001-46952
|
Active
|
05/05/2026
|
|
|
1
|
1
|
Cook
|
|
(2.69-Mile) Project consists of resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs. The work includes hot- mix asphalt resurfacing of roadway and parking areas, striping of park roadways and parking lots, bridge construction, pipe culvert replacements, sign replacements, multi-use path improvements, sidewalk and ADA improvements, and other miscellaneous improvement items. Project is in William Powers State Park, located in the City of Chicago in Cook County.
|
|
002-62M71
|
Active
|
05/01/2026
|
1 / 1 |
|
1
|
1
|
Kane, Kendall
|
|
(3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists of earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pavement, hot-mix asphalt binder and surface courses, pavement removal, PCC shoulder, hot-mix asphalt shoulder, combination concrete curb and gutter, concrete median, PCC sidewalk, drainage improvements, sheet pile retaining wall, cast in place box culverts, traffic signal installation, water main relocation, lighting, landscaping, erosion and sediment control, traffic control and protection. IL-47 from Jericho Road to south of Galena Road is within the City of Yorkville, Village of Sugar Grove and unincorporated Kane County and Kendall Counties.
|
|
003-62R61
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(710.53-Ft) Bridge Replacement and widening project (SN 016-2015) include pavement resurfacing/reconstruction, curb and gutter replacement, sidewalk replacement (including ADA improvements), various drainage improvements, watermain (including jacking beneath I-290), signing, pavement markings, bridge and underpass lighting, traffic signal modernization, replacement storm manhole The project is in the City of Chicago, Cook County on Laramie Ave. over I-290.
|
|
004-62T46
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(350.89-Ft) Bridge Deck Overlay consists of Bridge Joint Replace, bearing and Substructure Repairs. This improvement is located along 131st Street over Metra Railroad (SN 016-2611) located in Cook County, Illinois.
|
|
005-62U72
|
Active
|
05/01/2026
|
1 / 0 |
|
1
|
1
|
McHenry
|
|
(8,360-Ft) Roadway add lanes and reconstruction project consists of pavement removal, earth excavation and placement of embankment, precast box culvert installation, bridge replacement, storm sewer installation, construction of new PCC pavement with combination concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations, highway lighting replacement, water main and sanitary sewer relocation, placement of pavement marking, landscaping, erosion and sediment control. This project is in the City of McHenry within McHenry County.
|
|
006-62V63
|
Active
|
05/01/2026
|
|
|
1
|
1
|
McHenry
|
|
(0.895-Mile) Project consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. Location is in the City of Algonquin, McHenry County.
|
|
007-62V77
|
Active
|
05/05/2026
|
|
|
1
|
1
|
Lake
|
|
(9,669-Ft) Crack and Joint Sealing project consists of routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between the existing HMA pavement and curb and gutter, restriping with Modified Urethane pavement marking lines. The project is located within the Village of Lake Villa and unincorporated Lake Villa Township in Lake County.
|
|
008-62V78
|
Active
|
05/01/2026
|
|
|
1
|
1
|
DuPage, Kane
|
|
(1.31-Mile) This is a crack and joint sealant improvement consisting of routing cleaning, and sealing of longitudinal cracks and joints within concrete pavement, concrete patching, grading and shaping shoulders, some guardrail replacement, modified urethane pavement marking. This improvement is located within the City of Geneva and West Chicago in Kane and DuPage Counties.
|
|
009-62W82
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Various
|
|
This project proposes converting the entire closed loop system into a centralized traffic management system with remote connection capabilities. This project will install new single mode fiber optic cable, network switches, PTZ cameras and ATC controllers among other equipment to allow for remote access and monitoring capabilities at these locations. There are eighty-two (82) signalized intersections proposed on this project located in Cook and DuPage Counties within the Cities of Rolling Meadows and Des Plaines, and the Villages of Mount Prospect, Elk Grove and Bensenville.
|
|
010-62W83
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. The Project is in three different areas of Cook County.
|
|
011-62W91
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
This project proposes adding 10 traffic signals into the Central Traffic Management System and connecting two existing closed-loop systems together consists of installing fiber optic cable, network switches, PTZ Cameras and traffic controllers among other equipment to allow for remote access and monitoring capabilities. The project is in the Village of Olympia Fields, Village of Franklin Park, City of Northlake and City of Berwyn in Cook County.
|
|
012-62W99
|
Active
|
05/01/2026
|
5 / 2 |
|
1
|
1
|
Cook
|
|
The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement patching, storm sewer cleaning, bridge deck repairs, superstructure repairs, substructure repairs, lighting. Located in the Elk Grove Township and City of Schaumburg, Cook County, on IL 53/I-290 from south I-90 interchange to IL 72 (Higgins Rd).
|
|
013-62X28
|
Active
|
05/01/2026
|
1 / 1 |
|
1
|
1
|
Will
|
|
(1,079.50-Ft) Bridge Joint replace/repair culvert repair, and wing wall and abutment repair project consist of concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed joint seal, and polymer concrete, guardrail removal and replacement, traffic control, erosion control, furnishing and placing topsoil. This project is in the Village of Channahon in Will County, Illinois.
|
|
014-62X37
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Will
|
|
(4.25-Mile) Furnishing and installing landscaping along I-80 corridor from Gardner Street to Gouger Road in the City of Joliet, Joliet Township and the Village of New Lenox within Will County.
|
|
015-62X52
|
Active
|
05/01/2026
|
|
|
1
|
1
|
DuPage
|
|
The project consists of a full depth patching of the top slab over the culvert at the unnamed stream, concrete repair of the north headwall. Located at culvert (SN# 022-0567) in the City of Darien in DuPage County.
|
|
016-80B17
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Will
|
|
(2,809-Ft) Smart Overlay consists of thermoplastic pavement markings, and incidental work. Located in the City of Crete in Will County.
|
|
017-80B22
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(3.71-Mile) SMART overlay, proposed pavement markings, ADA ramp details at the ramps listed, installing APS push buttons at all signalized intersections listed, and replacement of all loop detectors impacted by the resurfacing. Project located at US 41 (Skokie Blvd)/ IL 50 (Cicero Ave) from Golf Road to Devon Ave is in the Villages of Skokie and Lincolnwood in Cook County, IL.
|
|
018-80B23
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Kane
|
|
(2.81-Mile) SMART Overlay and Shoulder Repair consist of pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings, shoulder work, rumble strips. The improvement is in the Villages of Gilberts and Pingree Grove in Kane County.
|
|
019-80B28
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(4,957.13-Ft) HMA overlay of existing concrete pavement and ADA improvements. The roadway scope of work includes HMA pavement, curb removal and replacement, median removal and replacement, pavement patching, driveway removal and replacement, thermoplastic pavement markings, ADA improvements, and traffic signal/APS improvements. Project is located along IL Route 62 (Algonquin Road) from Radisson Way to Barker Avenue in Rolling Meadows and Schaumburg, Illinois.
