Executed 02/22/2022 1 5 8 St. Clair 1.8 miles of resurfacing on IL 161 from St. Clair Avenue to 0.1 miles east of Dutch Hollow Road.
054-76P39 Executed 02/22/2022 1 / 1 2 5 8 Madison 4.6 miles of overlay on IL 111 / IL 140 from Annex Street to 0.1 miles west of IL 11 in Bethalto.
055-76P41 Executed 02/22/2022 1 5 8 Bond 2.8 miles of overlay on US 40 from 0.1 miles west of Overpass Road to 0.3 miles west of IL 127.
056-76P83 Executed 02/22/2022 5 8 St. Clair 1.4 miles of patching on Old IL 13 from New Athens / Darmstadt Road to IL 13.
057-76P87 Executed 02/22/2022 1 5 8 Bond 6.7 miles of patching on I-70 from the Madison County line to Sugar Loaf Road.
058-76P88 Executed 02/23/2022 1 5 8 St. Clair 10.7 miles of patching on I-64 from IL 159 to IL 4.
059-76R05 Executed 02/22/2022 5 8 Various Highway lighting, traffic signal repair and maintenance at various locations in District 8.
060-78595 Executed 02/22/2022 1 / 1 1 5 9 Jackson Removing a single span bridge on US 51 in Elkville with a 12x7 cast-in-place concrete box culvert. (SN 039-0002)
061-78849 Executed 02/22/2022 6 / 6 2 5 9 Johnson 10.5 miles of resurfacing, pipe underdrain work and bridge deck overlays on 12 bridges, on I-24 from 0.5 miles north of US 45 to the Massac County line.
062-78850 Executed 02/22/2022 1 / 1 1 5 9 Pulaski Slope repair on I-57 near mile post 14 southbound, south of Ullin.
063-78876 Executed 02/22/2022 1 5 9 White Bridge repairs to SN 097-0024 carrying US 45 over LandN Railroad in Enfield.
064-78888 Executed 02/22/2022 1 5 9 Jackson 6 miles of resurfacing on IL 13 from Orchard Drive in Carbondale to Old IL 13 and eastbound lanes only on IL 13 from Old IL 13 to the Big Muddy Bridge in Murphysboro.
065-78904 Executed 03/02/2022 1 / 1 1 5 9 Jefferson 5.8 miles of HMA surface removal, HMA resurfacing and patching on I-64 from 2.8 miles east of IL 142 to the Wayne County line.
066-61G71 Executed 03/04/2022 2 / 2 3 1 1 Cook Roadway reconstruction and lighting on Proviso Drive from the Union Pacific Rail Yard entrance to Wolf Road in Berkeley.
067-61H19 Executed 02/25/2022 1 1 DuPage Construction of a bike path along the North Central DuPage Regional Trail, from the Illinois Prairie Path to Forest Preserve Drive, in the Villages of Wayne and Bartlett.
068-61H29 Executed 03/08/2022 2 / 2 1 1 1 DuPage Geometric improvements and traffic signal modernizations at four intersections along 75th Street at Millbrook Drive, Modoff Road, Olympus Drive and Green Road in Naperville.
069-61H37 Executed 03/07/2022 2 1 1 DuPage Resurfacing Foster Avenue from Central Avenue to Spruce Avenue in Wood Dale
070-61H43 Executed 03/16/2022 1 1 1 Kane Resurfacing Spring Street from McLean Boulevard to La Fox Steet in Sourth Elgin .
071-61H53 Executed 03/08/2022 1 / 1 2 1 1 McHenry Resurfacing Mason Hill Road from 650' west of Cherry Valley Road to Crystl Lake Road in Bull Valley.
072-61H54 Executed 02/22/2022 2 1 1 McHenry Resurfacing Ringwood Road from the village limits north of McCullom Lake Road to a point 2,066 feet north of the village limits of Ringwood.
073-62N41 Deleted 12/02/2021 1 1 Will (1,195-Ff) Removal of existing 4-span bridge along Shepley Road over I-80 in Will County, IL and replacement with a 2-span 264'-00" long, 36'-10" out to out wide bridge. Bridge approach roadway improvements include pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control. , (1,195-Ff) Removal of existing 4-span bridge along Shepley Road over I-80 in Will County, IL and replacement with a 2-span 264'-00" long, 36'-10" out to out wide bridge. Bridge approach roadway improvements include pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control.
