July 30, 2021 Letting 12:00 PM
Notice of Letting
Volume 024, No. 026

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-46580 Executed 08/27/2021 1 / 1 1 4 7 Clark Various lengths of pavement marking rehabilitation throughout District 7.
002-46584 Executed 09/08/2021 2 3 Grundy, Kendall Removing and replacing existing centerline striping on FAI 80 (I-80) in Grundy County, FAP 591 (US 34) and FAP 311 (US 34 and IL 71) in Kendall County.
003-46585 Executed 08/27/2021 2 2 Various Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown on the plans.
004-46911 Executed 08/27/2021 1 4 6 Sangamon Removal and replacement of a portion of the existing parking lot, the sealing of the remainder of the existing parking lot and the construction of a bus lane and drop off connection at the Dana Thomas House State Historic Site in Springfield.
005-60M12 Executed 09/08/2021 1 1 Cook (2,558-Ft) Designed Overlay, ADA Improvements, includes HMA removal and replacement, Class D patching and PMK installation. Location: FAU 2839 California Ave. from 59th St. to 63rd St. within the City of Chicago in Cook County.
006-60X57 Executed 08/27/2021 4 / 4 1 1 1 Lake (1,300-Ft) Intersection Improvement, culvert replacement and extension, new traffic signal installation, in the Village of Wauconda, Wauconda and Freemont Townships.
007-60X74 Executed 09/08/2021 2 / 1 1 1 1 Cook (1229.52-Ft) This project consists of removal and replacement of the structure that carries IL 83 over Tinley Creek. Also included are intersection improvements, pavement reconstruction, widening, resurfacing, drainage adjustments, and ADA improvements. Located in the Villages of Alsip and Crestwood in Cook County.
008-61G56 Deleted 06/24/2021 1 1 Cook Patching, sidewalk construction, curb and gutter replacement and pavement markings on 25th Avenue between Waveland Avenue and Lawrence Avenue in Schiller Park.
009-61H07 Executed 09/10/2021 1 / 0 1 1 1 Cook Resurfacing Weathersfield Way from Braintree Drive to Salem Drive, includes the construction of an shared use path on the north side and new street lighting, in Schaumburg
010-61H16 Executed 09/10/2021 1 1 1 Cook Resurfacing and improvements on Summit drive from Wise Road to Schaumburg Road in Schaumburg.
011-62D86 Executed 10/04/2021 6 / 6 1 1 1 Lake The length of this improvement is 4711 feet (0.89 miles) the type of work is Bridge Replacement, Reconstruction, and Resurfacing in Lake County.
012-62G10 Executed 09/15/2021 1 1 1 Kendall, Will (1700-Ft) Traffic Signal Installation, Channelization. Roadway Reconstruction. Location: IL 126 at County Line Road in the Na-Au-Say and Plainfield Townships in Will and Kendall Counties.
013-62J25 Executed 08/27/2021 4 / 4 1 1 1 DuPage (636-Ft) Removal of the existing retaining wall and replacement with new soldier piles wall with lagging. Location: West side of IL 59, from Glen Ave to Forest Ave in the City of West Chicago in DuPage County.
014-62N83 Executed 08/27/2021 2 / 2 1 1 1 Cook I-80/94 (15,592-Ft), I-57 (2,000-Ft) Patching CRPCC with Class A and Full Depth HMA with Class D); Location: FAI 80: I-80/94 from IL 394 to IL/IN State Line in the Village of Lansing and I-57 at I-80 in the City of Country Club Hills
015-62P20 Executed 08/27/2021 1 1 Various This improvement consists of the repair and installation of fence along various expressway and arterial highways in various counties throughout District One.
016-62P21 Rejected 08/09/2021 1 1 Various This improvement consists of High Tension Cable Barrier Repairs at Various Locations on Various Expressway Medians District Wide.
017-64M00 Executed 08/20/2021 2 2 Rock Island 1.15 miles / replacement of Westbound scale and pavement patching in both weigh scale stations on I-80 located 1.4 miles south of IL 84.
018-64M90 Executed 09/08/2021 2 2 Whiteside Cold milling/HMA resurfacing/patching on IL 84 from US 30 to 0.2 miles North of 10th Ave. N, North of Albany.