|
|
020-80B33
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(5,764-Ft) Design Overlay, ADA Improvements consists of (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. The project is located within the City of Harvey in Cook County.
|
|
021-80B35
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(1.53-Mile) SMART overlay and ADA Improvement project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing hot-mix asphalt, pavement markings, raised reflective pavement markers, ADA ramps, traffic signals, and detector loops. Project is in the Village of River Grove, Village of Schiller Park and City of Chicago in Cook County.
|
|
022-80B47
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
Bridge Painting project consists of reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair. Project is located on FAI 90/94 (Kennedy Expressway) under Ainslie Street in the City of Chicago. (SN 016-1105)
|
|
023-80B51
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(0.20-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental work. The project is located at structure No. 1 (SN. 016-0436) carrying the IHB Railroad over US 12/20 (95th ST) in the Village of Bridgeview in Cook County.
|
|
024-80B58
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(3.20-Mile) Project consists of drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Villages of Forest Park, Maywood, Broadview, Bellwood and Westchester within Cook County.
|
|
025-80B66
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
This is a permanent protective shielding project and the work to be performed under this contract consists of installation of permanent protective shielding as shown on the plans and any incidental and collateral work necessary to complete located at various structures carrying Circle Ave, Harlem Ave and California Ave Over I-290 (Eisenhower) in the Villages of Oak Park, Forest Park and City of Chicago, in Cook County.
|
|
026-80B77
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Will
|
|
The project consists of the removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb and gutter removal and replacement, median surface removal and replacement, sidewalk improvements, pavement marking, landscaping, and erosion control located in Village of Bolingbrook, Will County, Illinois.
|
|
027-80B78
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(1.90-Mile) Project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from 51st Street to 59th Street in the City of Chicago, in Cook County.
|
|
028-80B87
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(5.37-Mile) Project consists of a design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter located in the Villages of Wheeling and Arlington Heights and the City of Prospect Heights in Cook County.
|
|
029-80C45
|
Active
|
05/01/2026
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
(1.2-Mile) Standard Overlay for US 14 and SMART Overlay for South Frontage Road project includes pavement patches, HMA surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, raised reflective pavement markers. The project is located within the City of Woodstock.
|
|
030-80C48
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Lake
|
|
(3,760-Ft) Standard Overlay, HMA surface removal and overlay, pavement patching maintenance of traffic, pavement marking, landscaping, ADA curb ramps, APS improvements, curb and gutter removal and replacement, median removal and replacement, guardrail removal and replacement, impact attenuator installation, bridge pier crash wall repairs. Located on W. Peterson Road from west of IL 137 to US 45 in the Village of Libertyville in Lake County.
|
|
031-80C89
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook, Lake
|
|
This work includes mast arm and pole replacement, installation of LED signal heads, installation of accessible pedestrian signals, controller replacement and all incidental and collateral work necessary to complete the project. This project is located in Lake and Cook Counties in District 1.
|
|
032-80C90
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(2,470-Ft) Bridge repair work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfolk Southern Railroad east and west spurs. Work includes installation of temporary shoring towers, structural steel repair, protective shielding, pavement marking and signing, traffic control and protection in the City of Chicago, Cook County
|
|
033-80C96
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Various
|
|
Forestry, weed control, and landscape work includes pruning, tree removal, and selective clearing of trees, shrubs, and brush, controlling and removing invasive weeds repairing, installing, and establishing new vegetative material including trees, shrubs, and seeding. Located within the right-of-way limits within the municipal limits of Chicago, Lincolnwood, Skokie, Morton Grove, Wilmette, Northfield, Glencoe, and Northbrook.
|
|
034-80C97
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(110-Ft) Project consists of advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue. The total length of the project is 110 feet (0.02 miles). The project is in the City of Chicago in Cook County.
|
|
035-80D00
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Cook
|
|
(4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Cook County.
|
|
036-80D36
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Will
|
|
This is an advanced procurement of selective mechanical and electrical components for the existing movable bridge (SN 099-0101) including the furnishing of the machinery brakes, motor brakes, and select bearings for the movable structure located at US 30 (Cass Street) Bridge over the Des Plaines River in the City of Joliet in Will County.
|
|
037-80D46
|
Active
|
05/01/2026
|
|
|
1
|
1
|
Lake
|
|
The scope of work for this improvement includes a new 5x3 culvert under US 41 with associated pavement removal and patching, ditch grading, pavement removal and patching, temporary concrete barriers, curb and gutter, barrier median and landscaping. Located in the Village of Lake Bluff and Shields Township in Lake County.
|
|
038-61L30
|
Active
|
04/29/2026
|
|
|
1
|
1
|
Kane
|
|
Full-depth reclamation and HMA surfacing of Brown Road, Campton Hills Road, Denker Road and Town Hall Road in the village of Campton Hills.
|
|
039-61M42
|
Active
|
04/29/2026
|
|
|
1
|
1
|
Kane
|
|
Resurfacing Wheeler Road from Esker Drive to IL 47 in the village of Sugar Grove.
|
|
040-61M43
|
Active
|
05/07/2026
|
|
|
1
|
1
|
Kane
|
|
Resurfacing Dugan Road from North Wheeler Road to south of Fays Lane in the village of Sugar Grove.
|
|
041-61M44
|
Active
|
05/07/2026
|
|
|
1
|
1
|
Kane
|
|
Resurfacing 1st Street from IL 72 to Dunning Avenue in the village of West Dundee.
|
|
042-61M46
|
Active
|
04/29/2026
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing of Skokie Boulevard from the southern city limits to Lake-Cook Road in the village of Northbrook.
|
|
043-61M51
|
Active
|
04/29/2026
|
|
|
1
|
1
|
Cook
|
|
Reconstruction of HMA trail from 109th Street and Lavergne Avenue to Harold L. Richards High School in the village of Oak Lawn.
|
|
044-61M53
|
Active
|
04/29/2026
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Lexington Drive from Lake Cook Road to McHenry Road in the village of Wheeling.
|
|
045-64L94
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Henry
|
|
0.91 miles of reconstruction on IL 81 from 0.2 miles west of Union St to 0.3 miles west of IL 78 in Kewanee. This includes ADA improvements.
|
|
046-64T07
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Ogle
|
|
Bridge repairs and joint replacement on SN 071-0036, carrying IL 72 over drainage, 4.1 miles east of IL 26 and SN 071-0037, carrying IL 72 over drainage, 7.9 miles east of IL 26.
