001-62B78
|
Executed
|
08/20/2019
|
14 / 0 |
1 |
1
|
1
|
Cook
|
Voluntary
|
Pump station 4 reconstruction. I-290 just west of the Des Plaines River in Forest Park.
|
002-93729
|
Executed
|
08/29/2019
|
1 / 0 |
|
4
|
6
|
Montgomery
|
|
Sidewalk construction, traffic signal modifications, drainage improvements and lighting at various locations in the City of Litchfield.
|
003-62G13
|
Executed
|
08/09/2019
|
|
|
1
|
1
|
Will
|
|
2.73 miles of shoulder widening and milled rumble strips with ditch regrading on IL 53 between Murphey Drive to IL 7 in Romeoville.
|
004-62G29
|
Executed
|
08/20/2019
|
|
|
1
|
1
|
McHenry
|
|
1.8 miles of resurfacing and pedestrian ramps on IL 47 from State Line Road to IL 173 in the Village of Hebron.
|
005-62G59
|
Executed
|
08/13/2019
|
|
|
1
|
1
|
DuPage
|
|
1.6 miles of resurfacing and ADA sidewalk repair on IL 53 from St. Charles Road to Sidney Avenue in the Villages of Addison and Lombard.
|
006-62G69
|
Executed
|
08/12/2019
|
1 / 0 |
|
1
|
1
|
Cook
|
|
Standard overlay, ADA improvements, and pedestrian traffic signal on IL-58 from Lincoln St. to IL-43 in Morton Grove and Glenview.
|
007-62G70
|
Executed
|
08/15/2019
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on Central Avenue from just south of 53rd Street to just north of 47th Street in Chicago
|
008-62G76
|
Executed
|
08/12/2019
|
1 / 0 |
|
1
|
1
|
Cook
|
|
1.7745 miles of resurfacing (smart) and ADA improvements on Niles Center Road in Skokie.
|
009-62G77
|
Executed
|
08/15/2019
|
2 / 0 |
1 |
1
|
1
|
Cook
|
|
1.9 miles of resurfacing and pedestrian ramps on Elston Avenue in Chicago.
|
010-62H54
|
Executed
|
08/13/2019
|
|
|
1
|
1
|
Cook
|
|
Light tower removal and replacement, installing new light towers, light poles, foundations, conduits, cables, and site restoration at I-57 at US 30 in Matteson and I-290/IL-53 at I-90 in Rolling Meadows.
|
011-62H56
|
Executed
|
08/12/2019
|
|
|
1
|
1
|
Cook
|
|
0.95 miles of standard overlay and pedestrian ramp improvements on Touhy Avenue from US 41 to Lawndale Avenue in Lincolnwood and Skokie.
|
012-62H83
|
Executed
|
08/12/2019
|
1 / 0 |
|
1
|
1
|
McHenry
|
|
1.3 miles of standard overlay and ADA improvements on IL 31 from James R. Rakow Road to north of US 14 in Crystal Lake.
|
013-62H92
|
Executed
|
09/03/2019
|
|
|
1
|
1
|
Lake
|
|
1.8 miles of resurfacing and pedestrian ramp improvements along US 45 from Lake Woodlawn Dr. to IL RTE 83 in Mundelein.
|
014-62H93
|
Executed
|
08/19/2019
|
|
|
1
|
1
|
Will
|
|
1.3 miles of resurfacing along IL 50 from Cicero Avenue to Manhattan-Monee Road in Monee Township
|
015-62H95
|
Executed
|
08/12/2019
|
|
|
1
|
1
|
Lake
|
|
3.56 miles of standard overlay and pedestrian ramp upgrades on IL-176 from Hilltop Terrace to De Webb Blvd. and on IL 60/83 from IL-176 to CN Railroad in Mundelein.
|
016-62H98
|
Executed
|
08/09/2019
|
|
|
1
|
1
|
Kane
|
|
1.20 miles of designed overlay and improvements on IL-31 from Webster St. to Rathbone Ave. in Aurora.
