April 25, 2025 Letting 12:00 PM
160-93826

Plans and Special Provisions are not available at this time

Bulletin Description

Reconstruction, Widening, and Resurfacing Fifth Street Road from I-55 to Lincoln Parkway in Lincoln.
Region District DBE % VBP % Federal Project #
4 6 Pending Pending
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Logan
  • FIFTH STREET ROAD
  • C-96-035-25
  • 6-00136-0106
  • 6-10025-0000
  • 6-10025-0010
Contract Specifics
Previously advertised on March 07, 2025 (Item 134).
No More Contract Specifics

Ask Subscribe Questions and Answers (9 Submitted / 9 Answered ) Questions not accepted as of April 15, 2025 04:30 PM.

  • Standard Specifications Section 611.04 indicates a concrete slab or paved ditch section shall be constructed over the existing drain tile pipe according to the details shown on the plans. No details are included with the Contract Documents, please provide these details.
    Should this field tile condition be encountered during construction, a detail will be provided at that time. (04/15/2025)

  • Standard Specifications Section 611.03 indicates that pipe drain outletting into the roadway ditch shall have a concrete headwall constructed at the outfall end according to the details shown on the plans. No details are included with the Contract Documents, please provide these details.
    Should this field tile condition be encountered during construction, a detail will be provided at that time. (04/15/2025)

  • Special Provision Pgs 8 & 9 indicate numerous utility companies intend to perform utility relocations "During Construction", please provide plans & durations for any utility relocations or betterments we will need to allow time for throughout construction. In the event the minor adjustments of valve boxes, hydrants & pedestals to grade are the extent of the utility relocations required, please indicate that will be the extent of utility relocations bidders need to anticipate during construction
    Please refer to the utility coordination special provision. The plans and durations will have to be coordinated with each utility company during construction. (04/15/2025)

  • Concrete Pavement Part 2 - If a precast railroad crossing system will be used (By Others), please provide the correct tie-in detail for our use, particularly the means of isolating the railroad panels from the proposed concrete roadway pavement.
    At the railroad crossing interface with the concrete pavement, contractors shall comply with IDOT standard 420501-07. (04/15/2025)

  • Concrete Pavement Part 1 -At the interface between reconstructed railroad track (By Others) & a proposed concrete pavement (under this contract). Please provide a detail of how the concrete pavement section will tie to the railroad crossing rail bed section. If Contractors need to comply with Standard Detail 420501-07, (indicating a 6-Foot wide asphalt plug) please confirm that this detail should be followed & that a reinforced 10-IN concrete pavement approach along the asphalt plug is correct
    At the railroad crossing interface with the concrete pavement, contractors shall comply with IDOT standard 420501-07. (04/15/2025)

  • Please indicate the anticipated duration required for the railroad replacement scope of work "By Others".
    The schedule and duration for this work is at the railroad’s discretion and no schedule or duration has been provided by the Railroad. (04/15/2025)

  • The specs call out two separate (a)(5) locations. But only on landfill authorization sample. What (a)(5) does IDOT want the landfill authorization sample collected?
    The sites are directly across the street from each other. It is common to have a single sample be intended to be representative for an intersection vs. sampling every A5 site. It won't matter which site is sampled, or they can even composite a sample from both. The requirement for the BDE 2730 is that the sample be collected from either an A1 or A5 location. (04/15/2025)

  • Can you please post the questions and answers for the March letting for Item 134
    They cannot be posted since it was withdrawn from the letting. New questions will have to be asked. (04/14/2025)

  • There is a pay item for Changable Message Boards for 100 calender days, but I don't find anywhere in the plans that call out for message boards. All I have seen is message boards will be up to the engineer if needed. How many boards? How long are the boards needed?
    See Detour General Note 4 on Sheet 45. (04/02/2025)

Authorized Bidders

  • 2825 Illinois Valley Paving, a div of UCM, Inc.
    3151 Robbins Road
    Springfield, IL 62704
    P.O. Box 13420
    Springfield, IL 62791
    Phone: (217) 546-6192 Fax: (217) 546-1904 Email: IVP@ucm.biz

  • 3163 Kinney Contractors, Inc.
    19342 E. Frontage Rd.
    Raymond, IL 62560
    Phone: (217) 229-3322 Fax: (217) 229-3609 Email: kinney@roadbuilder.net

  • 0335 Otto Baum Company, Inc.
    866 N. Main Street
    Morton, IL 61550
    Phone: (309) 266-7114 Fax: (309) 263-1050 Email: timgillette@ottobaum.com

  • 0635 P. H. Broughton & Sons, Inc.
    905 N. Lincoln Ave.
    Springfield, IL 62702
    Phone: (217) 787-2393 Fax: (217) 787-2397 Email: kent@phbroughton.com

  • 0958 William Charles Construction Company, LLC
    833 Featherstone Road
    Rockford, IL 61107
    P.O. Box 2071
    Loves Park, IL 61130
    Phone: (815) 654-4700 Fax: (815) 654-4736 Email: bids@williamcharles.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.