074-62N44 Executed 02/22/2022 1 / 1 3 1 1 McHenry (3.00-Mile) SMART overlay and ADA improvements on Virginia St/Northwest Hwy from Crystal Lake Av to Pingree Rd. located in the City of Crystal Lake.
075-62N56 Executed 02/22/2022 2 / 2 4 1 1 McHenry (1.79-Mile) SMART overlay along IL 31 from S of McCullom Lake Road to Johnsburg Road located in the City of McHenry and the Village of Johnsburg.
076-62P86 Executed 02/22/2022 1 1 Will The improvement consists of cleaning(sweeping} various arterial highways in District One throughout Will County.
077-72E46 Deleted 12/02/2021 4 6 Logan Milling and resurfacing on IL 10 from 0.1 miles east of the Mason County line to 2.5 miles east of New Holland and culvert replacement at a ditch 0.8 miles east of the Mason County line. (SN 054-7009)
078-72F91 Executed 02/23/2022 2 4 6 Morgan 1.4 miles of resurfacing, shoulder work, gutter removal and replacement and pipe culvert removal and replacement on IL 267 from south of Woodson to the Greene County line.
079-72M18 Executed 02/23/2022 1 / 1 1 4 6 Montgomery, Sangamon 5.4 miles of standard overlay on I-55 south of the Sangamon / Montgomery County line to Brush Creek 0.7 miles south of IL 104 and on Brown Street / East Divernon Road east of State Street in Divernon to 0.1 miles east of Sullivan Road.
080-72N18 Executed 02/22/2022 1 4 6 Sangamon Patching on I-55 from the Montgomery County line to Exit 105, north of Sherman.
081-74A79 Executed 03/11/2022 4 7 Lawrence, Richland 10 miles of patching on US 50 from 0.6 miles west of Ste Marie Road to Sumner.
082-74A80 Executed 02/23/2022 4 7 Fayette Patching on I-70 from mile post 60 to mile post 74.
083-74A77 Executed 02/23/2022 1 / 1 4 7 Macon 2.9 miles of patching on IL 48 from 0.1 miles north of I-72 to Pershing Road in Decatur.
084-85715 Executed 02/23/2022 3 / 3 2 2 2 Winnebago Replace the double cell box culvert with a single cell box culvert over Sugar Creek, 6.0 miles northeast of Durand.
085-85717 Executed 02/23/2022 4 / 4 3 2 2 Stephenson Replace the existing box culvert over Cedar Creek, 2.5 miles north of Dakota, with a triple cell box culvert.
086-85718 Executed 02/23/2022 1 2 2 Lee Resurfacing Franklin Road from west city limits of Franklin Grove to US 30, and Gap Road from IL 38 to Franklin Road.
087-85719 Executed 02/16/2022 2 2 Stephenson Cold-in-Place Recycling on Fairgrounds Road from south of Forest Road to IL 26, and on Florence Road from 1250' west of Clover Road to IL 26.
088-95898 Executed 02/23/2022 4 7 Clay Replace the bridge carrying TR 373 over Nickolson Creek, 0.5 mile west of Xenia
089-97765 Executed 02/23/2022 3 / 3 1 5 8 Randolph Resurfacing CH5/CH2 from Rockcastle Road to IL 3.
090-97768 Executed 02/23/2022 1 5 8 Madison Resurfacing Brown Street from Main Street to Worden Avenue in Alton.
091-61E87 Executed 03/08/2022 6 / 6 2 1 1 DuPage Reconstruct the intersection of 87th Street and Woodrige Avenue in Woodridge. Work consists of Pavement widening, resurfacing, storm sewer, curb and gutter, Sidewalks, traffic Signals, lighting and pavment Markings.
092-61F88 Executed 02/23/2022 2 1 1 DuPage Sidewalk improvement on IL 53 from Hobson Road to Mulligan Drive in the Village of Woodridge. , Sidewalk removal and replacement, curb and gutter replacement, installation of pedestrian traffic signals and pavement markings on IL 53 from Hobson Road to Mulligan Drive in Woodridge.
093-61H35 Executed 02/23/2022 1 1 1 Kane Reconfirguration of the ATC East Parking Lot to improve vehical and pedestrian traffic flow and to add additonal parking to lot on Spring Street between the BNSF Metra Line and the BNSF Railroad in Aurora.
094-61H36 Executed 03/07/2022 1 1 1 DuPage Pavement reconstruction and resurfacing on Garfield Street from Hindsdale Avenue to 55th Street in Hinsdale.
