01X-76J90
|
Executed
|
08/24/2022
|
67 / 67 |
4 |
5
|
8
|
Madison
|
Mandatory
|
Replacement of SN 060-0035 which carries I-270 over the Mississippi River.
|
002-46596
|
Executed
|
08/26/2022
|
|
|
4
|
6
|
Various
|
|
Pavement marking on various routes in various counties of District 6.
|
003-62P74
|
Executed
|
09/06/2022
|
|
|
1
|
1
|
McHenry
|
|
(2,260-Ft) Standard Overlay and ADA Improvements: HMA removal and resurfacing, Class D patching, curb ramps (ADA) improvements, PMK of FAP 525: U.S. 20 from Page Street to Locust Street, located in the City of Marengo in McHenry County.
|
004-62N48
|
Executed
|
08/10/2022
|
|
|
1
|
1
|
Cook, Will
|
|
(6.47-Mile) Crack and Joint Sealing. streiff ln to scrementi lane in Will and Cook Counties.
|
005-62N57
|
Executed
|
08/10/2022
|
|
|
1
|
1
|
Kane
|
|
(9.07-Mile) Crack and Joint Sealing, Kane County.
|
006-62N64
|
Executed
|
08/10/2022
|
|
1 |
1
|
1
|
Cook
|
|
(4.8-Mile) This improvement consists of crack and joint sealing. The project is in the Villages of Barrington Hills, Barrington, Inverness and Palatine.
|
007-62R56
|
Executed
|
08/10/2022
|
6 / 5 |
2 |
1
|
1
|
Cook
|
|
(1,827-Ft) The improvement consists of bridge beam repairs located on IL 171 from Joliet Rd to the Sanitary Ship Canal in the Villages of McCook and Summit in Cook County.
|
008-62R64
|
Executed
|
08/08/2022
|
|
1 |
1
|
1
|
DuPage
|
|
(230-Ft) Bridge wing wall repair and the work consist of reconstructing the bridge wing wall, structure excavation, removal and replacement of curb and gutter in the city of Elmhurst, DuPage County.
|
009-64P42
|
Executed
|
09/06/2022
|
|
|
2
|
2
|
Jo Daviess
|
|
4.66 Miles - Cold Milling, Pavement Patching, ADA Ramps, and Hot-Mix Asphalt Galena Oaks Drive to 0.2 Miles West of Logemann Road.
|
010-66D26
|
Deleted
|
06/10/2022
|
|
|
2
|
3
|
|
|
|
011-66M52
|
Active
|
06/09/2022
|
|
|
2
|
3
|
Grundy
|
|
This work is located at the Interchange of I-80 and IL 47 in Grundy County. This work consists of removal and replacement of highway light poles, luminaries and breakaway couplings.
|
012-68G71
|
Executed
|
09/09/2022
|
2 / 2 |
1 |
3
|
4
|
Warren
|
|
Bridge preservation to SN 094-0028 carrying Cameron Rd over US 34 (bridge deck waterproofing and deck overlay, bridge joint replacement/repair, misc repairs) and related collateral work.
|
013-68H07
|
Executed
|
09/09/2022
|
1 / 1 |
1 |
3
|
4
|
Peoria
|
|
Transverse and longitudinal partial-depth patching along IL 29 from North of Gardner Ln. to North of Lorentz Ave. in Peoria County. Total length is 2.45 miles.
|
014-68H10
|
Executed
|
08/08/2022
|
2 / 2 |
|
3
|
4
|
Peoria
|
|
1360 feet of PCC TY B Pavement Patching from Martin to Moss Avenue in Peoria.
|
015-70F89
|
Executed
|
08/08/2022
|
|
|
3
|
5
|
DeWitt, McLean
|
|
0.282 Mile of Standard Overlay at Median Turnaround at Mclean I Dewitt County Line South of Heyworth and at Quest Drive Frontage Road South of Bloomington.
|
016-70F97
|
Executed
|
08/12/2022
|
|
|
3
|
5
|
Various
|
|
District Wide On-call Guardrail and Fence Repairs.
|
017-72401
|
Executed
|
09/13/2022
|
2 / 2 |
|
4
|
6
|
Sangamon
|
|
Parking lot construction at the IDOT Central Office Headquarters and new District 6 facility in Springfield.
|
018-62R86
|
Executed
|
08/08/2022
|
3 / 3 |
|
1
|
1
|
Various
|
|
This improvement consists of the repair and installation of fence along various expressway and arterial highways in various counties throughout District One.
|