001-62D49
|
Executed
|
02/25/2022
|
2 / 2 |
3 |
1
|
1
|
Will
|
|
Scope of work consists of bridge replacement of the structure that carries IL lover Deer Creek with a two-cell cast-in-place culvert. Also included are sheet-pile wingwall installation, concrete curb and gutter.
|
002-62H49
|
Executed
|
02/22/2022
|
16 / 16 |
4 |
1
|
1
|
Cook
|
|
(0.989-Mile) Bridge new deck, widening, bridge repair scour mitigation and lighting in the City of Countryside and the Villages of Willow Springs, Justice and Hodgkins.
|
003-62K99
|
Executed
|
02/25/2022
|
1 / 1 |
3 |
1
|
1
|
DuPage
|
|
(1,562-Ft) Intersection improvement and signal installation project including HMA surface removal, pavement widening, pavement resurfacing, and traffic signal installation in the City of West Chicago.
|
004-62L19
|
Deleted
|
12/01/2021
|
|
|
1
|
1
|
Cook
|
|
(1.987-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements etc. Loc.: FAU 2714: 25th Ave, I-290 (Eisenhower Expwy) to 26th St in the Villages of Broadview and Forest Park. , (1.987-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements etc. Loc.: FAU 2714: 25th Ave, I-290 (Eisenhower Expwy) to 26th St in the Villages of Broadview and Forest Park.
|
005-62M54
|
Executed
|
02/25/2022
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
(1,334-Ft) Bridge rehabilitation project on the four bridges that carry I-57 over I-80. The work includes deck overlay with latex concrete, substructure repair and reconstruction and patching of bridge approaches located within the City of Country Club Hills.
|
006-62N18
|
Executed
|
04/26/2022
|
|
|
1
|
1
|
Various
|
|
Expressway mowing south.
|
007-62N28
|
Executed
|
02/22/2022
|
1 / 1 |
2 |
1
|
1
|
Will
|
|
(1,000-Ft) Culvert replacement located on US 52 (Cedar Road) over Ditch N of Forked Creek (2 .9 Ml S of Hoff Roda) in the unincorporated Wilton Township.
|
008-62P18
|
Executed
|
02/22/2022
|
|
2 |
1
|
1
|
Cook
|
|
Designed Overlay project on IL 43 (Harlem Ave.) at 26th Street and continues northerly direction for (4.49 mile) to south of IL 64 North Ave located in the City of Berwyn and the Villages of Forest Park, North Riverside, Oak Park, River Forest, and Riverside.
|
009-62P23
|
Executed
|
02/22/2022
|
|
|
1
|
1
|
Cook
|
|
(378.5-Ft) Cleaning and painting designated steel surfaces of bridge structure carrying Ashland Ave over Calumet Sag Channel in the City of Blue Island and Village of Calumet Park. Calumet Township, SN 016-0 294.
|
010-62P28
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
Various
|
|
This project is located on various routes at 12 weigh stations through District One within Cook, Dupage, Lake, McHenry and Will Counties. The scope of work includes weigh station scale pit cleaning and various vegetation maintenance work.
|
011-62P29
|
Executed
|
02/25/2022
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
(813-Ft) Bridge Preservation Project including partial bridge deck patching, approach slab scarification and overlay, expansion joints replacement, substructure repairs and underpass lighting replacement located on the bridge carrying 127th St over I-57 in the City of Calumet Park.
|
012-62P35
|
Withdrawn
|
01/11/2022
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
This project is located at various locations along US Rte. 6, US Rte. 30, US Rte. 52 and IL Rte. 7 in the City of Joliet in Will County. The ADA improvement includes sidewalk removal, combination concrete curb and gutter removal and replacement and installation of concrete sidewalk.
|
013-62P85
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
Cook
|
|
Improvement consists of pigeon abatement on existing steel structures at 2 locations along 1-90/94 (Kennedy Expressway) at IL-19 (Irving Park Road) in the City of Chicago in Cook County. SN 016-0115, SN 016-0116.
|
014-64J63
|
Executed
|
03/25/2022
|
|
1 |
2
|
2
|
Stephenson
|
|
Removal and replacement of two (2) concrete box culverts carrying IL 75 over drainage ditches: SN 089-1047 located 0.2 mile East of Tower Road, and SN 089- 1048 located 0.4 mile East of Tower Road.
|
015-64N03
|
Executed
|
02/22/2022
|
|
1 |
2
|
2
|
Stephenson
|
|
Removal and replacement of concrete bridge deck on the structure (SN 089-0043) carrying IL 26 over Cedar Creek North of Cedarville.
|
016-64N48
|
Executed
|
04/15/2022
|
|
1 |
2
|
2
|
Boone
|
|
Replace existing ESN 004-1022 box culvert with a double, cast-in-place double 10'x5' box culvert (PSN 004-1030) including a patch. The roadway template will accommodate a future reconstruction of the IL 173 at IL 76 intersection.
|
017-64P16
|
Executed
|
02/22/2022
|
|
1 |
2
|
2
|
Jo Daviess
|
|
Cold-milling, pavement patching, hot-mix asphalt resurfacing, removing and replacing damaged curb and gutter, and removing and replacing damaged inlet lids.
|
018-64P84
|
Executed
|
02/22/2022
|
7 / 7 |
2 |
2
|
2
|
Winnebago
|
|
Bridge deck overlay I-39/US 51 over the Kishwaukee River (SN 101-0133 and 101-0134).
|
019-64P88
|
Executed
|
02/22/2022
|
11 / 10 |
3 |
2
|
2
|
Ogle
|
|
Bridge deck overlay, deck repairs and joint repairs on structure carrying IL 64 over I-39/US 51 (SN 071-0055).