095-61H41 Executed 03/11/2022 1 1 1 Kane Resurfacing, Curb and Gutter, Sidewalk replacement and pavement markings on Indian Trail from Farnsworth Avenue to the DuPage County line in Aurora.
096-61H45 Withdrawn 12/16/2021 1 1 Lake Pavement reconstruction, curb and gutter, Sidewalk replacement, storm sewer, drainage structures and pavment marking on Brandywyn Lane from Deerfield Pkwy to Thompson Boulevard, and on Thompson Boulevard from Arlington Heights Road to Brandywyn Lane in Buffalo Grove. , Pavement reconstruction, curb and gutter, Sidewalk replacement, storm sewer, drainage structures and pavment marking on Brandywyn Lane from Deerfield Pkwy to Thompson Boulevard, and on Thompson Boulevard from Arlington Heights Road to Brandywyn Lane in Buffalo Grove.
097-61H48 Executed 03/07/2022 1 1 1 Kane Resurfcing, curb and gutter replacement and sidewalk replacement on East New York Street from Ohio Street to Farnsworth Avenue in Aurora.
098-62H06 Executed 02/23/2022 1 / 1 2 1 1 Lake (2.810-Mile) Standard Overlay and ADA improvements along Grand Ave. from IL-131 to IL-137 (Amstutz Expy.) in the City of Waukegan.
099-62H38 Withdrawn 01/18/2022 3 / 3 2 1 1 Cook (2,600-Ft) Resurfacing, drainage improvement, and retaining wall construction from Nicholas Drive to Western Avenue, also includes HMA milling and paving, PCC pavement removal and placement, and storm sewer and drainage structure installation located in the City of Des Plaines. , (2,600-Ft) Resurfacing, drainage improvement, and retaining wall construction from Nicholas Drive to Western Avenue, also includes HMA milling and paving, PCC pavement removal and placement, and storm sewer and drainage structure installation located in the City of Des Plaines.
100-62N59 Executed 02/23/2022 2 / 2 2 1 1 Kane (7.05-Mile) SMART Overlay project consists of roadway resurfacing, patching, aggregate shoulders, and centerline rumble strips. The project is along IL 47 from Big Timber Rd to Plato Rd in the Villages of Hampshire, Huntley, and Pingree Grove.
101-62N71 Executed 02/23/2022 1 / 1 3 1 1 Cook (1,569-Ft) Designed Overlay and ADA improvements along Addison Street from Halsted Street to US 41 (Lake Shore Dr.) in the City of Chicago.
102-62N87 Withdrawn 01/11/2022 1 1 1 Will This is a curb ramps for sidewalks ADA improvement project, consisting of sidewalk removal and replacement, comb. conc. curb and gutter removal and replacement and collateral and incidental work at various locations along US Route 6, 30, 52 and IL Routes 7 and 171 in the City of Joliet in Will County.
103-62P56 Executed 02/23/2022 1 1 Cook, Will This project consists of cleaning and painting of steel bridge structures at 5 locations. SN-0016-0048 and 0049 structures carrying 1-57 NB and SB over RR, Rich Township, Cook County. SN-099-0005; 0286 and 0304 structures carrying 1-55 NB and SB over RR and creek, in Wilmington Township, Will County.
104-62P57 Executed 02/23/2022 1 1 Cook Cleaning and painting existing steel structures at 7 locations. Bridge structures are located along 1-290 (Einsenhower Expressway) from 25th Avenue to Circle Avenue in the Villages of Broadview, Bellwood, Maywood and and Forest Park.
105-62P87 Executed 02/23/2022 1 1 Cook The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Cook County.
106-62P88 Executed 02/23/2022 1 1 DuPage The improvement consists of cleaning(sweeping) various arterial highways in District One throughout DuPage County.
107-62P89 Executed 02/23/2022 1 1 Cook The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Cook County.
108-62R14 Executed 02/23/2022 1 1 Various This improvement consists of the repair and installation of guardrail along various expressway and arterial highways in various counties throughout District One.
109-66E20 Executed 02/23/2022 6 / 6 3 2 3 DeKalb The project is located on FAP 17 (IL 64) from Clare Rd to 0.4 Ml W of IL 23(S) in Sycamore, for a total of 6.59 miles, the work consists of 3P milling and resurfacing (designed overlay). Other work includes grading and shaping ditches, shoulder stone, culvert work, guardrail work, pavement marking, and raised reflectors.
