Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
1 | 1 | 0.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
15 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 9.000 | |||
70200100 | L SUM | NIGHTTIME WORK ZONE LIGHTING | Base items | 1.000 | |||
70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 111.000 | |||
70307120 | FOOT | TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE | Base items | 333.000 | |||
70400100 | FOOT | TEMPORARY CONCRETE BARRIER | Base items | 250.000 | |||
70400125 | EACH | PINNING TEMPORARY CONCRETE BARRIER | Base items | 54.000 | |||
70600260 | EACH | IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 | Base items | 1.000 | |||
78000200 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 4" | Base items | 333.000 | |||
78200011 | EACH | BARRIER WALL REFLECTORS, TYPE C | Base items | 10.000 | |||
78300201 | SQ FT | PAVEMENT MARKING REMOVAL - GRINDING | Base items | 38.000 | |||
X7011015 | L SUM | TRAFFIC CONTROL AND PROTECTION (EXPRESSWAYS) | Base items | 1.000 | |||
X7830050 | EACH | RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REMOVAL | Base items | 30.000 | |||
Z0001905 | POUND | STRUCTURAL STEEL REPAIR | Base items | 2,720.000 | |||
Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 51.400 | |||
Z0048665 | L SUM | RAILROAD PROTECTIVE LIABILITY INSURANCE | Base items | 1.000 | |||
Z0049100 | EACH | RAISED PAVEMENT MARKER REFLECTOR REPLACEMENT | Base items | 30.000 | |||
Z0073300 | L SUM | TEMPORARY SHORING AND CRIBBING | Base items | 1.000 | |||
No More Pay Items |