|
020-64R31
|
Executed
|
02/22/2022
|
1 / 1 |
1 |
2
|
2
|
Rock Island
|
|
Bridge expansion joints and steel repairs on SN's 081-0007 and 081-0008 carrying I-74/280 over Shaeffer Creek.
|
021-66L94
|
Deleted
|
12/08/2021
|
|
|
2
|
3
|
LaSalle
|
|
This project is located at the Interchange of I-39 and I-80 in LaSalle County. This project Consists of removing existing asphalt shoulders, excavating and grading existing shoulders, placement of Hot-Mix Asphalt Shoulders, pavement striping, delineators and other related construction items on the North "Inner Loops" of the interchange.
|
022-66L98
|
Executed
|
02/25/2022
|
|
1 |
2
|
3
|
LaSalle
|
|
This project is located at Structure No. 050-0215 carrying FAP 653 (IL 18) over FAI 39 (I-39) approximately 1.05 miles North of the Marshall County Line.
|
023-68G59
|
Executed
|
02/22/2022
|
|
1 |
3
|
4
|
Peoria
|
|
Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River.
|
024-68G75
|
Executed
|
02/22/2022
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County.
|
025-70755
|
Executed
|
02/22/2022
|
1 / 1 |
|
3
|
5
|
Piatt
|
|
Culvert replacements of SN 074-8052 and SN 074-8054 on FAS 1517 (US 150) at 1.7 and 2.6 miles E of Dewitt Co. Line. Gross Length=Net Length= 0.014 miles 71.5ft.
|
026-70D64
|
Rejected
|
02/04/2022
|
1 / 1 |
1 |
3
|
5
|
McLean
|
|
Bridge deck overlay on I-55 from N of Lexington to Livingston Co. line for a gross length of 9.96 miles.
|
027-70D89
|
Executed
|
03/07/2022
|
3 / 3 |
|
3
|
5
|
Vermilion
|
|
Guardrail improvements at 30 Locations on Various Routes in Vermilion County.
|
028-70E48
|
Executed
|
02/22/2022
|
5 / 5 |
2 |
3
|
5
|
Champaign
|
|
Bridge Deck repairs S.N. 010-0027, 0028, 0029, 0030.
|
029-70E74
|
Executed
|
02/22/2022
|
|
|
3
|
5
|
McLean
|
|
Bridge painting at 10 structure locations on FAI-74 and FAI-39 in McLean County.
|
030-70F40
|
Executed
|
02/28/2022
|
|
1 |
3
|
5
|
Champaign, Douglas
|
|
9.194 Miles of Smart Resurfacing from Madison Street in Philo to NCL of Villa Grove.
|
031-72A26
|
Active
|
11/16/2021
|
1 / 1 |
1 |
4
|
6
|
Christian
|
|
Bridge deck replacement on SN 011-0010 and full bridge replacement of SN 011-0011, both located on IL 29 southeast of Taylorville.
|
032-72F99
|
Executed
|
02/22/2022
|
1 / 1 |
2 |
4
|
6
|
Hancock
|
|
5 miles of resurfacing, parking lanes, guardrail and ADA improvements on IL 61 from IL 101 in Augusta through Plymouth to the McDonough County line.
|
033-72L55
|
Executed
|
02/22/2022
|
|
1 |
4
|
6
|
Macoupin
|
|
6.8 miles of cold in-place recycling standard overlay on IL 138 from IL 159 to Sawyerville Hills Road, 0.9 miles east of Wilsonville.
|
034-72L59
|
Executed
|
03/07/2022
|
|
2 |
4
|
6
|
Montgomery
|
|
Patching and resurfacing on I-55 West Frontage Road from Waggoner Avenue, east of Waggoner, to 0.1 miles south of Macoupin Creek, south of Farmersville.
|
035-72M19
|
Executed
|
02/22/2022
|
4 / 4 |
1 |
4
|
6
|
Adams
|
|
6.5 miles of pavement preservation with cape seal and fog sealing shoulders on IL 110/336 from US 24 to just north of IL 61.
|
036-72M20
|
Executed
|
02/22/2022
|
2 / 2 |
1 |
4
|
6
|
Hancock
|
|
8.3 miles of micro-surfacing, cape seal of pavement and fog seal of shoulders on IL 10 from 3 miles east of Carthage to the McDonough County line.
|
037-72M27
|
Executed
|
02/23/2022
|
1 / 1 |
2 |
4
|
6
|
Pike
|
|
Bridge deck overlay on IL 96 over Two Mile Creek, 1.6 miles south of US 54, and on IL 96 over Six Mile Creek, 1 mile northwest of Pleasant Hill. (SN 075-0075 and SN 075-0045)
|
038-72M65
|
Executed
|
02/23/2022
|
|
2 |
4
|
6
|
Scott
|
|
Bridge joint repair and replacement with a microsilica deck overlay on IL 100 over Wolf Creek, 1 mile south of Norfolk Southern in Bluffs; Microsilica deck overlay on IL 100 over Eagle Run Creek, 1.4 miles south of the Morgan County line. (SN 086-0006 and 086-0046)
|
039-72M67
|
Executed
|
02/22/2022
|
1 / 1 |
|
4
|
6
|
Cass
|
|
Bridge joint repair and replacement with a microsilica deck overlay on IL 100 / US 67 over Indian Creek, 3.9 miles north of the Morgan County line. (SN 009- 012)
|
040-72M87
|
Executed
|
03/02/2022
|
|
|
4
|
6
|
Various
|
|
Weed spraying along I-55 and I-72 in various counties.
|
041-72N06
|
Executed
|
02/22/2022
|
|
|
4
|
6
|
Logan
|
|
Bridge painting on SN 054-0059 carrying County Highway 2 over I-55, 3.1 miles east of I-155.