|
|
047-64T46
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Whiteside
|
|
Bridge repairs, deck overlay and joint replacement on SN 098-0103, carrying IL 78 over Coon Creek, 1.8 miles south of Prophetstown.
|
|
048-64T47
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Ogle
|
|
Bridge repairs, deck overlay and joint replacement on SN 071-0078, carrying IL 64 over Pine Creek, 4.1 miles east of IL 26.
|
|
049-64T58
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Stephenson
|
|
Bridge repairs and joint replacement on SN 089-0038, carrying IL 75 over Pecatonica River in Freeport.
|
|
050-64V31
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Various
|
|
Intersection safety improvements at US 52/IL 64 and IL 78 in Carroll County, US 52 and Freeport Rd. and IL 72 and River Rd. in Ogle County, IL 70 and Meridian Rd. and IL 75 and Meridian Rd. in Winnebago County, and IL 251 and Chicago/Shaw Rd. in Lee County.
|
|
051-64V39
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Stephenson
|
|
1.41 miles of patching and standard overlay on South St from Locust Ave to Galena Ave in Freeport.
|
|
052-64V40
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Rock Island
|
|
Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of IL 5 and ends approximately 0.4 miles south of IL 5. The work along IL 5 begins at 16th St and ends approximately 0.3 miles east of I-74. the gross length of the project is 10,559 ft.
|
|
053-64V42
|
Active
|
05/01/2026
|
|
|
2
|
2
|
Whiteside
|
|
0.76 miles of patching, cold milling, and standard overlay on WB IL 2 East 4th St to IL 40 in Sterling.
|
|
054-85791
|
Active
|
04/29/2026
|
|
|
2
|
2
|
Winnebago
|
|
Construction of a shared-use path along Rockton Road from 0.1 mile west of Aspland Drive to Old Meadow Lane in the village of Rockton.
|
|
055-85794
|
Active
|
04/29/2026
|
|
|
2
|
2
|
Rock Island
|
|
Sidewalk replacement and construction of new sidewalks at various locations in the city of Rock Island.
|
|
056-66A91
|
Active
|
05/01/2026
|
|
|
2
|
3
|
LaSalle
|
|
Pavement resurfacing on the I-80 and I-39 interchange entrance/exit ramps with minor rehabilitation and repair work at select structures, improvements to existing pipe and box culverts, slope and ditch grading, upgrading guardrails, impact attenuators, high tension cable barriers, and superelevation on FAI 80(I-80) from 0.1 miles east of IL-351 to 0.3 miles west of IL-178. Approximately 4.13 miles gross length.
|
|
057-66C06
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Grundy
|
|
Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe culvert end section_replacements and cleaning, detector loop replacement, pavement marking, and raised reflective pavement markers on US 6 beginning at IL 47 in Morris, and ends 0.7 miles west of Nigas Road._Approximately 6.81 miles gross length.
|
|
058-66K39
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Ford
|
|
Improvements to a dual structure (SN 027-0052 and 027-0053) which carries Interstate 57 (I-57) over Big Four Ditch about 2.4 miles south of IL 9 in Ford County.
|
|
059-66M80
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Iroquois
|
|
Superstructure replacement of various structures on I-57 including SN 038-0003, SN 038-0004, SN 038-0005, SN 038-0006, SN 038-0009 and SN 038-0010. The project includes deck replacements of SN 038-0007 and SN 038-0008; structure repairs on SN 038-0001, SN 038-0002, SN 038-0031, which include bridge latex overlay; and repairs on SN 038-0086 and SN 038-0129. There are also two median crossovers and pavement marking replacement. Project is located along I-57 from 0.3 miles north of Prairie Creek to 0.7 miles south of N600E Rd in Iroquois County.
|
|
060-66M84
|
Active
|
05/01/2026
|
|
|
2
|
3
|
LaSalle
|
|
Removal of the existing box culvert (SN 050-2546) and replacement with 2-42" EQRS 42" culverts on US 34 over Mendota Creek Tributary, approximately 4.1 miles west of I-39 in Mendota in LaSalle County. Approximately 259 feet gross length.
|
|
061-66M85
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Livingston
|
|
Deck replacement (SN 053-0149) on IL 23 at the BNSF RR and Vermilion River, 0.8 miles south of the LaSalle County Line.
|
|
062-66M92
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Livingston
|
|
Culvert replacements (SN 053-2588 and -2589) over an Indian Creek Tributary 1 miles north of Ford County Line and 0.2 mile north of N200N Rd in Strawn.
|
|
063-66N23
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Livingston
|
|
Removal and replacement of the existing culvert structure (SN 053-2548) carrying IL 116 over_a stream located 5.6 miles west of I-55 in Livingston County. Additional work includes roadwayresurfacing, guardrail placement,_and slope and ditch grading.
|
|
064-66N45
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Bureau
|
|
Superstructure replacement (SN 006-0112) at CH 8 (Overhead), 2 miles north of US 6 on I-80.
|
|
065-66T09
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Iroquois
|
|
Various sizes of Class B pavement patching pavement striping and aggregate wedge shoulders at the Sheldon Weight Station approximately 1.9 miles east of US Route 52 (N) in Sheldon, Iroquois County.
|
|
066-66T10
|
Active
|
05/01/2026
|
|
|
2
|
3
|
LaSalle
|
|
Removal and replacement of the fabric reinforced elastomeric troughs and associated hardware at Structure No. 050-0219 carrying F.A.S. Route 268A (CH 15) over the Illinois River approximately 0.4 mile south of US 6 (Marseilles) in LaSalle County.
|
|
067-66T11
|
Active
|
05/01/2026
|
|
|
2
|
3
|
LaSalle
|
|
Washing all components of Structure No. 050-0079 carrying F.A.P. Route 46 (IL 251) over the Illinois River and CSX Railroad approximately 0.1 mile south of US 6 (Peru) in LaSalle County. This includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and elastomeric troughs.
|
|
068-66T12
|
Active
|
05/05/2026
|
|
|
2
|
3
|
Grundy
|
|
Project is located at Structure No. 032-0099 carrying F.A.P. Route 326 (IL 47) over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 (Morris) in Grundy County. This work consists of washing all components of the structure which includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and elastomeric troughs.
|
|
069-66T14
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Bureau, LaSalle
|
|
Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle County and IL 26 and Backbone Rd in Bureau County.
|
|
070-66T15
|
Active
|
05/01/2026
|
|
|
2
|
3
|
LaSalle
|
|
Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May Rd and IL 251 in LaSalle County.
|
|
071-66T24
|
Deleted
|
05/05/2026
|
|
|
2
|
3
|
Ford
|
|
This project is located on F.A.P. Route 326 (IL Route 9/47), beginning at IL 9 (L.M. 0.00) and ending at IL 9/47/54 in Gibson City. This project consists of Class B pavement patching of mainline pavement. 0.56 miles gross length.