019-64N91 Executed 08/30/2021 1 / 1 1 2 2 Rock Island Cold milling, pavement patching, and HMA resurfacing. From 0.4 mile East of Il 92(N) to US 67 in Milan.
020-64P53 Executed 09/08/2021 4 / 4 2 2 Whiteside Expansion joint replacement, deck patching, concrete overlay, parapet wall repairs, and other miscellaneous repairs on SN 098-0099, carrying US 30 over the UP Railroad and Harvey Road.
021-64P92 Executed 09/08/2021 2 2 2 Whiteside Expansion joint replacement, deck patching and concrete overlay, parapet wall repairs, and other miscellaneous repairs on SN 098-0005, carrying US 30 over the UP Railroad, 2.5 miles West of Morrison.
022-64R18 Executed 09/08/2021 2 2 Various Concrete sealer applied to bridge decks at various locations in Henry, Rock Island, and Whiteside Counties.
023-64R20 Executed 09/08/2021 2 2 Various Concrete sealer applied to bridge decks at various locations in Carroll, JoDaviess, Lee, and Ogle Counties.
024-64R21 Executed 08/27/2021 2 2 Various Maintenance of signs along state maintained routes within District 2.
025-66K47 Executed 08/27/2021 2 3 LaSalle 3P milling and resurfacing project of 3 3/4" on US 52 / IL 251 from US 52 (N) to 0.3 mile South of the BNSF Railroad overpass in Mendota. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking, and raised reflectors.
026-66L21 Executed 09/15/2021 2 3 Kendall This work is located on FAP Route 607 (US 52) at Sta. 398+51 approximately 7.5 miles East of IL 47 (1.6 miles West of Will County Line). This project consists of removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail removal and replacement, also including other related construction items.
027-66L81 Executed 08/30/2021 2 / 2 2 3 Livingston This project is located at two locations on FAI 55 (I-55) in Livingston County. Location 1 begins at M.M. 205.0 and ends at M.M. 209.0 (S. of Odell), Location 2 begins at M.M. 212.0 and ends at M.M. 215.3 (N. of Odell). This project consists of centerline repairs cleaning and filling potholes, depressions and cracks and micro surfacing.
028-66L83 Executed 08/31/2021 2 3 Iroquois This project is located on FAI 57 (I-57) beginning at the Ford County Line and ending at IL Route 116 (Ashkum). This work consists of Class A pavement patching, pavement striping, and other related construction items.
029-66L91 Executed 08/27/2021 2 3 Ford, Iroquois The project consists of 7.15 miles of crack routing and crack sealing on FAP 71 (IL 54) from IL 115 in Roberts to Structure 038-0213 in Ford and Iroquois Counties.
030-68799 Executed 09/13/2021 2 / 2 3 4 Peoria Removal and replacement of the existing structure carrying IL Route 8 over BNSF Railway (Existing S.N. 072-0049; Proposed S.N. 072-0248) at Edwards on a realigned IL Route 8. The project length is 0.68 mile.
031-68F71 Executed 09/08/2021 1 / 1 1 3 4 Warren Bridge joint replace/repair on Structure No. 094-0016 carrying IL 94/IL 135 over Henderson Creek, approximately 2.0 miles North of Little York in Warren County.
032-68F78 Executed 09/08/2021 1 3 4 Mercer Bridge joint replace/repair, bridge painting, bridge repair to S.N. 066-0007 carrying Illinois Route 94 over Camp Creek, approximately 5 miles North of Aledo in Mercer County.
033-72M73 Executed 08/24/2021 4 6 Various On-call repair of guardrail, cable median barrier, impact attenuators and fence at various locations throughout District 6 as needed.
034-72M91 Executed 08/24/2021 4 6 Adams Deck and substructure repairs on SN 001-0011 carrying US 24 over BNSF Railroad and Cedar Creek, 1.5 miles north of IL 104.
035-72M99 Executed 08/31/2021 4 6 Scott Lot improvements at the Riggston Maintenance Yard.
036-74915 Executed 09/08/2021 3 / 3 4 7 Crawford Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363.
037-74A15 Executed 08/24/2021 4 7 Macon Signal modernization at the intersection of IL 105 and 24th Street in Decatur.
