Home > Notice of Letting > Contract Detail

April 25, 2025 Letting 12:00 PM
12A-GA012

Bulletin Description

Rehabilitate Auto Parking Lots and Access Road
Region District DBE % VBP % Federal Project #
3 4 4.00 0.00 N/A
County(s) IL Project # Airport Sponsor City
  • Knox
GBG 4988 Galesburg Municipal City of Galesburg Galesburg
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
30 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of April 15, 2025 04:30 PM.

Authorized Bidders

  • 2242 Gunther Construction, a div of UCM, Inc.
    600 East Main Street
    Galesburg, IL 61401
    P.O. Box 1488
    Galesburg, IL 61402
    Phone: (309) 342-4155 Fax: (309) 342-4150 Email: Gunther@ucm.biz
    Base $261,838.98 is within a reasonable approximation of the Estimate
    Additive 1 $54,885.28

  • 0593 Brandt Construction Co.
    700 4th Street West
    Milan, IL 61264
    Phone: (309) 787-4644 Fax: (309) 787-6344 Email: bids@brandtconstructionco.com
    Base $328,444.00
    Additive 1 $66,989.00

  • 3391 Laverdiere Construction, Inc.
    4055 W Jackson St
    Macomb, IL 61455
    Phone: (309) 837-1258 Fax: (309) 833-4993 Email: mlynn@lavconinc.com

Non Bidders

  • 4741 Phoenix Corporation of the Quad Cities
    1006 Rosehill Rd
    Port Byron, IL 61275
    PO Box 445
    Rapids City, IL 61278
    Phone: (309) 523-3687 Fax: (309) 523-3752 Email: mdecap@phoenixcorp.org

Pay Item # UOM Description Type Quantity Unit Price
AR150520 L SUM MOBILIZATION Base items 1.000
AR152410 CU YD UNCLASSIFIED EXCAVATION Base items 664.000
AR152480 SQ YD SHOULDER ADJUSTMENT Base items 1,089.000
AR209608 SQ YD CRUSHED AGG. BASE COURSE - 8" Base items 1,851.000
AR401613 TON BIT. SURF. CSE.-METHOD I, SUPERPAVE Base items 446.000
AR401900 SQ YD REMOVE BITUMINOUS PAVEMENT Base items 792.000
AR403613 TON BIT. BASE CSE.-METHOD I, SUPERPAVE Base items 314.000
AR602510 GALLON BITUMINOUS PRIME COAT Base items 463.000
AR603510 GALLON BITUMINOUS TACK COAT Base items 235.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 1,004.000
AR751411 EACH INLET-TYPE A Base items 1.000
AR751927 EACH REPLACE FRAME & GRATE Base items 1.000
AR901510 ACRE SEEDING Base items 0.230
AR908510 ACRE MULCHING Base items 0.230
AS152410 CU YD UNCLASSIFIED EXCAVATION Additive 1 239.000
AS152480 SQ YD SHOULDER ADJUSTMENT Additive 1 65.000
AS209606 SQ YD CRUSHED AGG. BASE COURSE - 6" Additive 1 668.000
AS401613 TON BIT. SURF. CSE.-METHOD I, SUPERPAVE Additive 1 75.000
AS403613 TON BIT. BASE COURSE-METHOD I SUPERPAVE Additive 1 112.000
AS602510 GALLON BITUMINOUS PRIME COAT Additive 1 167.000
AS603510 GALLON BITUMINOUS TACK COAT Additive 1 33.000
AS620520 SQ FT PAVEMENT MARKING-WATERBORNE Additive 1 154.000
AS901510 ACRE SEEDING Additive 1 0.020
AS908510 ACRE MULCHING Additive 1 0.020