|
|
072-66T29
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Ford
|
|
This project is located on F.A.P. Route 681 (IL 116), Section (115, 116)PP, beginning at Iroquois County Line to Livingston County Line. This project consists of Class B pavement patching of mainline pavement. 6.0 miles gross length.
|
|
073-66T36
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Various
|
|
One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds.
|
|
074-66T39
|
Active
|
05/01/2026
|
|
|
2
|
3
|
LaSalle
|
|
Pavement patching and joint repair along I-39 at the following interchanges in LaSalle County: Tonica (SB only), IL 71, IL 251, Oglesby, I-80, and US 34. 3.06 miles gross length.
|
|
075-66T40
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Various
|
|
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated within the right-of-way of the Interstate Routes, including, but not limited to, medians; inside and outside areas adjacent to exit and entrance ramps at various interchanges; interchange gore areas between mainline and ramps; and inside and outside of on/off ramps at rest areas within District 3 on interstates I-180, I-39, and I-80, throughout Bureau, LaSalle, Kendall, and Grundy Counties.
|
|
076-66T41
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Grundy, Livingston
|
|
Litter picking on interstate I-55, throughout Livingston and Grundy Counties in District 3.
|
|
077-66T42
|
Active
|
05/01/2026
|
|
|
2
|
3
|
Ford, Iroquois, Kankakee
|
|
Litter picking_on interstate I-57, throughout Ford, Iroquois, and Kankakee Counties.
|
|
078-66T45
|
Active
|
05/01/2026
|
|
|
2
|
3
|
LaSalle
|
|
Class B patching at the concrete section of FAP 603 (US 52) over I-39, beginning 0.47 miles west of I-39 (Station 191+44) and ending 0.35 miles east of I-39 (Station 234+23), and also includes the entrance and exit ramps at the interchange in LaSalle County. 4,500 feet gross length.
|
|
079-87859
|
Active
|
04/29/2026
|
|
|
2
|
3
|
Iroquois
|
|
Resurfacing of E 980N Road from IL 99 to the west corporate limits of Milford.
|
|
080-87895
|
Active
|
04/29/2026
|
|
|
2
|
3
|
Iroquois
|
|
Resurface 800 N Road from I-57 ramps to US 45.
|
|
081-46678
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Various
|
|
Installation of pavement marking on various routes in various counties throughout District 4.
|
|
082-46679
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Various
|
|
Replaecment of raised reflective pavement markers on various routes in various counties throughout District 4.
|
|
083-46918
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Marshall, Woodford
|
|
Reconstruction of SFWA roads with a Bituminous Surface Treatment_with Fog Seal Surface, the excavation and reconstruction at sinkhole locations in the Woodford State Fish and Wildlife Area (SFWA). Placement of a Bituminous Surface Treatment with Fog Seal Surface on the parking lot and camp road are proposed at the Marshall SFWA. Other necessary work at the two locations is included. 0.9 mile gross length.
|
|
084-68C93
|
Active
|
05/01/2026
|
6 / 0 |
|
3
|
4
|
Peoria
|
|
Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peoria County. 2.94 miles gross length.
|
|
085-68J15
|
Active
|
05/01/2026
|
|
|
3
|
4
|
Tazewell
|
|
Bridge deck overlay, joint replacement/repairs and bridge approach roadway improvements at S.N. 090-0124 carrying WB BUS 24 over US 24 near_Washington and resurface BUS 24 from US 24 to IL 8 in Tazewell County. 1.430 miles gross length.
|
|
086-68J31
|
Active
|
05/01/2026
|
|
|
3
|
4
|
Tazewell
|
|
Resurface IL 98 from IL 29 to 0.2 mile East of Parkway Drive in Tazewell County. 1.3551 miles gross length.
|
|
087-68J50
|
Active
|
05/01/2026
|
|
|
3
|
4
|
Warren
|
|
Resurfacing 20th St from US 34 to North St in Kirkwood and on North St from 20th St to US 34 in Kirkwood in Warren County. 1.823 gross miles.
|
|
088-68J56
|
Active
|
05/01/2026
|
|
|
3
|
4
|
Peoria
|
|
Resurface IL 116 (W. Harmon Highway, W. Lincoln Ave.) from Kickapoo Creek to Griswold St. in Peoria. 1.00 mile gross length.
|
|
089-68J59
|
Active
|
05/01/2026
|
|
|
3
|
4
|
Tazewell
|
|
Resurfacing McMullen Rd and IL 122 from west of I-155 to 2.1 miles east of Hopedale, including cold-in-place recycling in Tazewell County. 5.086 miles gross length.
|
|
090-68J61
|
Active
|
05/05/2026
|
1 / 0 |
|
3
|
4
|
Knox
|
|
6.17 miles patching and resurfacing of I-74 from 0.3 miles west of E Main Street in Galesburg to east of the IL 97 interchange; 0.40 miles of patching and resurfacing of E Main Street from 0.2 miles east of Michigan Avenue to_0.1 mile east of Soangetaha Road; and 1.19 miles of patching and resurfacing of US 150/IL 97 from 0.2 miles_east of I-74 westbound ramps to 0.1 miles west of Junction IL 97 south on IL 97.
|
|
091-68J70
|
Active
|
05/01/2026
|
|
|
3
|
4
|
Woodford
|
|
9 miles of patching, CIR, resurfacing, guardrail replacedment, and ADA ramps on IL 117 from south of Raymond St to the US 150 intersection and on US 150 from west of the IL 117 intersection to the McLean County Line.
|
|
092-68J72
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Marshall
|
|
Resurfacing IL 89 from the Putnam County line to IL 17, South of Varna in Marshall County. 5.527 miles gross length.
|
|
093-68K14
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Henderson
|
|
Resurfacing IL 94 from IL 116 to 300N in Henderson County. 5.737 miles gross length.
|
|
094-68K18
|
Active
|
05/01/2026
|
1 / 1 |
1 |
3
|
4
|
Tazewell
|
|
Resurfacing US 24/IL 29 (Main St) from north of Wesley Rd to south of Poplar St in Creve Coeur in Tazewell County. 1.31 miles gross length.
|
|
095-68K19
|
Active
|
05/05/2026
|
|
|
3
|
4
|
McDonough
|
|
Resurfacing US 136 from 0.1 miles westof TR 226 to 0.1 miles west of CH 18, west of Macomb in McDonough County. 1.276 gross miles.
|
|
096-68K21
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Warren
|
|
Resurfacing BUS 67 from 0.5 mi. S. of 90th Ave., N. of Roseville to 0.4 mi. S. of 60th Ave., S. of Roseville. 2.79 miles gross length.
