Home > Notice of Letting

April 28, 2023 Letting 12:00 PM
Notice of Letting
Volume 026, No. 017

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-46607 Executed 06/06/2023 2 3 Various This project is located on various highways, freeways and expressways throughout District 3. This work consists of repairing various widths of pavement marking including lines, letters, numbers and symbols.
002-46608 Executed 06/06/2023 2 3 Various This project is located on various highways, freeways and expressways throughout District 3. This work consists of removing and replacing raised reflective pavement markers and reflectors.
003-46609 Executed 06/02/2023 2 3 Various This project is located on various highways, freeways and expressways in the following counties in District 3. Livingston, Grundy, Kankakee, Iroquois, and Ford. This work consists of removing and replacing raised reflective pavement markers and reflectors.
004-46613 Executed 06/06/2023 2 2 Various This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order.
005-62N62 Executed 06/02/2023 1 / 1 1 1 1 Kane (1.22-Mile) Smart Overlay and ADA Improvements on IL 56 (Butterfield Road) from Church Road to DuPage County Line in the City of Aurora in Kane County.
006-62N73 Executed 05/30/2023 1 1 1 Cook (1.31-Mile) Smart Overlay and ADA Improvements on Dixie Hwy from 149th Street to 159th Street in the City of Harvey, Cook County.
007-62T98 Executed 06/02/2023 1 1 1 Lake (172.9-Ft) The proposed improvement consists of partial removal and replacement of culvert located on IL 60 at the Ditch (West of Peterson Road) in the Village of Round Lake, Lake County.
008-62U00 Executed 06/02/2023 5 / 5 1 1 1 Cook (291-Ft) Proposed improvement consists of bridge girder repair of the structure located on I-55 at BNSF RR in the City of Chicago, Cook County.
009-62U49 Executed 06/02/2023 1 1 1 Cook (1,932-Ft) Bridge Preservation Project: bridge repair, joint replace/ repair and deck sealing on bridge carrying 127th Street over Railroads (Metra) (0.5 miles west of I-57). Located in the City of Blue Island in Cook County.
010-62U55 Executed 06/02/2023 1 / 0 1 1 Cook, DuPage This contract consists of debris and litter cleaning along I-55 from I-355 to IL-43 (Harlem Ave).
011-62U56 Executed 06/02/2023 1 1 Will This contract consists of debris and litter cleaning along I-55 from I-355 to Reed Road.
012-64P85 Executed 06/06/2023 1 2 2 Rock Island Bridge deck overlay and repairs on SN's 081-0122, 081-0123, 081-0128, 081-0129, 081-0134 and 081-0135.
013-64R45 Rejected 08/21/2023 2 2 Various Removal of dead trees along State maintained routes.
014-64S01 Executed 05/30/2023 6 / 6 1 2 2 Ogle, Winnebago 10.6miles pavement patching from IL 72 (E) in Byron to Beltline Road South of Rockford.
015-64S04 Withdrawn 04/12/2023 2 2 Whiteside Bridge joint replacement and misc bridge repairs carrying SN 098-0065 over I-88.
016-64S23 Executed 05/30/2023 1 / 1 2 2 Whiteside SN 098-0034 Bridge Deck Grinding over the Rock River 1.5 MI W of Rock Falls.
017-66F93 Executed 05/30/2023 3 / 3 2 3 Livingston This project is located at the I-55 and IL 17 interchange, beginning at Sta. 32+90 and ending at Sta. 66+40, for a total of 0.63 miles, and includes the removal of SN 053-0014 and replacement with SN 053-0193. Other work includes HMA milling and resurfacing, pavement marking and raised reflective pavement markers.
018-66M19 Executed 05/30/2023 2 3 Iroquois This project consists of 8.0 miles of shoulder widening and rumble strip installation on IL 49 from 725 ft south of E 1200N Rd to just south of E 2000N Rd in Iroquois County.
019-66M33 Executed 05/30/2023 1 / 1 2 3 LaSalle This project is located in LaSalle county, on I-80 over Fox River, 2.5 mile east of IL 23, Latex Overlay and bridge deck repairs.
020-66M42 Executed 06/06/2023 2 3 Iroquois This work is located on FAP Route 840 (IL 49) beginning at the intersection of IL 49 and IL 24 (L.M. 0.00) and ending at the Vermilion County Line (L.M. 21.50) This work consists of Class B pavement patching and related construction work.
021-66M69 Executed 05/30/2023 2 3 LaSalle This project is located on county highway 13 over I-80, 0.45 mi west of the I-80 and I-39 interchange, and 6th Road over I-80, 0.57 mi east of the I-80 and I-39 interchange, in LaSalle county. Latex overlay, Bridge deck repairs.
