001-62C52
|
Executed
|
04/02/2021
|
|
|
1
|
1
|
Cook
|
|
(3.57-Mile) Resurfacing project consisting of HMA surface removal, pavement patching, HMA resurfacing, ADA improvements and pavement marking on Dixie HWy.
|
002-62D14
|
Executed
|
04/13/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(4.8-Mile) of SMART overlay, milled rumble strips and ADA improvements on Palatine Road from IL 62 (Algonquin Road) to east of Roselle Road in the Villages of Barrington Hills, Hoffman Estates, Inverness, Palatine and South Barrington.
|
003-62H51
|
Executed
|
04/08/2021
|
10 / 10 |
1 |
1
|
1
|
Cook
|
|
Bridge rehab, ADA improvements and shared-use path on Cermak Road in the Villages of Broadview and Westchester (SN 016-0631, 016-0632, 016-0633).
|
004-62L18
|
Executed
|
04/13/2021
|
|
1 |
1
|
1
|
Cook
|
|
2.5 miles of resurfacing, patching and ADA improvements on IL 53 / Hicks Road from US 14 (Northwest Highway) to Lake-Cook Road, in the Village of Palatine.
|
005-62L23
|
Executed
|
04/07/2021
|
|
|
1
|
1
|
DuPage
|
|
(2.3-Mile) SMART resurfacing and ADA improvements on IL 83 from north of I-290 to IL 19 within the Villages of Addison and Bensenville and Cities of Elmhurst and Wooddale.
|
006-62L36
|
Executed
|
04/07/2021
|
|
|
1
|
1
|
Will
|
|
ADA improvements project consist of retrofitting curb ramps for sidewalks to make compliant with PROWAG. Location: Along various State routes (see remarks) in Lockport, Plainfield, and New Lenox in Will County.
|
007-62L52
|
Deleted
|
01/12/2021
|
|
|
1
|
1
|
Cook
|
|
(1.762-Mile) Cleaning and sealing longitudinal joints in the existing HMA pavement between traffic lanes and curb and gutter, restriping pavement marking in the City of Chicago, Lake and North Chicago Townships. , (1.762-Mile) Cleaning and sealing longitudinal joints in the existing HMA pavement between traffic lanes and curb and gutter, restriping pavement marking in the City of Chicago, Lake and North Chicago Townships.
|
008-62L53
|
Executed
|
04/02/2021
|
|
|
1
|
1
|
McHenry
|
|
(1.1-Mile) SMART resurfacing and ADA improvements on US 12 (Main Street) from Wisconsin Street to IL 173 (Kenosha Street) in the Village of Richmond.
|
009-62L54
|
Executed
|
04/07/2021
|
|
|
1
|
1
|
Cook
|
|
(0.7-Mile) Standard overlay with ADA improvements on Ashland Avenue from just south of Marketplace Access Road to Cermak Road, in the City of Chicago.
|
010-66B52
|
Withdrawn
|
03/03/2021
|
2 / 2 |
1 |
2
|
3
|
LaSalle
|
|
The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles. , The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles.
|
011-66K56
|
Executed
|
04/02/2021
|
2 / 2 |
|
2
|
3
|
Iroquois
|
|
6 miles of milling, resurfacing, and ADA improvements on US 45 from North Street in Buckley to Jefferson Street in Loda. 1 foot saftey shoulders will be added to the rural section between Buckley and Loda.
|
012-66K61
|
Executed
|
04/02/2021
|
|
|
2
|
3
|
Ford
|
|
Project is located in Piper City, Ford County. The job length is 1.09 miles and consists of milling and resurfacing 3.75" of HMA on the mainline pavement. The work also includes several ADA improvements.
|
013-66L23
|
Executed
|
05/27/2021
|
|
1 |
2
|
3
|
LaSalle
|
|
This work is located at Structure No. 050-0011 (EB) and 050-0012 (WB) over Illinois Railway, approximately 2.0 miles East of IL 23 in LaSalle County. This work consists of bridge painting.
|
014-66L46
|
Executed
|
04/02/2021
|
3 / 3 |
|
2
|
3
|
LaSalle
|
|
The project is located 2.1 mi south of I-80 with a length of 450 ft. The work consists of regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls. These will be built into existing box culvert (050-2524) with some drainage items. The final graded slope will be seeded.
|
015-68636
|
Executed
|
04/21/2021
|
8 / 8 |
1 |
3
|
4
|
Warren
|
|
Widening and resurfacing on US Route 67 from just west of Tom's Creek on US 67/IL 135 to just south of 270th Avenue/CH 3 in Warren County. Net length= 4.5 miles.
|
016-68F12
|
Executed
|
04/07/2021
|
4 / 4 |
2 |
3
|
4
|
Peoria
|
|
Overlay on IL 29 (Fourth Street) from Senachwine Creek to Truitt Avenue in Chillicothe with ADA ramp construction. Length =0.94 mile.
|
017-68F67
|
Executed
|
04/16/2021
|
|
1 |
3
|
4
|
Henderson
|
|
0.15 mile, Bridge Preservation, Bridge deck overlay and bridge joint replace/repair at Structure No. 036-0042 carrying IL Route 94 over Fall Creek, 4.3 miles north of IL Route 164.
|
018-70C93
|
Executed
|
04/07/2021
|
2 / 1 |
|
3
|
5
|
DeWitt
|
|
Bridge Deck Overlay S.N. 020-0043 over N Fork Salt Creek 3 Mi W of Dewitt.
|
019-70E99
|
Executed
|
04/07/2021
|
|
|
3
|
5
|
DeWitt, McLean
|
|
BRIDGE JOINT REPAIR/REPLACE AT VARIOUS LOCATIONS IN DEWITT AND MCLEAN COUNTIES.
|
020-70F24
|
Executed
|
04/09/2021
|
|
|
3
|
5
|
Various
|
|
Tree Removal and seeding at various routes in various counties throughout the District.
|
021-70F25
|
Executed
|
04/13/2021
|
|
|
3
|
5
|
Champaign
|
|
Bridge Painting, 1.0 and 2.0 Mi S of Ludlow.
|
022-72999
|
Executed
|
04/09/2021
|
|
1 |
4
|
6
|
Sangamon
|
|
Replacing a single span reinforced concrete slab bridge with a double barrel 10' x 10' precast box culvert on IL 123 over Richland Creek, 0.6 miles north of IL 125.
|
023-72D40
|
Deleted
|
01/26/2021
|
|
|
4
|
6
|
Scott
|
|
Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston. , Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston.