|
|
097-68K85
|
Active
|
05/05/2026
|
1 / 1 |
|
3
|
4
|
Peoria, Tazewell, Warren
|
|
Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties.
|
|
098-68K90
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Fulton
|
|
Partial depth HMA patching on US 24 and resurfacing (1,000 ft) rest area roadway in Fulton County. 0.402 mile total gross length.
|
|
099-68K93
|
Active
|
05/01/2026
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties.
|
|
100-68K96
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Tazewell
|
|
Partial and full depth HMA patching on Morton Ave from north of Clark St to Jackson St (US 150) in Morton. 0.205 mile gross length.
|
|
101-68K98
|
Active
|
05/05/2026
|
|
|
3
|
4
|
Stark
|
|
Partial and full depth patching on IL 93 from IL 91 (S) to IL 40 in Stark County. 9.54 miles gross length.
|
|
102-89864
|
Active
|
04/29/2026
|
|
|
3
|
4
|
Mercer
|
|
Removal and replacement of sidewalk along SW 6th St. from west of College Ave. (IL 94) to west of SW 9th Ave. in the city of Aledo.
|
|
103-89892
|
Active
|
04/29/2026
|
|
|
3
|
4
|
Mercer
|
|
Cape seal with pavement markings on CH 2 and bituminous surface treatment on CH 9 and CH 16 in Mercer County.
|
|
104-70794
|
Active
|
05/05/2026
|
1 / 0 |
|
3
|
5
|
McLean
|
|
4.99 miles of pavement rehab Designed_Overlay Resurfacing (INT-4th), Pipe Underdrains, 1.8 miles south of Shirley to I-55/74 Interchange southwest of Bloomington.
|
|
105-70E98
|
Deleted
|
05/07/2026
|
|
|
3
|
5
|
Douglas
|
|
11.867 miles of designed overlay, new shoulders, culvert replacements and extensions 0.5 mile east of I-57 to the Coles County Line.
|
|
106-70C08
|
Deleted
|
05/07/2026
|
|
|
3
|
5
|
McLean
|
|
2.834 Mi. of 3R D.O.L. Widening existing pavement, ADA improvements, traffic signal modernization, bridge deck overlay from Gregory St/Bowles St in Normal to Olive St in Bloominton.
|
|
107-70D62
|
Active
|
05/05/2026
|
|
|
3
|
5
|
Edgar
|
|
Replacement of SN 023-0014 with SN 023-0036 over the DandEI Railroad 0.3 miles west of the DandEI Railroad to 0.1 miles east of North 1800th St east of Paris. This requires roadway profile change on the eastern and western approaches to raise the grade of the bridge.
|
|
108-70F48
|
Active
|
05/01/2026
|
|
|
3
|
5
|
McLean
|
|
Paving and parking lot improvements at three (3) McLean County IDOT storage facilities located in Bloomington, Leroy, and Towanda. The work includes paving over existing HMA and aggregate surfaces, painting dedicated parking stalls, and any other work necessary to complete the project.
|
|
109-70G29
|
Active
|
05/05/2026
|
|
|
3
|
5
|
Champaign
|
|
0.72 mile of sanitary sewer at Illini Prairie Rest Areas.
|
|
110-70H86
|
Active
|
05/01/2026
|
|
|
3
|
5
|
Champaign
|
|
1.18 miles of patching and chip seal A-1 (Fog Seal), Ford Harris Rd to Hensley Rd north of Champaign.
|
|
111-72459
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Pike
|
|
6 miles of patching, HMA surface removal, HMA overlay, resurfacing HMA shoulders and aggregate wedge shoulders on IL 100 from 0.9 miles south of Oak Street in Milton to south of CH 10 (Vin Fiz Road) west of Pearl.
|
|
112-72491
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Sangamon
|
|
Patching, curb and gutter replacement, HMA removal and overlay, guardrail replacement and traffic signal replacement on I-55 Business from 0.2 miles north of Fancy Creek in Sherman to 0.2 miles north of Dirksen Parkway in Springfield.
|
|
113-72509
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Logan
|
|
Highway lighting upgrades on I-55 at the Broadwell interchange.
|
|
114-72512
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Morgan
|
|
Bridge deck patching on SN 069-0512 carrying US 67 southbound over Mauvaise Terre Creek, 1.3 miles east of Concord/Arenzville Road.
|
|
115-72547
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Menard, Sangamon
|
|
5.9 miles of resurfacing on IL 29 / IL 123 from 0.1 miles west of the Menard / Sangamon County line to the IL 29 / 123 junction and from the IL 123 junction to 0.1 miles south of Andrew Road.
|
|
116-72552
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Cass
|
|
Gutter removal and replacement on IL 78 from south of CH 7 (Chandlerville Road) to north of Virginia.
|
|
117-72601
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Pike
|
|
Bridge deck overlay and bridge painting on SN 075-0098 and 075-0099 carrying I-72 over TR 92 (250th Street), NS Railroad, Hadley Creek and TR 149 (315th Street), 1.8 miles west of CH 4 at the Barry interchange.
|
|
118-72639
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Adams, Pike
|
|
9.8 miles of shoulder repair on I-72 from I-172 to 0.9 miles east of IL 96 and on I-172 from I-72 to 0.9 miles south of IL 57.
|
|
119-72E71
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Logan
|
|
Bridge joint repairs at various locations on I-55 near Lincoln.
|
|
120-72E72
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Hancock
|
|
Shoulder repairs on IL 110, IL 336 from CH 10 to the Adams County line.
|
|
121-72E73
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Schuyler
|
|
Riprap installation and minor bridge repairs on SN 085-0039 carrying IL 100 over Sugar Creek, 2.3 miles north of Frederick.
|
|
122-72E76
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Sangamon
|
|
Structural steel repairs on SN 084-0106 and 084-0111 over I-55 at the Divernon and Glenarm interchanges.
|
|
123-72D17
|
Deleted
|
05/07/2026
|
|
|
4
|
6
|
Sangamon
|
|
1 mile of roadway reconstruction on 6th Street from the I-55/I-72 interchange to Stevenson Drive.
|
|
124-72D29
|
Active
|
05/01/2026
|
2 / 1 |
|
4
|
6
|
Adams
|
|
HMA surface removal, HMA resurfacing, paved shoulders with rumble strips, concrete gutter replacement and guardrail replacement on US 24 from 0.1 miles east of IL 96 (N) to 0.1 miles east of 1343rd Lane (Old US 24) east of Fowler.
|
|
125-72J41
|
Active
|
05/01/2026
|
1 / 0 |
|
4
|
6
|
Adams
|
|
4.6 miles of resurfacing, ADA improvements and bridge deck repairs on IL 96 from south of Birch Street in Ursa to 0.4 miles north of US 24.