|
042-72N10
|
Executed
|
02/23/2022
|
|
1 |
4
|
6
|
Sangamon
|
|
3.9 miles of longitudinal joint repair, partial width resurfacing and patching on Wabash Avenue from west of Robbins Road to MacArthur Boulevard and on MacArthur Boulevard from Wabash Avenue to South Grand Avenue.
|
043-74440
|
Executed
|
03/07/2022
|
1 / 1 |
2 |
4
|
7
|
Lawrence
|
|
Bridge deck replacement on US 50 over State Street in Lawrenceville. (SN 051-0010)
|
044-74596
|
Executed
|
02/22/2022
|
8 / 8 |
2 |
4
|
7
|
Macon
|
|
Complete replacement of bridge decks, abutments, steel girders and approach slabs, using cross-overs, on IL 105 over Lake Decatur. (SN 058-0047 and 058-0048)
|
045-74860
|
Executed
|
02/22/2022
|
|
|
4
|
7
|
Lawrence
|
|
Replacing the structure carrying IL 1 over Big Slough, 5 miles south of Lawrenceville, with a triple barrel box. (SN 051-0008)
|
046-74905
|
Executed
|
02/23/2022
|
|
1 |
4
|
7
|
Moultrie, Shelby
|
|
Patching, overlay, ditch cleaning and upgrading two field entrance culverts on IL 128 from Bruce/Findlay Road to the Bethany Blacktop.
|
047-74966
|
Executed
|
02/22/2022
|
|
1 |
4
|
7
|
Clark
|
|
1.5 miles of designed overlay on US 40 from the Cumberland County line to west of IL 49.
|
048-74A74
|
Executed
|
02/22/2022
|
|
|
4
|
7
|
Coles, Effingham
|
|
Lighting upgrades to LED on I-57 at US 45 and at IL 16 in Mattoon and at the northbound Green Creek Rest Area.
|
049-76P18
|
Executed
|
03/04/2022
|
|
|
5
|
8
|
Madison
|
|
7.9 miles of crack and joint sealing on IL 157 from IL 140 to IL 143.
|
050-76P20
|
Executed
|
02/22/2022
|
|
|
5
|
8
|
Clinton
|
|
Crack and joint sealing on Slant Road from IL 161 to IL 127.
|
051-76P21
|
Executed
|
03/04/2022
|
|
|
5
|
8
|
Bond
|
|
7.5 miles of crack and joint sealing on IL 127 from Sale Barn Avenue to 0.6 miles north of the Clinton County line.
|
052-76P34
|
Executed
|
02/22/2022
|
|
|
5
|
8
|
St. Clair
|
|
Traffic signal modernization, flashing yellow arrows, on IL 161 from IL 159 to the YMCA and SWIC entrances.
|
053-76P37
|
Executed
|
02/22/2022
|
|
1 |
5
|
8
|
St. Clair
|
|
1.8 miles of resurfacing on IL 161 from St. Clair Avenue to 0.1 miles east of Dutch Hollow Road.
|
054-76P39
|
Executed
|
02/22/2022
|
1 / 1 |
2 |
5
|
8
|
Madison
|
|
4.6 miles of overlay on IL 111 / IL 140 from Annex Street to 0.1 miles west of IL 11 in Bethalto.
|
055-76P41
|
Executed
|
02/22/2022
|
|
1 |
5
|
8
|
Bond
|
|
2.8 miles of overlay on US 40 from 0.1 miles west of Overpass Road to 0.3 miles west of IL 127.
|
056-76P83
|
Executed
|
02/22/2022
|
|
|
5
|
8
|
St. Clair
|
|
1.4 miles of patching on Old IL 13 from New Athens / Darmstadt Road to IL 13.
|
057-76P87
|
Executed
|
02/22/2022
|
|
1 |
5
|
8
|
Bond
|
|
6.7 miles of patching on I-70 from the Madison County line to Sugar Loaf Road.
|
058-76P88
|
Executed
|
02/23/2022
|
|
1 |
5
|
8
|
St. Clair
|
|
10.7 miles of patching on I-64 from IL 159 to IL 4.
|
059-76R05
|
Executed
|
02/22/2022
|
|
|
5
|
8
|
Various
|
|
Highway lighting, traffic signal repair and maintenance at various locations in District 8.
|
060-78595
|
Executed
|
02/22/2022
|
1 / 1 |
1 |
5
|
9
|
Jackson
|
|
Removing a single span bridge on US 51 in Elkville with a 12x7 cast-in-place concrete box culvert. (SN 039-0002)
|
061-78849
|
Executed
|
02/22/2022
|
6 / 6 |
2 |
5
|
9
|
Johnson
|
|
10.5 miles of resurfacing, pipe underdrain work and bridge deck overlays on 12 bridges, on I-24 from 0.5 miles north of US 45 to the Massac County line.
|
062-78850
|
Executed
|
02/22/2022
|
1 / 1 |
1 |
5
|
9
|
Pulaski
|
|
Slope repair on I-57 near mile post 14 southbound, south of Ullin.
|
063-78876
|
Executed
|
02/22/2022
|
|
1 |
5
|
9
|
White
|
|
Bridge repairs to SN 097-0024 carrying US 45 over LandN Railroad in Enfield.
|
064-78888
|
Executed
|
02/22/2022
|
|
1 |
5
|
9
|
Jackson
|
|
6 miles of resurfacing on IL 13 from Orchard Drive in Carbondale to Old IL 13 and eastbound lanes only on IL 13 from Old IL 13 to the Big Muddy Bridge in Murphysboro.
|
065-78904
|
Executed
|
03/02/2022
|
1 / 1 |
1 |
5
|
9
|
Jefferson
|
|
5.8 miles of HMA surface removal, HMA resurfacing and patching on I-64 from 2.8 miles east of IL 142 to the Wayne County line.