|
024-72L72
|
Executed
|
04/13/2021
|
3 / 3 |
|
4
|
6
|
Hancock
|
|
7.7 miles of pavement preservation with Cape Seal of mainline, Fog Seal of shoulders and microsurfacing of medians and intersections on IL 110/336, on and off ramps in Carthage and US 136.
|
025-72L88
|
Executed
|
04/09/2021
|
4 / 4 |
|
4
|
6
|
Christian
|
|
5.1 miles of micro-surfacing, Cape Seal of pavement and Fog Seal of shoulders on US 51 from approximately 0.9 miles north of Assumption to the Shelby County line.
|
026-72L89
|
Executed
|
04/21/2021
|
1 / 1 |
|
4
|
6
|
Cass
|
|
12.2 miles of cape seal, fog seal and grinding on IL 125 from 0.1 miles east of IL 78 to 0.1 miles west of the Sangamon County line.
|
027-72L91
|
Executed
|
04/13/2021
|
|
|
4
|
6
|
Montgomery
|
|
13.1 miles of single pass micro-surfacing on Nokomis Blacktop from IL 127 to 0.2 miles east of E 20th Road.
|
028-72M52
|
Executed
|
04/13/2021
|
|
|
4
|
6
|
Sangamon
|
|
Painting two bridges carrying I-55 over Brush Creek, 0.7 miles south of IL 104. (SN 084-0107 and SN 084-0108)
|
029-72M53
|
Deleted
|
01/26/2021
|
|
|
4
|
6
|
Macoupin
|
|
Painting SN 059-0009 carrying IL 4 over Union Pacific Railroad, 0.9 miles north of Staunton. , Painting SN 059-0009 carrying IL 4 over Union Pacific Railroad, 0.9 miles north of Staunton.
|
030-74364
|
Withdrawn
|
02/02/2021
|
1 / 1 |
|
4
|
7
|
Cumberland
|
|
Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road. , Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road.
|
031-74366
|
Deleted
|
01/21/2021
|
|
|
4
|
7
|
Effingham
|
|
Removal and replacement of SN 025-0044 on IL 128, 3.3 miles south of IL 33. , Removal and replacement of SN 025-0044 on IL 128, 3.3 miles south of IL 33.
|
032-74915
|
Deleted
|
01/21/2021
|
|
|
4
|
7
|
Crawford
|
|
Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363. , Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363.
|
033-74943
|
Executed
|
04/07/2021
|
1 / 1 |
1 |
4
|
7
|
Cumberland
|
|
7.2 miles of milling and resurfacing on Montrose Blacktop from IL 121 to the Effingham County line near Montrose.
|
034-74A11
|
Executed
|
04/09/2021
|
1 / 1 |
1 |
4
|
7
|
Moultrie
|
|
Intersection reconstruction and safety improvements on IL 32 at Bruce-Findlay Road, south of Sullivan.
|
035-76K45
|
Executed
|
04/21/2021
|
8 / 8 |
1 |
5
|
8
|
St. Clair
|
|
Standard overlay resurfacing, patching and guardrail improvements on IL 157 from Petroff Drive in Caseyville to State Street in Caseyville; and IL 157 interchange ramps to St. Clair Avenue / IL 111.
|
036-76N71
|
Executed
|
04/13/2021
|
1 / 1 |
|
5
|
8
|
Madison
|
|
5.7 miles of 1 pass microsurfacing on IL 159 from 0.3 miles north of IL 140 to IL 143.
|
037-76N73
|
Withdrawn
|
03/04/2021
|
|
|
5
|
8
|
Jersey, Madison
|
|
8.2 miles of crack and joint sealing on IL 3 from 0.04 miles north of Pierce Lane to IL 109. , 8.2 miles of crack and joint sealing on IL 3 from 0.04 miles north of Pierce Lane to IL 109.
|
038-76N77
|
Executed
|
04/14/2021
|
2 / 2 |
|
5
|
8
|
St. Clair
|
|
4.1 miles of crack and joint sealing on IL 159 from 0.1 miles north of Fountains Parkway to Rosewood Village Drive.
|
039-76N78
|
Withdrawn
|
03/03/2021
|
1 / 1 |
1 |
5
|
8
|
Clinton
|
|
Crack and joint sealing on IL 127 from the Bond County line to 0.2 miles north of Williams Road. , Crack and joint sealing on IL 127 from the Bond County line to 0.2 miles north of Williams Road.
|
040-76P11
|
Executed
|
04/13/2021
|
1 / 1 |
|
5
|
8
|
Clinton
|
|
Bridge painting on IL 161 over Wilken Lake, 0.5 miles east of Germantown (SN 014-0009) and over Shoal Creek overflow, 0.6 miles east of Germantown (SN 014-0010).
|
041-78151
|
Deleted
|
01/21/2021
|
|
|
5
|
9
|
Saline
|
|
Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032) , Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032)
|
042-78336
|
Executed
|
03/05/2021
|
2 / 2 |
|
5
|
9
|
Franklin
|
|
Removal and replacement of a box culvert (SN 028-7029) carrying IL 34 over a drainage ditch, 5.5 miles east of IL 37 in Benton.
|
043-78501
|
Executed
|
04/09/2021
|
1 / 1 |
1 |
5
|
9
|
Saline
|
|
Replacement of box culvert carrying US 45 over a stream and replacement of a single span bridge with a double box culvert carrying Feazel Road, off of US 45, over Pankey Branch. This project is located near Harrisburg.
|
044-78590
|
Executed
|
04/09/2021
|
|
|
5
|
9
|
Saline
|
|
16.3 miles of tree pruning along IL 34 and US 45 in Saline County.
|
045-78622
|
Deleted
|
01/21/2021
|
|
|
5
|
9
|
Hamilton
|
|
Removal and replacement of a box culvert (SN 033-2000) carrying IL 242 over an unnamed stream, 3.5 miles north of McLeansboro. , Removal and replacement of a box culvert (SN 033-2000) carrying IL 242 over an unnamed stream, 3.5 miles north of McLeansboro.
|
046-78660
|
Deleted
|
01/21/2021
|
|
|
5
|
9
|
Jackson
|
|
Conversion of 2 intersections to Restricted Crossing U-Turn intersections: 1) IL 13/127 and Ava Road; 2) IL 13/127 and Grange Hall Road. , Conversion of 2 intersections to Restricted Crossing U-Turn intersections: 1) IL 13/127 and Ava Road; 2) IL 13/127 and Grange Hall Road.