038-76N17 Executed 08/24/2021 1 / 1 5 8 Madison Bridge repair, HMA overlay and joint repair on IL 11 over the Union Pacific Railroad (SN 060-0122) approximately 2 miles north of I-270 and on IL 111 over the Norfolk Southern Railroad and an access road (SN 060-0123) approximately 1.2 miles north of I-270.
039-76N59 Executed 08/24/2021 5 8 Various Maintain and service all ITS equipment at various locations throughout District 8 and the removal and replacement of a dynamic message board on eastbound I-55/64 at 4th Street.
040-76P14 Executed 08/17/2021 5 8 Various Guardrail and cable median repair at various locations in District 8.
041-76P28 Executed 09/08/2021 5 8 Madison 3.9 miles of resurfacing and design overlay on IL 111 from 0.1 miles south of Horseshoe Lake Road to the St. Clair County line.
042-78550 Executed 08/27/2021 12 / 12 2 5 9 Jefferson Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange.
043-78656 Executed 08/27/2021 15 / 15 2 5 9 Franklin 9 miles of lane addition, median barrier installation and resurfacing existing lanes of I-57 from mile post 66 to Marcum Branch.
044-78838 Executed 08/27/2021 3 / 3 1 5 9 Jackson, Perry 17.8 miles of pavement patching, HMA surface removal, HMA surfacing, HMA shoulders and ADA sidewalk improvements on US 51 from near Industrial Park Road in Carbondale to Grant Way in Du Quoin.
045-78863 Executed 09/08/2021 5 9 Johnson 3.4 miles of patching, milling, surfacing, median repairs and curb and gutter repairs at 2 locations: 1) US 45 from 0.7 miles northeast of I-24 to 1.07 miles southwest of I-24; 2) Just north of IL 146 to 1.85 miles south of IL 146.
046-78865 Executed 08/27/2021 5 9 Jackson 6.2 miles of HMA surface removal, resurfacing of the mainline and shoulders and ADA upgrades on IL 149 from IL 13/127 in Murphysboro to US 51 in Desoto.
047-78872 Executed 08/27/2021 1 / 1 5 9 Pulaski, Union 5 miles of micro-surfacing on Northbound I-57 / US 51 from 1 mile south of Big Creek to Perks Road.
048-78886 Executed 08/27/2021 2 / 2 5 9 Pulaski 1000- of milling, resurfacing, guardrail removal and replacement and concrete rail removal and replacement on West Cedar Street from east of SN 077-0030 to Front Street in Olmstead.
049-85713 Executed 08/27/2021 6 / 6 2 2 2 Boone Replace the bridge carrying TR 120 over Piscasaw Creek, 3.5 miles southeast of Poplar Grove.
050-87725 Executed 09/08/2021 1 / 1 2 3 Iroquois Replace the bridge carrying CH 4 over Pike Creek, 3.3 miles west of IL 1.
051-87754 Rejected 08/25/2021 2 3 DeKalb Resurfacing, sidewalk replacement, curb and gutter, pavement markings and pedestrian signal improvements at three locations on Northern University Campus in the City of DeKalb.
052-87767 Rejected 08/09/2021 3 / 3 1 2 3 DeKalb Replace the bridge carrying TR 244 over Coon Creek 0.30 mile south of IL 72.
053-87780 Executed 09/15/2021 2 3 Ford Resurfacing and aggregate shoulders on Elliot Road from IL 54 to IL 9.
054-87781 Executed 08/27/2021 2 3 Bureau Repair the undermining at the abutments and install improved drainage at the bridge carrying Peru Road over Negro Creek, just south of US 6.
055-89784 Executed 08/31/2021 3 4 Tazewell Resurfacing on Parkway Drive from Lick Creek to Willow Street in Pekin.
056-89786 Executed 09/27/2021 3 4 Peoria Construction of sidewalks and ADA ramps on the south side of West Knolls Road from North University Drive to 0.15 mile east of Allen Road in Peoria.
057-89791 Executed 08/31/2021 3 4 Knox Resurfacing, patching and ADA ramps on Henderson Road from the County Fairground entrance to Poplar Street in Knoxville.
058-89807 Executed 08/27/2021 3 4 Putnam Resurfacing, aggregate shoulders, and guardrail on CH 11 from IL 89 to the LaSalle County line.
