Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-62B78 Executed 08/20/2019 14 / 0 1 1 1 Cook Voluntary Pump station 4 reconstruction. I-290 just west of the Des Plaines River in Forest Park.
002-93729 Executed 08/29/2019 1 / 0 4 6 Montgomery Sidewalk construction, traffic signal modifications, drainage improvements and lighting at various locations in the City of Litchfield.
003-62G13 Executed 08/09/2019 1 1 Will 2.73 miles of shoulder widening and milled rumble strips with ditch regrading on IL 53 between Murphey Drive to IL 7 in Romeoville.
004-62G29 Executed 08/20/2019 1 1 McHenry 1.8 miles of resurfacing and pedestrian ramps on IL 47 from State Line Road to IL 173 in the Village of Hebron.
005-62G59 Executed 08/13/2019 1 1 DuPage 1.6 miles of resurfacing and ADA sidewalk repair on IL 53 from St. Charles Road to Sidney Avenue in the Villages of Addison and Lombard.
006-62G69 Executed 08/12/2019 1 / 0 1 1 Cook Standard overlay, ADA improvements, and pedestrian traffic signal on IL-58 from Lincoln St. to IL-43 in Morton Grove and Glenview.
007-62G70 Executed 08/15/2019 1 1 Cook Resurfacing and pedestrian ramps on Central Avenue from just south of 53rd Street to just north of 47th Street in Chicago
008-62G76 Executed 08/12/2019 1 / 0 1 1 Cook 1.7745 miles of resurfacing (smart) and ADA improvements on Niles Center Road in Skokie.
009-62G77 Executed 08/15/2019 2 / 0 1 1 1 Cook 1.9 miles of resurfacing and pedestrian ramps on Elston Avenue in Chicago.
010-62H54 Executed 08/13/2019 1 1 Cook Light tower removal and replacement, installing new light towers, light poles, foundations, conduits, cables, and site restoration at I-57 at US 30 in Matteson and I-290/IL-53 at I-90 in Rolling Meadows.
011-62H56 Executed 08/12/2019 1 1 Cook 0.95 miles of standard overlay and pedestrian ramp improvements on Touhy Avenue from US 41 to Lawndale Avenue in Lincolnwood and Skokie.
012-62H83 Executed 08/12/2019 1 / 0 1 1 McHenry 1.3 miles of standard overlay and ADA improvements on IL 31 from James R. Rakow Road to north of US 14 in Crystal Lake.
013-62H92 Executed 09/03/2019 1 1 Lake 1.8 miles of resurfacing and pedestrian ramp improvements along US 45 from Lake Woodlawn Dr. to IL RTE 83 in Mundelein.
014-62H93 Executed 08/19/2019 1 1 Will 1.3 miles of resurfacing along IL 50 from Cicero Avenue to Manhattan-Monee Road in Monee Township
015-62H95 Executed 08/12/2019 1 1 Lake 3.56 miles of standard overlay and pedestrian ramp upgrades on IL-176 from Hilltop Terrace to De Webb Blvd. and on IL 60/83 from IL-176 to CN Railroad in Mundelein.
016-62H98 Executed 08/09/2019 1 1 Kane 1.20 miles of designed overlay and improvements on IL-31 from Webster St. to Rathbone Ave. in Aurora.
017-62J02 Executed 08/09/2019 1 1 Cook 2.63 miles of standard overlay and pedestrian ramp improvements on IL-1 from US 6 to Ridge Rd. in Harvey and Homewood.
018-62J03 Executed 08/15/2019 1 1 Lake 0.98 miles of designed overlay and pedestrian ramp improvements on IL 43 from McGaw Road / Pulaski Road to US 41 in Park City and Waukegan.
019-62J21 Executed 08/13/2019 1 1 Cook Lining of existing drainage structures on Vermont Street from Western Avenue to Ashland Avenue in the Village of Blue Island.
