Home > Notice of Letting

June 12, 2026 Letting 12:00 PM
Notice of Letting
Volume 029, No. 018

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-46952 Active 05/05/2026 1 1 Cook (2.69-Mile) Project consists of resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs. The work includes hot- mix asphalt resurfacing of roadway and parking areas, striping of park roadways and parking lots, bridge construction, pipe culvert replacements, sign replacements, multi-use path improvements, sidewalk and ADA improvements, and other miscellaneous improvement items. Project is in William Powers State Park, located in the City of Chicago in Cook County.
002-62M71 Active 05/01/2026 1 / 1 1 1 Kane, Kendall (3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists of earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pavement, hot-mix asphalt binder and surface courses, pavement removal, PCC shoulder, hot-mix asphalt shoulder, combination concrete curb and gutter, concrete median, PCC sidewalk, drainage improvements, sheet pile retaining wall, cast in place box culverts, traffic signal installation, water main relocation, lighting, landscaping, erosion and sediment control, traffic control and protection. IL-47 from Jericho Road to south of Galena Road is within the City of Yorkville, Village of Sugar Grove and unincorporated Kane County and Kendall Counties.
003-62R61 Active 05/01/2026 1 1 Cook (710.53-Ft) Bridge Replacement and widening project (SN 016-2015) include pavement resurfacing/reconstruction, curb and gutter replacement, sidewalk replacement (including ADA improvements), various drainage improvements, watermain (including jacking beneath I-290), signing, pavement markings, bridge and underpass lighting, traffic signal modernization, replacement storm manhole The project is in the City of Chicago, Cook County on Laramie Ave. over I-290.
004-62T46 Active 05/01/2026 1 1 Cook (350.89-Ft) Bridge Deck Overlay consists of Bridge Joint Replace, bearing and Substructure Repairs. This improvement is located along 131st Street over Metra Railroad (SN 016-2611) located in Cook County, Illinois.
005-62U72 Active 05/01/2026 1 / 0 1 1 McHenry (8,360-Ft) Roadway add lanes and reconstruction project consists of pavement removal, earth excavation and placement of embankment, precast box culvert installation, bridge replacement, storm sewer installation, construction of new PCC pavement with combination concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations, highway lighting replacement, water main and sanitary sewer relocation, placement of pavement marking, landscaping, erosion and sediment control. This project is in the City of McHenry within McHenry County.
006-62V63 Active 05/01/2026 1 1 McHenry (0.895-Mile) Project consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. Location is in the City of Algonquin, McHenry County.
007-62V77 Active 05/05/2026 1 1 Lake (9,669-Ft) Crack and Joint Sealing project consists of routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between the existing HMA pavement and curb and gutter, restriping with Modified Urethane pavement marking lines. The project is located within the Village of Lake Villa and unincorporated Lake Villa Township in Lake County.
008-62V78 Active 05/01/2026 1 1 DuPage, Kane (1.31-Mile) This is a crack and joint sealant improvement consisting of routing cleaning, and sealing of longitudinal cracks and joints within concrete pavement, concrete patching, grading and shaping shoulders, some guardrail replacement, modified urethane pavement marking. This improvement is located within the City of Geneva and West Chicago in Kane and DuPage Counties.
009-62W82 Active 05/01/2026 1 1 Various This project proposes converting the entire closed loop system into a centralized traffic management system with remote connection capabilities. This project will install new single mode fiber optic cable, network switches, PTZ cameras and ATC controllers among other equipment to allow for remote access and monitoring capabilities at these locations. There are eighty-two (82) signalized intersections proposed on this project located in Cook and DuPage Counties within the Cities of Rolling Meadows and Des Plaines, and the Villages of Mount Prospect, Elk Grove and Bensenville.
010-62W83 Active 05/01/2026 1 1 Cook This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. The Project is in three different areas of Cook County.
011-62W91 Active 05/01/2026 1 1 Cook This project proposes adding 10 traffic signals into the Central Traffic Management System and connecting two existing closed-loop systems together consists of installing fiber optic cable, network switches, PTZ Cameras and traffic controllers among other equipment to allow for remote access and monitoring capabilities. The project is in the Village of Olympia Fields, Village of Franklin Park, City of Northlake and City of Berwyn in Cook County.
012-62W99 Active 05/01/2026 5 / 2 1 1 Cook The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement patching, storm sewer cleaning, bridge deck repairs, superstructure repairs, substructure repairs, lighting. Located in the Elk Grove Township and City of Schaumburg, Cook County, on IL 53/I-290 from south I-90 interchange to IL 72 (Higgins Rd).
013-62X28 Active 05/01/2026 1 / 1 1 1 Will (1,079.50-Ft) Bridge Joint replace/repair culvert repair, and wing wall and abutment repair project consist of concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed joint seal, and polymer concrete, guardrail removal and replacement, traffic control, erosion control, furnishing and placing topsoil. This project is in the Village of Channahon in Will County, Illinois.
014-62X37 Active 05/01/2026 1 1 Will (4.25-Mile) Furnishing and installing landscaping along I-80 corridor from Gardner Street to Gouger Road in the City of Joliet, Joliet Township and the Village of New Lenox within Will County.
015-62X52 Active 05/01/2026 1 1 DuPage The project consists of a full depth patching of the top slab over the culvert at the unnamed stream, concrete repair of the north headwall. Located at culvert (SN# 022-0567) in the City of Darien in DuPage County.
016-80B17 Active 05/01/2026 1 1 Will (2,809-Ft) Smart Overlay consists of thermoplastic pavement markings, and incidental work. Located in the City of Crete in Will County.
017-80B22 Active 05/01/2026 1 1 Cook (3.71-Mile) SMART overlay, proposed pavement markings, ADA ramp details at the ramps listed, installing APS push buttons at all signalized intersections listed, and replacement of all loop detectors impacted by the resurfacing. Project located at US 41 (Skokie Blvd)/ IL 50 (Cicero Ave) from Golf Road to Devon Ave is in the Villages of Skokie and Lincolnwood in Cook County, IL.
