001-62D60
|
Executed
|
02/23/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(3.40-mile) Standard overlay, ADA improvements and channelization on Kedzie Ave. from n/o 871h St. to 103rd St. and 115th St. to n/o 131 St. and at 87th St. Located within the City of Blue Island, Villages of Alsip, Evergreen Park, and Merrionette Park.
|
002-62H50
|
Executed
|
02/23/2021
|
4 / 4 |
2 |
1
|
1
|
Cook
|
|
(672.28 FT) The improvement on IL Rte. 50 over BRC Railroad consist of Bridge Deck Overlay, Joint Repairs and Substructure Repairs. Located in the City of Chicago and Village of Bedford Park.
|
003-62J73
|
Executed
|
02/23/2021
|
2 / 2 |
|
1
|
1
|
Cook
|
|
(1.46-Mile) Standard overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA sidewalk repair and thermoplastic pavement marking on US 34 from 1-294 to Edgewood Avenue within the Villages of Western Springs and LaGrange.
|
004-62K93
|
Executed
|
03/01/2021
|
1 / 1 |
|
1
|
1
|
Lake, McHenry
|
|
ADA improvement project along various State maintained routes. Located in the City of Zion and Villages of Richmond, Winthrop Harbor, Fox Lake, Lake Villa and Grayslake.
|
005-62L03
|
Executed
|
02/26/2021
|
7 / 7 |
1 |
1
|
1
|
Lake
|
|
(5.660-Mile) Improvement on IL-173 (Rosecrans Road) from Mc Henry Co. Line to west of Lake Ave. and Orchard Street to Madison Ave. consists of pavement patching, micro-surfacing, sidewalk ramps improvements, curb Gutter replacement in the village of Antioch, Antioch Township.
|
006-62L04
|
Withdrawn
|
12/05/2020
|
|
|
1
|
1
|
Cook
|
|
(2.53-Mile) Improvement on Church St from Gross Point to Dodge Ave consists of Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston Niles and Evanston Townships. , (2.53-Mile) Improvement on Church St from Gross Point to Dodge Ave consists of Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston Niles and Evanston Townships.
|
007-62L05
|
Withdrawn
|
12/05/2020
|
|
|
1
|
1
|
Will
|
|
(3.32 mile) Improvement on IL-53 from Hoff Rd to Manhattan Rd consists of smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township. , (3.32 mile) Improvement on IL-53 from Hoff Rd to Manhattan Rd consists of smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township.
|
008-62L25
|
Executed
|
03/18/2021
|
|
|
1
|
1
|
Will
|
|
(1.988-Mile) SMART overlay on Governor's Hwy. From IL-50 to Cook County Line. Located in the Village of University Park in Will County.
|
009-62L26
|
Executed
|
02/26/2021
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(2.27 4-Mile) Standard overlay project on 47th Street from east of Plainfield Road to west of IL Rte. 43 (Harlem Avenue) that includes ADA sidewalk improvements. Located in Villages of Brookfield, McCook, and Lyons.
|
010-62L37
|
Executed
|
03/11/2021
|
2 / 2 |
|
1
|
1
|
Will
|
|
County-wide ADA improvements of curb ramps for sidewalks on IL 7 from Hamilton Street to Madison Street and on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will County.
|
011-62L38
|
Executed
|
03/01/2021
|
|
|
1
|
1
|
Lake, McHenry
|
|
ADA improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will, Southern Lake and McHenry Counties. Located in the City of Crystal Lake and Villages of Barrington and Wauconda.
|
012-62L46
|
Executed
|
03/02/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(6.69-Mile) Improvement on 1-290 from 1-88 to East of Austin Blvd consist of sealing cracks and joints in the existing HMA pavement, restriping with modified urethane pavement marking in the village of Hillside, Bellwood, Maywood, Forest Park, Broadview, and Oak Park, Provisio and Oak Park Townships.
|
013-62L74
|
Executed
|
03/02/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(1,444-Ft.) SMART Overlay and ADA Ramp Improvement. Location: IL 64 (North Ave.) Sheffield Ave to Halsted St. in The City of Chicago in Cook County.
|
014-62L79
|
Executed
|
02/25/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(5.98-Mile) SMART Overlay and ADA Pedestrian Ramps project on IL-43 (FAP 348) from north of US 6 (159th St) to north of 111th St. Located within the Villages of Orland Park, Worth and Palos Heights in Cook County.
|
015-62M39
|
Executed
|
03/01/2021
|
|
1 |
1
|
1
|
Lake
|
|
The improvement of IL 176 (Park Avenue) over Des Plaines River consists of a bridge deck overlay and joint repair located in the Village of Libertyville.
|
016-62M91
|
Executed
|
03/09/2021
|
1 / 1 |
1 |
1
|
1
|
Lake, McHenry
|
|
Cleaning and painting existing steel structures at 5 locations. 1st location, US 12 over Pistakee Lake (SN 049-0019). 2nd location, IL 43 over IL 120 (SN 049-0111). 3rd location, Metra RR over Person Rd. (SN 049-0127). 4th location, US 12 over Nippersink Lake (SN 049-0167). 5th location, US 14 over UP RR and McComb St. (SN 056-0007).
|
017-64N02
|
Executed
|
03/11/2021
|
1 / 1 |
|
2
|
2
|
Jo Daviess
|
|
Erosion repairs adjacent to US 20 from 0. 5 mile east to 1.3 miles east of Powder House Hill Road.
|
018-64G94
|
Executed
|
03/02/2021
|
2 / 2 |
1 |
2
|
2
|
Henry
|
|
HMA Resurfacing on IL 81 from US 150 to 0.4 mile West of I-74.
|
019-64P44
|
Executed
|
03/16/2021
|
|
|
2
|
2
|
Various
|
|
Guardrail and fence repairs along State maintained routes in Boone, Carroll, JoDaviess, Ogle, Stephenson and Winnebago Counties.