|
017-62J02
|
Executed
|
08/09/2019
|
|
|
1
|
1
|
Cook
|
|
2.63 miles of standard overlay and pedestrian ramp improvements on IL-1 from US 6 to Ridge Rd. in Harvey and Homewood.
|
018-62J03
|
Executed
|
08/15/2019
|
|
|
1
|
1
|
Lake
|
|
0.98 miles of designed overlay and pedestrian ramp improvements on IL 43 from McGaw Road / Pulaski Road to US 41 in Park City and Waukegan.
|
019-62J21
|
Executed
|
08/13/2019
|
|
|
1
|
1
|
Cook
|
|
Lining of existing drainage structures on Vermont Street from Western Avenue to Ashland Avenue in the Village of Blue Island.
|
020-64C06
|
Executed
|
08/12/2019
|
3 / 0 |
|
2
|
2
|
Henry
|
|
Resurfacing I-74 from 0.4 miles of IL-81 to 0.2 miles N of IL-17.
|
021-64J40
|
Executed
|
08/12/2019
|
|
1 |
2
|
2
|
Henry
|
|
Resurfacing 10.6 miles of IL-78 between 0.2 miles N of IL-92(W) and 0.4 miles N of I-80.
|
022-64K15
|
Executed
|
08/20/2019
|
|
|
2
|
2
|
Henry
|
|
Pavement patching and HMA resurfacing on IL-82 form IL-92 to Smith St. in Geneseo.
|
023-64N32
|
Executed
|
08/13/2019
|
|
|
2
|
2
|
Whiteside
|
|
Finger joint replacement, deck patching, and concrete overlay on SN 098-0100 carrying IL-78 over the rock river on the North edge of Prophetstown.
|
024-64N55
|
Executed
|
08/20/2019
|
|
1 |
2
|
2
|
Whiteside
|
|
Cold milling, HMA resurfacing and drainage improvements form IL-40 to 0.2 miles E and IL-40 from US 30 to 0.4 miles S.
|
025-66A81
|
Executed
|
08/08/2019
|
|
|
2
|
3
|
Ford
|
|
6 miles of milling and resurfacing of US 24 from Livingston county line to the Iroquois county line.
|
026-66A84
|
Executed
|
08/19/2019
|
|
|
2
|
3
|
Iroquois
|
|
8.09 miles of 3.75 milling and resurfacing from US 24 to US 45/52.
|
027-66B06
|
Executed
|
08/12/2019
|
|
|
2
|
3
|
LaSalle
|
|
10.9 miles of 3P milling and resurfacing on mainline pavement and pavement striping on IL-18 from IL-251 to WCL of Streator.
|
028-66D54
|
Executed
|
08/15/2019
|
1 / 0 |
1 |
2
|
3
|
LaSalle
|
|
6.3 miles of milling and resurfacing 3.75" of HMA at US-34 mainline and shoulders. Including removing and resurfacing 1" of HMA surface at bridge decks.
|
029-66D59
|
Executed
|
08/19/2019
|
|
|
2
|
3
|
Kankakee, Livingston
|
|
1.954 miles of 3P milling and resurfacing W of Reddick to 0.3 mile W of TR 48. It also includes centerline and shoulder rumble strips.
|
030-66F25
|
Executed
|
08/19/2019
|
|
|
2
|
3
|
Livingston
|
|
10.2 miles of 3P milling and resurfacing of 3.75" on or 66 from IL-23 to Prairie St. on Odell. Other work included is shoulder stone, pavement marking and raised reflective pavement markers.
|
031-66F86
|
Executed
|
08/01/2019
|
|
|
2
|
3
|
Iroquois
|
|
8.948 miles of 3P milling and resurfacing on IL-1 in Watseka to the Indiana St line.
|
032-66H58
|
Executed
|
08/12/2019
|
|
|
2
|
3
|
Bureau
|
|
9.9 miles of 3P 3.75" milling and resurfacing on IL-26 from N of IL-92 to S of red covered bridge road according to tamp designed overlay policy. Other work includes shoulder stone, pavement marking, and raised reflective pavement markers.