018-80B23 Active 05/01/2026 1 1 Kane (2.81-Mile) SMART Overlay and Shoulder Repair consist of pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings, shoulder work, rumble strips. The improvement is in the Villages of Gilberts and Pingree Grove in Kane County.
019-80B28 Active 05/01/2026 1 1 Cook (4,957.13-Ft) HMA overlay of existing concrete pavement and ADA improvements. The roadway scope of work includes HMA pavement, curb removal and replacement, median removal and replacement, pavement patching, driveway removal and replacement, thermoplastic pavement markings, ADA improvements, and traffic signal/APS improvements. Project is located along IL Route 62 (Algonquin Road) from Radisson Way to Barker Avenue in Rolling Meadows and Schaumburg, Illinois.
020-80B33 Active 05/01/2026 1 1 Cook (5,764-Ft) Design Overlay, ADA Improvements consists of (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. The project is located within the City of Harvey in Cook County.
021-80B35 Active 05/01/2026 1 1 Cook (1.53-Mile) SMART overlay and ADA Improvement project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing hot-mix asphalt, pavement markings, raised reflective pavement markers, ADA ramps, traffic signals, and detector loops. Project is in the Village of River Grove, Village of Schiller Park and City of Chicago in Cook County.
022-80B47 Active 05/01/2026 1 1 Cook Bridge Painting project consists of reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair. Project is located on FAI 90/94 (Kennedy Expressway) under Ainslie Street in the City of Chicago. (SN 016-1105)
023-80B51 Active 05/01/2026 1 1 Cook (0.20-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental work. The project is located at structure No. 1 (SN. 016-0436) carrying the IHB Railroad over US 12/20 (95th ST) in the Village of Bridgeview in Cook County.
024-80B58 Active 05/01/2026 1 1 Cook (3.20-Mile) Project consists of drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Villages of Forest Park, Maywood, Broadview, Bellwood and Westchester within Cook County.
025-80B66 Active 05/01/2026 1 1 Cook This is a permanent protective shielding project and the work to be performed under this contract consists of installation of permanent protective shielding as shown on the plans and any incidental and collateral work necessary to complete located at various structures carrying Circle Ave, Harlem Ave and California Ave Over I-290 (Eisenhower) in the Villages of Oak Park, Forest Park and City of Chicago, in Cook County.
026-80B77 Active 05/01/2026 1 1 Will The project consists of the removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb and gutter removal and replacement, median surface removal and replacement, sidewalk improvements, pavement marking, landscaping, and erosion control located in Village of Bolingbrook, Will County, Illinois.
027-80B78 Active 05/01/2026 1 1 Cook (1.90-Mile) Project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from 51st Street to 59th Street in the City of Chicago, in Cook County.
028-80B87 Active 05/01/2026 1 1 Cook (5.37-Mile) Project consists of a design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter located in the Villages of Wheeling and Arlington Heights and the City of Prospect Heights in Cook County.
029-80C45 Active 05/01/2026 1 / 1 1 1 McHenry (1.2-Mile) Standard Overlay for US 14 and SMART Overlay for South Frontage Road project includes pavement patches, HMA surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, raised reflective pavement markers. The project is located within the City of Woodstock.
030-80C48 Active 05/01/2026 1 1 Lake (3,760-Ft) Standard Overlay, HMA surface removal and overlay, pavement patching maintenance of traffic, pavement marking, landscaping, ADA curb ramps, APS improvements, curb and gutter removal and replacement, median removal and replacement, guardrail removal and replacement, impact attenuator installation, bridge pier crash wall repairs. Located on W. Peterson Road from west of IL 137 to US 45 in the Village of Libertyville in Lake County.
031-80C89 Active 05/01/2026 1 1 Cook, Lake This work includes mast arm and pole replacement, installation of LED signal heads, installation of accessible pedestrian signals, controller replacement and all incidental and collateral work necessary to complete the project. This project is located in Lake and Cook Counties in District 1.
032-80C90 Active 05/01/2026 1 1 Cook (2,470-Ft) Bridge repair work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfolk Southern Railroad east and west spurs. Work includes installation of temporary shoring towers, structural steel repair, protective shielding, pavement marking and signing, traffic control and protection in the City of Chicago, Cook County
033-80C96 Active 05/01/2026 1 1 Various Forestry, weed control, and landscape work includes pruning, tree removal, and selective clearing of trees, shrubs, and brush, controlling and removing invasive weeds repairing, installing, and establishing new vegetative material including trees, shrubs, and seeding. Located within the right-of-way limits within the municipal limits of Chicago, Lincolnwood, Skokie, Morton Grove, Wilmette, Northfield, Glencoe, and Northbrook.
034-80C97 Active 05/01/2026 1 1 Cook (110-Ft) Project consists of advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue. The total length of the project is 110 feet (0.02 miles). The project is in the City of Chicago in Cook County.
035-80D00 Active 05/01/2026 1 1 Cook (4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Cook County.
036-80D36 Active 05/01/2026 1 1 Will This is an advanced procurement of selective mechanical and electrical components for the existing movable bridge (SN 099-0101) including the furnishing of the machinery brakes, motor brakes, and select bearings for the movable structure located at US 30 (Cass Street) Bridge over the Des Plaines River in the City of Joliet in Will County.
037-80D46 Active 05/01/2026 1 1 Lake The scope of work for this improvement includes a new 5x3 culvert under US 41 with associated pavement removal and patching, ditch grading, pavement removal and patching, temporary concrete barriers, curb and gutter, barrier median and landscaping. Located in the Village of Lake Bluff and Shields Township in Lake County.
038-61L30 Active 04/29/2026 1 1 Kane Full-depth reclamation and HMA surfacing of Brown Road, Campton Hills Road, Denker Road and Town Hall Road in the village of Campton Hills.
039-61M42 Active 04/29/2026 1 1 Kane Resurfacing Wheeler Road from Esker Drive to IL 47 in the village of Sugar Grove.
040-61M43 Active 05/07/2026 1 1 Kane Resurfacing Dugan Road from North Wheeler Road to south of Fays Lane in the village of Sugar Grove.