|
020-64P45
|
Executed
|
03/16/2021
|
|
|
2
|
2
|
Various
|
|
Guardrail and fence repairs along State maintained routes in Henry. Lee, Rock Island, Whiteside, and portions of LaSalle Counties.
|
021-64P46
|
Executed
|
03/02/2021
|
|
|
2
|
2
|
Various
|
|
Roadside restoration of Right-Of-Way turf damage caused by motorists along State maintained routes within District 2.
|
022-64P51
|
Executed
|
02/24/2021
|
1 / 1 |
1 |
2
|
2
|
Henry
|
|
Expansion joint replacement, deck patching and concrete overlay on the structure (SN 037-0137) carrying IL 82 over the north branch of the Edwards River, located 2 miles South of IL 81.
|
023-64P67
|
Executed
|
03/30/2021
|
1 / 1 |
|
2
|
2
|
Lee
|
|
Cold milling and Hot Mix Asphalt Resurfacing from 0.1 mile west to 0.1 mile East of Franklin Creek located West of Franklin Grove.
|
024-66E45
|
Executed
|
02/26/2021
|
3 / 3 |
2 |
2
|
3
|
Grundy
|
|
The work consists of the replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad. Additional work includes substructure repairs, structural steel painting, tree removal, landscaping,grading ditches, and resurfacing pavement. The project length is 0.4 miles and is located 5.3 miles East of Morris in Grundy Co.
|
025-66H91
|
Withdrawn
|
12/11/2020
|
|
|
2
|
3
|
LaSalle
|
|
This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. , This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. , This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items.
|
026-66K95
|
Executed
|
03/16/2021
|
1 / 1 |
|
2
|
3
|
Bureau
|
|
This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal.
|
027-66L00
|
Executed
|
02/23/2021
|
10 / 10 |
3 |
2
|
3
|
LaSalle
|
|
Latex overlay, cleaning and painting structural steel and expansion joint repair of SN 050-0171 carrying US 52 over 1-39 in Troy Grove.
|
028-66L24
|
Executed
|
03/01/2021
|
|
|
2
|
3
|
Bureau
|
|
This work is located at Structure No. 006-0153, IL 92 over a stream, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting.
|
029-66L25
|
Executed
|
03/09/2021
|
1 / 1 |
|
2
|
3
|
Bureau
|
|
This work is located at Structure No. 006-0128, TR 333 over 1-180, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting.
|
030-66L26
|
Executed
|
03/01/2021
|
2 / 2 |
|
2
|
3
|
Bureau
|
|
This work is located at Structure No. 006-0041 (SB), 006-0042 (NB), approximately 2.54 miles North of IL 26 and Structure No. 006-0043 (NB), 006-0044 (SB), approximately 2.04 miles North of IL 26 in Bureau County. This work consists of bridge painting.
|
031-66L40
|
Executed
|
03/02/2021
|
|
1 |
2
|
3
|
Livingston
|
|
This work is located at the Illinois Department of Transportation, District 3, Pontiac Maintenance Facility in Livingston County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a polymer HMA binder cse (2¼" lift) and a polymer HMA surface cse (1 ¼" lift).
|
032-68F97
|
Executed
|
03/04/2021
|
|
|
3
|
4
|
Peoria
|
|
Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River in Peoria County.
|
033-68F99
|
Executed
|
02/23/2021
|
|
|
3
|
4
|
Knox
|
|
Replace two steel girders on Bridge S.N. 048-0065 carrying Farnham Street over US Route 34, just west of the 1-74 interchange in Galesburg for a total length of 0.11 mile.
|
034-68G07
|
Executed
|
03/01/2021
|
|
|
3
|
4
|
Fulton, Peoria, Warren
|
|
This project consists of tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, along US 67 north of Monmouth in Warren County, and along IL 40 between Northmoor Road and Mt. Hawley in Peoria County.
|
035-68G08
|
Rejected
|
04/15/2021
|
1 / 1 |
|
3
|
4
|
Various
|
|
District-wide weed spraying (off road) in various counties on various routes.
|
036-70D16
|
Executed
|
02/23/2021
|
3 / 3 |
1 |
3
|
5
|
McLean
|
|
Bridge Deck Overlay at Funk's Grove Rest Area.
|
037-70D96
|
Executed
|
03/03/2021
|
2 / 2 |
|
3
|
5
|
Douglas
|
|
Six bridge deck overlays at various locations between Arcola and Hindsboro.
|
038-70E36
|
Executed
|
02/23/2021
|
4 / 4 |
|
3
|
5
|
Champaign, Douglas, Vermilion
|
|
Salt Containment Structures at Fithian, Leverett, and Tuscola facilities.
|
039-70F23
|
Executed
|
03/01/2021
|
1 / 1 |
|
3
|
5
|
Various
|
|
567.5 miles of spraying, approximately 2004 acres on state right of way along US 51 on interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties.
|
040-72L92
|
Executed
|
03/09/2021
|
|
|
4
|
6
|
Pike
|
|
4.4 miles of crack and joint sealing on US 54 from 0.1 miles north of North Monroe Street in Pittsfield to I-72.
|
041-72L94
|
Executed
|
03/01/2021
|
|
|
4
|
6
|
Sangamon
|
|
0.16 miles of milling and resurfacing on I-55 at the Lake Springfield Bridges, south of Springfield.
|
042-72M38
|
Executed
|
02/25/2021
|
|
|
4
|
6
|
Adams, Hancock
|
|
Bridge washing and concrete sealing on the Quincy Bayview Bridge and the US US 136 / Mississippi River Bridge at Keokuk, Iowa. (SN 001-0068 and SN 034-0062)
|
043-72M50
|
Executed
|
02/23/2021
|
1 / 1 |
|
4
|
6
|
Brown
|
|
Replacing the concrete wearing surface on SN 005-0004 carrying IL 99 over a drainage ditch, 1.2 miles northwest of the Pike County line.
|
044-74549
|
Executed
|
03/01/2021
|
1 / 1 |
1 |
4
|
7
|
Macon, Shelby
|
|
4.25 miles of designed overlay on US 51 from 0.5 miles north of the Shelby County line to the Christian County line.