|
066-61G71
|
Executed
|
03/04/2022
|
2 / 2 |
3 |
1
|
1
|
Cook
|
|
Roadway reconstruction and lighting on Proviso Drive from the Union Pacific Rail Yard entrance to Wolf Road in Berkeley.
|
067-61H19
|
Executed
|
02/25/2022
|
|
|
1
|
1
|
DuPage
|
|
Construction of a bike path along the North Central DuPage Regional Trail, from the Illinois Prairie Path to Forest Preserve Drive, in the Villages of Wayne and Bartlett.
|
068-61H29
|
Executed
|
03/08/2022
|
2 / 2 |
1 |
1
|
1
|
DuPage
|
|
Geometric improvements and traffic signal modernizations at four intersections along 75th Street at Millbrook Drive, Modoff Road, Olympus Drive and Green Road in Naperville.
|
069-61H37
|
Executed
|
03/07/2022
|
|
2 |
1
|
1
|
DuPage
|
|
Resurfacing Foster Avenue from Central Avenue to Spruce Avenue in Wood Dale
|
070-61H43
|
Executed
|
03/16/2022
|
|
1 |
1
|
1
|
Kane
|
|
Resurfacing Spring Street from McLean Boulevard to La Fox Steet in Sourth Elgin .
|
071-61H53
|
Executed
|
03/08/2022
|
1 / 1 |
2 |
1
|
1
|
McHenry
|
|
Resurfacing Mason Hill Road from 650' west of Cherry Valley Road to Crystl Lake Road in Bull Valley.
|
072-61H54
|
Executed
|
02/22/2022
|
|
2 |
1
|
1
|
McHenry
|
|
Resurfacing Ringwood Road from the village limits north of McCullom Lake Road to a point 2,066 feet north of the village limits of Ringwood.
|
073-62N41
|
Deleted
|
12/02/2021
|
|
|
1
|
1
|
Will
|
|
(1,195-Ff) Removal of existing 4-span bridge along Shepley Road over I-80 in Will County, IL and replacement with a 2-span 264'-00" long, 36'-10" out to out wide bridge. Bridge approach roadway improvements include pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control. , (1,195-Ff) Removal of existing 4-span bridge along Shepley Road over I-80 in Will County, IL and replacement with a 2-span 264'-00" long, 36'-10" out to out wide bridge. Bridge approach roadway improvements include pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control.
|
074-62N44
|
Executed
|
02/22/2022
|
1 / 1 |
3 |
1
|
1
|
McHenry
|
|
(3.00-Mile) SMART overlay and ADA improvements on Virginia St/Northwest Hwy from Crystal Lake Av to Pingree Rd. located in the City of Crystal Lake.
|
075-62N56
|
Executed
|
02/22/2022
|
2 / 2 |
4 |
1
|
1
|
McHenry
|
|
(1.79-Mile) SMART overlay along IL 31 from S of McCullom Lake Road to Johnsburg Road located in the City of McHenry and the Village of Johnsburg.
|
076-62P86
|
Executed
|
02/22/2022
|
|
|
1
|
1
|
Will
|
|
The improvement consists of cleaning(sweeping} various arterial highways in District One throughout Will County.
|
077-72E46
|
Deleted
|
12/02/2021
|
|
|
4
|
6
|
Logan
|
|
Milling and resurfacing on IL 10 from 0.1 miles east of the Mason County line to 2.5 miles east of New Holland and culvert replacement at a ditch 0.8 miles east of the Mason County line. (SN 054-7009)
|
078-72F91
|
Executed
|
02/23/2022
|
|
2 |
4
|
6
|
Morgan
|
|
1.4 miles of resurfacing, shoulder work, gutter removal and replacement and pipe culvert removal and replacement on IL 267 from south of Woodson to the Greene County line.
|
079-72M18
|
Executed
|
02/23/2022
|
1 / 1 |
1 |
4
|
6
|
Montgomery, Sangamon
|
|
5.4 miles of standard overlay on I-55 south of the Sangamon / Montgomery County line to Brush Creek 0.7 miles south of IL 104 and on Brown Street / East Divernon Road east of State Street in Divernon to 0.1 miles east of Sullivan Road.
|
080-72N18
|
Executed
|
02/22/2022
|
|
1 |
4
|
6
|
Sangamon
|
|
Patching on I-55 from the Montgomery County line to Exit 105, north of Sherman.
|
081-74A79
|
Executed
|
03/11/2022
|
|
|
4
|
7
|
Lawrence, Richland
|
|
10 miles of patching on US 50 from 0.6 miles west of Ste Marie Road to Sumner.
|
082-74A80
|
Executed
|
02/23/2022
|
|
|
4
|
7
|
Fayette
|
|
Patching on I-70 from mile post 60 to mile post 74.
|
083-74A77
|
Executed
|
02/23/2022
|
1 / 1 |
|
4
|
7
|
Macon
|
|
2.9 miles of patching on IL 48 from 0.1 miles north of I-72 to Pershing Road in Decatur.
|
084-85715
|
Executed
|
02/23/2022
|
3 / 3 |
2 |
2
|
2
|
Winnebago
|
|
Replace the double cell box culvert with a single cell box culvert over Sugar Creek, 6.0 miles northeast of Durand.
|
085-85717
|
Executed
|
02/23/2022
|
4 / 4 |
3 |
2
|
2
|
Stephenson
|
|
Replace the existing box culvert over Cedar Creek, 2.5 miles north of Dakota, with a triple cell box culvert.
|
086-85718
|
Executed
|
02/23/2022
|
|
1 |
2
|
2
|
Lee
|
|
Resurfacing Franklin Road from west city limits of Franklin Grove to US 30, and Gap Road from IL 38 to Franklin Road.