020-64C06 Executed 08/12/2019 3 / 0 2 2 Henry Resurfacing I-74 from 0.4 miles of IL-81 to 0.2 miles N of IL-17.
021-64J40 Executed 08/12/2019 1 2 2 Henry Resurfacing 10.6 miles of IL-78 between 0.2 miles N of IL-92(W) and 0.4 miles N of I-80.
022-64K15 Executed 08/20/2019 2 2 Henry Pavement patching and HMA resurfacing on IL-82 form IL-92 to Smith St. in Geneseo.
023-64N32 Executed 08/13/2019 2 2 Whiteside Finger joint replacement, deck patching, and concrete overlay on SN 098-0100 carrying IL-78 over the rock river on the North edge of Prophetstown.
024-64N55 Executed 08/20/2019 1 2 2 Whiteside Cold milling, HMA resurfacing and drainage improvements form IL-40 to 0.2 miles E and IL-40 from US 30 to 0.4 miles S.
025-66A81 Executed 08/08/2019 2 3 Ford 6 miles of milling and resurfacing of US 24 from Livingston county line to the Iroquois county line.
026-66A84 Executed 08/19/2019 2 3 Iroquois 8.09 miles of 3.75 milling and resurfacing from US 24 to US 45/52.
027-66B06 Executed 08/12/2019 2 3 LaSalle 10.9 miles of 3P milling and resurfacing on mainline pavement and pavement striping on IL-18 from IL-251 to WCL of Streator.
028-66D54 Executed 08/15/2019 1 / 0 1 2 3 LaSalle 6.3 miles of milling and resurfacing 3.75" of HMA at US-34 mainline and shoulders. Including removing and resurfacing 1" of HMA surface at bridge decks.
029-66D59 Executed 08/19/2019 2 3 Kankakee, Livingston 1.954 miles of 3P milling and resurfacing W of Reddick to 0.3 mile W of TR 48. It also includes centerline and shoulder rumble strips.
030-66F25 Executed 08/19/2019 2 3 Livingston 10.2 miles of 3P milling and resurfacing of 3.75" on or 66 from IL-23 to Prairie St. on Odell. Other work included is shoulder stone, pavement marking and raised reflective pavement markers.
031-66F86 Executed 08/01/2019 2 3 Iroquois 8.948 miles of 3P milling and resurfacing on IL-1 in Watseka to the Indiana St line.
032-66H58 Executed 08/12/2019 2 3 Bureau 9.9 miles of 3P 3.75" milling and resurfacing on IL-26 from N of IL-92 to S of red covered bridge road according to tamp designed overlay policy. Other work includes shoulder stone, pavement marking, and raised reflective pavement markers.
033-68C97 Executed 08/15/2019 3 4 Tazewell, Woodford Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka.
034-68D88 Executed 08/20/2019 3 4 Peoria Milling and resurfacing on IL-9 from 0.27 miles E of US 24 to the McNaughton bridge.
035-70952 Executed 08/19/2019 1 3 5 Champaign 3.504 miles of pavement preservation designed HMA overlay of Leverett Rd. from Market St. to US 45 in Champaign county.
036-70B09 Executed 08/22/2019 1 3 5 McLean 6.225 miles of pavement rehabilitation: standard overlay from N of Lexington to the Livingston CO. line.
037-70E01 Executed 08/13/2019 3 5 Douglas, Piatt 9.693 miles of cape seal operations from Moultrie County line to US RTE 45 W of Tuscola.
038-70E04 Executed 08/19/2019 3 5 McLean Pavement preservation smart overlay from 0.1 miles W of Morris Ave to 0.3 miles W of US 51 BUS in Bloomington.
039-72K75 Executed 08/15/2019 4 6 Various Painting portions of five bridges on various routes in Adams, Hancock and Pike Counties (SN 001-0052, 001-0069, 034-0065, 075-0133, 075-0134)
040-72K77 Executed 08/28/2019 4 6 Macoupin, Montgomery Painting three bridges on I-55 in Macoupin and Montgomery Counties (SN 068-0052, 059-0037, 059-0038).