|
045-74721
|
Executed
|
02/24/2021
|
|
|
4
|
7
|
Fayette
|
|
2.28 miles of standard overlay, tree removal, tree planting and aggregate shoulders on US 40 from the Bond County line to 2.28 miles east of Hurricane Creek.
|
046-74757
|
Executed
|
03/01/2021
|
10 / 10 |
|
4
|
7
|
Macon
|
|
3.95 miles of rubblization and overlay including earthwork, sign panels, patching, pavement replacement at overhead structures, rest area ramp overlay, pavement marking, riprap, guardrail, pavement removal, concrete pavement, underdrains, culverts and drainage
|
047-74906
|
Executed
|
02/24/2021
|
1 / 1 |
|
4
|
7
|
Clay
|
|
4.9 miles of patching, milling, surfacing, ramped nose medians and corrugated median construction on US 45 from US 50 to the Wayne County line.
|
048-74915
|
Deleted
|
11/24/2020
|
|
|
4
|
7
|
Crawford
|
|
Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363. , Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363.
|
049-74A14
|
Executed
|
02/24/2021
|
|
|
4
|
7
|
Coles
|
|
0.2 miles of patching and resurfacing on Lerna Road from north of Samsa Drive to IL 16.
|
050-74A41
|
Executed
|
03/09/2021
|
|
|
4
|
7
|
Coles
|
|
Cleaning and painting 2 structures on IL 16. (SN 015-0015 and SN 015-0016)
|
051-76K78
|
Executed
|
02/23/2021
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Bridge deck sealing of the McKinley Bridge (Salisbury Street) over the Mississippi River. (SN 060-6002)
|
052-76M33
|
Active
|
11/10/2020
|
|
|
5
|
8
|
St. Clair
|
|
Cleaning of the Missouri Avenue Pump Station on I-55/I-64. , Cleaning of the Missouri Avenue Pump Station on I-55/64.
|
053-76M78
|
Active
|
11/10/2020
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Chemical treatment of deep wells at various locations in East St. Louis. , Deep well treatment at various locations in East St. Louis.
|
054-76M84
|
Deleted
|
11/13/2020
|
|
|
5
|
8
|
Madison
|
|
6.7 miles of standard overlay resurfacing on IL 159 from the Macoupin County line to 0.3 miles north of IL 140. , 6.7 miles of standard overlay resurfacing on IL 159 from the Macoupin County line to 0.3 miles north of IL 140.
|
055-76N40
|
Executed
|
02/23/2021
|
1 / 1 |
2 |
5
|
8
|
Madison
|
|
Traffic signal interconnect (CMAQ) on IL 157 from Horseshoe Lake Road to West Main Street in Collinsville.
|
056-76N86
|
Executed
|
03/30/2021
|
|
|
5
|
8
|
Madison
|
|
Resurfacing of Old Alton Edwardsville Road from 0.3 miles east of Wanda Road to Cahokia Creek Road.
|
057-76N87
|
Executed
|
02/23/2021
|
|
|
5
|
8
|
Greene
|
|
Bituminous surface treatment on CH 24 (State Road) from IL 267 to South Street in Rockbridge.
|
058-76N91
|
Executed
|
03/01/2021
|
|
|
5
|
8
|
Madison
|
|
Patching on US 67 from 10th Street to 6th Street in Alton.
|
059-76N96
|
Executed
|
02/26/2021
|
|
|
5
|
8
|
Randolph
|
|
Patching on IL 13 / IL 153 from IL 4 to the Perry County line.
|
060-76P13
|
Executed
|
03/01/2021
|
1 / 1 |
|
5
|
8
|
Jersey, Madison
|
|
Weed spraying along IL 100 from IL 96 to the Piasa Bird Monument and along IL IL 255 from I-270 to US 67.
|
061-78151
|
Deleted
|
11/25/2020
|
|
|
5
|
9
|
Saline
|
|
Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032) , Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032)
|
062-78328
|
Executed
|
02/26/2021
|
5 / 5 |
2 |
5
|
9
|
White
|
|
Replacing the existing single span, closed abutment bridge with a new triple opening, cast-in-place reinforced concrete box culvert on IL 1, 2.75 miles north of Norris City.
|
063-78336
|
Deleted
|
11/25/2020
|
|
|
5
|
9
|
Franklin
|
|
Removal and replacement of a box culvert (SN 028-7029) carrying IL 34 over a drainage ditch, 5.5 miles east of IL 37 in Benton. , Removal and replacement of a box culvert (SN 028-7029) carrying IL 34 over a drainage ditch, 5.5 miles east of IL 37 in Benton.
|
064-78622
|
Deleted
|
11/25/2020
|
|
|
5
|
9
|
Hamilton
|
|
Removal and replacement of a box culvert (SN 033-2000) carrying IL 242 over an unnamed stream, 3.5 miles north of McLeansboro. , Removal and replacement of a box culvert (SN 033-2000) carrying IL 242 over an unnamed stream, 3.5 miles north of McLeansboro.
|
065-78785
|
Executed
|
02/26/2021
|
2 / 2 |
1 |
5
|
9
|
Pulaski
|
|
16 miles of pavement patching, milling, surfacing, shoulder repair and ADA ramp improvements on Old US 51 from 2.1 miles south of the Union County line to IL 37 just north of Cairo.
|
066-78805
|
Executed
|
02/26/2021
|
|
1 |
5
|
9
|
Hamilton
|
|
Removal and replacement of a box culvert (SN 033-7024) carrying IL 142 over a ditch, 0.1 miles north of Main Street in Broughton.
|
067-78821
|
Executed
|
02/26/2021
|
|
|
5
|
9
|
Alexander
|
|
Bridge deck overlay on SN 002-0032 on IL 3 over Sexton Creek, west of Gale.
