Home > Notice of Letting

January 15, 2021 Letting 12:00 PM
Notice of Letting
Volume 023, No. 048

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
004-62K93 Executed 03/01/2021 1 / 1 1 1 Lake, McHenry ADA improvement project along various State maintained routes. Located in the City of Zion and Villages of Richmond, Winthrop Harbor, Fox Lake, Lake Villa and Grayslake.
010-62L37 Executed 03/11/2021 2 / 2 1 1 Will County-wide ADA improvements of curb ramps for sidewalks on IL 7 from Hamilton Street to Madison Street and on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will County.
011-62L38 Executed 03/01/2021 1 1 Lake, McHenry ADA improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will, Southern Lake and McHenry Counties. Located in the City of Crystal Lake and Villages of Barrington and Wauconda.
021-64P46 Executed 03/02/2021 2 2 Various Roadside restoration of Right-Of-Way turf damage caused by motorists along State maintained routes within District 2.
023-64P67 Executed 03/30/2021 1 / 1 2 2 Lee Cold milling and Hot Mix Asphalt Resurfacing from 0.1 mile west to 0.1 mile East of Franklin Creek located West of Franklin Grove.
026-66K95 Executed 03/16/2021 1 / 1 2 3 Bureau This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal.
032-68F97 Executed 03/04/2021 3 4 Peoria Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River in Peoria County.
035-68G08 Rejected 04/15/2021 1 / 1 3 4 Various District-wide weed spraying (off road) in various counties on various routes.
039-70F23 Executed 03/01/2021 1 / 1 3 5 Various 567.5 miles of spraying, approximately 2004 acres on state right of way along US 51 on interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties.
060-76P13 Executed 03/01/2021 1 / 1 5 8 Jersey, Madison Weed spraying along IL 100 from IL 96 to the Piasa Bird Monument and along IL IL 255 from I-270 to US 67.
070-62L39 Executed 03/01/2021 1 1 Lake ADA improvement project along various State maintained routes within Eastern Lake County. Located in the Cities of Waukegan, Park City, North Chicago and Villages of Mundelein and Libertyville.
071-62L48 Executed 02/25/2021 1 1 Kane (1.937-Mile) Improvement consists of crack cleaning and sealing in the existing concrete pavement between traffic lanes, curb and gutter, restriping pavement marking in Villages of East and West Dundee, Dundee Township.
072-62L75 Executed 03/03/2021 1 1 Cook (2.9-Mile) Crack and Joint Sealing on existing HMA pavement. Location: IL 64 (North Ave.) Damen Ave to US 41 within the City of Chicago in Cook County.
073-62L77 Executed 02/25/2021 1 1 DuPage (3.157-Mile) Crack and joint sealing project on IL 64 (North Avenue) from IL 53 (Rohlwing Road) to Villa Ave. within the Villages of Lombard, Addison and Villa Ave. within the Villages of Lombard, Addison and Villa Park in DuPage County.
074-62L78 Executed 03/03/2021 1 1 Cook (1.71-Mile) Crack and joint sealing improvements on IL 171 from Forest Preserve Dr. to south of Des Plaines River Rd. Located within the Village of River Grove in Cook County.
093-62L49 Executed 02/25/2021 1 1 Lake (2.578-Mile) Improvement on IL-120 (Belvidere Road) from McHenry Co. Line to East of IL-60 consist of sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages of Lakemoor, Round Lake, and Volo, Wauconda Township.
111-62L44 Executed 03/03/2021 1 1 Lake Cleaning and sealing longitudinal joints and cracks of the existing concrete pavement from Riverwoods Blvd to US 41 (Skokie Hwy) pavement markings restriping in the Villages of Mettawa and Lake Forest, Libertyville, Shields, Vernon and Deerfield Townships.
118-72M13 Executed 03/04/2021 4 6 Brown Insertion culvert liners on IL 99 and IL 107 from the Pike County line to the Schuyler County line.
125-62N18 Rejected 02/18/2021 1 1 Various Expressway mowing north.
126-62N19 Rejected 02/18/2021 1 1 Various Expressway mowing north.
146-62L45 Executed 03/23/2021 1 1 Cook Smart Overlay, Class D patching and ADA improvement. Project begins 50 ft south of 31st St. and proceeds approximately 4637.9 ft in a northerly direction to 23rd St. in the Villages of Brookfield and Berwyn Township.
161-62K38 Executed 04/27/2021 1 1 Cook The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St.
162-62K40 Executed 05/06/2021 1 1 Cook The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy.
163-62K41 Executed 03/05/2021 1 1 Cook The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy).
164-62K43 Executed 03/05/2021 1 1 Cook The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island.
165-62K46 Executed 03/05/2021 1 1 Cook The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave).
166-62L40 Executed 02/25/2021 1 1 Cook (2788 Ft.) Crack and Joint Sealing project from Western Ave to Carrol Ave. in the Village of Harvey, in Thornton Township.
168-62L43 Executed 02/25/2021 1 1 Cook (1.74-Mile) Improvement on IL 38 from Harrison St to Manheim Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages Hillside and Westchester, Proviso Township.
170-62L70 Active 12/02/2020 1 1 Will (2.87-Mile) Crack and joint sealing improvements on US 30 from Larkin Ave. to US 30 (Center St. SB), located within the Cities of Joliet and Crest Hill.
171-62L71 Executed 03/03/2021 1 1 Cook 1.69 miles of cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter on IL 43 from IL 72 to south of Collum Ave. in Norridge and the City of Chicago.
172-62L72 Executed 02/25/2021 1 1 Cook (3.49-Mile) Crack and Joint sealing on PCC pavement. Location: IL 62 (Algonquin Rd) from Penny Rd to Center Port Dr. in the Village of South Barrington, Palatine and Hoffman Estates.
173-62M00 Executed 03/03/2021 1 1 Will (6.395-Mile) Crack and Joint Sealing of PCC Pavement; Location: FAP 338: IL 59 from DuPage County Line to North of Pheasant Chase Drive in the City of Naperville and Village of Plainfield in Will County.
No More Data