110-68755 Executed 02/23/2022 1 3 4 Knox Replace bridge 048-0017 carrying IL 8 over Hickory Creek, 0.7 mile east of IL 97.
111-68D73 Executed 02/23/2022 1 3 4 Tazewell Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061).
112-68F11 Executed 02/23/2022 1 3 4 Tazewell This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles.
113-68G76 Executed 03/02/2022 3 4 Stark Tree removal along IL 17/91 over the Spoon River (SN 088-0002) in Stark County.
114-72M36 Executed 02/23/2022 1 / 1 4 6 Sangamon 8.9 miles of crack seal on various routes in Sangamon County.
115-72N19 Executed 02/23/2022 3 / 3 4 6 Logan Cured-in-place liners on I-55 and I-155 around Lincoln.
116-72N50 Executed 02/23/2022 4 6 Macoupin Bridge bearing replacement on SN 059-0042 carrying TR 457 over I-55, 2 miles south of IL 138.
117-87669 Executed 02/23/2022 5 / 5 1 2 3 Kankakee Construction of a shared use path, pedestrian crosswalks and signals, storm sewer, sidewalks and pavment markings adjacent to IL route 50 from the South Northfield Square Mall entrance on Bradley Drive to Larry Power Road in Bradley
118-87761 Executed 02/23/2022 1 / 1 2 2 3 Kankakee Construction of new curb bump outs, sidewalk replacement, landscaping, pavment markings for proposed bike lanes and pavement resurfacing on IL 50 from East Station Street to just north of East Charles Street in Kankakee.
119-89787 Executed 02/25/2022 10 / 9 1 3 4 Tazewell Reconstruction and widening of Courtland Street to a 5-lane section from Walton Avenue to Main Street in Morton.
120-95906 Executed 03/25/2022 4 7 Lawrence Replace the bridge carrying TR 18 over Bugaboo Creek, 4.8 mies south of Chauncey.
121-99634 Executed 02/23/2022 3 / 3 3 5 9 Williamson Reconstruct existing lane confirguration with traffic signal modifications and pavment markings on Williamson County Parkway at 17th Street in Marion.
122-46539 Executed 03/25/2022 1 1 Various Replacing deteriorated various types of overhead sign structures, installing new sign panels, and relocating sign panels, installing new drilled shaft foundations
123-62L09 Executed 03/08/2022 1 1 1 Cook This project consists of full depth patching along Palatine Road from Quentin Road to Smith Street spanning a total length of 4,073 ft (0.77 Miles) in the Village of Palatine, Cook County.
124-62M84 Executed 03/02/2022 5 / 3 2 1 1 Cook (7.63-Mile) Standard overlay, Class A patching, drainage, ITS improvements, and bridge deck sealing on Interstate 57 (I-57) between I-294 and IL 1 (Halsted St.), located within the City of Chicago and Villages of Calumet Park, Blue Island, Posen, Dixmoor and Riverdale.
125-62M92 Executed 02/23/2022 1 / 1 1 1 Lake (1.21-Mile) Roadway lighting improvement, located in Gurnee, Park City and Waukegan, IL on IL 120 from west of O'Plaine Rd. to US 41 {Skokie Hwy). Light tower and foundation removal. Install new light poles, foundations, LED luminaires, controllers, conduits and cables, excavations, and site restoration
126-62N35 Executed 02/23/2022 1 1 1 Cook Intersection improvement and traffic signal modernization project on US Route 6/Illinois Route 83 (Torrence Avenue), approximately 2,640 feet north of the I- 80/94 (Kingery Expressway) overpass and extends in a north for 1,007 lineal feet within the Village of Lansing and City of Calumet City.
127-62P16 Executed 02/25/2022 8 / 7 2 1 1 Cook (3.007 Mile) Design Overlay and ADA ramp improvements from Brainard Avenue to 159th Street. Work also includes sidewalk and curb and gutter removal and replacement, detectable warnings. structure adjustments and pavement markings located in the city of Calumet City and the Village of Burnham.
128-62P48 Executed 02/23/2022 1 1 1 Cook This improvement consists of bridge repairs and substructure repair at the bridge spanning 1-290 over Des Plaines River (SN 016-0090) in the Village of Park, Proviso Township, Cook County.
129-62P90 Executed 02/23/2022 3 / 3 2 1 1 Cook (1.13-Mile) Drainage improvements, culvert replacement, culvert removal, and ditch cleaning in Cook County.