041-61M44 Active 05/07/2026 1 1 Kane Resurfacing 1st Street from IL 72 to Dunning Avenue in the village of West Dundee.
042-61M46 Active 04/29/2026 1 1 Cook HMA resurfacing of Skokie Boulevard from the southern city limits to Lake-Cook Road in the village of Northbrook.
043-61M51 Active 04/29/2026 1 1 Cook Reconstruction of HMA trail from 109th Street and Lavergne Avenue to Harold L. Richards High School in the village of Oak Lawn.
044-61M53 Active 04/29/2026 1 1 Cook Resurfacing Lexington Drive from Lake Cook Road to McHenry Road in the village of Wheeling.
045-64L94 Active 05/01/2026 2 2 Henry 0.91 miles of reconstruction on IL 81 from 0.2 miles west of Union St to 0.3 miles west of IL 78 in Kewanee. This includes ADA improvements.
046-64T07 Active 05/01/2026 2 2 Ogle Bridge repairs and joint replacement on SN 071-0036, carrying IL 72 over drainage, 4.1 miles east of IL 26 and SN 071-0037, carrying IL 72 over drainage, 7.9 miles east of IL 26.
047-64T46 Active 05/01/2026 2 2 Whiteside Bridge repairs, deck overlay and joint replacement on SN 098-0103, carrying IL 78 over Coon Creek, 1.8 miles south of Prophetstown.
048-64T47 Active 05/01/2026 2 2 Ogle Bridge repairs, deck overlay and joint replacement on SN 071-0078, carrying IL 64 over Pine Creek, 4.1 miles east of IL 26.
049-64T58 Active 05/01/2026 2 2 Stephenson Bridge repairs and joint replacement on SN 089-0038, carrying IL 75 over Pecatonica River in Freeport.
050-64V31 Active 05/01/2026 2 2 Various Intersection safety improvements at US 52/IL 64 and IL 78 in Carroll County, US 52 and Freeport Rd. and IL 72 and River Rd. in Ogle County, IL 70 and Meridian Rd. and IL 75 and Meridian Rd. in Winnebago County, and IL 251 and Chicago/Shaw Rd. in Lee County.
051-64V39 Active 05/01/2026 2 2 Stephenson 1.41 miles of patching and standard overlay on South St from Locust Ave to Galena Ave in Freeport.
052-64V40 Active 05/01/2026 2 2 Rock Island Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of IL 5 and ends approximately 0.4 miles south of IL 5. The work along IL 5 begins at 16th St and ends approximately 0.3 miles east of I-74. the gross length of the project is 10,559 ft.
053-64V42 Active 05/01/2026 2 2 Whiteside 0.76 miles of patching, cold milling, and standard overlay on WB IL 2 East 4th St to IL 40 in Sterling.
054-85791 Active 04/29/2026 2 2 Winnebago Construction of a shared-use path along Rockton Road from 0.1 mile west of Aspland Drive to Old Meadow Lane in the village of Rockton.
055-85794 Active 04/29/2026 2 2 Rock Island Sidewalk replacement and construction of new sidewalks at various locations in the city of Rock Island.
056-66A91 Active 05/01/2026 2 3 LaSalle Pavement resurfacing on the I-80 and I-39 interchange entrance/exit ramps with minor rehabilitation and repair work at select structures, improvements to existing pipe and box culverts, slope and ditch grading, upgrading guardrails, impact attenuators, high tension cable barriers, and superelevation on FAI 80(I-80) from 0.1 miles east of IL-351 to 0.3 miles west of IL-178. Approximately 4.13 miles gross length.
057-66C06 Active 05/01/2026 2 3 Grundy Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe culvert end section_replacements and cleaning, detector loop replacement, pavement marking, and raised reflective pavement markers on US 6 beginning at IL 47 in Morris, and ends 0.7 miles west of Nigas Road._Approximately 6.81 miles gross length.
058-66K39 Active 05/01/2026 2 3 Ford Improvements to a dual structure (SN 027-0052 and 027-0053) which carries Interstate 57 (I-57) over Big Four Ditch about 2.4 miles south of IL 9 in Ford County.
059-66M80 Active 05/01/2026 2 3 Iroquois Superstructure replacement of various structures on I-57 including SN 038-0003, SN 038-0004, SN 038-0005, SN 038-0006, SN 038-0009 and SN 038-0010. The project includes deck replacements of SN 038-0007 and SN 038-0008; structure repairs on SN 038-0001, SN 038-0002, SN 038-0031, which include bridge latex overlay; and repairs on SN 038-0086 and SN 038-0129. There are also two median crossovers and pavement marking replacement. Project is located along I-57 from 0.3 miles north of Prairie Creek to 0.7 miles south of N600E Rd in Iroquois County.
060-66M84 Active 05/01/2026 2 3 LaSalle Removal of the existing box culvert (SN 050-2546) and replacement with 2-42" EQRS 42" culverts on US 34 over Mendota Creek Tributary, approximately 4.1 miles west of I-39 in Mendota in LaSalle County. Approximately 259 feet gross length.
061-66M85 Active 05/01/2026 2 3 Livingston Deck replacement (SN 053-0149) on IL 23 at the BNSF RR and Vermilion River, 0.8 miles south of the LaSalle County Line.
062-66M92 Active 05/01/2026 2 3 Livingston Culvert replacements (SN 053-2588 and -2589) over an Indian Creek Tributary 1 miles north of Ford County Line and 0.2 mile north of N200N Rd in Strawn.
063-66N23 Active 05/01/2026 2 3 Livingston Removal and replacement of the existing culvert structure (SN 053-2548) carrying IL 116 over_a stream located 5.6 miles west of I-55 in Livingston County. Additional work includes roadwayresurfacing, guardrail placement,_and slope and ditch grading.
064-66N45 Active 05/01/2026 2 3 Bureau Superstructure replacement (SN 006-0112) at CH 8 (Overhead), 2 miles north of US 6 on I-80.
065-66T09 Active 05/01/2026 2 3 Iroquois Various sizes of Class B pavement patching pavement striping and aggregate wedge shoulders at the Sheldon Weight Station approximately 1.9 miles east of US Route 52 (N) in Sheldon, Iroquois County.