|
033-68C97
|
Executed
|
08/15/2019
|
|
|
3
|
4
|
Tazewell, Woodford
|
|
Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka.
|
034-68D88
|
Executed
|
08/20/2019
|
|
|
3
|
4
|
Peoria
|
|
Milling and resurfacing on IL-9 from 0.27 miles E of US 24 to the McNaughton bridge.
|
035-70952
|
Executed
|
08/19/2019
|
|
1 |
3
|
5
|
Champaign
|
|
3.504 miles of pavement preservation designed HMA overlay of Leverett Rd. from Market St. to US 45 in Champaign county.
|
036-70B09
|
Executed
|
08/22/2019
|
|
1 |
3
|
5
|
McLean
|
|
6.225 miles of pavement rehabilitation: standard overlay from N of Lexington to the Livingston CO. line.
|
037-70E01
|
Executed
|
08/13/2019
|
|
|
3
|
5
|
Douglas, Piatt
|
|
9.693 miles of cape seal operations from Moultrie County line to US RTE 45 W of Tuscola.
|
038-70E04
|
Executed
|
08/19/2019
|
|
|
3
|
5
|
McLean
|
|
Pavement preservation smart overlay from 0.1 miles W of Morris Ave to 0.3 miles W of US 51 BUS in Bloomington.
|
039-72K75
|
Executed
|
08/15/2019
|
|
|
4
|
6
|
Various
|
|
Painting portions of five bridges on various routes in Adams, Hancock and Pike Counties (SN 001-0052, 001-0069, 034-0065, 075-0133, 075-0134)
|
040-72K77
|
Executed
|
08/28/2019
|
|
|
4
|
6
|
Macoupin, Montgomery
|
|
Painting three bridges on I-55 in Macoupin and Montgomery Counties (SN 068-0052, 059-0037, 059-0038).
|
041-72K78
|
Executed
|
08/15/2019
|
|
|
4
|
6
|
Scott
|
|
Painting portions of two bridges on IL 100 and Hillview Road (SN 086-0016, 086-0039).
|
042-72L37
|
Executed
|
08/09/2019
|
|
|
4
|
6
|
Mason
|
|
11.9 miles of resurfacing on US 136 from east of Charlotte Street in Havana to 0.1 miles east of TR 2800 (Forest City Road).
|
043-74461
|
Executed
|
08/13/2019
|
|
|
4
|
7
|
Cumberland
|
|
Milling and resurfacing on I-57 from US 45 to the Coles County line.
|
044-74718
|
Executed
|
08/19/2019
|
|
|
4
|
7
|
Coles
|
|
4.9 miles of resurfacing on IL 130 from Fairgrange Road to the Douglas County line.
|
045-74778
|
Executed
|
08/13/2019
|
|
|
4
|
7
|
Coles
|
|
5.9 miles of patching, resurfacing and guardrail replacement on IL 16 from west of Douglas Drive in Charleston.
|
046-76K36
|
Deleted
|
08/20/2019
|
|
|
5
|
8
|
Calhoun
|
|
7.1 miles of resurfacing and ADA improvements on IL 100 from IL 96 to the Pike County line.
|
047-76K38
|
Executed
|
08/19/2019
|
1 / 0 |
1 |
5
|
8
|
Monroe
|
|
3.4 miles of resurfacing on IL 3 from just north of Gilmore Lake Road to Halifax Drive.
|
048-76K42
|
Executed
|
08/19/2019
|
|
1 |
5
|
8
|
Madison
|
|
3.1 miles of resurfacing and new full depth shoulders on IL 140 from just east of Moreland Road to 0.2 miles west of IL 159.
|
049-76K44
|
Executed
|
08/15/2019
|
1 / 0 |
1 |
5
|
8
|
Washington
|
|
4.7 miles of resurfacing and guardrail upgrades on IL 127 from Conservation Road to the Perry County line.