|
047-78760
|
Executed
|
04/20/2021
|
1 / 1 |
|
5
|
9
|
Saline
|
|
12.8 miles of pavement patching and resurfacing on US 45 from IL 145 in Harrisburg to the Williamson County line in Stonefort.
|
048-78836
|
Executed
|
04/08/2021
|
3 / 3 |
1 |
5
|
9
|
Various
|
|
Cleaning and painting of portions of 16 structures in various counties of District 9.
|
049-78858
|
Executed
|
04/09/2021
|
|
|
5
|
9
|
Various
|
|
Weed spraying for Johnson grass along I-57 at various locations in various counties.
|
050-78859
|
Executed
|
04/07/2021
|
|
|
5
|
9
|
Various
|
|
Weed spraying for broadleaf weeds along I-57 at various locations in various counties.
|
051-62L56
|
Executed
|
04/07/2021
|
4 / 4 |
2 |
1
|
1
|
Lake
|
|
(7.6-Mile) SMART overlay, patching and pedestrian ramps on IL 137 from south of Greenwood Avenue to north of Russell Road in the Villages of Beach Park, Winthrop Harbor and Cities of Waukegan and Zion.
|
052-62L73
|
Executed
|
04/08/2021
|
|
|
1
|
1
|
Cook
|
|
(3.05-Mile) Standard overlay and pedestrian ramp ADA improvements on IL 64 from IL 43 (Harlem Ave.) to IL 50 (Cicero Ave) within the Village of Oak Park and City of Chicago.
|
053-62L82
|
Deleted
|
01/12/2021
|
|
|
1
|
1
|
DuPage
|
|
(3.9-Mile) Crack and joint sealing on US 20 (Lake Street) from I-355 to IL 83 (Kingery Highway) within the Village of Addison. , (3.9-Mile) Crack and joint sealing on US 20 (Lake Street) from I-355 to IL 83 (Kingery Highway) within the Village of Addison.
|
054-62L85
|
Deleted
|
01/13/2021
|
|
|
1
|
1
|
Cook
|
|
(0.25-Mile) SMART overlay and ADA improvements on Des Plaines Avenue from Madison Street to Randolph Street within the Village of Forest Park.
|
055-62M08
|
Executed
|
04/08/2021
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(2.8-Mile) SMART overlay, detector loop replacement and ADA improvements on US 30 (Lincoln Highway) from IL 43 (Harlem Avenue) to IL 50 (Cicero Avenue) within the Village of Matteson.
|
056-62N17
|
Deleted
|
01/23/2021
|
|
|
1
|
1
|
Cook
|
|
Cleaning and painting existing steel structures at 3 locations. 1st located on Grand Avenue over Des Plaines River {SN 016-0 855), in the Village of River Grove; 2nd and 3rd located on US 64 (North Avenue) at RR-CN (SN 016-0500 and SN 016-1126), in the Village of River Grove. , Cleaning and painting existing steel structures at 3 locations. 1st located on Grand Avenue over Des Plaines River {SN 016-0 855), in the Village of River Grove; 2nd and 3rd located on US 64 (North Avenue) at RR-CN (SN 016-0500 and SN 016-1126), in the Village of River Grove.
|
057-66L17
|
Executed
|
04/13/2021
|
6 / 6 |
3 |
2
|
3
|
LaSalle
|
|
This work is located at two sets of structures, SN 050-0210 and SN 050-0211 carrying FAI 39 Over the Nor-Folk Southern Railway, 1.48 miles north of IL Rte 18 and SN 050-0212 and SN 050-0213 carrying FAI 39 over Sandy creek, 1.23 mi. north of IL Rte. 18. This project consists of removing and replacing the expansion joints and approach slabs.
|
058-72L90
|
Executed
|
04/14/2021
|
|
|
4
|
6
|
Macoupin
|
|
4.7 miles of crack and joint sealing on IL 4 from 0.2 miles south of Cambridge Road, south of Girard, to west Donaldson Road / Jones Road.
|
059-72M25
|
Executed
|
04/20/2021
|
1 / 1 |
|
4
|
6
|
Various
|
Voluntary
|
Cleaning of weigh station scale pit and jet cleaning drain tiles at the Pittsfield, Litchfield and Williamsville Weigh Stations. (I-55 and US 54/IL 106)
|
060-72M51
|
Executed
|
04/23/2021
|
|
|
4
|
6
|
Scott
|
|
Field tile removal and replacement on IL 106 west of Ehlert Lane.
|
061-72M54
|
Executed
|
04/09/2021
|
|
|
4
|
6
|
Montgomery
|
|
Patching on I-55 from the Macoupin/Madison County line to the Montgomery / Sangamon County line.
|
062-72M64
|
Executed
|
04/09/2021
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the Western half of the district.
|
063-74752
|
Deleted
|
01/21/2021
|
|
|
4
|
7
|
Effingham
|
|
Shoulder work, base course widening, curb and gutter, ADA sidewalk improvements and box culvert replacement on US 40 from the Fayette County line to Division Street in Altamont and on IL 128 from US 40 in Altamont to 0.1 miles north of I-70. , Shoulder work, base course widening, curb and gutter, ADA sidewalk improvements and box culvert replacement on US 40 from the Fayette County line to Division Street in Altamont and on IL 128 from US 40 in Altamont to 0.1 miles north of I-70.
|
064-74945
|
Executed
|
04/08/2021
|
2 / 2 |
2 |
4
|
7
|
Clark
|
|
10.7 miles of milling and surfacing on IL 49 from the Coles County line to 0.3 miles north of I-70; includes bridge repairs on 2 structures, culvert replacement and shoulder work. (SN 012-8633, 012-0061, 012-0066)
|
065-74946
|
Executed
|
04/09/2021
|
|
|
4
|
7
|
Clay
|
|
Bridge joint repair/replacement on SN 013-0020 carrying Dieterich Blacktop over the Little Wabash River Overflow, 0.8 miles north of Clay City.
|
066-76K69
|
Executed
|
04/08/2021
|
|
|
5
|
8
|
Madison
|
|
Bridge deck sealing on I-270 at the Chain of Rocks Bridge (SN 060-0345) and Mississippi River Bridge (SN 060-0035).
|
067-76M84
|
Executed
|
04/16/2021
|
|
1 |
5
|
8
|
Madison
|
|
6.7 miles of standard overlay resurfacing on IL 159 from the Macoupin County line to 0.3 miles north of IL 140.