066-66T10 Active 05/01/2026 2 3 LaSalle Removal and replacement of the fabric reinforced elastomeric troughs and associated hardware at Structure No. 050-0219 carrying F.A.S. Route 268A (CH 15) over the Illinois River approximately 0.4 mile south of US 6 (Marseilles) in LaSalle County.
067-66T11 Active 05/01/2026 2 3 LaSalle Washing all components of Structure No. 050-0079 carrying F.A.P. Route 46 (IL 251) over the Illinois River and CSX Railroad approximately 0.1 mile south of US 6 (Peru) in LaSalle County. This includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and elastomeric troughs.
068-66T12 Active 05/05/2026 2 3 Grundy Project is located at Structure No. 032-0099 carrying F.A.P. Route 326 (IL 47) over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 (Morris) in Grundy County. This work consists of washing all components of the structure which includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and elastomeric troughs.
069-66T14 Active 05/01/2026 2 3 Bureau, LaSalle Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle County and IL 26 and Backbone Rd in Bureau County.
070-66T15 Active 05/01/2026 2 3 LaSalle Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May Rd and IL 251 in LaSalle County.
071-66T24 Deleted 05/05/2026 2 3 Ford This project is located on F.A.P. Route 326 (IL Route 9/47), beginning at IL 9 (L.M. 0.00) and ending at IL 9/47/54 in Gibson City. This project consists of Class B pavement patching of mainline pavement. 0.56 miles gross length.
072-66T29 Active 05/01/2026 2 3 Ford This project is located on F.A.P. Route 681 (IL 116), Section (115, 116)PP, beginning at Iroquois County Line to Livingston County Line. This project consists of Class B pavement patching of mainline pavement. 6.0 miles gross length.
073-66T36 Active 05/01/2026 2 3 Various One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds.
074-66T39 Active 05/01/2026 2 3 LaSalle Pavement patching and joint repair along I-39 at the following interchanges in LaSalle County: Tonica (SB only), IL 71, IL 251, Oglesby, I-80, and US 34. 3.06 miles gross length.
075-66T40 Active 05/01/2026 2 3 Various Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated within the right-of-way of the Interstate Routes, including, but not limited to, medians; inside and outside areas adjacent to exit and entrance ramps at various interchanges; interchange gore areas between mainline and ramps; and inside and outside of on/off ramps at rest areas within District 3 on interstates I-180, I-39, and I-80, throughout Bureau, LaSalle, Kendall, and Grundy Counties.
076-66T41 Active 05/01/2026 2 3 Grundy, Livingston Litter picking on interstate I-55, throughout Livingston and Grundy Counties in District 3.
077-66T42 Active 05/01/2026 2 3 Ford, Iroquois, Kankakee Litter picking_on interstate I-57, throughout Ford, Iroquois, and Kankakee Counties.
078-66T45 Active 05/01/2026 2 3 LaSalle Class B patching at the concrete section of FAP 603 (US 52) over I-39, beginning 0.47 miles west of I-39 (Station 191+44) and ending 0.35 miles east of I-39 (Station 234+23), and also includes the entrance and exit ramps at the interchange in LaSalle County. 4,500 feet gross length.
079-87859 Active 04/29/2026 2 3 Iroquois Resurfacing of E 980N Road from IL 99 to the west corporate limits of Milford.
080-87895 Active 04/29/2026 2 3 Iroquois Resurface 800 N Road from I-57 ramps to US 45.
081-46678 Active 05/05/2026 3 4 Various Installation of pavement marking on various routes in various counties throughout District 4.
082-46679 Active 05/05/2026 3 4 Various Replaecment of raised reflective pavement markers on various routes in various counties throughout District 4.
083-46918 Active 05/05/2026 3 4 Marshall, Woodford Reconstruction of SFWA roads with a Bituminous Surface Treatment_with Fog Seal Surface, the excavation and reconstruction at sinkhole locations in the Woodford State Fish and Wildlife Area (SFWA). Placement of a Bituminous Surface Treatment with Fog Seal Surface on the parking lot and camp road are proposed at the Marshall SFWA. Other necessary work at the two locations is included. 0.9 mile gross length.
084-68C93 Active 05/01/2026 6 / 0 3 4 Peoria Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peoria County. 2.94 miles gross length.
085-68J15 Active 05/01/2026 3 4 Tazewell Bridge deck overlay, joint replacement/repairs and bridge approach roadway improvements at S.N. 090-0124 carrying WB BUS 24 over US 24 near_Washington and resurface BUS 24 from US 24 to IL 8 in Tazewell County. 1.430 miles gross length.
086-68J31 Active 05/01/2026 3 4 Tazewell Resurface IL 98 from IL 29 to 0.2 mile East of Parkway Drive in Tazewell County. 1.3551 miles gross length.
087-68J50 Active 05/01/2026 3 4 Warren Resurfacing 20th St from US 34 to North St in Kirkwood and on North St from 20th St to US 34 in Kirkwood in Warren County. 1.823 gross miles.
088-68J56 Active 05/01/2026 3 4 Peoria Resurface IL 116 (W. Harmon Highway, W. Lincoln Ave.) from Kickapoo Creek to Griswold St. in Peoria. 1.00 mile gross length.
089-68J59 Active 05/01/2026 3 4 Tazewell Resurfacing McMullen Rd and IL 122 from west of I-155 to 2.1 miles east of Hopedale, including cold-in-place recycling in Tazewell County. 5.086 miles gross length.
090-68J61 Active 05/05/2026 1 / 0 3 4 Knox 6.17 miles patching and resurfacing of I-74 from 0.3 miles west of E Main Street in Galesburg to east of the IL 97 interchange; 0.40 miles of patching and resurfacing of E Main Street from 0.2 miles east of Michigan Avenue to_0.1 mile east of Soangetaha Road; and 1.19 miles of patching and resurfacing of US 150/IL 97 from 0.2 miles_east of I-74 westbound ramps to 0.1 miles west of Junction IL 97 south on IL 97.