|
068-61G78
|
Executed
|
03/01/2021
|
|
|
1
|
1
|
Cook
|
|
Traffic signal replacement and sidewalk construction on US 20 from Walnut Avenue to Center Avenue in Streamwood.
|
069-61G83
|
Executed
|
02/26/2021
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
Reconstruction of Bolz Road from Amarillo Drive to Kennedy Drive in the Village of Carpentersville.
|
070-62L39
|
Executed
|
03/01/2021
|
|
|
1
|
1
|
Lake
|
|
ADA improvement project along various State maintained routes within Eastern Lake County. Located in the Cities of Waukegan, Park City, North Chicago and Villages of Mundelein and Libertyville.
|
071-62L48
|
Executed
|
02/25/2021
|
|
|
1
|
1
|
Kane
|
|
(1.937-Mile) Improvement consists of crack cleaning and sealing in the existing concrete pavement between traffic lanes, curb and gutter, restriping pavement marking in Villages of East and West Dundee, Dundee Township.
|
072-62L75
|
Executed
|
03/03/2021
|
|
|
1
|
1
|
Cook
|
|
(2.9-Mile) Crack and Joint Sealing on existing HMA pavement. Location: IL 64 (North Ave.) Damen Ave to US 41 within the City of Chicago in Cook County.
|
073-62L77
|
Executed
|
02/25/2021
|
|
|
1
|
1
|
DuPage
|
|
(3.157-Mile) Crack and joint sealing project on IL 64 (North Avenue) from IL 53 (Rohlwing Road) to Villa Ave. within the Villages of Lombard, Addison and Villa Ave. within the Villages of Lombard, Addison and Villa Park in DuPage County.
|
074-62L78
|
Executed
|
03/03/2021
|
|
|
1
|
1
|
Cook
|
|
(1.71-Mile) Crack and joint sealing improvements on IL 171 from Forest Preserve Dr. to south of Des Plaines River Rd. Located within the Village of River Grove in Cook County.
|
075-62M06
|
Executed
|
02/26/2021
|
|
|
1
|
1
|
Will
|
|
8.5 miles SMART overlay project consisting of milling and resurfacing, and the installation of shoulder rumble strips on I-55 from north of River Road to north of IandM Canal.
|
076-64P57
|
Executed
|
02/25/2021
|
|
|
2
|
2
|
Rock Island
|
|
Concrete sealer applied to bridge decks at various locations.
|
077-72L96
|
Executed
|
03/01/2021
|
1 / 1 |
2 |
4
|
6
|
Logan
|
|
Bridge deck overlay on SN 054-0104 carrying Lincoln Parkway over ICRR, 0.3 miles southeast of Union in Lincoln.
|
078-72M41
|
Executed
|
02/25/2021
|
|
|
4
|
6
|
Cass, Menard
|
|
Bridge washing and concrete sealing on the Sangamon River bridges on IL 78 and Athens Blacktop. (SN 009-0510 and SN 065-0019)
|
079-72M56
|
Executed
|
03/09/2021
|
|
|
4
|
6
|
Morgan
|
|
Painting portions of two bridges carrying I-72 over Mauvaise Terre Creek, 1.1 miles east of Old US 36 near Jacksonville. (SN 069-0048 and SN 069-0049)
|
080-74949
|
Executed
|
03/01/2021
|
1 / 1 |
1 |
4
|
7
|
Effingham
|
|
4.8 miles of cape seal surface treatment on US 40 from 0.3 miles west of Lake Sara Road to Henriette Street in Effingham.
|
081-76M85
|
Executed
|
02/25/2021
|
3 / 3 |
1 |
5
|
8
|
Madison
|
|
1.76 miles of resurfacing on IL 140 from IL 160 to the Bond County line.
|
082-76N69
|
Executed
|
03/11/2021
|
1 / 1 |
|
5
|
8
|
Clinton
|
|
Microsurfacing on IL 161 from 0.1 miles west of Slant Road to 0.2 miles west of Broadway in Centralia.
|
083-78815
|
Executed
|
02/26/2021
|
7 / 7 |
1 |
5
|
9
|
White
|
|
Bridge deck repairs on SN 097-0040 carrying I-64 over Pond Creek, 0.25 miles east of Wayne; SN 097-0042 and 097-0043 carrying I-64 over Tributary to Randolph Ditch, 11.5 miles west of IL 1; and SN 097-0046 and 097-0047 carrying I-64 over Randolph Drainage Ditch, 9.5 miles west of IL 1.
|
084-89759
|
Executed
|
02/26/2021
|
|
|
3
|
4
|
McDonough
|
|
Replace the bridge carrying CH 5 over the North Fork of Lamoine River, 4.3 miles east of IL 110/US 67.
|
085-91596
|
Executed
|
03/04/2021
|
2 / 2 |
1 |
3
|
5
|
Champaign
|
|
Resurfcing Maplewood Drive from the north city limits of Rantoul to Veteran's Parkway in Rantoul.
|
086-91752
|
Executed
|
03/04/2021
|
4 / 2 |
1 |
3
|
5
|
Vermilion
|
|
Resurfacing various routes within the city of Danville.
|
087-93752
|
Executed
|
02/25/2021
|
5 / 5 |
|
4
|
6
|
Adams
|
|
Guardrail replacement on various routes in Adams County.
|
088-93755
|
Executed
|
02/26/2021
|
3 / 3 |
|
4
|
6
|
Macoupin
|
|
Construction of a reinforced concrete culvert and the replacement of the superstructure carrying CH 26 over Big Branch Creek, 0.3 miles west of Sawyerville.
|
089-95885
|
Executed
|
02/25/2021
|
1 / 0 |
|
4
|
7
|
Coles
|
|
Resurfacing various routes within Charleston.
|
090-97746
|
Executed
|
03/01/2021
|
2 / 2 |
|
5
|
8
|
Clinton
|
|
Replace the bridge carrying CH 3 over Gibbs Creek, 5.0 miles northwest of Shattuc.
|
091-99656
|
Executed
|
02/26/2021
|
|
|
5
|
9
|
Saline
|
|
Resurfacing Liberty Road from Barnett Street to US 45.