|
087-85719
|
Executed
|
02/16/2022
|
|
|
2
|
2
|
Stephenson
|
|
Cold-in-Place Recycling on Fairgrounds Road from south of Forest Road to IL 26, and on Florence Road from 1250' west of Clover Road to IL 26.
|
088-95898
|
Executed
|
02/23/2022
|
|
|
4
|
7
|
Clay
|
|
Replace the bridge carrying TR 373 over Nickolson Creek, 0.5 mile west of Xenia
|
089-97765
|
Executed
|
02/23/2022
|
3 / 3 |
1 |
5
|
8
|
Randolph
|
|
Resurfacing CH5/CH2 from Rockcastle Road to IL 3.
|
090-97768
|
Executed
|
02/23/2022
|
|
1 |
5
|
8
|
Madison
|
|
Resurfacing Brown Street from Main Street to Worden Avenue in Alton.
|
091-61E87
|
Executed
|
03/08/2022
|
6 / 6 |
2 |
1
|
1
|
DuPage
|
|
Reconstruct the intersection of 87th Street and Woodrige Avenue in Woodridge. Work consists of Pavement widening, resurfacing, storm sewer, curb and gutter, Sidewalks, traffic Signals, lighting and pavment Markings.
|
092-61F88
|
Executed
|
02/23/2022
|
|
2 |
1
|
1
|
DuPage
|
|
Sidewalk improvement on IL 53 from Hobson Road to Mulligan Drive in the Village of Woodridge. , Sidewalk removal and replacement, curb and gutter replacement, installation of pedestrian traffic signals and pavement markings on IL 53 from Hobson Road to Mulligan Drive in Woodridge.
|
093-61H35
|
Executed
|
02/23/2022
|
|
1 |
1
|
1
|
Kane
|
|
Reconfirguration of the ATC East Parking Lot to improve vehical and pedestrian traffic flow and to add additonal parking to lot on Spring Street between the BNSF Metra Line and the BNSF Railroad in Aurora.
|
094-61H36
|
Executed
|
03/07/2022
|
|
1 |
1
|
1
|
DuPage
|
|
Pavement reconstruction and resurfacing on Garfield Street from Hindsdale Avenue to 55th Street in Hinsdale.
|
095-61H41
|
Executed
|
03/11/2022
|
|
1 |
1
|
1
|
Kane
|
|
Resurfacing, Curb and Gutter, Sidewalk replacement and pavement markings on Indian Trail from Farnsworth Avenue to the DuPage County line in Aurora.
|
096-61H45
|
Withdrawn
|
12/16/2021
|
|
|
1
|
1
|
Lake
|
|
Pavement reconstruction, curb and gutter, Sidewalk replacement, storm sewer, drainage structures and pavment marking on Brandywyn Lane from Deerfield Pkwy to Thompson Boulevard, and on Thompson Boulevard from Arlington Heights Road to Brandywyn Lane in Buffalo Grove. , Pavement reconstruction, curb and gutter, Sidewalk replacement, storm sewer, drainage structures and pavment marking on Brandywyn Lane from Deerfield Pkwy to Thompson Boulevard, and on Thompson Boulevard from Arlington Heights Road to Brandywyn Lane in Buffalo Grove.
|
097-61H48
|
Executed
|
03/07/2022
|
|
1 |
1
|
1
|
Kane
|
|
Resurfcing, curb and gutter replacement and sidewalk replacement on East New York Street from Ohio Street to Farnsworth Avenue in Aurora.
|
098-62H06
|
Executed
|
02/23/2022
|
1 / 1 |
2 |
1
|
1
|
Lake
|
|
(2.810-Mile) Standard Overlay and ADA improvements along Grand Ave. from IL-131 to IL-137 (Amstutz Expy.) in the City of Waukegan.
|
099-62H38
|
Withdrawn
|
01/18/2022
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
(2,600-Ft) Resurfacing, drainage improvement, and retaining wall construction from Nicholas Drive to Western Avenue, also includes HMA milling and paving, PCC pavement removal and placement, and storm sewer and drainage structure installation located in the City of Des Plaines. , (2,600-Ft) Resurfacing, drainage improvement, and retaining wall construction from Nicholas Drive to Western Avenue, also includes HMA milling and paving, PCC pavement removal and placement, and storm sewer and drainage structure installation located in the City of Des Plaines.
|
100-62N59
|
Executed
|
02/23/2022
|
2 / 2 |
2 |
1
|
1
|
Kane
|
|
(7.05-Mile) SMART Overlay project consists of roadway resurfacing, patching, aggregate shoulders, and centerline rumble strips. The project is along IL 47 from Big Timber Rd to Plato Rd in the Villages of Hampshire, Huntley, and Pingree Grove.
|
101-62N71
|
Executed
|
02/23/2022
|
1 / 1 |
3 |
1
|
1
|
Cook
|
|
(1,569-Ft) Designed Overlay and ADA improvements along Addison Street from Halsted Street to US 41 (Lake Shore Dr.) in the City of Chicago.
|
102-62N87
|
Withdrawn
|
01/11/2022
|
|
1 |
1
|
1
|
Will
|
|
This is a curb ramps for sidewalks ADA improvement project, consisting of sidewalk removal and replacement, comb. conc. curb and gutter removal and replacement and collateral and incidental work at various locations along US Route 6, 30, 52 and IL Routes 7 and 171 in the City of Joliet in Will County.
|
103-62P56
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
Cook, Will
|
|
This project consists of cleaning and painting of steel bridge structures at 5 locations. SN-0016-0048 and 0049 structures carrying 1-57 NB and SB over RR, Rich Township, Cook County. SN-099-0005; 0286 and 0304 structures carrying 1-55 NB and SB over RR and creek, in Wilmington Township, Will County.