091-68J70 Active 05/01/2026 3 4 Woodford 9 miles of patching, CIR, resurfacing, guardrail replacedment, and ADA ramps on IL 117 from south of Raymond St to the US 150 intersection and on US 150 from west of the IL 117 intersection to the McLean County Line.
092-68J72 Active 05/05/2026 3 4 Marshall Resurfacing IL 89 from the Putnam County line to IL 17, South of Varna in Marshall County. 5.527 miles gross length.
093-68K14 Active 05/05/2026 3 4 Henderson Resurfacing IL 94 from IL 116 to 300N in Henderson County. 5.737 miles gross length.
094-68K18 Active 05/01/2026 1 / 1 1 3 4 Tazewell Resurfacing US 24/IL 29 (Main St) from north of Wesley Rd to south of Poplar St in Creve Coeur in Tazewell County. 1.31 miles gross length.
095-68K19 Active 05/05/2026 3 4 McDonough Resurfacing US 136 from 0.1 miles westof TR 226 to 0.1 miles west of CH 18, west of Macomb in McDonough County. 1.276 gross miles.
096-68K21 Active 05/05/2026 3 4 Warren Resurfacing BUS 67 from 0.5 mi. S. of 90th Ave., N. of Roseville to 0.4 mi. S. of 60th Ave., S. of Roseville. 2.79 miles gross length.
097-68K85 Active 05/05/2026 1 / 1 3 4 Peoria, Tazewell, Warren Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties.
098-68K90 Active 05/05/2026 3 4 Fulton Partial depth HMA patching on US 24 and resurfacing (1,000 ft) rest area roadway in Fulton County. 0.402 mile total gross length.
099-68K93 Active 05/01/2026 3 4 Peoria, Tazewell Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties.
100-68K96 Active 05/05/2026 3 4 Tazewell Partial and full depth HMA patching on Morton Ave from north of Clark St to Jackson St (US 150) in Morton. 0.205 mile gross length.
101-68K98 Active 05/05/2026 3 4 Stark Partial and full depth patching on IL 93 from IL 91 (S) to IL 40 in Stark County. 9.54 miles gross length.
102-89864 Active 04/29/2026 3 4 Mercer Removal and replacement of sidewalk along SW 6th St. from west of College Ave. (IL 94) to west of SW 9th Ave. in the city of Aledo.
103-89892 Active 04/29/2026 3 4 Mercer Cape seal with pavement markings on CH 2 and bituminous surface treatment on CH 9 and CH 16 in Mercer County.
104-70794 Active 05/05/2026 1 / 0 3 5 McLean 4.99 miles of pavement rehab Designed_Overlay Resurfacing (INT-4th), Pipe Underdrains, 1.8 miles south of Shirley to I-55/74 Interchange southwest of Bloomington.
105-70E98 Deleted 05/07/2026 3 5 Douglas 11.867 miles of designed overlay, new shoulders, culvert replacements and extensions 0.5 mile east of I-57 to the Coles County Line.
106-70C08 Deleted 05/07/2026 3 5 McLean 2.834 Mi. of 3R D.O.L. Widening existing pavement, ADA improvements, traffic signal modernization, bridge deck overlay from Gregory St/Bowles St in Normal to Olive St in Bloominton.
107-70D62 Active 05/05/2026 3 5 Edgar Replacement of SN 023-0014 with SN 023-0036 over the DandEI Railroad 0.3 miles west of the DandEI Railroad to 0.1 miles east of North 1800th St east of Paris. This requires roadway profile change on the eastern and western approaches to raise the grade of the bridge.
108-70F48 Active 05/01/2026 3 5 McLean Paving and parking lot improvements at three (3) McLean County IDOT storage facilities located in Bloomington, Leroy, and Towanda. The work includes paving over existing HMA and aggregate surfaces, painting dedicated parking stalls, and any other work necessary to complete the project.
109-70G29 Active 05/05/2026 3 5 Champaign 0.72 mile of sanitary sewer at Illini Prairie Rest Areas.
110-70H86 Active 05/01/2026 3 5 Champaign 1.18 miles of patching and chip seal A-1 (Fog Seal), Ford Harris Rd to Hensley Rd north of Champaign.
111-72459 Active 05/01/2026 4 6 Pike 6 miles of patching, HMA surface removal, HMA overlay, resurfacing HMA shoulders and aggregate wedge shoulders on IL 100 from 0.9 miles south of Oak Street in Milton to south of CH 10 (Vin Fiz Road) west of Pearl.
112-72491 Active 05/01/2026 4 6 Sangamon Patching, curb and gutter replacement, HMA removal and overlay, guardrail replacement and traffic signal replacement on I-55 Business from 0.2 miles north of Fancy Creek in Sherman to 0.2 miles north of Dirksen Parkway in Springfield.
113-72509 Active 05/01/2026 4 6 Logan Highway lighting upgrades on I-55 at the Broadwell interchange.
114-72512 Active 05/01/2026 4 6 Morgan Bridge deck patching on SN 069-0512 carrying US 67 southbound over Mauvaise Terre Creek, 1.3 miles east of Concord/Arenzville Road.
115-72547 Active 05/01/2026 4 6 Menard, Sangamon 5.9 miles of resurfacing on IL 29 / IL 123 from 0.1 miles west of the Menard / Sangamon County line to the IL 29 / 123 junction and from the IL 123 junction to 0.1 miles south of Andrew Road.
116-72552 Active 05/01/2026 4 6 Cass Gutter removal and replacement on IL 78 from south of CH 7 (Chandlerville Road) to north of Virginia.
117-72601 Active 05/01/2026 4 6 Pike Bridge deck overlay and bridge painting on SN 075-0098 and 075-0099 carrying I-72 over TR 92 (250th Street), NS Railroad, Hadley Creek and TR 149 (315th Street), 1.8 miles west of CH 4 at the Barry interchange.
118-72639 Active 05/01/2026 4 6 Adams, Pike 9.8 miles of shoulder repair on I-72 from I-172 to 0.9 miles east of IL 96 and on I-172 from I-72 to 0.9 miles south of IL 57.
119-72E71 Active 05/01/2026 4 6 Logan Bridge joint repairs at various locations on I-55 near Lincoln.