|
068-76N92
|
Executed
|
04/16/2021
|
1 / 1 |
|
5
|
8
|
Clinton
|
|
0.67 miles of resurfacing along Ferrin Road / County Highway 3 from US 50 to Louis Street.
|
069-76P15
|
Executed
|
04/20/2021
|
|
|
5
|
8
|
Various
|
|
Weed spraying along various interstate routes in various counties of District 8.
|
070-76P36
|
Executed
|
04/21/2021
|
|
|
5
|
8
|
St. Clair
|
|
2.8 miles of partial depth patching on I-55 / I-70 between the BandO Railroad and IL 111.
|
071-78804
|
Executed
|
04/09/2021
|
|
1 |
5
|
9
|
Hamilton, Jefferson
|
|
Bridge deck overlay and joint repair on SN 041-0040 and bridge deck overlays on SN 041-0041, 041-0042 and 033-0012; all on IL 142 in Jefferson and Hamilton Counties.
|
072-61G92
|
Executed
|
04/20/2021
|
|
1 |
1
|
1
|
Cook
|
|
Full Depth reconstruction on Acacia Drive, beginning at the south intersection with Wolf Road and ending at the north intersection with Wolf Road, in the Village of Indian Head Park
|
073-61G93
|
Executed
|
04/15/2021
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
Construction of a bike path from east of Illinois Route 31 into the park, in the Village of Cary.
|
074-62L95
|
Executed
|
04/09/2021
|
|
|
1
|
1
|
Cook
|
|
(2.5-Mile) SMART overlay and ADA improvements on Cermak Road from Kedzie Avenue to Halsted Street in the City of Chicago.
|
075-62M02
|
Executed
|
04/09/2021
|
2 / 2 |
|
1
|
1
|
Will
|
|
Pavement patching, HMA surface removal, HMA resurfacing, pedestrian ramp improvements and culvert replacement at 2 locations: 1) IL 1 from west of IL 394 to just south of Burville Road; 2) IL 394 from north of County Line Road to north of IL 1.
|
076-62M18
|
Executed
|
04/08/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(1.5-Mile) SMART resurfacing and ADA improvements on Ballard Road from Rand Road to Greenwood in the City of Des Plaines, City of Park Ridge, Village of Niles and unincorporated Maine Township.
|
077-62M29
|
Executed
|
04/14/2021
|
2 / 2 |
|
1
|
1
|
Cook
|
|
Bridge deck overlay, joint repairs, bearing replacement and concrete repairs on SN 016-0456 and 016-1041 carrying IL 394 over CN and NS Railroads, south of US 30.
|
078-62M32
|
Executed
|
04/13/2021
|
|
|
1
|
1
|
Will
|
|
(4.6-Mile) Pavement patching and crack and joint sealing on US 45 from north of Colorado Avenue to Stuenkel Road within the Village of Frankfort.
|
079-62M70
|
Executed
|
04/20/2021
|
|
|
1
|
1
|
Lake
|
|
This is a building demolition project for gas station. Work includes removing of all existing improvements: one-story building, canopy with gas pumps and storage tanks. Location: 491 South IL. Route 83, Village of Grayslake.
|
080-64M35
|
Executed
|
04/15/2021
|
4 / 2 |
1 |
2
|
2
|
Lee
|
|
ADA curb ramp improvements along US 52 from Wasson Road to Bluff Street in Amboy.
|
081-64P64
|
Executed
|
04/09/2021
|
|
1 |
2
|
2
|
Winnebago
|
|
Expansion Joint Replacement on 101-0073 and 101-0074 carrying US 20 over the Kishwaukee River.
|
082-72L67
|
Withdrawn
|
03/05/2021
|
14 / 14 |
1 |
4
|
6
|
Sangamon
|
|
Bridge deck repairs on I-55 over the Sangamon River (2.7 miles north of IL 54/ Sangamon Avenue); I-55 over IL 54 / Sangamon Avenue; I-55 over the IC Railroad (0.3 miles north of IL 54 / Sangamon Avenue). (SN 084-0014, 084-0015, 084-0016, 084-0017, 084-0018, 084-0019)
|
083-72L95
|
Executed
|
04/23/2021
|
1 / 1 |
|
4
|
6
|
Adams
|
|
8.7 miles of HMA removal and 2 pass micro-surfacing on I-172 from IL 96 to US 24, east of Quincy.
|
084-72M63
|
Executed
|
04/08/2021
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of the district.
|
085-85707
|
Executed
|
04/20/2021
|
|
|
2
|
2
|
Ogle
|
|
Resurface Meridian Road from IL 72 to IL 64.
|
086-89475
|
Executed
|
04/16/2021
|
1 / 1 |
|
3
|
4
|
Knox
|
|
Replace the bridge carrying CH 8 over Brush Creek, 5 miles east of Abingdon.
|
087-89674
|
Executed
|
04/27/2021
|
3 / 3 |
1 |
3
|
4
|
McDonough
|
|
Streetscape project including curb and gutter, sidewalks, lighting and resurfacing on various streets in and around the downtown square in Macomb.
|
088-89788
|
Executed
|
04/20/2021
|
1 / 1 |
|
3
|
4
|
McDonough
|
|
Resurface CH 24 from CH 19 to CH 8.
|
089-97749
|
Executed
|
04/13/2021
|
1 / 1 |
1 |
5
|
8
|
Marion
|
|
Replace the bridge carrying TR 64 over Turkey Creek, 1.5 miles east of Junction .
|
090-99651
|
Executed
|
04/13/2021
|
|
|
5
|
9
|
Jackson
|
|
Resurfacing and pavement markings on Brick Plant Road, from Randolph County line to IL 4.
|
091-99657
|
Executed
|
04/27/2021
|
|
|
5
|
9
|
Pope
|
|
Resurface New Liberty Road from the Massac County line to 0.1 mile northeast of New Liberty Road.
|
092-99658
|
Executed
|
04/27/2021
|
3 / 3 |
2 |
5
|
9
|
Pope
|
|
Resurface Eddyville Blacktop from Ragen Road south for 1.0 mile.
|
093-99659
|
Executed
|
04/09/2021
|
1 / 1 |
|
5
|
9
|
Williamson
|
|
Intersection improvements including replacement of sidewalks, enhancement of crosswalks and warning signs on Monroe Street from North 20th Street to North 16th Street in the City of Herrin.