041-72K78 Executed 08/15/2019 4 6 Scott Painting portions of two bridges on IL 100 and Hillview Road (SN 086-0016, 086-0039).
042-72L37 Executed 08/09/2019 4 6 Mason 11.9 miles of resurfacing on US 136 from east of Charlotte Street in Havana to 0.1 miles east of TR 2800 (Forest City Road).
043-74461 Executed 08/13/2019 4 7 Cumberland Milling and resurfacing on I-57 from US 45 to the Coles County line.
044-74718 Executed 08/19/2019 4 7 Coles 4.9 miles of resurfacing on IL 130 from Fairgrange Road to the Douglas County line.
045-74778 Executed 08/13/2019 4 7 Coles 5.9 miles of patching, resurfacing and guardrail replacement on IL 16 from west of Douglas Drive in Charleston.
046-76K36 Deleted 08/20/2019 5 8 Calhoun 7.1 miles of resurfacing and ADA improvements on IL 100 from IL 96 to the Pike County line.
047-76K38 Executed 08/19/2019 1 / 0 1 5 8 Monroe 3.4 miles of resurfacing on IL 3 from just north of Gilmore Lake Road to Halifax Drive.
048-76K42 Executed 08/19/2019 1 5 8 Madison 3.1 miles of resurfacing and new full depth shoulders on IL 140 from just east of Moreland Road to 0.2 miles west of IL 159.
049-76K44 Executed 08/15/2019 1 / 0 1 5 8 Washington 4.7 miles of resurfacing and guardrail upgrades on IL 127 from Conservation Road to the Perry County line.
050-76L12 Executed 08/08/2019 5 8 Jersey 5.4 miles of resurfacing on IL 267 from the Greene County line to the Macoupin County line.
051-76L13 Executed 08/19/2019 5 8 Bond Resurfacing on IL 127 from the Montgomery County line to just north of the IL 140 junction.
052-76L19 Executed 08/19/2019 5 8 Randolph 2.8 miles of resurfacing on IL 3 from 0.2 miles south of 1st Street in Ruma to 0.2 miles south of South Prairie Road.
053-76M64 Executed 08/19/2019 5 8 Clinton 2.5 miles of resurfacing on IL 160 from the Madison County line to 0.3 miles north of US 50.
054-76M65 Executed 08/19/2019 5 8 Madison 9.1 miles of crack and joint seal on I-70 from 2.5 miles east of the I-55/70 interchange to 0.1 miles west of Prairie Road.
055-76M66 Executed 08/19/2019 5 8 St. Clair 11.7 miles of crack and joint seal on I-64 from 0.6 miles east of I-55/70 to 0.3 miles west of IL 157 and from 0.2 miles west of Greenmount to 0.4 miles west of IL 4.
056-76M72 Executed 08/15/2019 1 / 0 1 5 8 Madison 6.5 miles of resurfacing on IL 255 from I-270 to IL 143.
057-76M73 Executed 08/13/2019 5 8 St. Clair 4.4 miles of resurfacing on IL 158/US 50 from US 50 to IL 161.
058-76M75 Executed 08/09/2019 5 8 Monroe 13.4 miles of crack and joint seal on IL 3 from Country Club Lane to the Randolph County line.
059-76M76 Executed 08/19/2019 5 8 Clinton 3.2 miles of resurfacing on US 50 from 0.2 miles west of IL 160 to the Sugar Creek Overflow.
060-78489 Executed 08/22/2019 5 9 Johnson 4.3 miles of resurfacing on IL 146 from the Union County line to just east of IL 37.
061-78565 Executed 08/12/2019 5 9 Jackson Resurfacing on Old US 51 between the intersections of US 51 and Old US 51, including the Old US 51 spur.
062-78607 Executed 08/12/2019 5 9 Perry 9.5 miles of resurfacing on IL 13/127.