120-72E72 Active 05/01/2026 4 6 Hancock Shoulder repairs on IL 110, IL 336 from CH 10 to the Adams County line.
121-72E73 Active 05/01/2026 4 6 Schuyler Riprap installation and minor bridge repairs on SN 085-0039 carrying IL 100 over Sugar Creek, 2.3 miles north of Frederick.
122-72E76 Active 05/01/2026 4 6 Sangamon Structural steel repairs on SN 084-0106 and 084-0111 over I-55 at the Divernon and Glenarm interchanges.
123-72D17 Deleted 05/07/2026 4 6 Sangamon 1 mile of roadway reconstruction on 6th Street from the I-55/I-72 interchange to Stevenson Drive.
124-72D29 Active 05/01/2026 2 / 1 4 6 Adams HMA surface removal, HMA resurfacing, paved shoulders with rumble strips, concrete gutter replacement and guardrail replacement on US 24 from 0.1 miles east of IL 96 (N) to 0.1 miles east of 1343rd Lane (Old US 24) east of Fowler.
125-72J41 Active 05/01/2026 1 / 0 4 6 Adams 4.6 miles of resurfacing, ADA improvements and bridge deck repairs on IL 96 from south of Birch Street in Ursa to 0.4 miles north of US 24.
126-72J76 Active 05/01/2026 4 6 Schuyler Microsilica concrete overlays on IL 99 at Cedar Creek 0.5 miles north of Camden and Missouri Creek and Little Missouri Creek 1 mile and 0.3 miles north of the Brown County line. (085-0031, 085-0030, and 085-0029)
127-93848 Active 04/29/2026 4 6 Adams HMA resurfacing of North 36th St. from Wavering Park Rd. to Wisman Ln.
128-93854 Active 04/29/2026 4 6 Christian Construction of PCC sidewalk with ADA compliance from Pana Junior High School to residential areas in the city of Pana.
129-93857 Active 04/29/2026 4 6 Scott Full-depth reclamation with soil cement base, surface profiling and bituminous surface treatment on CH 14 from north of Walnut Creek to I-72 in Scott County.
130-93858 Active 04/29/2026 4 6 Hancock Microsurfacing on Ferris Road from 1000E Road to 1750 Road in Hancock County.
131-74435 Active 05/01/2026 4 7 Coles Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a cloverleaf to a raindrop diamond configuration.
132-74650 Active 05/01/2026 4 7 Coles Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004)
133-74705 Active 05/01/2026 4 7 Macon Replacement of 2 structures carrying I-72 over IL 121 and the IC Railroad, northwest of Decatur. (SN 058-0074 and 058-0075)
134-74829 Active 05/01/2026 1 / 0 4 7 Moultrie 1.5 miles of resurfacing with curb and gutter upgrades on IL 32 in Sullivan.
135-74856 Active 05/01/2026 4 7 Macon Bridge replacement on US 36/IL 121 over Lake Shore Drive in Decatur. (SN 058-0019)
136-74E26 Active 05/01/2026 4 7 Wabash 7.7 miles of shoulder reconstruction on IL 1 from E. 1200 Road (Bridgeport Road) to the Lawrence County line.
137-74A10 Active 05/01/2026 4 7 Macon Replacement of SN 058-0021 carrying US 36 over Long Creek tributary approximately 1.6 miles east of IL 121.
138-74B79 Active 05/01/2026 4 7 Richland Bridge joint replacement, bridge deck patching, bridge deck scarification and overlay, and new approaches on SN 080-0009 carrying IL 130 over East Fork Fox River, 0.4 miles north of County Road 1275N, north of Olney.
139-74D08 Active 05/01/2026 4 7 Macon Bridge joint replacement, bridge deck patching, bridge deck scarification, bridge deck overlay and slope wall repairs at four four structures located on I-72 / US 51 at Eldorado Street and Grand Avenue North at the Harristown Interchange. (SN 058-0068, 058-0069, 058-0070, 058-0071)
140-74D42 Active 05/01/2026 4 7 Effingham Demolition of buildings, tree removal, sign removal, and seeding on US 40 / IL 33 (Fayette Avenue) from Banker Street to Willow Street in Effingham.
141-74D51 Active 05/01/2026 4 7 Effingham Fencing removing and replacement at the Effingham Maintenance Yard.
142-74D52 Active 05/01/2026 1 / 0 4 7 Clark 17.5 miles of resurfacing on US 40 from IL 49 to IL 1 in Marshall.
143-74D54 Active 05/01/2026 4 7 Coles 8 miles of resurfacing, aggregate wedge shoulder, HMA shoulders and patching on Old IL 316, 0.2 miles north of IL 16 in Mattoon to D Street in Charleston.
144-74D55 Active 05/01/2026 4 7 Macon 4.3 miles of patching, milling and resurfacing on US 51 from 0.8 miles south of US 36 to 0.3 miles east of US 51 Business southwest of Decatur.
145-74D58 Active 05/01/2026 4 7 Wayne Applying chip seal at the Fairfield Maintenance Yard.
146-95996 Active 04/29/2026 4 7 Effingham Reconstruction of intersections along US 40 from Race Street to Wall Street in the village of Teutopolis.
147-95997 Active 04/29/2026 1 / 0 4 7 Fayette Construction of sidewalks from Kaskakia College to various locations in the city of Vandalia.
148-95A06 Active 05/05/2026 4 7 Cumberland Full-depth pavement reclamation with an A-2 bituminous surface treatment on 1200E Road from the north corporate limits of Toledo to 1050N Road.
149-95A12 Active 04/29/2026 4 7 Shelby A-2 bituminous surface treatment on CH 15 from the southern city limit of Tower Hill to the northern city limit of Herrick.
150-76M95 Active 05/01/2026 1 / 1 5 8 Washington Resurfacing on I-64 from 0.5 miles west of Beaver Pond Creek to 0.9 miles west of CH 11.
151-76R32 Active 05/01/2026 5 8 Madison New bridge deck on SN 060-0120 carrying IL 111 / IL 3 over Rodgers Avenue and Bloomer Drive in Alton.