|
094-60T06
|
Deleted
|
01/22/2021
|
|
|
1
|
1
|
Cook
|
|
Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 , Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 , Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314
|
095-61G22
|
Executed
|
04/14/2021
|
8 / 8 |
|
1
|
1
|
Cook
|
|
Replace the bridge carrying Brookfield Avenue over Salt Creek in Brookfield.
|
096-61G40
|
Executed
|
04/09/2021
|
|
|
1
|
1
|
Lake
|
|
Reconstruction on North Krueger Road from Gilmer Road to IL 22 in Long Grove.
|
097-61G81
|
Executed
|
04/20/2021
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
Pavement reconstruction, storm sewer, sidewalks and pavment markings on 123rd Street from 76th Avenue to Harlem Avenue in Palos Heights.
|
098-61G90
|
Executed
|
04/27/2021
|
|
|
1
|
1
|
Kane
|
|
Pavement widening, markings and signing to acommodate on-street bicycle lanes on various routes within Aurora.
|
099-62L04
|
Executed
|
04/22/2021
|
|
|
1
|
1
|
Cook
|
|
(2.53-Mile) Improvement on Church St from Gross Point to Dodge Ave consists of Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston Niles and Evanston Townships. , (2.53-Mile) This improvement on Church St from Gross Point to Dodge Ave consist of Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston, Niles and Evanston Townships.
|
100-62L05
|
Executed
|
04/09/2021
|
|
|
1
|
1
|
Will
|
|
(3.32 mile) Improvement on IL-53 from Hoff Rd to Manhattan Rd consists of smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township.
|
101-62M12
|
Executed
|
06/10/2021
|
|
1 |
1
|
1
|
Cook
|
|
(2.7-Mile) SMART overlay and ADA improvements on 87th Street from Keeler Avenue to Damen Street in the Village of Evergreen Park, and the Cities of Chicago and Hometown.
|
102-62N09
|
Executed
|
04/14/2021
|
|
|
1
|
1
|
Cook
|
|
Cleaning and painting the steel surfaces of bridge structures carrying Sauk Trail over 1-57 in the Village of Richton Park, Rich Township.
|
103-62N11
|
Deleted
|
01/29/2021
|
|
|
1
|
1
|
|
|
|
104-62N14
|
Executed
|
04/22/2021
|
|
|
1
|
1
|
Various
|
|
Improvement consists of removing and replacing signs along various district One expressways and arterials routes in the counties of Cook, DuPage, Kane, Lake, McHenry and Will.
|
105-62N16
|
Executed
|
04/14/2021
|
|
1 |
1
|
1
|
Will
|
|
Cleaning and painting existing steel on the structures No. 1: carrying 1-55 E. Frontage Road (Thomas Dillon Dr.) over I and M Canal, No. 2: US Route 6 (Jackson St.} over Spring Creek, No. 3: IL-113 over 1-55, in Village of Channahon and Diamond, and in City of Joliet, Wilmington, and Braidwood.
|
106-72L66
|
Executed
|
04/08/2021
|
1 / 1 |
|
4
|
6
|
Pike
|
|
HMA resurfacing, HMA shoulders, pipe underdrain replacement and bridge repairs on I-72 from east of the US 54 / IL 107 interchange to 0.6 miles east of the 290th Avenue overhead.
|
107-72L82
|
Executed
|
04/08/2021
|
|
|
4
|
6
|
Various
|
|
Sealing the decks, parapets and concrete bridge approach pavement on various structures throughout District 6.
|
108-72L93
|
Executed
|
04/14/2021
|
|
|
4
|
6
|
Mason
|
|
19.5 miles of crack and joint sealing at 3 locations: 1) IL 97 from east of S. McKinley Street in Havana to 0.3 miles north of E CR 800; 2) US 136 from 0.1 miles east of Forrest City Road (CR 2800 E) to west of IL 29(S); 3) IL 29 from 3 miles south of US 136 to) .2 miles north of IL 10 in Mason City.
|
109-74544
|
Executed
|
04/08/2021
|
3 / 3 |
1 |
4
|
7
|
Macon
|
|
Designed overlay, bridge repair and ramp repair on US 36 from I-72 to 0.2 miles west of Harristown Boulevard and on US 51 from I-72 to 0.3 miles south of Cantrell Road west of Decatur. (SN 058-0066 and 058-0067)
|
110-74941
|
Executed
|
04/08/2021
|
|
|
4
|
7
|
Effingham
|
|
7.9 miles of milling and resurfacing on Dietrich Blacktop from Church Street in Dietrich to 2 miles north of the Clay County line; also includes 10 miles of HMA shoulders and bridge improvements to SN 025-0091.
|
111-74944
|
Executed
|
04/14/2021
|
1 / 1 |
1 |
4
|
7
|
Fayette
|
|
10.9 miles of milling and surfacing on US 51 from 0.2 miles south of 9th Street in Ramsey to Imco Drive in Vandalia. , 10.9 miles of milling and surfacing on US 51 from 0.2 miles south of 9th Street in Ramsey to Imco Drive in Vandalia.
|
112-74A32
|
Executed
|
04/09/2021
|
|
|
4
|
7
|
Coles
|
|
1.9 miles of patching on US 45 / IL 121 from IL 16 to Rudy Avenue in Mattoon and on IL 16 from 34th Street to 21st Street in Mattoon.
|
113-85697
|
Executed
|
04/27/2021
|
3 / 3 |
|
2
|
2
|
Rock Island
|
|
Sidewalk construction, curb and gutter, storm swer, water main, segmental block retaining wall, intersection resurfacing and pavement markings on IL 84/High Street, from 11th street to south of Linn Street in Port Byron.
|
114-85704
|
Executed
|
04/22/2021
|
14 / 13 |
1 |
2
|
2
|
Winnebago
|
|
Rehabilitate the bridge carrying Alpine Road over Forest Hills Road, 0.2 mile south of Windsor Road.
|
115-85705
|
Deleted
|
01/26/2021
|
|
|
2
|
2
|
Whiteside
|
|
Cold-In-Place Recycling and resurfacing on Lyndon Road from US 30 to Commercial Street. , Cold-In-Place Recycling and resurfacing on Lyndon Road from US 30 to Commercial Street.
|
116-85710
|
Executed
|
04/13/2021
|
|
1 |
2
|
2
|
Lee
|
|
Cold-In-Place Recycling with HMA overlay on Shaw Road from Brooklyn to IL 251.
|
117-87735
|
Executed
|
04/21/2021
|
|
1 |
2
|
3
|
Livingston
|
|
Resurfcing CH 6/CH 1 from Chestnut Street in Fairbury (Livingston County) to north of the railroad in McLean County.