|
092-62K96
|
Executed
|
03/01/2021
|
3 / 3 |
1 |
1
|
1
|
DuPage
|
|
The improvement on 1-55 over Madison Street consist of Bridge Deck Overlay, Approach Slab Overlay, Joint Repairs and Substructure Repairs. Located in the Village of Burr Ridge in DuPage County. LT=392 FT(0.10-Mile)
|
093-62L49
|
Executed
|
02/25/2021
|
|
|
1
|
1
|
Lake
|
|
(2.578-Mile) Improvement on IL-120 (Belvidere Road) from McHenry Co. Line to East of IL-60 consist of sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages of Lakemoor, Round Lake, and Volo, Wauconda Township.
|
094-62M07
|
Executed
|
02/26/2021
|
4 / 4 |
3 |
1
|
1
|
Lake
|
|
(4.176-Mile) Resurfacing (SMART Overlay), ADA Improvements; Location: FAU 2711: IL 131 from North of ILL 120 to CN (fmr EJandE) Railroad in the Cities of Waukegan and North Chicago in Lake County.
|
095-62M22
|
Executed
|
02/23/2021
|
2 / 2 |
|
1
|
1
|
Cook
|
|
(426.26-FT) Improvement of 31st street over Des Plaines River consists of bridge deck overlay and joint repair. Located in the Village of Riverside, in Cook County, IL. SN=016-0870
|
096-62M49
|
Executed
|
03/01/2021
|
2 / 2 |
2 |
1
|
1
|
Cook
|
|
(793-FT) Improvement on 3151 Street over Salt Creek consist of Bridge Deck Overlay, Approach Slab Reconstruction, Joint Repairs and Substructure Repairs. Located in the Village of Westchester and Village of La Grange Park SN=016-0868
|
097-62M60
|
Executed
|
02/26/2021
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes.
|
098-62N09
|
Withdrawn
|
12/05/2020
|
|
|
1
|
1
|
Cook
|
|
Cleaning and painting the steel surfaces of bridge structures carrying Sauk Trail over 1-57 in the Village of Richton Park, Rich Township. , Cleaning and painting the steel surfaces of bridge structures carrying Sauk Trail over 1-57 in the Village of Richton Park, Rich Township.
|
099-62N10
|
Withdrawn
|
12/05/2020
|
|
|
1
|
1
|
Kane
|
|
This improvement consists of a culvert repair of the structure (SN 045-0299) carrying IL Route 47 over Pingree Creek in Plato Township. , This improvement consists of a culvert repair of the structure (SN 045-0299) carrying IL Route 47 over Pingree Creek in Plato Township.
|
100-64P52
|
Executed
|
03/01/2021
|
4 / 4 |
1 |
2
|
2
|
Henry
|
|
Expansion joint replacement, deck patching and concrete overlay on the structure (SN 037-0141) carrying US 6 over the BN RR and Township Road 38 (TR 38), located 3 miles East of the Rock Island County line.
|
101-64P55
|
Executed
|
02/25/2021
|
|
|
2
|
2
|
Various
|
|
Concrete sealer applied to bridge decks at various locations within District 2.
|
102-64P56
|
Executed
|
02/25/2021
|
|
|
2
|
2
|
Henry
|
|
Concrete sealer applied to bridge decks at various locations.
|
103-68G06
|
Withdrawn
|
01/12/2021
|
|
1 |
3
|
4
|
Various
|
|
Installation of dilemma zone detection and LED lighting at various signalized intersections in District Four. , Installation of dilemma zone detection and LED lighting at various signalized intersections in District Four.
|
104-72L84
|
Executed
|
02/25/2021
|
1 / 1 |
|
4
|
6
|
Montgomery
|
|
ADA improvements, traffic signal replacements, storm sewer work and sign replacements, storm sewer work and sign replacements on IL 16 and IL 127 in Hillsboro.
|
105-72M59
|
Executed
|
03/01/2021
|
|
|
4
|
6
|
Sangamon
|
|
Longitudinal joint repair on I-72 from just west of Chatham Road to 0.4 miles west of Second Street Overhead.
|
106-74364
|
Deleted
|
11/24/2020
|
|
|
4
|
7
|
Cumberland
|
|
Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road. , Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road.
|
107-76M48
|
Executed
|
02/25/2021
|
|
|
5
|
8
|
Madison
|
|
5.1 miles of resurfacing on IL 157 from 0.2 miles north of Horseshoe Lake Road to 0.1 miles north of Chain of Rocks Road.
|
108-78501
|
Deleted
|
11/25/2020
|
|
|
5
|
9
|
Saline
|
|
Replacement of box culvert carrying US 45 over a stream and replacement of a single span bridge with a double box culvert carrying Feazel Road, off of US 45, over Pankey Branch. This project is located near Harrisburg. , Replacement of box culvert carrying US 45 over a stream and replacement of a single span bridge with a double box culvert carrying Feazel Road, off of US 45, over Pankey Branch. This project is located near Harrisburg.
|
109-91586
|
Executed
|
02/25/2021
|
1 / 1 |
|
3
|
5
|
Vermilion
|
|
Pavement removal, construction of PCC pavement, sidewalks, curb and gutter, on CH 36 from South Forest Avenue to US 150.
|
110-60T17
|
Deleted
|
11/24/2020
|
|
|
1
|
1
|
Cook
|
|
Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson. , Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson.
|
111-62L44
|
Executed
|
03/03/2021
|
|
|
1
|
1
|
Lake
|
|
Cleaning and sealing longitudinal joints and cracks of the existing concrete pavement from Riverwoods Blvd to US 41 (Skokie Hwy) pavement markings restriping in the Villages of Mettawa and Lake Forest, Libertyville, Shields, Vernon and Deerfield Townships.