|
050-76L12
|
Executed
|
08/08/2019
|
|
|
5
|
8
|
Jersey
|
|
5.4 miles of resurfacing on IL 267 from the Greene County line to the Macoupin County line.
|
051-76L13
|
Executed
|
08/19/2019
|
|
|
5
|
8
|
Bond
|
|
Resurfacing on IL 127 from the Montgomery County line to just north of the IL 140 junction.
|
052-76L19
|
Executed
|
08/19/2019
|
|
|
5
|
8
|
Randolph
|
|
2.8 miles of resurfacing on IL 3 from 0.2 miles south of 1st Street in Ruma to 0.2 miles south of South Prairie Road.
|
053-76M64
|
Executed
|
08/19/2019
|
|
|
5
|
8
|
Clinton
|
|
2.5 miles of resurfacing on IL 160 from the Madison County line to 0.3 miles north of US 50.
|
054-76M65
|
Executed
|
08/19/2019
|
|
|
5
|
8
|
Madison
|
|
9.1 miles of crack and joint seal on I-70 from 2.5 miles east of the I-55/70 interchange to 0.1 miles west of Prairie Road.
|
055-76M66
|
Executed
|
08/19/2019
|
|
|
5
|
8
|
St. Clair
|
|
11.7 miles of crack and joint seal on I-64 from 0.6 miles east of I-55/70 to 0.3 miles west of IL 157 and from 0.2 miles west of Greenmount to 0.4 miles west of IL 4.
|
056-76M72
|
Executed
|
08/15/2019
|
1 / 0 |
1 |
5
|
8
|
Madison
|
|
6.5 miles of resurfacing on IL 255 from I-270 to IL 143.
|
057-76M73
|
Executed
|
08/13/2019
|
|
|
5
|
8
|
St. Clair
|
|
4.4 miles of resurfacing on IL 158/US 50 from US 50 to IL 161.
|
058-76M75
|
Executed
|
08/09/2019
|
|
|
5
|
8
|
Monroe
|
|
13.4 miles of crack and joint seal on IL 3 from Country Club Lane to the Randolph County line.
|
059-76M76
|
Executed
|
08/19/2019
|
|
|
5
|
8
|
Clinton
|
|
3.2 miles of resurfacing on US 50 from 0.2 miles west of IL 160 to the Sugar Creek Overflow.
|
060-78489
|
Executed
|
08/22/2019
|
|
|
5
|
9
|
Johnson
|
|
4.3 miles of resurfacing on IL 146 from the Union County line to just east of IL 37.
|
061-78565
|
Executed
|
08/12/2019
|
|
|
5
|
9
|
Jackson
|
|
Resurfacing on Old US 51 between the intersections of US 51 and Old US 51, including the Old US 51 spur.
|
062-78607
|
Executed
|
08/12/2019
|
|
|
5
|
9
|
Perry
|
|
9.5 miles of resurfacing on IL 13/127.
|
063-78608
|
Executed
|
08/22/2019
|
|
|
5
|
9
|
Franklin, Williamson
|
|
2.6 miles of resurfacing on IL 148 from Maple Street in Zeigler to 0.8 miles south of Franklin/Williamson County line.
|
064-78638
|
Executed
|
08/12/2019
|
|
|
5
|
9
|
Perry
|
|
3.6 miles of resurfacing on IL 127 in Perry County.
|
065-78639
|
Executed
|
08/12/2019
|
|
|
5
|
9
|
Williamson
|
|
2.1 miles of resurfacing on Herrin Road from Christmas Tree Road to just east of I-57.
|
066-78673
|
Executed
|
08/12/2019
|
|
|
5
|
9
|
Jackson
|
|
1.6 miles of resurfacing on US 51 in Jackson County.
|
067-78691
|
Executed
|
08/12/2019
|
|
|
5
|
9
|
Perry
|
|
1.8 miles of resurfacing on IL 14 from just west of the intersection of IL 14 and Old IL 14 West Connector to just east of the intersection of IL 14 and Old IL 14 East Connector.