022-66M70 Executed 05/30/2023 2 3 Bureau Bridge Approach removal and replacement, resurfacing, guardrail removal, and re-installation and pavement marking on IL 26 over Big Bureau Creek.
023-66M75 Executed 06/02/2023 2 3 Livingston Bridge Repairs at SN 053-0027, 2.5 mi. east of IL 23 and SN 053-0167, 2.8 mi. east of IL 23.
024-66N14 Executed 05/30/2023 2 3 Ford Milling, resurfacing at the Gibson City Maintenance Facility located at 401 S. Illinois Dr. just east of Gibson City.
025-66N20 Executed 05/30/2023 2 3 Various Repair and maintain Traffic signal, Flashing beacons and Roadway lighting in various counties in District 3.
026-66N21 Withdrawn 05/03/2023 2 3 Various Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in various counties in District 3.
027-68G37 Executed 06/06/2023 3 4 Henderson Microsurface (1-Pass) on US 34 along Biggsville Bypass.
028-68H13 Executed 06/13/2023 3 4 Tazewell Centerline joint repair on IL 8/US 150 (Washington/Camp Streets) from east of Main Street to east of Rosedale Street in East Peoria in Tazewell County.
029-68H57 Executed 06/13/2023 3 4 Peoria Installation of fiber optic cable within existing conduit along US 150 (War Memorial Drive) from IL 29 interchange to Koerner/Trigger Road in Peoria.
030-70840 Executed 06/09/2023 1 / 1 1 3 5 Vermilion 8.231 miles, 3P Policy Standard Overlay, Cold Milling,Guardrail, Culvert Replacement,_ADA Improvements.
031-70992 Executed 06/02/2023 1 3 5 Piatt 9.63 Miles of Designed Overlay ADA Improvements from ILL 48 to Cerro Gordo.
032-70996 Executed 06/02/2023 3 5 Piatt 4.992 miles of resurfacing (3P) standard overlay, DeWitt County Line to WCL of Mansfield.
033-70A58 Executed 05/30/2023 1 3 5 McLean 2.23 Mi, Standard Overlay ADA Improvements, Clearwater Ave to Old Route 66 in Bloomington/Normal.
034-70E29 Executed 06/02/2023 3 5 Edgar West Parking Lot Resurfacing with ADA Improvements, Paris Headquarters Complex.
035-70E86 Executed 05/30/2023 3 / 3 1 3 5 McLean Resurfacing (3P) Standard Overlay of F.A.P. 693 (ILL 9) from 0.4 Mi E of ILL 165 to Arrowsmith Rd.
036-70F30 Executed 06/06/2023 3 5 McLean 7.281 Miles of Micro-Surfacing 1 Pass and Crack and Joint Sealing on US 24 from Mclean St. in Gridley to 0.4 mile West of 1-55 at Chenoa.
037-70F46 Executed 06/02/2023 3 5 Champaign Length N/A, Patching Parking Improvement Drainage, Champaign Complex.
038-70G08 Executed 05/30/2023 1 3 5 McLean 2.615 Miles of Interstate Smart Overlay on I-74 from 0.4 Mile North of I-55 Business to 0.3 Mile East of US 51 at Bloomington and 1-55 Business from I-55 to 0.4 Mile North.
039-70G19 Executed 06/06/2023 3 5 DeWitt, Piatt Class A Patching (Special) on 1-74 in DeWitt and Piatt Counties.
040-70G21 Executed 06/06/2023 3 5 DeWitt 9.452 miles of patching on US 51 from IL 54 in Clinton to the McLean County Line.
041-70G22 Executed 05/30/2023 3 5 Champaign 0.587 miles, patching, Prospect Ave to State St in Champaign.
042-70G23 Executed 06/02/2023 3 5 Champaign 0.375 Mile of Standard Overlay from Salt Fork River to Main Street in Sidney.
043-72706 Executed 09/12/2023 4 6 Logan Patching on I-55 at the IL 10 overhead.
044-72G00 Executed 05/30/2023 1 4 6 Hancock 8.1 miles of overlay, parking lanes, guardrail replacement, drainage improvements and AD improvements on IL 61 and IL 101 from IL 94 in Bowen through Augusta to the Schuyler County line.
045-72M82 Withdrawn 04/21/2023 3 / 3 4 6 Sangamon 1 mile of standard overlay, concrete curb and gutter, ADA improvements and traffic signal improvements on 6th Street from north of Stanford Avenue to Myrtle Street in Springfield.
046-72N03 Executed 06/02/2023 2 / 2 4 6 Sangamon 5.3 miles of cold milling, designed overlay and drainage improvements on IL 54 from 0.2 miles east of Prairie School Road to the Logan County line.