|
118-87765
|
Executed
|
04/27/2021
|
3 / 3 |
1 |
2
|
3
|
DeKalb
|
|
Resurfacing, sidewalks, curb and gutter, pavement markings on East Hill Street from Sycamore Street to IL 23 in Genoa.
|
119-89765
|
Executed
|
04/20/2021
|
4 / 4 |
1 |
3
|
4
|
Fulton
|
|
Processing modified soil, HMA resurfacing, aggregate shoulders, box culvert extension, and the construction of a box culvert, located on CH2 from CH 14 to Airport Road.
|
120-93756
|
Executed
|
04/23/2021
|
1 / 1 |
|
4
|
6
|
Menard
|
|
Remove existing three span concrete bridge over an abandoned railroad and then and fill area with earth, add curb and gutter, pipe culverts, sewer, HMA pavement with markings on the east edge of Peterburg.
|
121-93757
|
Executed
|
04/16/2021
|
|
|
4
|
6
|
Schuyler
|
|
Replace the bridge carrying La Prairie Road over South Fork Cedar Creek, east of the Adams County line.
|
122-93758
|
Executed
|
04/16/2021
|
|
|
4
|
6
|
Adams
|
|
Resurfcing, sidewalk replacement, curb and gutter replacement, and pavement markinghs on Maine Street from 24th Street to 30th Street in Quincy.
|
123-95888
|
Executed
|
04/21/2021
|
|
|
4
|
7
|
Fayette
|
|
Replace the bridge carrying TR 312 over flat creek, 5.0 miles east of Shobonier .
|
124-95889
|
Executed
|
04/14/2021
|
|
|
4
|
7
|
Shelby
|
|
Resurfacing CH 22 from the Fayett County line to IL 128.
|
125-95890
|
Executed
|
04/21/2021
|
1 / 1 |
1 |
4
|
7
|
Macon
|
|
Replace the bridge carrying Center Street over Steven Creek and reconstruct the approach roadway. Project is located northwest of Hunt Street in Decatur.
|
126-99654
|
Executed
|
04/16/2021
|
5 / 5 |
1 |
5
|
9
|
Williamson
|
|
Construct a multi-use path, a three-sided concrete structure and traffic signal improvements. Project begins at the southwest corner of IL 13 and Greenbriar Road to an existing path at John A Logan Community College.
|
127-46927
|
Executed
|
04/16/2021
|
1 / 0 |
|
3
|
5
|
McLean
|
|
The work includes HMA resurfacing of roadway and parking areas, striping of of parking areas, sign replacements, aggregate resurfacing of camp sites and hunting lots, guardrail replacement, concrete barrier wall construction, and other misc. improvement items at Moraine View State Recreation Area (IDNR) in LeRoy, McLean County.
|
128-60T17
|
Deleted
|
01/22/2021
|
|
|
1
|
1
|
Cook
|
|
Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson. , Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson.
|
129-62N22
|
Executed
|
04/14/2021
|
|
1 |
1
|
1
|
Will
|
|
Bridge deck overlay and bridge joint repairs on 8 structures on I-55 from south of I-80 to south of Weber Road. Includes intermittent 2- surface for joints and full depth patching.
|
130-64P78
|
Executed
|
04/13/2021
|
|
|
2
|
2
|
Henry
|
|
Pavement patching on 1-74/280 from 0.5 mile west to 0.5 mile east of Mosquito Creek.
|
131-64P79
|
Rejected
|
03/17/2021
|
|
|
2
|
2
|
Henry
|
|
Pavement patching on 1-74 from the 1-74/1-80/1-280 Interchange to IL 81.
|
132-64P80
|
Executed
|
04/13/2021
|
|
|
2
|
2
|
Rock Island
|
|
Pavement patching on 1-74/280, weigh scales, EB 1 mile East of and WB 3.3 miles East of the l-74/ I-280/ US 6 Interchange.
|
133-64P81
|
Executed
|
04/13/2021
|
|
|
2
|
2
|
Whiteside
|
|
Pavement patching on US 30 from Prophetstown Road to IL 40 in Rock Falls.
|
134-64P82
|
Rejected
|
03/17/2021
|
|
|
2
|
2
|
Various
|
|
"On-call" maintenance for traffic signals, flashing beacons, and roadway lighting along State maintained routes in Boone, Jo Daviess, Lee, Ogle, Stephenson, and Winnebago counties.
|
135-64P83
|
Executed
|
04/15/2021
|
|
|
2
|
2
|
Various
|
|
"On-call" maintenance for traffic signals, flashing beacons, and roadway lighting along State maintained routes in Carroll, Henry, Rock Island, and Whiteside Counties.
|
136-66B07
|
Executed
|
04/13/2021
|
2 / 2 |
1 |
2
|
3
|
LaSalle
|
|
3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAS FAP 603 (US 52 and IL 23) from 0.5 miles West of 1-39 to IL 23 (S) in LaSalle County IL 23.
|
137-66D55
|
Executed
|
04/13/2021
|
2 / 2 |
1 |
2
|
3
|
Various
|
|
3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 649 (IL i 7) from IL 251 in Wenona to IL 23 S of Streator.
|
138-66F09
|
Executed
|
04/15/2021
|
4 / 4 |
1 |
2
|
3
|
Kankakee
|
|
8.426 miles of 3R Resurfacing (Standard Overlay) and Structure Repairs from 0.7 mi North of the Iroquois County Line to 0.8 mi les north of the Kankakee River Bridge.
|
139-68F69
|
Executed
|
04/20/2021
|
1 / 1 |
1 |
3
|
4
|
Tazewell
|
|
0.89 mile, resurfacing of Main Street (IL 1 16/US 150) from North of 1-74 to South Highview Road in East Peoria, Tazewell County.
|
140-68F96
|
Executed
|
04/21/2021
|
|
|
3
|
4
|
Various
|
|
Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high- tension cable barrier) at various location in District Four.
|
141-68G02
|
Executed
|
04/14/2021
|
|
|
3
|
4
|
Various
|
|
Bridge painting at various locations in various counties.
|
142-68G06
|
Executed
|
04/29/2021
|
1 / 1 |
1 |
3
|
4
|
Various
|
|
Installation of dilemma zone detection and LED lighting at various signalized intersections in District Four.
|
143-70E78
|
Executed
|
04/29/2021
|
|
|
3
|
5
|
Various
|
|
BRIDGE DECK SEALING ALONG VARIOUS ROUTES THROUGHOUT REGION 3 / DISTRICT 5.