130-62R15 Executed 02/23/2022 1 1 Various The improvement consists of impact attenuators and sand barrels on various expressways throughout District One in various counties.
131-64D78 Deleted 12/04/2021 2 2 Whiteside 0.86 Mi along IL 40 - Standard overlay, milling and ADA Improvements from 0.1 Mi N of Lynn Blvd and 0.1 Mi N to 0.1 Mi S of LeFevre Rd; reconstruction and ADA improvements from Lynn Blvd to 0.1 Mi N of LeFevre Rd in Sterling.
132-64R19 Executed 02/23/2022 1 2 2 Winnebago Concrete sealer applied to bridge decks at various locations in Winnebago County.
133-64R23 Executed 02/23/2022 2 2 Various Guardrail and fence repairs along State maintained routes in District 2.
134-64R24 Executed 02/25/2022 1 / 1 2 2 Various Roadside restoration of Right-Of-Way tuft damage caused by motorists along State maintained routes within District 2.
135-64R32 Executed 02/23/2022 1 / 1 2 2 Stephenson Approach pavement repair and resurfacing on SN 089-0074.
136-64R36 Executed 02/16/2022 1 2 2 Carroll Milling and resurfacing of the rest area along US 52/IL 64, 1 mile North of IL 64 East.
137-66932 Executed 02/23/2022 1 2 3 Iroquois Bridge Replacement (SN 038-0023) at Coon Creek, 5.4 miles South of US 24.
138-66J00 Executed 02/25/2022 2 / 2 1 2 3 LaSalle Bridge replacement (SN 050-0039) at Sutphens Run, 0.6 mile East of E 12th Rd.
139-66M11 Executed 02/23/2022 2 3 Iroquois This project is located at two structures on I-57, SN 038-0123 carrying I-57 over IL 116 (Ashkum Interchange) and SN 038-0125 carrying TR 89 over I-57, 2.5 mi. south of IL 116 and one structure on US 52, SN 038-0182 carrying US 52 over the Iroquois River near the village of Iroquois. This project consists of cleaning and painting all structural steel and other steel components of the structures.
140-66M12 Executed 02/23/2022 2 3 Ford This work is located at one structure on IL 54: Structure No. 027-0076 over the E. Branch of the Vermilion River, two structures on IL 9/47: Structure No. 027-0084 over Drummer Creek (in Gibson) and Structure No. 027-0085_over Drummer Creek (In Gibson). This project consists of cleaning and painting all structural steel and other steel components of the structure.
141-66M22 Executed 02/23/2022 2 3 Various Work consists on performing Bridge Deck Concrete sealing at various bridges decks with bare PCC wearing surfaces in Dekalb, Kendall, Grundy counties, and the Abraham Lincoln Bridge in LaSalle county.
142-72N08 Executed 02/23/2022 4 6 Various Bridge washing on seven Mississippi and Illinois River bridges on various routes in various counties within District 6. (SN 034-0062, 001-0068, 009- 0001, 075-0122, 075-0123, 069-0525, and 086-0001)
143-72N22 Executed 02/23/2022 4 6 Various On-call repair of guardrail and impact attenuators at various locations throughout District 6 as needed.
144-74A39 Executed 02/23/2022 4 7 Macon Cleaning and painting two bridges carrying eastbound and westbound US 36 over US 51 in Harristown. (SN 058-0106 and SN 058-0107)
145-74A67 Executed 02/23/2022 4 7 Jasper Cleaning and painting SN 040-0017 on IL 33 at the Jasper and Crawford County line.
146-74A72 Executed 02/23/2022 1 / 1 4 7 Various Chain link fence replacement at 4 locations: D7 headquarters in Effingham, Shelbyville Yard, Charleston Yard and Lawrenceville Yard.
147-46586 Executed 02/28/2022 1 1 1 Various Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in region one
148-61G01 Executed 03/11/2022 2 / 2 1 1 1 McHenry Reconstruct the intersection of Madison Street, South Street, and Lake Avenue into a roundabout in the City of Woodstock.
149-61G73 Executed 03/11/2022 13 / 12 2 1 1 Will Pavement reconstruction, HMA and PCC pavement, storm sewer, culverts, curb and gutter, sidewalks, guardrail, traffic signals, lighting and pavement markings on 80th Avenue from Greenway Boulevard to Timber Drive and replacing the bridge carrying 80th Avenue over I-80, in Tinley Park.