152-76R36 Active 05/07/2026 5 8 St. Clair Bridge deck patching, microsilica concrete overlay, joint replacement, end diaphragm replacement, and cleaning and painting of beam ends and fascia beams on I-64 over Little Silver Creek and Silver Creek, 1.5 miles west of the IL 4 interchange. (SN 082-0186, 082-0188, 082-0187 and 082-0189)
153-76U38 Active 05/01/2026 1 / 0 5 8 Madison, St. Clair Traffic signal replacement at various locations in Madison and St. Clair Counties.
154-76U54 Active 05/01/2026 5 8 Bond 9.6 miles of micro-surfacing on IL 127 from the Montgomery County line to 0.1 miles north of IL 140.
155-76U76 Active 05/01/2026 5 8 St. Clair Bridge deck repairs and deck overlay on SN 082-0007 carrying I-55 / I-64 over Tendley Avenue in East St. Louis.
156-76U77 Active 05/01/2026 5 8 Marion Bridge repairs, deck repairs and joint replacement/repairs on SN 061-0077 carrying US 51 over IC Railroad.
157-76U81 Active 05/01/2026 5 8 Madison, St. Clair Bridge cleaning at various locations in Madison and St. Clair counties.
158-76U82 Active 05/01/2026 5 8 St. Clair Bridge deck repairs on SN 082-0251 and 082-0252 carrying I-55 / I-64 over IL 3 ramps and UP Railroad.
159-76U86 Active 05/01/2026 5 8 Madison Bridge painting on IL 3 over NS Railroad in Granite City. (SN 060-0193 and 060-0194)
160-76U96 Active 05/01/2026 5 8 Various Highway lighting and traffic signal maintenance at various locations throughout District 8.
161-76U97 Active 05/01/2026 5 8 Various Guardrail and cable median repairs at various locations in District 8.
162-76U98 Active 05/01/2026 5 8 Various Maintenance and service of all ITS equipment at various locations throughout District 8.
163-76V03 Active 05/05/2026 5 8 Madison Bridge painting on SN 060-0350 and 060-0351 carrying I-270 over the Mississippi River.
164-76V06 Active 05/01/2026 5 8 Jersey, Madison 40.25 miles of tree removal at various locations in Madison and Jersey Counties.
165-76V08 Active 05/01/2026 5 8 Various Various interstate bridge deck patching on a callout basis throughout District 8.
166-76V09 Active 05/01/2026 5 8 Various Structural repairs to various bridges at various locations throughout District 8.
167-76V11 Active 05/01/2026 5 8 Madison 13 miles of pavement patching on IL 140 from Hamel to Alhambra and on IL 4 from IL 143 to south of US 40.
168-76V12 Active 05/01/2026 5 8 St. Clair 0.4 miles of patching and slurry seal on South 26th Street from Bond Avenue to IL 15 in East St. Louis.
169-76V13 Active 05/01/2026 5 8 Various Traffic signal modernization at various locations throughout District 8.
170-76V17 Active 05/01/2026 1 / 0 5 8 Madison 10.4 miles of bridge repairs and resurfacing on I-55/I-70/US 40 from 0.5 miles west of Black Lane to 0.4 miles east of IL 159.
171-76V18 Active 05/01/2026 5 8 Clinton, St. Clair 6.5 miles of longitudinal joint repair on I-64 from 0.5 miles west of IL 4 in Mascoutah to 0.3 miles east of the Clinton County line.
172-97884 Active 04/29/2026 1 / 1 5 8 Madison Resurfacing North Alby Street from Humber tRoad to Wesley Way in the village of Godfrey.
173-97896 Active 05/05/2026 5 8 Madison Sidewalk construction along various streets in the village of Worden.
174-97897 Active 04/29/2026 5 8 Monroe Cold-in-place pavement recycling on Bluff Road from DD Road to Hanover Road in Monroe County.
175-97899 Active 04/29/2026 5 8 St. Clair Resurfacing Martin Luther King Jr. Drive from State Street to Columbia Place in the city of East St. Louis.
176-97903 Active 04/29/2026 5 8 Madison Traffic signal installation at the intersection of Horseshoe Lake Road and McDonough Lake Road in the city of Collinsville.
177-78791 Active 05/01/2026 5 9 Alexander Removal and replacement of SN 002-0012 carrying IL 3 over a drainage ditch 0.5 miles west of IL 127.
178-78977 Active 05/01/2026 1 / 0 5 9 Franklin Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks.
179-78A13 Active 05/01/2026 5 9 Union Box culvert replacements at 4 locations: 1) SN 091-2005 carrying IL 127 over a stream, 3.0 miles northwest of Jonesboro; 2) SN 091-2012 carrying IL 146 over a stream, 0.6 miles west of Jonesboro 3) SN 091-7022 carrying Old US 51 over an unnamed ditch south of Dongola 4) SN 091-7027 carrying US 51 over an unnamed ditch. 3.0 miles south of Anna.
180-78A85 Active 05/05/2026 5 9 Alexander Pavement patching, HMA removal, HMA resurfacing, shoulder work and ADA upgrades on US 51 from 0.29 miles south of New Cross Street to 3.38 miles south of New Cross Street. Includes small portions of Patierdale Road, Kessler Road and Turner Lane.
181-78B49 Active 05/01/2026 5 9 Jefferson 0.4 miles of pavement removal with PCC replacement, aggregate subgrade improvement, shoulders, curb and gutter, median island and ramp pavement patching on I-64 from Bunny Farm Road to just past the I-64 westbound ramp.
182-78B59 Active 05/01/2026 5 9 Franklin 1.8 miles of resurfacing on IL 148 from IL 14 to Yellow Bank Road.
183-78B80 Active 05/01/2026 5 9 Franklin 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line.
184-78B94 Active 05/07/2026 5 9 Saline Mast arm upgrades at the intersection of US 45 and IL 13.
185-78C10 Active 05/01/2026 5 9 White Repairs to SN 097-0062 carrying US 45 over Skillet Fork Creek, 0.8 miles south of Mill Shoals.
186-78C13 Active 05/01/2026 5 9 Williamson Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13.