|
144-72M55
|
Executed
|
04/13/2021
|
|
|
4
|
6
|
Logan
|
|
Patching on I-55 from the Sangamon County line to the Atlanta exit.
|
145-74A33
|
Executed
|
04/09/2021
|
|
|
4
|
7
|
Cumberland
|
|
Patching on IL 130 and the ramps at the ILL 130/I-70 interchange in Greenup; the project starts 0.1 miles north of Wagon Road and extends south for 0.7 miles to IL 121.
|
146-74A44
|
Withdrawn
|
03/02/2021
|
|
|
4
|
7
|
Various
|
|
Cleaning and painting 8 bridges on I-57 in various counties of District 7.
|
147-61E91
|
Executed
|
04/15/2021
|
5 / 2 |
1 |
1
|
1
|
Cook
|
|
Widening US 14 to add southbound, right-turn lane for proposed Metra access road. Project begins at Klingenberg Lane to Metra Station Access Road in Barrington.
|
148-61G57
|
Executed
|
04/27/2021
|
5 / 5 |
2 |
1
|
1
|
Cook
|
|
Construction of a multi-use path on the west side of US 12, from Central Road to Elk Boulevard in Des Plaines.
|
149-61G60
|
Executed
|
04/13/2021
|
2 / 2 |
2 |
1
|
1
|
McHenry
|
|
Construction of bicycle facilities, pavement reconstruction, traffic signal improvements, roadway lighting, streetscape items, construction of a roundabout, and pavement markings. Improvement begins on Harrison Street at the McHenry County Conservation District Prairie Trail and extends north to Park Street, westerly to Riverview Drive, south to Main Street, then north to the existing multi-use path at IL 31 in Algonquin.
|
150-62L93
|
Executed
|
04/13/2021
|
|
1 |
1
|
1
|
Cook
|
|
(5.1-Mile) SMART overlay and ADA improvements on Arlington Heights Road from Palatine Road to IL 72 (Higgins Road) within the City of Arlington Heights.
|
151-66H15
|
Executed
|
04/14/2021
|
3 / 3 |
|
2
|
3
|
Grundy
|
|
BRIDGE REPLACEMENT (032-0079) IL 47 OVER 1-55, AND RECONSTRUCTION OF IL 47 FROM NORTHBROOK AVE TO THE SOUTH ABUTMENT OF SN 032-0110, ALONG WITH ADJACENT LIGHTING.
|
152-74947
|
Executed
|
04/29/2021
|
|
|
4
|
7
|
Macon, Moultrie, Shelby
|
|
Sealing of 94 bridge decks on various routes in Macon, Moultrie and Shelby counties.
|
153-85658
|
Executed
|
04/27/2021
|
7 / 7 |
1 |
2
|
2
|
Rock Island
|
|
Construction of a shared-use path through East Moline and Silvis Improvement starts at the Grand Illinois Trail at the Mississppi River with route signing. Construction starts at 8th Street and 21st Avenue, then along 21st Avenue, Archer Drive and 30th Avenue/Crosstown, ending at 10th Street and Crosstown Avenue.
|
154-95883
|
Executed
|
04/29/2021
|
|
|
4
|
7
|
Clark
|
|
Construction of a reinforced concrete box culvert extension, aggregate surface course and shoulders, guardrail and pavement markings on CH 26, 1.0 mile southwest of Moriah at Mounts Branch.
|
155-97751
|
Executed
|
04/21/2021
|
2 / 2 |
1 |
5
|
8
|
St. Clair
|
|
Resurfacing, sidewalk replacement, curb and gutter replacement and pavement markings on West Main street to 28th Street in Belleville.
|
156-62K36
|
Executed
|
05/24/2021
|
|
|
1
|
1
|
Cook, DuPage
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway.
|
157-62K37
|
Executed
|
05/24/2021
|
|
|
1
|
1
|
Cook, DuPage
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd.
|
158-62K39
|
Executed
|
05/24/2021
|
|
|
1
|
1
|
Cook, Lake
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy).
|
159-62K42
|
Executed
|
04/22/2021
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-57 expressway from I 94 (Dan Ryan Expwy) to I-80.
|
160-62K44
|
Executed
|
05/24/2021
|
|
|
1
|
1
|
Cook, Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-294 to I-355.
|
161-95892
|
Executed
|
03/05/2021
|
3 / 2 |
2 |
4
|
7
|
Macon
|
|
Construction of the Stevens Creek Multi-Use Path from Cresthaven Park in Decatur to Timber Lane in Forsyth.
|
162-62L70
|
Executed
|
05/12/2021
|
|
|
1
|
1
|
Will
|
|
(2.87-Mile) Crack and joint sealing improvements on US 30 from Larkin Ave. to US 30 (Center St. SB), located within the Cities of Joliet and Crest Hill.
|
163-62N26
|
Executed
|
04/20/2021
|
3 / 3 |
2 |
1
|
1
|
Various
|
|
The improvement consists of cleaning (nighttime sweeping) various expressways throughout District One in various counties.
|
164-76M33
|
Active
|
01/28/2021
|
2 / 2 |
|
5
|
8
|
St. Clair
|
|
Cleaning of the Missouri Avenue Pump Station on I-55/I-64.
|
165-76M78
|
Rejected
|
03/17/2021
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Chemical treatment of deep wells at various locations in East St. Louis. , Deep well treatment at various locations in East St. Louis.
|
166-62M87
|
Executed
|
04/20/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Trombone Mast Arm Replacement at various locations in District One.
|
167-62N10
|
Executed
|
04/21/2021
|
|
1 |
1
|
1
|
Kane
|
|
This improvement consists of a culvert repair of the structure (SN 045-0299) carrying IL Route 47 over Pingree Creek in Plato Township.
|
168-62633
|
Deleted
|
02/11/2021
|
|
|
1
|
1
|
Cook
|
|
(4,391-Ft) Intersection improvement including channelization, traffic signal modernization and resurfacing of IL 58 at Niles Center Rd. and at US 41 (Skokie Blvd.) in the Village of Skokie. , (4,391-Ft) Intersection improvement including channelization, traffic signal modernization and resurfacing of IL 58 at Niles Center Rd. and at US 41 (Skokie Blvd.) in the Village of Skokie.
|
169-62J27
|
Executed
|
04/14/2021
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
(2,589.74-Ft) Culvert removal and replacement, drainage improvements, roadway removal and replacement, earth excavation. landscaping, and erosion control at Farmers Creek over and at unnamed ditch. Located in the City of Des Plaines and Village of Niles in Cook County.