150-61H24 Executed 03/29/2022 2 / 1 1 1 Cook Resurfacing, streetscape, lighting and traffic signal improvements at various locations in Berwyn.
151-61H40 Executed 02/25/2022 2 / 2 2 1 1 Kane Replace the bridge carrying Farnsworth Avenue over Indian Creek in Aurora
152-61H49 Executed 03/25/2022 2 / 2 2 1 1 Kane Reconstruct the intersection of Orchard Road and US 30 in Montgomery.
153-64880 Executed 03/02/2022 8 / 8 3 2 2 Jo Daviess Reconstruction of US 20 from Gear Street to Main Street in Galena.
154-74756 Executed 02/23/2022 1 / 1 1 4 7 Macon 7.8 miles of standard overlay, resurfacing and ramp repair on I-72 / US 36 from the Sangamon County line to 1.4 miles west of US 51, west of Decatur.
155-87763 Executed 03/08/2022 2 / 2 2 3 DeKalb Full depth pavement reclamation, HMA pavement, curb and gutter, sidewalks, storm sewer, water main construction and pavement markings on Latham Street from Center Street to Sandhurst Drive in Sandwich.
156-93762 Executed 03/11/2022 5 / 5 1 4 6 Sangamon Construction of four structures to carry the Norfolk Southern and Union Pacific Railroad over Madison Street and Jefferson Street in Springfield. Project extends from 9th St. to 11th St., along Madison, Jefferson, Washington, Monroe, and Capitol Avenue.
157-95893 Rejected 02/04/2022 8 / 7 1 4 7 Macon Construction of a grade separation structure to carry Brush College Road over the Norfold Southern Railroad and Fairies Parkway in Decatur.
158-97708 Rejected 02/04/2022 2 / 2 1 5 8 Madison Construction of a rounabout intersection at Keebler Road and IL 162 in Maryville.
159-74456 Executed 02/23/2022 1 4 7 Effingham 3 miles of designed overlay and ADA improvements on US 40 from Salt Creek to 1500th Avenue in Teutopolis. , 3 miles of designed overlay and ADA improvements on US 40 from Salt Creek to 1500th Avenue in Teutopolis.
160-62K45 Executed 03/25/2022 1 1 Will The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line.
161-66F74 Executed 02/28/2022 4 / 4 2 2 3 Kankakee Removal and replacement of four structures carrying I-57 over Grinnell Road and the Norfolk Southern Railway tracks in Kankakee county. The work includes the reconstruction of a section of I-57 affected by the new structures. The length of the project is 0.83 miles. Staging will be accomplished using crossovers.
162-74366 Executed 03/21/2022 1 4 7 Effingham Removal and replacement of SN 025-0044 on IL 128, 3.3 miles south of IL 33.
01A-MA032 Executed 05/17/2022 1 / 1 1 3 4 Marshall Reconstruct Terminal Area Ramp, Phase 2
02A-KE018 Executed 05/11/2022 1 / 1 2 2 Henry Reconstruct West Portion of Ramp
03A-TR011 Executed 06/29/2022 2 2 Carroll Phase 2: Tree Removal and House Demolition
04A-AU071 Rejected 08/17/2022 3 / 3 2 1 1 Kane Airfield Pavement Rehabilitation - Phase 4
05A-SR095 Executed 06/13/2022 4 / 4 5 8 Madison Rehabilitate Runway 17/35 Pavement and Lighting
06A-SA035 Executed 05/05/2022 5 8 Marion Rehabilitate a portion of main bituminous aircraft parking ramp and bituminous taxiway
07A-MV066 Executed 05/19/2022 1 / 1 5 9 Jefferson Rehabilitate Interior Perimeter Service Road
08A-KA051 Rejected 03/04/2022 2 3 Kankakee Construct a new airfield electrical vault and replace apron lighting
09A-IL033 Executed 06/17/2022 1 / 1 2 2 3 LaSalle Extend Parallel Taxiway North, Phase 2
10A-GA011 Executed 07/14/2022 3 / 3 1 3 4 Knox Rehabilitate Taxiway B
11A-CN026 Executed 08/22/2022 4 / 4 1 3 4 Fulton Rehabilitate Aircraft Parking Apron
12A-PA063 Executed 03/29/2022 1 1 Cook Rehabilitate Airfield Lighting, Phase 1 and Install ALCMS
No More Data