059-91606 Executed 09/08/2021 3 5 Vermilion Replace the bridge carrying TR 183 over Unnamed Stream, 1 mile south of Hope.
060-93764 Executed 09/10/2021 1 / 1 4 6 Hancock Replace the bridge carrying CH 19 over Panther Creek, 4 miles west of Plymouth.
061-93771 Executed 09/13/2021 4 6 Sangamon Install lighting at the intersection of Mechanicsburg-Illiopolis Road and Mt. Auburn Roiad in Sangamon County.
062-95904 Executed 08/31/2021 4 7 Lawrence Resurfacing, HMA shoulders, rumble strips and culvert replacement on FAS 1804 from 1150 North Road to Sun and Sand Road.
063-97758 Withdrawn 07/12/2021 1 / 1 5 8 Madison Replace the bridge carrying Albers Lane over Rocky Branch Creek, includes the realignment of Albers Lane between Walnut Ridge Drive and Culp Lane in Betholto. , Replace the bridge carrying Albers Lane over Rocky Branch Creek, includes the realignment of Albers Lane between Walnut Ridge Drive and Culp Lane in Betholto.
064-99601 Executed 08/24/2021 1 / 1 5 9 Saline Replace the bridge carrying Forest Road over Little Eagle Creek, 8 miles west of IL 1.
065-99612 Executed 08/27/2021 2 / 2 5 9 Gallatin Replace the bridge carrying Eldorado Blacktop Road over North Fork of Saline River, 1.8 miles west of IL 1.
066-61G74 Executed 09/13/2021 9 / 9 1 1 Will Construction of a 10' wide HMA trail that includes pedestrian tunnels, retaining walls, box culverts, storm sewers, sidewalks, curb and gutter, fencing and pavement markings. Project begins at Spring Creek Greenway Trail in Lockport and concludes at the intersection of Cougar Road and 159th Street.
067-62G11 Executed 09/08/2021 9 / 9 1 1 1 Kane (1,719 Ft.) The project consists of intersection reconstruction, new traffic signals, consolidating three drainage structures into two box culverts under State Street and IL 72, pedestrian and bicyclist accommodations, lighting improvements, ADA ramps, watermain and sanitary sewer improvements. Location: (IL 72) at State Street / Getzelman Road.
068-99668 Executed 09/08/2021 5 9 Jefferson Resurfacing and aggregate shoulders on East Divide Road from Harmony Lane to Papertown Lane.
069-46905 Executed 09/08/2021 2 / 2 4 6 Sangamon Removal and reconstruction of the concrete retaining wall and walkway from the tomb to the receiving vault and parking lot repairs at the Lincoln-s Tomb State Historic Site in Springfield.
070-66L38 Executed 08/27/2021 2 3 LaSalle This project includes 5400' of milling and resurfacing and reconstruction of curves of the Mattheissen State Park main entrance and parking lot area off IL 178 South of the IL 71 and IL 178 intersection.
071-70F31 Executed 08/24/2021 1 / 1 3 5 Various On-Call lighting repairs in the District West Field Area consisting of DeWitt, McLean, and Piatt Counties.
072-70F33 Executed 08/24/2021 3 5 Various District Wide On-call Guardrail and Fence Repairs.
01A-LK014 Executed 02/22/2022 4 / 4 1 1 1 McHenry Rehabilitate and Reprofile Runway 8-26
02A-DK062 Executed 03/28/2022 2 / 2 2 3 DeKalb Mill and Overlay Taxiway C
03A-VE055 Rejected 09/17/2021 55 / 55 3 5 Vermilion Voluntary Realign Taxiway A, Phase 1
04A-DU089 Executed 02/22/2022 1 1 DuPage Rehabilitate Airport Runways Homerun Ductbank
05A-DI031 Executed 03/10/2022 2 2 Lee Install Perimeter Fence, Phase 1 and 2
06A-LA044 Executed 03/12/2022 1 / 1 1 1 1 Cook Rehabilitate Lighting for Runway 18/36 and Parallel Taxiway
07A-DI032 Executed 02/28/2022 2 2 Lee Install Taxiway Lighting to Replace Reflective Markers
08A-PA063 Rejected 11/29/2021 3 / 3 1 1 1 Cook Rehabilitate Airfield Lighting, Phase 1 and Install ALCMS