|
|
126-72J76
|
Active
|
05/01/2026
|
|
|
4
|
6
|
Schuyler
|
|
Microsilica concrete overlays on IL 99 at Cedar Creek 0.5 miles north of Camden and Missouri Creek and Little Missouri Creek 1 mile and 0.3 miles north of the Brown County line. (085-0031, 085-0030, and 085-0029)
|
|
127-93848
|
Active
|
04/29/2026
|
|
|
4
|
6
|
Adams
|
|
HMA resurfacing of North 36th St. from Wavering Park Rd. to Wisman Ln.
|
|
128-93854
|
Active
|
04/29/2026
|
|
|
4
|
6
|
Christian
|
|
Construction of PCC sidewalk with ADA compliance from Pana Junior High School to residential areas in the city of Pana.
|
|
129-93857
|
Active
|
04/29/2026
|
|
|
4
|
6
|
Scott
|
|
Full-depth reclamation with soil cement base, surface profiling and bituminous surface treatment on CH 14 from north of Walnut Creek to I-72 in Scott County.
|
|
130-93858
|
Active
|
04/29/2026
|
|
|
4
|
6
|
Hancock
|
|
Microsurfacing on Ferris Road from 1000E Road to 1750 Road in Hancock County.
|
|
131-74435
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Coles
|
|
Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a cloverleaf to a raindrop diamond configuration.
|
|
132-74650
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Coles
|
|
Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004)
|
|
133-74705
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Macon
|
|
Replacement of 2 structures carrying I-72 over IL 121 and the IC Railroad, northwest of Decatur. (SN 058-0074 and 058-0075)
|
|
134-74829
|
Active
|
05/01/2026
|
1 / 0 |
|
4
|
7
|
Moultrie
|
|
1.5 miles of resurfacing with curb and gutter upgrades on IL 32 in Sullivan.
|
|
135-74856
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Macon
|
|
Bridge replacement on US 36/IL 121 over Lake Shore Drive in Decatur. (SN 058-0019)
|
|
136-74E26
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Wabash
|
|
7.7 miles of shoulder reconstruction on IL 1 from E. 1200 Road (Bridgeport Road) to the Lawrence County line.
|
|
137-74A10
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Macon
|
|
Replacement of SN 058-0021 carrying US 36 over Long Creek tributary approximately 1.6 miles east of IL 121.
|
|
138-74B79
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Richland
|
|
Bridge joint replacement, bridge deck patching, bridge deck scarification and overlay, and new approaches on SN 080-0009 carrying IL 130 over East Fork Fox River, 0.4 miles north of County Road 1275N, north of Olney.
|
|
139-74D08
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Macon
|
|
Bridge joint replacement, bridge deck patching, bridge deck scarification, bridge deck overlay and slope wall repairs at four four structures located on I-72 / US 51 at Eldorado Street and Grand Avenue North at the Harristown Interchange. (SN 058-0068, 058-0069, 058-0070, 058-0071)
|
|
140-74D42
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Effingham
|
|
Demolition of buildings, tree removal, sign removal, and seeding on US 40 / IL 33 (Fayette Avenue) from Banker Street to Willow Street in Effingham.
|
|
141-74D51
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Effingham
|
|
Fencing removing and replacement at the Effingham Maintenance Yard.
|
|
142-74D52
|
Active
|
05/01/2026
|
1 / 0 |
|
4
|
7
|
Clark
|
|
17.5 miles of resurfacing on US 40 from IL 49 to IL 1 in Marshall.
|
|
143-74D54
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Coles
|
|
8 miles of resurfacing, aggregate wedge shoulder, HMA shoulders and patching on Old IL 316, 0.2 miles north of IL 16 in Mattoon to D Street in Charleston.
|
|
144-74D55
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Macon
|
|
4.3 miles of patching, milling and resurfacing on US 51 from 0.8 miles south of US 36 to 0.3 miles east of US 51 Business southwest of Decatur.
|
|
145-74D58
|
Active
|
05/01/2026
|
|
|
4
|
7
|
Wayne
|
|
Applying chip seal at the Fairfield Maintenance Yard.
|
|
146-95996
|
Active
|
04/29/2026
|
|
|
4
|
7
|
Effingham
|
|
Reconstruction of intersections along US 40 from Race Street to Wall Street in the village of Teutopolis.
|
|
147-95997
|
Active
|
04/29/2026
|
1 / 0 |
|
4
|
7
|
Fayette
|
|
Construction of sidewalks from Kaskakia College to various locations in the city of Vandalia.
|
|
148-95A06
|
Active
|
05/05/2026
|
|
|
4
|
7
|
Cumberland
|
|
Full-depth pavement reclamation with an A-2 bituminous surface treatment on 1200E Road from the north corporate limits of Toledo to 1050N Road.
|
|
149-95A12
|
Active
|
04/29/2026
|
|
|
4
|
7
|
Shelby
|
|
A-2 bituminous surface treatment on CH 15 from the southern city limit of Tower Hill to the northern city limit of Herrick.
|
|
150-76M95
|
Active
|
05/01/2026
|
1 / 1 |
|
5
|
8
|
Washington
|
|
Resurfacing on I-64 from 0.5 miles west of Beaver Pond Creek to 0.9 miles west of CH 11.
|
|
151-76R32
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Madison
|
|
New bridge deck on SN 060-0120 carrying IL 111 / IL 3 over Rodgers Avenue and Bloomer Drive in Alton.
|
|
152-76R36
|
Active
|
05/07/2026
|
|
|
5
|
8
|
St. Clair
|
|
Bridge deck patching, microsilica concrete overlay, joint replacement, end diaphragm replacement, and cleaning and painting of beam ends and fascia beams on I-64 over Little Silver Creek and Silver Creek, 1.5 miles west of the IL 4 interchange. (SN 082-0186, 082-0188, 082-0187 and 082-0189)
|
|
153-76U38
|
Active
|
05/01/2026
|
1 / 0 |
|
5
|
8
|
Madison, St. Clair
|
|
Traffic signal replacement at various locations in Madison and St. Clair Counties.
|
|
154-76U54
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Bond
|
|
9.6 miles of micro-surfacing on IL 127 from the Montgomery County line to 0.1 miles north of IL 140.
|
|
155-76U76
|
Active
|
05/01/2026
|
|
|
5
|
8
|
St. Clair
|
|
Bridge deck repairs and deck overlay on SN 082-0007 carrying I-55 / I-64 over Tendley Avenue in East St. Louis.
|
|
156-76U77
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Marion
|
|
Bridge repairs, deck repairs and joint replacement/repairs on SN 061-0077 carrying US 51 over IC Railroad.
|
|
157-76U81
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Bridge cleaning at various locations in Madison and St. Clair counties.