063-78608 Executed 08/22/2019 5 9 Franklin, Williamson 2.6 miles of resurfacing on IL 148 from Maple Street in Zeigler to 0.8 miles south of Franklin/Williamson County line.
064-78638 Executed 08/12/2019 5 9 Perry 3.6 miles of resurfacing on IL 127 in Perry County.
065-78639 Executed 08/12/2019 5 9 Williamson 2.1 miles of resurfacing on Herrin Road from Christmas Tree Road to just east of I-57.
066-78673 Executed 08/12/2019 5 9 Jackson 1.6 miles of resurfacing on US 51 in Jackson County.
067-78691 Executed 08/12/2019 5 9 Perry 1.8 miles of resurfacing on IL 14 from just west of the intersection of IL 14 and Old IL 14 West Connector to just east of the intersection of IL 14 and Old IL 14 East Connector.
068-78692 Executed 08/22/2019 5 9 Williamson 0.8 miles of milling and resurfacing on IL 13 from IL 37 to Fair Street in Marion.
069-78723 Executed 08/12/2019 5 9 Various 13.5 miles of resurfacing on IL 142 from IL 14 to the Saline County line and 3.4 miles of resurfacing from 3 miles south of Eldorado to the west city limits.
070-78740 Executed 08/19/2019 5 9 White 6.5 miles of resurfacing on I-64 from the northwest White County line to County Road Bridge (1350E).
071-78741 Executed 08/19/2019 5 9 Jefferson Resurfacing on IL 142 from I-64 to the Hamilton County line.
072-78742 Executed 08/19/2019 1 / 0 5 9 Massac, Pope Resurfacing on IL 145 from IL 146 to the Massac County line and from the Pope County line to US 45 near Metropolis.
073-78743 Executed 08/22/2019 5 9 Massac 3.2 miles of resurfacing on US 45 from the Johnson County line to IL 169.
074-62F29 Executed 08/13/2019 2 / 0 1 1 Cook Extensive repairs to SN 016-0575 carrying Sauk Trail over I-57 in Richton.
075-64M22 Executed 08/22/2019 1 2 2 Henry 17.12 miles of routing, cleaning, and sealing the centerline and shoulder joints on I-80 from 0.5 miles W of the IL-82 to the Bureau County Line.
076-68D00 Executed 08/12/2019 3 4 Henry, Stark 2.93 miles of resurfacing, patching, and partial depth patching from N of IL-17 (W) to just N of the Stark/Henry County Line.
077-68D68 Executed 08/12/2019 3 4 Marshall, Peoria 7.5 miles of resurfacing on IL-29 from Senachwine Creek in Chilicothe to IL-17 E in Sparland.
078-68E93 Executed 08/20/2019 1 / 0 3 4 Peoria Resurfacing on IL-40 from Ravinswood Rd. to N of Timber Lane.
079-68F10 Executed 08/15/2019 3 4 Henderson Resurfacing Gulfport Interchange US 34 ramp EB to US 4, US 34 EB to Chinn Ave, US 34 WB to US 34 ramp WB. and Chinn Ave to US 34.
080-78652 Executed 08/15/2019 2 / 0 5 9 Hardin Replace box culvert SN 035-70222 carrying IL 34 over a ditch, 4.2 miles north of IL 34/146.
081-78676 Executed 08/15/2019 2 / 0 5 9 Perry Replace box culvert SN 073-7005 carrying US 51 over an unnamed stream, 0.26 mile north of IL 154, between DuQuoin and Tamaroa.
082-78705 Executed 08/12/2019 5 9 Jackson 7.9 miles of resurfacing and ADA improvements on IL 13/127 from Finny Road, north of Murphysboro, to the Perry County line.
083-78714 Executed 08/20/2019 1 / 0 5 9 Various Surfce preparation and application of bridge deck concrete sealer at various locations in Franklin, Hamilton and White counties.