187-78C15 Active 05/01/2026 5 9 White Painting two bridges over I-64 in White County. (SN 097-0045 and 097-0050)
188-78C18 Active 05/01/2026 5 9 Jackson, Williamson 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange.
189-78C20 Active 05/01/2026 5 9 Various Various electrical repairs and/or replacements at various locations throughout District 9.
190-78C24 Active 05/01/2026 5 9 Perry 5.8 miles of resurfacing on IL 127 from 0.3 miles north of Deer Run Road to the Washington County line.
191-78C25 Active 05/01/2026 5 9 Perry 2.8 miles of resurfacing on IL 150 from 0.2 miles north of Cutler (Reeses Hill Road) to IL 154.
192-99748 Active 04/29/2026 5 9 Williamson Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of Marion.
193-99769 Active 04/29/2026 5 9 Massac Resurfacing Grand Chain Road from Pulaski County Line to Boaz Road.
194-99770 Active 04/29/2026 5 9 Pope Resurfacing Bay City Road from 0.4 mile south of Azotus Road to 1.1 miles north of Upper Bottom Road.
195-99771 Active 04/29/2026 5 9 Jefferson HMA resurfacing of Tolle Rd. from E. Breezeway Rd. to N. Miller Lake Ln. in Jefferson County.
196-99772 Active 04/29/2026 5 9 Hamilton HMA resurfacing with aggregate shoulders and pavement marking on Blairsville Rd. from IL 242 to the White County Line in Hamilton County.
197-70G92 Active 05/06/2026 3 5 Champaign 0.75 mile of intersection reconstruction at Leverett Rd north of Urbana and at Flatville Rd in Thomasboro.
198-61M10 Active 05/06/2026 1 1 Kane Traffic signal modernization along Indian Trail Road between Ohio Street and Pennsbury Lane in the city of Aurora.
199-61M49 Active 05/06/2026 1 1 Cook Installation of pedestrian lighting along the illinois Prairie Path in the village of Maywood.
200-64N73 Active 05/06/2026 2 2 Stephenson 1.33 miles of pavement patching, cold milling, and HMA resurfacing along with ADA improvements and traffic signal modifications on US Bus 20 from Park Blvd to Clark St in Freeport.
201-64S70 Active 05/06/2026 2 2 Stephenson 5.0 miles of pavement patching, cold milling, and HMA resurfacing on IL 26 from the Wisconsin State Line to Brush Creek near Orangeville.
202-85792 Active 05/06/2026 2 2 Stephenson Cold-in-place recycling on Orangeville Road from McConnell Road to IL 26.
203-87851 Active 05/06/2026 2 3 Kankakee Replace the bridge carrying CH 14 over Trim Creek located 3.3 miles south of IL 17.
204-97827 Active 05/06/2026 5 8 St. Clair Construction of a southbound right-turn lane at the intersection of Old Collinsville Road and Ashland Avenue.
205-64U86 Active 05/06/2026 2 2 Winnebago 1.5 miles of pavement patching along Alpine Rd. between Riverside Blvd and Spring Creek Rd.
206-64V25 Active 05/06/2026 2 2 Winnebago Resurfacing US 20 ramp intersection returns at Montague Rd. and Meridian Rd.
207-66R94 Active 05/06/2026 2 3 Grundy Cleaning and painting all structural steel and non-structure steel components at SN 032-0092 carrying Carbon Hill Rd. over I-55 approx 4.8 mi. South of Reed Rd in Grundy County.
208-66T32 Active 05/06/2026 2 3 Livingston Herbicide, seeding, landscaping, and maintenance for this pollinator project located along FAI 55 (I-55) at the Limestone Rest Area sites south of Pontiac, IL.
209-66T60 Active 05/06/2026 2 3 Various Removal and proper disposal of medium (6-15 inch diameter) and large (greater than 15 inch diameter) trees, tree trimming, clearing of undesirable bushes, and the maintenance of old growth oak trees along state-maintained routes of Bureau, La Salle, Livingston, and Grundy counties. Work will be limited to occur between October 1, 2026 and March 31st, 2027 due to Threatened and Endangered Species (TandE).
210-70H72 Active 05/06/2026 3 5 Vermilion Wing wall repair at Kickapoo Pond 0.2 mi west of Skykine Dr. west of Tilton.
211-70J03 Active 05/06/2026 3 5 McLean, Piatt Bridge painting of two structures on I-55 and I-72 in McLean and Piatt Counties. SN's 057-0177 and 074-0058.
212-62L30 Active 05/07/2026 1 1 Cook (2.95-Mile) Roadway Reconstruction and widening with hot-mix asphalt pavement, resurfacing, multi-cell box culverts, pipe culverts, storm sewer systems, ditch grading, curb and gutter, pavement markings, landscaping, guardrail. Located on Main Street is a two-lane roadway located in the Village of Lemont and unincorporated Cook County.
213-62V08 Active 05/07/2026 1 1 Cook, DuPage, Kane The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County.
01A-LO034 Active 05/05/2026 4 6 Logan Replace Airport Perimeter Fencing, Phase 1
02A-VE060 Deleted 05/07/2026 3 5 Vermilion Reconstruct Automated Weather Observation System III
03A-DU097 Active 05/05/2026 1 1 DuPage Rehabilitate Taxiway C, Phase 2
04A-LA046 Active 05/05/2026 1 1 Cook Rehabilitate Runway 9/27
05A-KA056 Active 05/05/2026 2 3 Kankakee Rehabilitate Taxiway A, Phase 2
06A-BL074 Active 05/05/2026 3 5 McLean Voluntary Rehabilitate Runway 11/29: Phase 2 Construction
07A-BU001 Active 05/05/2026 1 1 Will Install Airport Perimeter Fencing, Phase 1
08A-DE089 Active 05/05/2026 4 7 Macon Reconstruct Runway 6/24 Lighting, Airfield Guidance Signs and Wind Cones - Construction
09A-LE058 Active 05/05/2026 1 1 Will Reseal Runway 2/20
10A-RB024 Active 05/05/2026 4 7 Crawford Reconstruct Airport Lighting Vault Equipment and Rehabilitate Airport Rotating Beacon
No More Data