|
|
158-76U82
|
Active
|
05/01/2026
|
|
|
5
|
8
|
St. Clair
|
|
Bridge deck repairs on SN 082-0251 and 082-0252 carrying I-55 / I-64 over IL 3 ramps and UP Railroad.
|
|
159-76U86
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Madison
|
|
Bridge painting on IL 3 over NS Railroad in Granite City. (SN 060-0193 and 060-0194)
|
|
160-76U96
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Various
|
|
Highway lighting and traffic signal maintenance at various locations throughout District 8.
|
|
161-76U97
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Various
|
|
Guardrail and cable median repairs at various locations in District 8.
|
|
162-76U98
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Various
|
|
Maintenance and service of all ITS equipment at various locations throughout District 8.
|
|
163-76V03
|
Active
|
05/05/2026
|
|
|
5
|
8
|
Madison
|
|
Bridge painting on SN 060-0350 and 060-0351 carrying I-270 over the Mississippi River.
|
|
164-76V06
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Jersey, Madison
|
|
40.25 miles of tree removal at various locations in Madison and Jersey Counties.
|
|
165-76V08
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Various
|
|
Various interstate bridge deck patching on a callout basis throughout District 8.
|
|
166-76V09
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Various
|
|
Structural repairs to various bridges at various locations throughout District 8.
|
|
167-76V11
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Madison
|
|
13 miles of pavement patching on IL 140 from Hamel to Alhambra and on IL 4 from IL 143 to south of US 40.
|
|
168-76V12
|
Active
|
05/01/2026
|
|
|
5
|
8
|
St. Clair
|
|
0.4 miles of patching and slurry seal on South 26th Street from Bond Avenue to IL 15 in East St. Louis.
|
|
169-76V13
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Various
|
|
Traffic signal modernization at various locations throughout District 8.
|
|
170-76V17
|
Active
|
05/01/2026
|
1 / 0 |
|
5
|
8
|
Madison
|
|
10.4 miles of bridge repairs and resurfacing on I-55/I-70/US 40 from 0.5 miles west of Black Lane to 0.4 miles east of IL 159.
|
|
171-76V18
|
Active
|
05/01/2026
|
|
|
5
|
8
|
Clinton, St. Clair
|
|
6.5 miles of longitudinal joint repair on I-64 from 0.5 miles west of IL 4 in Mascoutah to 0.3 miles east of the Clinton County line.
|
|
172-97884
|
Active
|
04/29/2026
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Resurfacing North Alby Street from Humber tRoad to Wesley Way in the village of Godfrey.
|
|
173-97896
|
Active
|
05/05/2026
|
|
|
5
|
8
|
Madison
|
|
Sidewalk construction along various streets in the village of Worden.
|
|
174-97897
|
Active
|
04/29/2026
|
|
|
5
|
8
|
Monroe
|
|
Cold-in-place pavement recycling on Bluff Road from DD Road to Hanover Road in Monroe County.
|
|
175-97899
|
Active
|
04/29/2026
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing Martin Luther King Jr. Drive from State Street to Columbia Place in the city of East St. Louis.
|
|
176-97903
|
Active
|
04/29/2026
|
|
|
5
|
8
|
Madison
|
|
Traffic signal installation at the intersection of Horseshoe Lake Road and McDonough Lake Road in the city of Collinsville.
|
|
177-78791
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Alexander
|
|
Removal and replacement of SN 002-0012 carrying IL 3 over a drainage ditch 0.5 miles west of IL 127.
|
|
178-78977
|
Active
|
05/01/2026
|
1 / 0 |
|
5
|
9
|
Franklin
|
|
Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks.
|
|
179-78A13
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Union
|
|
Box culvert replacements at 4 locations: 1) SN 091-2005 carrying IL 127 over a stream, 3.0 miles northwest of Jonesboro; 2) SN 091-2012 carrying IL 146 over a stream, 0.6 miles west of Jonesboro 3) SN 091-7022 carrying Old US 51 over an unnamed ditch south of Dongola 4) SN 091-7027 carrying US 51 over an unnamed ditch. 3.0 miles south of Anna.
|
|
180-78A85
|
Active
|
05/05/2026
|
|
|
5
|
9
|
Alexander
|
|
Pavement patching, HMA removal, HMA resurfacing, shoulder work and ADA upgrades on US 51 from 0.29 miles south of New Cross Street to 3.38 miles south of New Cross Street. Includes small portions of Patierdale Road, Kessler Road and Turner Lane.
|
|
181-78B49
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Jefferson
|
|
0.4 miles of pavement removal with PCC replacement, aggregate subgrade improvement, shoulders, curb and gutter, median island and ramp pavement patching on I-64 from Bunny Farm Road to just past the I-64 westbound ramp.
|
|
182-78B59
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Franklin
|
|
1.8 miles of resurfacing on IL 148 from IL 14 to Yellow Bank Road.
|
|
183-78B80
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Franklin
|
|
10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line.
|
|
184-78B94
|
Active
|
05/07/2026
|
|
|
5
|
9
|
Saline
|
|
Mast arm upgrades at the intersection of US 45 and IL 13.
|
|
185-78C10
|
Active
|
05/01/2026
|
|
|
5
|
9
|
White
|
|
Repairs to SN 097-0062 carrying US 45 over Skillet Fork Creek, 0.8 miles south of Mill Shoals.
|
|
186-78C13
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Williamson
|
|
Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13.
|
|
187-78C15
|
Active
|
05/01/2026
|
|
|
5
|
9
|
White
|
|
Painting two bridges over I-64 in White County. (SN 097-0045 and 097-0050)
|
|
188-78C18
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Jackson, Williamson
|
|
9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange.
|
|
189-78C20
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Various
|
|
Various electrical repairs and/or replacements at various locations throughout District 9.
|
|
190-78C24
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Perry
|
|
5.8 miles of resurfacing on IL 127 from 0.3 miles north of Deer Run Road to the Washington County line.
|
|
191-78C25
|
Active
|
05/01/2026
|
|
|
5
|
9
|
Perry
|
|
2.8 miles of resurfacing on IL 150 from 0.2 miles north of Cutler (Reeses Hill Road) to IL 154.
|
|
192-99748
|
Active
|
04/29/2026
|
|
|
5
|
9
|
Williamson
|
|
Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of Marion.
|
|
193-99769
|
Active
|
04/29/2026
|
|
|
5
|
9
|
Massac
|
|
Resurfacing Grand Chain Road from Pulaski County Line to Boaz Road.
|
|
194-99770
|
Active
|
04/29/2026
|
|
|
5
|
9
|
Pope
|
|
Resurfacing Bay City Road from 0.4 mile south of Azotus Road to 1.1 miles north of Upper Bottom Road.