|
068-78692
|
Executed
|
08/22/2019
|
|
|
5
|
9
|
Williamson
|
|
0.8 miles of milling and resurfacing on IL 13 from IL 37 to Fair Street in Marion.
|
069-78723
|
Executed
|
08/12/2019
|
|
|
5
|
9
|
Various
|
|
13.5 miles of resurfacing on IL 142 from IL 14 to the Saline County line and 3.4 miles of resurfacing from 3 miles south of Eldorado to the west city limits.
|
070-78740
|
Executed
|
08/19/2019
|
|
|
5
|
9
|
White
|
|
6.5 miles of resurfacing on I-64 from the northwest White County line to County Road Bridge (1350E).
|
071-78741
|
Executed
|
08/19/2019
|
|
|
5
|
9
|
Jefferson
|
|
Resurfacing on IL 142 from I-64 to the Hamilton County line.
|
072-78742
|
Executed
|
08/19/2019
|
1 / 0 |
|
5
|
9
|
Massac, Pope
|
|
Resurfacing on IL 145 from IL 146 to the Massac County line and from the Pope County line to US 45 near Metropolis.
|
073-78743
|
Executed
|
08/22/2019
|
|
|
5
|
9
|
Massac
|
|
3.2 miles of resurfacing on US 45 from the Johnson County line to IL 169.
|
074-62F29
|
Executed
|
08/13/2019
|
2 / 0 |
|
1
|
1
|
Cook
|
|
Extensive repairs to SN 016-0575 carrying Sauk Trail over I-57 in Richton.
|
075-64M22
|
Executed
|
08/22/2019
|
|
1 |
2
|
2
|
Henry
|
|
17.12 miles of routing, cleaning, and sealing the centerline and shoulder joints on I-80 from 0.5 miles W of the IL-82 to the Bureau County Line.
|
076-68D00
|
Executed
|
08/12/2019
|
|
|
3
|
4
|
Henry, Stark
|
|
2.93 miles of resurfacing, patching, and partial depth patching from N of IL-17 (W) to just N of the Stark/Henry County Line.
|
077-68D68
|
Executed
|
08/12/2019
|
|
|
3
|
4
|
Marshall, Peoria
|
|
7.5 miles of resurfacing on IL-29 from Senachwine Creek in Chilicothe to IL-17 E in Sparland.
|
078-68E93
|
Executed
|
08/20/2019
|
1 / 0 |
|
3
|
4
|
Peoria
|
|
Resurfacing on IL-40 from Ravinswood Rd. to N of Timber Lane.
|
079-68F10
|
Executed
|
08/15/2019
|
|
|
3
|
4
|
Henderson
|
|
Resurfacing Gulfport Interchange US 34 ramp EB to US 4, US 34 EB to Chinn Ave, US 34 WB to US 34 ramp WB. and Chinn Ave to US 34.
|
080-78652
|
Executed
|
08/15/2019
|
2 / 0 |
|
5
|
9
|
Hardin
|
|
Replace box culvert SN 035-70222 carrying IL 34 over a ditch, 4.2 miles north of IL 34/146.
|
081-78676
|
Executed
|
08/15/2019
|
2 / 0 |
|
5
|
9
|
Perry
|
|
Replace box culvert SN 073-7005 carrying US 51 over an unnamed stream, 0.26 mile north of IL 154, between DuQuoin and Tamaroa.
|
082-78705
|
Executed
|
08/12/2019
|
|
|
5
|
9
|
Jackson
|
|
7.9 miles of resurfacing and ADA improvements on IL 13/127 from Finny Road, north of Murphysboro, to the Perry County line.
|
083-78714
|
Executed
|
08/20/2019
|
1 / 0 |
|
5
|
9
|
Various
|
|
Surfce preparation and application of bridge deck concrete sealer at various locations in Franklin, Hamilton and White counties.
|