|
112-62L50
|
Executed
|
02/23/2021
|
2 / 2 |
|
1
|
1
|
Cook
|
|
(1,945-Mile) Pavement Patching and Crack and Joint Sealing project from South Indiana Ave to East of 1-94 (Bishop Ford Expy.) in Hyde Park Township, in Cook County.
|
113-62L55
|
Executed
|
03/01/2021
|
|
|
1
|
1
|
Will
|
|
(9.65-Mile) SMART Overlay, pedestrian ramps. rumble -strips. Location: IL-102, from 26-ft northwest of Ryan 73 feet east of Kankakee County Line Road in the City of Wilmington, Wilmington and Wesley Townships.
|
114-62M62
|
Executed
|
02/26/2021
|
1 / 1 |
|
1
|
1
|
Various
|
|
Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes.
|
115-62M87
|
Withdrawn
|
12/05/2020
|
|
|
1
|
1
|
Cook
|
|
(1.71-Mile) Crack and joint sealing improvements on IL 171 from Forest Preserve Dr. to south of Des Plaines River Rd. Located within the Village of River Grove in Cook County.
|
116-62N13
|
Executed
|
03/18/2021
|
|
|
1
|
1
|
Various
|
|
This improvement consists of the repair and installation of guardrail along various expressway and arterial highways in various counties throughout District One.
|
117-70A65
|
Executed
|
03/02/2021
|
|
|
3
|
5
|
McLean
|
|
3P Policy Standard Overlay ADA Improvements from W of Commerce Pkwy to 0.1 Mi N of E Washington St Gross Length = Net Length = 13,054.36 FT= 2.472 Mile.
|
118-72M13
|
Executed
|
03/04/2021
|
|
|
4
|
6
|
Brown
|
|
Insertion culvert liners on IL 99 and IL 107 from the Pike County line to the Schuyler County line.
|
119-46560
|
Executed
|
03/01/2021
|
|
|
2
|
3
|
Various
|
|
"On-Call" Pavement Marking with various materials including, thermoplastic, paint, preformed plastic, polyurea, modified urethane, pavement marking removal, hot-spray thermoplastic, grooving for pavement marking, and aerial mk.
|
120-61G66
|
Executed
|
02/23/2021
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Abbeywood Drive and Green Trails Drive from Naper Boulevard to College Road in the Village of Lisle.
|
121-61G76
|
Executed
|
03/04/2021
|
5 / 3 |
1 |
1
|
1
|
Cook
|
|
Roadway reconstruction, box culvert replacement, and constructon of a soldier pile retaining wall under the I-294 bridge, on Franklin Avenue from east of the Canadian Pacific Bensenville Yard entrance to est of the I-294 bridge in Franklin Park.
|
122-62M80
|
Executed
|
03/02/2021
|
9 / 8 |
1 |
1
|
1
|
Cook
|
|
(1,449-FT.) Improvement on 25th Avenue over IHB Railroad consist of Bridge Deck Overlay, Joint Repairs and Substructure Repairs. Located in the Village of Franklin Park and Melrose Park in Cook County.
|
123-62M90
|
Executed
|
03/09/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Cleaning and painting existing steel structures at 2 locations. 1st located on I-80 at Ridgeland Avenue (SN 016-0718) in the Village of Tinley Park. 2nd located on Torrence Avenue over CSXT and IHB Railroads (SN 016-0935) in the Village of Burnham, Cook.
|
124-62N15
|
Rejected
|
06/22/2021
|
|
|
1
|
1
|
Various
|
|
Installation of new fence and repair of damaged fence at various locations on a work order basis.
|
125-62N18
|
Rejected
|
02/18/2021
|
|
|
1
|
1
|
Various
|
|
Expressway mowing north.
|
126-62N19
|
Rejected
|
02/18/2021
|
|
|
1
|
1
|
Various
|
|
Expressway mowing north.
|
127-62N25
|
Rejected
|
02/10/2021
|
4 / 4 |
|
1
|
1
|
Various
|
|
The improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties.
|
128-62N26
|
Active
|
12/01/2020
|
1 / 1 |
|
1
|
1
|
Various
|
|
The improvement consists of cleaning (nighttime sweeping) various expressways throughout District One in various counties.
|
129-68F63
|
Executed
|
03/01/2021
|
|
|
3
|
4
|
Marshall, Mason, Tazewell
|
|
Bridge washing of eight (8) bridges over the Illinois River in Marshall, Tazewell and Mason counties.
|
130-74A11
|
Withdrawn
|
12/11/2020
|
|
|
4
|
7
|
Moultrie
|
|
Intersection reconstruction and safety improvements on IL 32 at Bruce-Findlay Road, south of Sullivan. , Intersection reconstruction and safety improvements on IL 32 at Bruce-Findlay Road, south of Sullivan.
|
131-74A40
|
Executed
|
03/09/2021
|
|
1 |
4
|
7
|
Various
|
|
Cleaning and painting 5 structures on various routes in District 7. (SN 025-0087, 051-0032, 051-0047, 051-0057, 093-0001)
|
132-78606
|
Executed
|
02/26/2021
|
10 / 10 |
2 |
5
|
9
|
Massac
|
|
Patching, resurfacing and bridge repairs on I-24 from the Johnson County line to the Ohio River Bridge.
|
133-78802
|
Executed
|
02/26/2021
|
2 / 2 |
|
5
|
9
|
Massac
|
|
4.6 miles of patching, HMA and PCC removal, HMA surfacing, median/curb repair, ADA ramps and signal upgrades on US 45 from 10th Street / Ferry Street to just east of Belgrade Road and on IL 145 from US 45 to approximately 900' north of US 45.
|
134-87744
|
Executed
|
03/16/2021
|
|
|
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 4B over Ditch Mole Creek, located 2.5 miles northwest of Flanagan.
|
135-87745
|
Executed
|
03/09/2021
|
|
|
2
|
3
|
Bureau
|
|
Resurfacing CH 19 from Angling Road to US 6.
|
136-87755
|
Executed
|
03/16/2021
|
2 / 2 |
|
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 118 over Mud Creek, 3.5 miles northeast of Cornell.