|
170-62K88
|
Executed
|
04/14/2021
|
|
|
1
|
1
|
Cook
|
|
This is an ADA Improvement project located along various State maintained routes within the Village of Oak Park and City of Park Ridge in Cook County.
|
171-62L57
|
Executed
|
04/16/2021
|
|
|
1
|
1
|
Cook
|
|
(3.1-Mile) Smart Overlay improvements, ADA improvements along IL 43 (Harlem Avenue) from .IL 64 (North Avenue) to IL 19 (Irving Park Road) in the City of Chicago and Villages of Elmwood Park, Oak Park and River Forest Cook County.
|
172-62L58
|
Deleted
|
02/11/2021
|
|
|
1
|
1
|
Cook
|
|
(4,147-Ft) SMART Overlay with ADA improvements. Location: Devon Ave, from N Springfield Ave to McCormick Blvd in Lincolnwood Township, in the City of Chicago and Village of Lincolnwood, in Cook County.
|
173-62L59
|
Executed
|
04/13/2021
|
|
|
1
|
1
|
Cook
|
|
(1.52-Mile) SMART Overlay, ADA improvements. Location: Busse Road, from 534-ft south of IL-72 (Higgins Road) to 86 feet south of IL-58 (Golf Road) in the Villages of Elk Grove and Mount Prospect, in Elk Grove Township in Cook County.
|
174-62L60
|
Executed
|
04/16/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
This improvement on Washington Blvd. from IL-50 (Cicero Ave.) to Hamlin Ave. consists of Smart Overlay Improvement in the City of Chicago in West Chicago Townships.
|
175-62L86
|
Executed
|
04/16/2021
|
|
2 |
1
|
1
|
Cook
|
|
(5.36-Mile) Smart overlay and ADA improvements project on Pulaski Rd from IL 64 (North Ave.) to Devon Ave. within the City of Chicago in Cook County.
|
176-62L94
|
Executed
|
05/12/2021
|
|
|
1
|
1
|
Cook
|
|
(1.80-Mile) SMART Overlay and ADA Improvements on Montrose Ave. between Central Ave. and Pulaski Road and is located within the City of Chicago.
|
177-62M14
|
Executed
|
04/20/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(1.08-Mile) SMART Overlay, ADA Improvements; Location: FAP 358: Torrence Ave from Grand Calumet River to Harding Ave in the Villages of Burnham and Calumet City.
|
178-62M94
|
Executed
|
04/13/2021
|
|
1 |
1
|
1
|
Cook
|
|
This work consists of building demolition located along Rand Road near the bridge over the Des Plaines River. This project has a gross length of 349 LF.
|
179-62M97
|
Executed
|
04/22/2021
|
|
|
1
|
1
|
Cook
|
|
Cleaning(sweeping) various arterial highways in District One throughout (North) Cook county.
|
180-62M98
|
Executed
|
04/22/2021
|
|
|
1
|
1
|
Cook
|
|
Cleaning(sweeping) various arterial highways in District One throughout (South) Cook county.
|
181-62N01
|
Active
|
02/11/2021
|
|
|
1
|
1
|
Lake
|
|
Cleaning(sweeping) various arterial highways in District One throughout Lake County.
|
182-62N02
|
Active
|
02/11/2021
|
|
|
1
|
1
|
Kane, McHenry
|
|
Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties.
|
183-62N03
|
Executed
|
04/13/2021
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
(575-Ft.) The improvement on Des Plaines Ave. bridge and Ridgeland Ave. bridge over 1-290 consists of bridge deck repairs and expansion joint repairs. Located in the Villages of Oak Park and Forest Park in Cook County, IL.
|
184-62N12
|
Executed
|
04/14/2021
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of cleaning and painting the steel surfaces at CTA bridge structure over 1-90/94 S. of 55th Street, in the City of Chicago, Lake Township.
|
185-62N21
|
Executed
|
04/14/2021
|
|
1 |
1
|
1
|
Will
|
|
(9.40-Mile) Pavement patching (intermittent resurfacing) project. Surface patching of longitudinal joints, lanes and shoulders and full depth (Class D) patching. Reinstate pavement markings affected by patching on Interstate 80 (I-80) from Kendall County Line to Des Plaines River in Will County.
|
01A-FR044
|
Executed
|
03/31/2022
|
|
|
2
|
2
|
Stephenson
|
|
Rehabilitate North Quadrant T-Hangar Access Taxiways
|
02A-RC010
|
Executed
|
08/04/2021
|
2 / 1 |
1 |
2
|
2
|
Ogle
|
|
Reconstruct Remaining Area of Main Aircraft Parking Apron Designated as R/1
|
03A-LA042
|
Executed
|
01/03/2022
|
|
|
1
|
1
|
Cook
|
|
Rehabilitate Portions of Taxiways C and F; Remove Taxiway F2 and Abandoned Taxiways
|
04A-MR024
|
Executed
|
09/16/2021
|
|
|
2
|
3
|
Grundy
|
|
Apply Emulsified Asphalt Seal Coat and Remark Runway 18-36
|
1LR-M1904
|
Active
|
01/26/2021
|
4 / 4 |
2 |
0
|
0
|
Vermilion
|
Voluntary
|
Stabilization of dangerous embankments at the Kickapoo State Park abandoned mine site by the Illinois Department of Natural Resources using federal Abandoned Mined Lands funds.
|
2LR-M1907
|
Active
|
01/26/2021
|
5 / 5 |
1 |
0
|
0
|
Saline
|
Voluntary
|
Elimination of clogged streams, clogged stream lands, hazardous equipment & facilities, and hazardous water bodies at the Blue Bird Coal Company #5 & 6 abandoned mine sites by the IDNR using federal abandoned mined lands and state bond forfeiture funds.
|
3LR-M2001
|
Active
|
01/26/2021
|
|
|
0
|
0
|
Williamson
|
Voluntary
|
Elimination of dangerous highwalls at the Thunderbird Collieries abandoned mine site by the Illinois Department of Natural Resources using federal abandoned mined lands funds.
|
4LR-M2004
|
Active
|
01/26/2021
|
1 / 1 |
1 |
0
|
0
|
Fulton
|
Voluntary
|
The Buckheart Mine Highwall Remedial Project is for the repair of an eroded sideslope and drainageways at the Buckheart Mine abandoned mine site by the Illinois Department of Natural Resources using federal abandoned mined lands funds.
|