001-62T04
|
Active
|
11/12/2024
|
|
|
1
|
1
|
Will
|
|
The proposed improvement consists of bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of the bridge located on La Grange Road/US 45 at Hickory Creek in Will County. Gross length: 4854 Ft (0.919 Mi), Net length: 1327 Ft (0.252 Mi).
|
002-62T17
|
Active
|
11/12/2024
|
|
1 |
1
|
1
|
DuPage
|
|
(760-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at IL 38 (Roosevelt Rd) at IL 53. This project is located in the Village of Glen Ellyn in DuPage County.
|
003-62T30
|
Active
|
11/12/2024
|
6 / 5 |
1 |
1
|
1
|
DuPage
|
|
(307-Ft) Bridge preservation project: Deck overlay, Joints replacement/repair. Located on IL 53 / Rohlwing Road, at Canadian National (CN) Railroad (approximately 0.1-miles South of Fullerton Avenue) in the Village of Addison.
|
004-64N05
|
Active
|
11/12/2024
|
5 / 5 |
3 |
2
|
2
|
Henry
|
|
5.795 miles of pavement patching, HMA resurfacing, HMA surface removal, the removal and replacement of concrete bridge decks for SNs 037-0023 and 037-0024 over Cleveland Road, deck replacements and deck repairs for SN-s 037-0021 and 037-0022 over the Rock River, deck repairs for SN-s 037-0027 and 037-0028 over the Iowa Interstate Railroad, and other necessary work to complete the proposed improvements along I-80 from the Rock River to US 6.
|
005-70D76
|
Active
|
11/12/2024
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
287' bridge repairs and bridge deck overlay at Saline Branch 0.8 mi west of US 45 and US 45 N of Urbana. SN's 010-0022 and 010-0023.
|
006-70E63
|
Active
|
11/12/2024
|
|
|
3
|
5
|
Vermilion
|
|
Bridge deck overlay and other repairs to SN 092-0177. About 875'.
|
007-70H01
|
Active
|
11/12/2024
|
|
|
3
|
5
|
Douglas
|
|
113.2' bridge repairs and overlay at Scattering Fork River 1.5 mi south of US 36.
|
008-72122
|
Active
|
11/12/2024
|
|
|
4
|
6
|
Sangamon
|
|
1.7 miles of reconstruction, milling and resurfacing, ADA improvements and accessible pedestrian traffic signals on Dirksen Parkway in Springfield, from 0.1 miles south of Peoria Road to north of Northfield Drive.
|
009-72426
|
Active
|
11/12/2024
|
|
|
4
|
6
|
Christian
|
|
Intersection reconstruction on US 51 at Leafland Street (CH 6) in Assumption.
|
010-72M81
|
Active
|
11/12/2024
|
1 / 1 |
1 |
4
|
6
|
Sangamon
|
|
Pavement patching, resurfacing, HMA shoulders, aggregate shoulders, grading and shaping ditches, rumble strips, and bridge repairs to SN 084-0111 on I-55 from 0.7 miles south of IL 104 to 0.5 miles north of Horse Farm Road/Old Route 66 at the Glenarm Interchange and on Horse Farm Road/Old Route 66 from 0.4 miles west to 1 mile east of I-55.
|
011-74B41
|
Active
|
11/12/2024
|
1 / 1 |
1 |
4
|
7
|
Cumberland
|
|
0.08 mile of bridge deck overlay, bridge joint replace/repair, bridge approach roadway, and bridge deck repairs at Cottonwood Creek, 0.1 mile east of CR 1125E (overhead).
|
012-76U07
|
Active
|
11/12/2024
|
|
|
5
|
8
|
Madison
|
|
Bridge joint replacement/repairs and bridge deck overlay on SN 060-0014 and 060-0015 carrying I-55/70 over Beltline Road.
|
013-78633
|
Active
|
11/12/2024
|
6 / 6 |
|
5
|
9
|
Williamson
|
|
7.8 miles of resurfacing, HMA shoulders, aggregate shoulders, earthwork, culvert replacement, tree removal, guardrail updates, addition of a right turn lane, and construction of a roundabout on IL 37, south of Marion, from Wildcat Road to IL 148.
|
014-78798
|
Active
|
11/12/2024
|
2 / 2 |
1 |
5
|
9
|
Williamson
|
|
8 miles of earthwork, HMA pavement, HMA resurfacing, drainage and guardrail in order to add a lane in each direction of I-57 from Westminster Drive in Marion to just south of the I-24 interchange.
|
015-78A27
|
Active
|
11/12/2024
|
|
|
5
|
9
|
Perry
|
|
Joint reconstruction with strip seals, base course widening, bridge deck, approach slab and structure repair, deck scarification, microsilica concrete overlay and approach HMA mill and fill on SN 073-0025 carrying IL 127 over Swanwick Creek and SN 073-0026 carrying IL 127 over Swanwick Creek Overflow north of Pinckneyville.
|
016-78A65
|
Active
|
11/12/2024
|
|
|
5
|
9
|
Williamson
|
|
7.8 miles of standard overlay on Crab Orchard Road from the IL 13 West Connector to the IL 13 East Connector.
|
017-78A67
|
Active
|
11/12/2024
|
|
|
5
|
9
|
Gallatin
|
|
8.8 miles of HMA surface removal, HMA resurfacing, aggregate wedge shoulders, pavement patching and guardrail improvements on IL 13 from IL 1 to the Old Shawneetown Bridge.
|
018-78A70
|
Active
|
11/12/2024
|
|
|
5
|
9
|
Johnson
|
|
1.1 miles of pavement patching, HMA surface removal and HMA resurfacing on IL 37 from the Williamson County line to 0.2 miles south of I-24.
|
019-78A71
|
Active
|
11/12/2024
|
|
|
5
|
9
|
Union
|
|
6 miles of overlay on IL 146 from 0.5 miles west of I-57 to the Johnson County line.
|
020-78A82
|
Active
|
11/12/2024
|
|
|
5
|
9
|
Perry
|
|
3 miles of resurfacing on IL 150 from IL 4 to Reeses Hill Road in Culter.
|
021-93671
|
Active
|
11/12/2024
|
|
1 |
4
|
6
|
Sangamon
|
|
Construction of two structures: Iron Bridge Road over the Union Pacific Railroad, and the Union Pacific Railroad over Woodside Road. Work includes; pedestrian truss bridge over Woodside Road, reconstruction of the signalized intersection of Iron Bridge and Woodside, and the relocation of the Interurban Trail.
|