|
|
195-99771
|
Active
|
04/29/2026
|
|
|
5
|
9
|
Jefferson
|
|
HMA resurfacing of Tolle Rd. from E. Breezeway Rd. to N. Miller Lake Ln. in Jefferson County.
|
|
196-99772
|
Active
|
04/29/2026
|
|
|
5
|
9
|
Hamilton
|
|
HMA resurfacing with aggregate shoulders and pavement marking on Blairsville Rd. from IL 242 to the White County Line in Hamilton County.
|
|
197-70G92
|
Active
|
05/06/2026
|
|
|
3
|
5
|
Champaign
|
|
0.75 mile of intersection reconstruction at Leverett Rd north of Urbana and at Flatville Rd in Thomasboro.
|
|
198-61M10
|
Active
|
05/06/2026
|
|
|
1
|
1
|
Kane
|
|
Traffic signal modernization along Indian Trail Road between Ohio Street and Pennsbury Lane in the city of Aurora.
|
|
199-61M49
|
Active
|
05/06/2026
|
|
|
1
|
1
|
Cook
|
|
Installation of pedestrian lighting along the illinois Prairie Path in the village of Maywood.
|
|
200-64N73
|
Active
|
05/06/2026
|
|
|
2
|
2
|
Stephenson
|
|
1.33 miles of pavement patching, cold milling, and HMA resurfacing along with ADA improvements and traffic signal modifications on US Bus 20 from Park Blvd to Clark St in Freeport.
|
|
201-64S70
|
Active
|
05/06/2026
|
|
|
2
|
2
|
Stephenson
|
|
5.0 miles of pavement patching, cold milling, and HMA resurfacing on IL 26 from the Wisconsin State Line to Brush Creek near Orangeville.
|
|
202-85792
|
Active
|
05/06/2026
|
|
|
2
|
2
|
Stephenson
|
|
Cold-in-place recycling on Orangeville Road from McConnell Road to IL 26.
|
|
203-87851
|
Active
|
05/06/2026
|
|
|
2
|
3
|
Kankakee
|
|
Replace the bridge carrying CH 14 over Trim Creek located 3.3 miles south of IL 17.
|
|
204-97827
|
Active
|
05/06/2026
|
|
|
5
|
8
|
St. Clair
|
|
Construction of a southbound right-turn lane at the intersection of Old Collinsville Road and Ashland Avenue.
|
|
205-64U86
|
Active
|
05/06/2026
|
|
|
2
|
2
|
Winnebago
|
|
1.5 miles of pavement patching along Alpine Rd. between Riverside Blvd and Spring Creek Rd.
|
|
206-64V25
|
Active
|
05/06/2026
|
|
|
2
|
2
|
Winnebago
|
|
Resurfacing US 20 ramp intersection returns at Montague Rd. and Meridian Rd.
|
|
207-66R94
|
Active
|
05/06/2026
|
|
|
2
|
3
|
Grundy
|
|
Cleaning and painting all structural steel and non-structure steel components at SN 032-0092 carrying Carbon Hill Rd. over I-55 approx 4.8 mi. South of Reed Rd in Grundy County.
|
|
208-66T32
|
Active
|
05/06/2026
|
|
|
2
|
3
|
Livingston
|
|
Herbicide, seeding, landscaping, and maintenance for this pollinator project located along FAI 55 (I-55) at the Limestone Rest Area sites south of Pontiac, IL.
|
|
209-66T60
|
Active
|
05/06/2026
|
|
|
2
|
3
|
Various
|
|
Removal and proper disposal of medium (6-15 inch diameter) and large (greater than 15 inch diameter) trees, tree trimming, clearing of undesirable bushes, and the maintenance of old growth oak trees along state-maintained routes of Bureau, La Salle, Livingston, and Grundy counties. Work will be limited to occur between October 1, 2026 and March 31st, 2027 due to Threatened and Endangered Species (TandE).
|
|
210-70H72
|
Active
|
05/06/2026
|
|
|
3
|
5
|
Vermilion
|
|
Wing wall repair at Kickapoo Pond 0.2 mi west of Skykine Dr. west of Tilton.
|
|
211-70J03
|
Active
|
05/06/2026
|
|
|
3
|
5
|
McLean, Piatt
|
|
Bridge painting of two structures on I-55 and I-72 in McLean and Piatt Counties. SN's 057-0177 and 074-0058.
|
|
212-62L30
|
Active
|
05/07/2026
|
|
|
1
|
1
|
Cook
|
|
(2.95-Mile) Roadway Reconstruction and widening with hot-mix asphalt pavement, resurfacing, multi-cell box culverts, pipe culverts, storm sewer systems, ditch grading, curb and gutter, pavement markings, landscaping, guardrail. Located on Main Street is a two-lane roadway located in the Village of Lemont and unincorporated Cook County.
|
|
213-62V08
|
Active
|
05/07/2026
|
|
|
1
|
1
|
Cook, DuPage, Kane
|
|
The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County.
|
|
01A-LO034
|
Active
|
05/05/2026
|
|
|
4
|
6
|
Logan
|
|
Replace Airport Perimeter Fencing, Phase 1
|
|
02A-VE060
|
Deleted
|
05/07/2026
|
|
|
3
|
5
|
Vermilion
|
|
Reconstruct Automated Weather Observation System III
|
|
03A-DU097
|
Active
|
05/05/2026
|
|
|
1
|
1
|
DuPage
|
|
Rehabilitate Taxiway C, Phase 2
|
|
04A-LA046
|
Active
|
05/05/2026
|
|
|
1
|
1
|
Cook
|
|
Rehabilitate Runway 9/27
|
|
05A-KA056
|
Active
|
05/05/2026
|
|
|
2
|
3
|
Kankakee
|
|
Rehabilitate Taxiway A, Phase 2
|
|
06A-BL074
|
Active
|
05/05/2026
|
|
|
3
|
5
|
McLean
|
Voluntary
|
Rehabilitate Runway 11/29: Phase 2 Construction
|
|
07A-BU001
|
Active
|
05/05/2026
|
|
|
1
|
1
|
Will
|
|
Install Airport Perimeter Fencing, Phase 1
|
|
08A-DE089
|
Active
|
05/05/2026
|
|
|
4
|
7
|
Macon
|
|
Reconstruct Runway 6/24 Lighting, Airfield Guidance Signs and Wind Cones - Construction
|
|
09A-LE058
|
Active
|
05/05/2026
|
|
|
1
|
1
|
Will
|
|
Reseal Runway 2/20
|
|
10A-RB024
|
Active
|
05/05/2026
|
|
|
4
|
7
|
Crawford
|
|
Reconstruct Airport Lighting Vault Equipment and Rehabilitate Airport Rotating Beacon
|