|
104-62P57
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
Cook
|
|
Cleaning and painting existing steel structures at 7 locations. Bridge structures are located along 1-290 (Einsenhower Expressway) from 25th Avenue to Circle Avenue in the Villages of Broadview, Bellwood, Maywood and and Forest Park.
|
105-62P87
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Cook County.
|
106-62P88
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
DuPage
|
|
The improvement consists of cleaning(sweeping) various arterial highways in District One throughout DuPage County.
|
107-62P89
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Cook County.
|
108-62R14
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
Various
|
|
This improvement consists of the repair and installation of guardrail along various expressway and arterial highways in various counties throughout District One.
|
109-66E20
|
Executed
|
02/23/2022
|
6 / 6 |
3 |
2
|
3
|
DeKalb
|
|
The project is located on FAP 17 (IL 64) from Clare Rd to 0.4 Ml W of IL 23(S) in Sycamore, for a total of 6.59 miles, the work consists of 3P milling and resurfacing (designed overlay). Other work includes grading and shaping ditches, shoulder stone, culvert work, guardrail work, pavement marking, and raised reflectors.
|
110-68755
|
Executed
|
02/23/2022
|
|
1 |
3
|
4
|
Knox
|
|
Replace bridge 048-0017 carrying IL 8 over Hickory Creek, 0.7 mile east of IL 97.
|
111-68D73
|
Executed
|
02/23/2022
|
|
1 |
3
|
4
|
Tazewell
|
|
Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061).
|
112-68F11
|
Executed
|
02/23/2022
|
|
1 |
3
|
4
|
Tazewell
|
|
This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles.
|
113-68G76
|
Executed
|
03/02/2022
|
|
|
3
|
4
|
Stark
|
|
Tree removal along IL 17/91 over the Spoon River (SN 088-0002) in Stark County.
|
114-72M36
|
Executed
|
02/23/2022
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
8.9 miles of crack seal on various routes in Sangamon County.
|
115-72N19
|
Executed
|
02/23/2022
|
3 / 3 |
|
4
|
6
|
Logan
|
|
Cured-in-place liners on I-55 and I-155 around Lincoln.
|
116-72N50
|
Executed
|
02/23/2022
|
|
|
4
|
6
|
Macoupin
|
|
Bridge bearing replacement on SN 059-0042 carrying TR 457 over I-55, 2 miles south of IL 138.
|
117-87669
|
Executed
|
02/23/2022
|
5 / 5 |
1 |
2
|
3
|
Kankakee
|
|
Construction of a shared use path, pedestrian crosswalks and signals, storm sewer, sidewalks and pavment markings adjacent to IL route 50 from the South Northfield Square Mall entrance on Bradley Drive to Larry Power Road in Bradley
|
118-87761
|
Executed
|
02/23/2022
|
1 / 1 |
2 |
2
|
3
|
Kankakee
|
|
Construction of new curb bump outs, sidewalk replacement, landscaping, pavment markings for proposed bike lanes and pavement resurfacing on IL 50 from East Station Street to just north of East Charles Street in Kankakee.
|
119-89787
|
Executed
|
02/25/2022
|
10 / 9 |
1 |
3
|
4
|
Tazewell
|
|
Reconstruction and widening of Courtland Street to a 5-lane section from Walton Avenue to Main Street in Morton.
|
120-95906
|
Executed
|
03/25/2022
|
|
|
4
|
7
|
Lawrence
|
|
Replace the bridge carrying TR 18 over Bugaboo Creek, 4.8 mies south of Chauncey.
|
121-99634
|
Executed
|
02/23/2022
|
3 / 3 |
3 |
5
|
9
|
Williamson
|
|
Reconstruct existing lane confirguration with traffic signal modifications and pavment markings on Williamson County Parkway at 17th Street in Marion.
|
122-46539
|
Executed
|
03/25/2022
|
|
|
1
|
1
|
Various
|
|
Replacing deteriorated various types of overhead sign structures, installing new sign panels, and relocating sign panels, installing new drilled shaft foundations
|
123-62L09
|
Executed
|
03/08/2022
|
|
1 |
1
|
1
|
Cook
|
|
This project consists of full depth patching along Palatine Road from Quentin Road to Smith Street spanning a total length of 4,073 ft (0.77 Miles) in the Village of Palatine, Cook County.
|
124-62M84
|
Executed
|
03/02/2022
|
5 / 3 |
2 |
1
|
1
|
Cook
|
|
(7.63-Mile) Standard overlay, Class A patching, drainage, ITS improvements, and bridge deck sealing on Interstate 57 (I-57) between I-294 and IL 1 (Halsted St.), located within the City of Chicago and Villages of Calumet Park, Blue Island, Posen, Dixmoor and Riverdale.
|
125-62M92
|
Executed
|
02/23/2022
|
1 / 1 |
|
1
|
1
|
Lake
|
|
(1.21-Mile) Roadway lighting improvement, located in Gurnee, Park City and Waukegan, IL on IL 120 from west of O'Plaine Rd. to US 41 {Skokie Hwy). Light tower and foundation removal. Install new light poles, foundations, LED luminaires, controllers, conduits and cables, excavations, and site restoration
|
126-62N35
|
Executed
|
02/23/2022
|
|
1 |
1
|
1
|
Cook
|
|
Intersection improvement and traffic signal modernization project on US Route 6/Illinois Route 83 (Torrence Avenue), approximately 2,640 feet north of the I- 80/94 (Kingery Expressway) overpass and extends in a north for 1,007 lineal feet within the Village of Lansing and City of Calumet City.
|
127-62P16
|
Executed
|
02/25/2022
|
8 / 7 |
2 |
1
|
1
|
Cook
|
|
(3.007 Mile) Design Overlay and ADA ramp improvements from Brainard Avenue to 159th Street. Work also includes sidewalk and curb and gutter removal and replacement, detectable warnings. structure adjustments and pavement markings located in the city of Calumet City and the Village of Burnham.