|
137-95880
|
Executed
|
03/01/2021
|
|
|
4
|
7
|
Macon
|
|
Resurfcing CH 24 (Reas Bridge Road from North Brush College Road to north of TR 250.
|
138-95886
|
Executed
|
02/26/2021
|
|
|
4
|
7
|
Lawrence
|
|
Replace the bridge carrying CH 8 over Raccoon Creek located 8.5 miles south of Bridgeport.
|
139-95887
|
Executed
|
02/26/2021
|
|
|
4
|
7
|
Lawrence
|
|
Replace the bridge carrying TR 266 over Taylor Ditch, located 2.5 miles southwest of Russellville.
|
140-97726
|
Executed
|
03/04/2021
|
1 / 1 |
|
5
|
8
|
Greene
|
|
Sidewalk construction at various locations in the city of Carrollton.
|
141-61F89
|
Executed
|
03/04/2021
|
26 / 16 |
2 |
1
|
1
|
Lake
|
|
Construction of a pedestrian bridge over the Wisconsin Central Railroad at the Mundelein Metra Station in the Village of Mundelein.
|
142-61G19
|
Executed
|
02/23/2021
|
17 / 17 |
2 |
1
|
1
|
DuPage
|
|
Pavement widening and reconstruction, sidewalks, multi-use path, storm sewer, traffic signals, lighting and pavement markings on North Aurora Road from Frontenanc Road to Fairwy Drive in Naperville.
|
143-61G59
|
Executed
|
03/03/2021
|
|
1 |
1
|
1
|
DuPage
|
|
Resurfacing Clarendon Hjills Road between 91st Street and 79th Street within Downers Grove Township in Dupage County.
|
144-61G68
|
Executed
|
03/02/2021
|
7 / 7 |
1 |
1
|
1
|
Cook
|
|
Resurfacing, curb and gutter replacement, sidewalk replacement and pavement markings on Oak Park Avenue from Roosevelt Road to North Avenue in Oak Park.
|
145-61G84
|
Executed
|
03/02/2021
|
14 / 10 |
2 |
1
|
1
|
Lake
|
|
Replace the bridge carrying Clavey Road over Skokie Ditch, and the reconstruction of the roadway from east of US 41 to Green Bay Road in Highland.
|
146-62L45
|
Executed
|
03/23/2021
|
|
|
1
|
1
|
Cook
|
|
Smart Overlay, Class D patching and ADA improvement. Project begins 50 ft south of 31st St. and proceeds approximately 4637.9 ft in a northerly direction to 23rd St. in the Villages of Brookfield and Berwyn Township.
|
147-62M01
|
Executed
|
03/03/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(1.373-Mile) HMA SMART Overlay of IL-1 (Halsted St), approx. 600' north of the intersection of 159th St, and extends to the north through Harvey and Phoenix in Cook County to a point approx. 200' north of East 149th St.
|
148-72M42
|
Executed
|
02/23/2021
|
|
1 |
4
|
6
|
Pike
|
|
Bridge washing and concrete sealing on various bridges in Pike County and expansion joint replacement on the Valley City Eagle Bridges carrying I-72 over the Illinois River. (SN 069-0525, SN 075-0098, SN 075-0099, SN 075-0122, and SN 075-0123)
|
149-78817
|
Executed
|
03/02/2021
|
|
|
5
|
9
|
Williamson
|
|
Replacing a gabion wing wall on SN 100-5002 at the intersection of Herrin Road and Collins Road near Johnston City.
|
150-85675
|
Executed
|
03/09/2021
|
2 / 2 |
1 |
2
|
2
|
Ogle
|
|
Sidewalk replacement and construction of new sidewalks at various locataions in Creston.
|
151-85698
|
Executed
|
03/09/2021
|
|
|
2
|
2
|
Rock Island
|
|
Guardrail replacement on various routes in Rock Island County.
|
152-85703
|
Executed
|
03/11/2021
|
7 / 7 |
2 |
2
|
2
|
Winnebago
|
|
Replace the bridge carrying _Seminary Street over Keith Creek, 0.5 mile north of 15th Avenue in Rockford.
|
153-89720
|
Executed
|
03/17/2021
|
1 / 1 |
|
3
|
4
|
Tazewell
|
|
Replace the bridge carrying CH 14 over Dry Creek, 2.3 miles east of Green Valley.
|
154-93753
|
Executed
|
02/23/2021
|
6 / 6 |
2 |
4
|
6
|
Mason
|
|
Replace the bridge carrying CH 20 over Quiver Creek and roadway reconstruction, located 4.0 miles northeast of Havana.
|
155-95881
|
Executed
|
03/16/2021
|
|
|
4
|
7
|
Macon
|
|
Replace the bridge carrying Strawn Road over Willow Branch, 3.25 miles northeast of Niantic.
|
156-95884
|
Executed
|
03/03/2021
|
2 / 1 |
|
4
|
7
|
Coles
|
|
Replace the bridge carrying CH 27 over Kickapoo Creek, 0.5 mile southeast of Mattoon.
|
157-61G26
|
Executed
|
03/03/2021
|
|
1 |
1
|
1
|
DuPage
|
|
Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Prince Crossing Road from Geneva Road to IL 164 in West Chicago.
|
158-61G86
|
Executed
|
03/01/2021
|
5 / 4 |
1 |
1
|
1
|
Cook
|
|
Resurfacing, curb and gutter replacement, sidewalk replacement, pavement widening to accommodate bike lanes, and pavement markings on McCarthy Road from Illinois Street to Walker Road in Lemont.
|
159-61G87
|
Executed
|
03/03/2021
|
|
1 |
1
|
1
|
Cook
|
|
Resurfacing Kenilworth Avenue from Green Bay Road to Sheridan Road in the Village of Kenilworth.
|
160-61G88
|
Executed
|
03/09/2021
|
1 / 0 |
|
1
|
1
|
Cook
|
|
Replace the superstructure that carries Roy Avenue over Addison Creek, located south of Country Club Drive in Northlake.