|
128-62P48
|
Executed
|
02/23/2022
|
|
1 |
1
|
1
|
Cook
|
|
This improvement consists of bridge repairs and substructure repair at the bridge spanning 1-290 over Des Plaines River (SN 016-0090) in the Village of Park, Proviso Township, Cook County.
|
129-62P90
|
Executed
|
02/23/2022
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
(1.13-Mile) Drainage improvements, culvert replacement, culvert removal, and ditch cleaning in Cook County.
|
130-62R15
|
Executed
|
02/23/2022
|
|
|
1
|
1
|
Various
|
|
The improvement consists of impact attenuators and sand barrels on various expressways throughout District One in various counties.
|
131-64D78
|
Deleted
|
12/04/2021
|
|
|
2
|
2
|
Whiteside
|
|
0.86 Mi along IL 40 - Standard overlay, milling and ADA Improvements from 0.1 Mi N of Lynn Blvd and 0.1 Mi N to 0.1 Mi S of LeFevre Rd; reconstruction and ADA improvements from Lynn Blvd to 0.1 Mi N of LeFevre Rd in Sterling.
|
132-64R19
|
Executed
|
02/23/2022
|
|
1 |
2
|
2
|
Winnebago
|
|
Concrete sealer applied to bridge decks at various locations in Winnebago County.
|
133-64R23
|
Executed
|
02/23/2022
|
|
|
2
|
2
|
Various
|
|
Guardrail and fence repairs along State maintained routes in District 2.
|
134-64R24
|
Executed
|
02/25/2022
|
1 / 1 |
|
2
|
2
|
Various
|
|
Roadside restoration of Right-Of-Way tuft damage caused by motorists along State maintained routes within District 2.
|
135-64R32
|
Executed
|
02/23/2022
|
1 / 1 |
|
2
|
2
|
Stephenson
|
|
Approach pavement repair and resurfacing on SN 089-0074.
|
136-64R36
|
Executed
|
02/16/2022
|
|
1 |
2
|
2
|
Carroll
|
|
Milling and resurfacing of the rest area along US 52/IL 64, 1 mile North of IL 64 East.
|
137-66932
|
Executed
|
02/23/2022
|
|
1 |
2
|
3
|
Iroquois
|
|
Bridge Replacement (SN 038-0023) at Coon Creek, 5.4 miles South of US 24.
|
138-66J00
|
Executed
|
02/25/2022
|
2 / 2 |
1 |
2
|
3
|
LaSalle
|
|
Bridge replacement (SN 050-0039) at Sutphens Run, 0.6 mile East of E 12th Rd.
|
139-66M11
|
Executed
|
02/23/2022
|
|
|
2
|
3
|
Iroquois
|
|
This project is located at two structures on I-57, SN 038-0123 carrying I-57 over IL 116 (Ashkum Interchange) and SN 038-0125 carrying TR 89 over I-57, 2.5 mi. south of IL 116 and one structure on US 52, SN 038-0182 carrying US 52 over the Iroquois River near the village of Iroquois. This project consists of cleaning and painting all structural steel and other steel components of the structures.
|
140-66M12
|
Executed
|
02/23/2022
|
|
|
2
|
3
|
Ford
|
|
This work is located at one structure on IL 54: Structure No. 027-0076 over the E. Branch of the Vermilion River, two structures on IL 9/47: Structure No. 027-0084 over Drummer Creek (in Gibson) and Structure No. 027-0085_over Drummer Creek (In Gibson). This project consists of cleaning and painting all structural steel and other steel components of the structure.
|
141-66M22
|
Executed
|
02/23/2022
|
|
|
2
|
3
|
Various
|
|
Work consists on performing Bridge Deck Concrete sealing at various bridges decks with bare PCC wearing surfaces in Dekalb, Kendall, Grundy counties, and the Abraham Lincoln Bridge in LaSalle county.
|
142-72N08
|
Executed
|
02/23/2022
|
|
|
4
|
6
|
Various
|
|
Bridge washing on seven Mississippi and Illinois River bridges on various routes in various counties within District 6. (SN 034-0062, 001-0068, 009- 0001, 075-0122, 075-0123, 069-0525, and 086-0001)
|
143-72N22
|
Executed
|
02/23/2022
|
|
|
4
|
6
|
Various
|
|
On-call repair of guardrail and impact attenuators at various locations throughout District 6 as needed.
|
144-74A39
|
Executed
|
02/23/2022
|
|
|
4
|
7
|
Macon
|
|
Cleaning and painting two bridges carrying eastbound and westbound US 36 over US 51 in Harristown. (SN 058-0106 and SN 058-0107)
|
145-74A67
|
Executed
|
02/23/2022
|
|
|
4
|
7
|
Jasper
|
|
Cleaning and painting SN 040-0017 on IL 33 at the Jasper and Crawford County line.
|
146-74A72
|
Executed
|
02/23/2022
|
1 / 1 |
|
4
|
7
|
Various
|
|
Chain link fence replacement at 4 locations: D7 headquarters in Effingham, Shelbyville Yard, Charleston Yard and Lawrenceville Yard.
|
147-46586
|
Executed
|
02/28/2022
|
|
1 |
1
|
1
|
Various
|
|
Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in region one
|
148-61G01
|
Executed
|
03/11/2022
|
2 / 2 |
1 |
1
|
1
|
McHenry
|
|
Reconstruct the intersection of Madison Street, South Street, and Lake Avenue into a roundabout in the City of Woodstock.