|
161-62K38
|
Executed
|
04/27/2021
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290/IL 110 Expressway from Austin Blvd to Wells St.
|
162-62K40
|
Executed
|
05/06/2021
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-90; I-90/94 expressways from W of US 12/45 Mannheim Rd to Congress Pkwy.
|
163-62K41
|
Executed
|
03/05/2021
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-90/94 (Dan Ryan Expy) from Congress Pkwy to I-57/I-94 Bishop Ford Expy).
|
164-62K43
|
Executed
|
03/05/2021
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12(95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island.
|
165-62K46
|
Executed
|
03/05/2021
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expwy from Lake Shore Dr to IL 43 (Harlem Ave).
|
166-62L40
|
Executed
|
02/25/2021
|
|
|
1
|
1
|
Cook
|
|
(2788 Ft.) Crack and Joint Sealing project from Western Ave to Carrol Ave. in the Village of Harvey, in Thornton Township.
|
167-62L41
|
Executed
|
03/03/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(6.2-Mile) Cleaning and Sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping pavement marking from Balbo Dr to 57th Dr in City of Chicago.
|
168-62L43
|
Executed
|
02/25/2021
|
|
|
1
|
1
|
Cook
|
|
(1.74-Mile) Improvement on IL 38 from Harrison St to Manheim Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages Hillside and Westchester, Proviso Township.
|
169-62L47
|
Executed
|
02/25/2021
|
1 / 1 |
2 |
1
|
1
|
Cook, DuPage
|
|
(2.80-Mile) Improvement on 1-290 from Grand Ave to Cook County Line Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, new pavement marking in the village of Elmhurst, York and Addison Townships.
|
170-62L70
|
Active
|
12/02/2020
|
|
|
1
|
1
|
Will
|
|
(2.87-Mile) Crack and joint sealing improvements on US 30 from Larkin Ave. to US 30 (Center St. SB), located within the Cities of Joliet and Crest Hill.
|
171-62L71
|
Executed
|
03/03/2021
|
|
|
1
|
1
|
Cook
|
|
1.69 miles of cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter on IL 43 from IL 72 to south of Collum Ave. in Norridge and the City of Chicago.
|
172-62L72
|
Executed
|
02/25/2021
|
|
|
1
|
1
|
Cook
|
|
(3.49-Mile) Crack and Joint sealing on PCC pavement. Location: IL 62 (Algonquin Rd) from Penny Rd to Center Port Dr. in the Village of South Barrington, Palatine and Hoffman Estates.
|
173-62M00
|
Executed
|
03/03/2021
|
|
|
1
|
1
|
Will
|
|
(6.395-Mile) Crack and Joint Sealing of PCC Pavement; Location: FAP 338: IL 59 from DuPage County Line to North of Pheasant Chase Drive in the City of Naperville and Village of Plainfield in Will County.
|
174-62M38
|
Executed
|
02/26/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(522-FT) Improvement of Illinois 171 over Des Plaines River consists of bridge deck overlay and joint repairs. Located in the Village of River Grove, in Cook County, IL. SN=016-0697
|
175-62M61
|
Executed
|
02/26/2021
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. , Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes.
|
176-62M99
|
Executed
|
02/26/2021
|
|
1 |
1
|
1
|
Will
|
|
Cleaning(sweeping) various arterial highways in District One throughout (South) Will county.
|
177-62N00
|
Executed
|
02/26/2021
|
|
|
1
|
1
|
DuPage
|
|
Cleaning (sweeping) various arterial highways in District One throughout DuPage County.
|
178-66L44
|
Executed
|
02/25/2021
|
|
|
2
|
3
|
Bureau, Livingston
|
|
The work consists on performing Bridge Deck Concrete sealing at various bare concrete bridge decks in Bureau and Livingston counties.
|
179-68F54
|
Executed
|
03/01/2021
|
2 / 2 |
1 |
3
|
4
|
Tazewell
|
|
This project is 5.5 miles long and the structure repair work consists of bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repair, substructure repair, and other related work on various structures on 1-74 from 0.8 miles east of Morton Ave. to the Woodford County line.
|
180-95872
|
Executed
|
03/02/2021
|
|
1 |
4
|
7
|
Effingham
|
|
Resurfacing, sidewalks, curb and gutter, storm sewer, lighting, pavement markings at various locations in Dieterich.
|
01A-LI039
|
Executed
|
07/29/2021
|
4 / 4 |
1 |
4
|
6
|
Montgomery
|
|
Extend Partial Parallel Taxiway B and Related Lighting/Electrical from Existing End to Runway 9 Turnaround
|
02A-MA031
|
Executed
|
05/25/2021
|
2 / 2 |
|
3
|
4
|
Marshall
|
|
Reconstruct Terminal Aircraft Parking Apron
|
03A-GR011
|
Rejected
|
06/24/2021
|
1 / 1 |
|
5
|
8
|
Bond
|
|
Replace Runway and Taxiway Lights and Cables
|
04A-QI063
|
Executed
|
09/09/2021
|
27 / 27 |
1 |
4
|
6
|
Adams
|
Voluntary
|
Reconstruct Runway 4/22, Phase 1 (Construction)
|
05A-SA034
|
Executed
|
05/21/2021
|
|
|
5
|
8
|
Marion
|
|
Reconstruct Concrete Apron, Phase 2
|
06A-SR094
|
Rejected
|
02/22/2021
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
Reconstruct Bituminous T-Hangar Taxilanes (West)
|
07A-MS010
|
Executed
|
08/12/2021
|
|
|
4
|
6
|
Brown
|
|
Replace Perimeter Fence, Phase 2
|
08A-MB033
|
Rejected
|
02/22/2021
|
|
|
3
|
4
|
McDonough
|
|
Rehabilitate Parallel Taxiway to Runway 9/27
|
09A-BN018
|
Executed
|
09/07/2021
|
|
|
5
|
9
|
Franklin
|
|
Re-mark Runway 18-36
|