|
149-61G73
|
Executed
|
03/11/2022
|
13 / 12 |
2 |
1
|
1
|
Will
|
|
Pavement reconstruction, HMA and PCC pavement, storm sewer, culverts, curb and gutter, sidewalks, guardrail, traffic signals, lighting and pavement markings on 80th Avenue from Greenway Boulevard to Timber Drive and replacing the bridge carrying 80th Avenue over I-80, in Tinley Park.
|
150-61H24
|
Executed
|
03/29/2022
|
2 / 1 |
|
1
|
1
|
Cook
|
|
Resurfacing, streetscape, lighting and traffic signal improvements at various locations in Berwyn.
|
151-61H40
|
Executed
|
02/25/2022
|
2 / 2 |
2 |
1
|
1
|
Kane
|
|
Replace the bridge carrying Farnsworth Avenue over Indian Creek in Aurora
|
152-61H49
|
Executed
|
03/25/2022
|
2 / 2 |
2 |
1
|
1
|
Kane
|
|
Reconstruct the intersection of Orchard Road and US 30 in Montgomery.
|
153-64880
|
Executed
|
03/02/2022
|
8 / 8 |
3 |
2
|
2
|
Jo Daviess
|
|
Reconstruction of US 20 from Gear Street to Main Street in Galena.
|
154-74756
|
Executed
|
02/23/2022
|
1 / 1 |
1 |
4
|
7
|
Macon
|
|
7.8 miles of standard overlay, resurfacing and ramp repair on I-72 / US 36 from the Sangamon County line to 1.4 miles west of US 51, west of Decatur.
|
155-87763
|
Executed
|
03/08/2022
|
2 / 2 |
|
2
|
3
|
DeKalb
|
|
Full depth pavement reclamation, HMA pavement, curb and gutter, sidewalks, storm sewer, water main construction and pavement markings on Latham Street from Center Street to Sandhurst Drive in Sandwich.
|
156-93762
|
Executed
|
03/11/2022
|
5 / 5 |
1 |
4
|
6
|
Sangamon
|
|
Construction of four structures to carry the Norfolk Southern and Union Pacific Railroad over Madison Street and Jefferson Street in Springfield. Project extends from 9th St. to 11th St., along Madison, Jefferson, Washington, Monroe, and Capitol Avenue.
|
157-95893
|
Rejected
|
02/04/2022
|
8 / 7 |
1 |
4
|
7
|
Macon
|
|
Construction of a grade separation structure to carry Brush College Road over the Norfold Southern Railroad and Fairies Parkway in Decatur.
|
158-97708
|
Rejected
|
02/04/2022
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
Construction of a rounabout intersection at Keebler Road and IL 162 in Maryville.
|
159-74456
|
Executed
|
02/23/2022
|
|
1 |
4
|
7
|
Effingham
|
|
3 miles of designed overlay and ADA improvements on US 40 from Salt Creek to 1500th Avenue in Teutopolis. , 3 miles of designed overlay and ADA improvements on US 40 from Salt Creek to 1500th Avenue in Teutopolis.
|
160-62K45
|
Executed
|
03/25/2022
|
|
|
1
|
1
|
Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line.
|
161-66F74
|
Executed
|
02/28/2022
|
4 / 4 |
2 |
2
|
3
|
Kankakee
|
|
Removal and replacement of four structures carrying I-57 over Grinnell Road and the Norfolk Southern Railway tracks in Kankakee county. The work includes the reconstruction of a section of I-57 affected by the new structures. The length of the project is 0.83 miles. Staging will be accomplished using crossovers.
|
162-74366
|
Executed
|
03/21/2022
|
|
1 |
4
|
7
|
Effingham
|
|
Removal and replacement of SN 025-0044 on IL 128, 3.3 miles south of IL 33.
|
01A-MA032
|
Executed
|
05/17/2022
|
1 / 1 |
1 |
3
|
4
|
Marshall
|
|
Reconstruct Terminal Area Ramp, Phase 2
|
02A-KE018
|
Executed
|
05/11/2022
|
1 / 1 |
|
2
|
2
|
Henry
|
|
Reconstruct West Portion of Ramp
|
03A-TR011
|
Executed
|
06/29/2022
|
|
|
2
|
2
|
Carroll
|
|
Phase 2: Tree Removal and House Demolition
|
04A-AU071
|
Rejected
|
08/17/2022
|
3 / 3 |
2 |
1
|
1
|
Kane
|
|
Airfield Pavement Rehabilitation - Phase 4
|
05A-SR095
|
Executed
|
06/13/2022
|
4 / 4 |
|
5
|
8
|
Madison
|
|
Rehabilitate Runway 17/35 Pavement and Lighting
|
06A-SA035
|
Executed
|
05/05/2022
|
|
|
5
|
8
|
Marion
|
|
Rehabilitate a portion of main bituminous aircraft parking ramp and bituminous taxiway
|
07A-MV066
|
Executed
|
05/19/2022
|
1 / 1 |
|
5
|
9
|
Jefferson
|
|
Rehabilitate Interior Perimeter Service Road
|
08A-KA051
|
Rejected
|
03/04/2022
|
|
|
2
|
3
|
Kankakee
|
|
Construct a new airfield electrical vault and replace apron lighting
|
09A-IL033
|
Executed
|
06/17/2022
|
1 / 1 |
2 |
2
|
3
|
LaSalle
|
|
Extend Parallel Taxiway North, Phase 2
|
10A-GA011
|
Executed
|
07/14/2022
|
3 / 3 |
1 |
3
|
4
|
Knox
|
|
Rehabilitate Taxiway B
|
11A-CN026
|
Executed
|
08/22/2022
|
4 / 4 |
1 |
3
|
4
|
Fulton
|
|
Rehabilitate Aircraft Parking Apron
|
12A-PA063
|
Executed
|
03/29/2022
|
|
|
1
|
1
|
Cook
|
|
Rehabilitate Airfield Lighting, Phase 1 and Install ALCMS
|