047-74974 Executed 05/19/2023 4 7 Clark 12.4 miles of resurfacing and new shoulders on IL 1 from 1350 North to 0.3 miles north of the Crawford County line.
048-74A85 Withdrawn 04/27/2023 4 7 Crawford Culvert removal and precast concrete culvert placement at 5 entrance locations on TR 183A (East 1000th Avenue) in Palestine.
049-74A93 Executed 06/02/2023 4 7 Clay, Fayette 8.8 miles of crack and joint sealing from the Marion County line to the Effingham County line.
050-74B22 Executed 05/19/2023 1 / 1 4 7 Moultrie 8.6 miles of resurfacing on IL 133 from IL 32 at Lovington to the Douglas County line.
051-74B24 Executed 06/16/2023 4 7 Coles 3.7 miles of crack and joint sealing on I-57 from the Cumberland County line to 0.5 miles west of US 45 at Mattoon.
052-74B36 Executed 06/23/2023 4 7 Macon Bridge painting on SN 058-0091 on I-72 at the Argenta interchange.
053-74B44 Executed 05/30/2023 4 7 Lawrence Tree removal on IL 33 from 0.5 miles north of US 50 to 0.5 miles south of US 50.
054-74B50 Rejected 05/11/2023 4 7 Macon 7.9 miles of longitudinal joint repair on I-72 from US 36 to US 51.
055-74B69 Executed 06/09/2023 4 7 Cumberland Removal of dead trees along I-70 and US 40 in Cumberland County.
056-74B84 Executed 06/02/2023 4 7 Macon Fence replacement at the Decatur Maintenance Yard.
057-74C06 Executed 05/16/2023 4 7 Various Guardrail repair at specific locations due to motorist damage and on call repair of guardrail.
058-76K86 Executed 06/16/2023 5 8 St. Clair Deck sealing on the Martin Luther King Bridge (SN 082-6001) carrying Illinois Avenue over the Mississippi River.
059-76M82 Executed 05/30/2023 5 8 Madison 1.7 miles of resurfacing and ADA improvements on IL 111 from 0.1 miles south of Pontoon Road to 0.1 miles south of Horseshoe Lake Road.
060-76M83 Executed 06/07/2023 5 8 Madison 4.6 miles of resurfacing, ADA improvements and intersection improvements on IL 157 from St. Louis Street to South University Drive in Edwardsville.
061-76P65 Withdrawn 04/20/2023 2 / 2 5 8 St. Clair 1.5 miles of resurfacing and ADA improvements on US 50 from 0.1 miles west of Schantz Road to Anne Avenue in O-Fallon.
062-76R60 Executed 06/09/2023 1 / 1 5 8 Various Applying oil and chip at various maintenance yards in District 8.
063-76R63 Executed 05/30/2023 5 8 Madison Bridge joint repair and replacement on SN 060-0077 carrying US 40 over Silver Creek, 1.6 miles west of IL 4.
064-76R64 Withdrawn 03/31/2023 5 8 Clinton Bridge joint replacement and repair on SN 014-0015 carrying IL 127 over NS Railroad, 0.2 miles north of IL 161.
065-76R72 Executed 06/07/2023 5 8 Jersey 1.3 miles of partial and full depth patching on IL 16 from Mounds Street in Jerseyville to 1.3 miles east of Mounds Street.
066-76R75 Executed 05/30/2023 5 8 Bond Resurfacing and patching on Pocahontas Avenue / Freys Meadow from Pokey Road to 1 mile west of Pokey Road.
067-76R76 Executed 06/02/2023 5 8 Clinton 0.8 miles of patching and resurfacing along Collins Street/Huey Road/County Highway 4 from US 50 to 0.2 miles south of Sherman Street.
068-76R90 Executed 05/30/2023 5 8 Madison 19.6 miles of intermittent pavement patching on I-55 and its connecting ramps from I-270 to the Macoupin County line.
069-78824 Executed 06/23/2023 1 5 9 Johnson Embankment stabilization on IL 146, 0.3 miles west of the Pope County line.
070-78918 Executed 05/30/2023 1 5 9 Williamson Superstructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek.
071-78921 Executed 05/30/2023 5 9 Union Approach slab repair, HMA widening and waterproofing with HMA overlay on SN 091-0068 carrying IL 127 over Clear Creek south of Alto Pass; approximately 0.16 miles south of Brown Section Road.
072-78939 Executed 05/30/2023 5 9 Jackson, Johnson Bridge deck overlay on SN 044-0012 carrying IL 37 over an abandoned railroad, 0.2 miles south of Cypress and bridge deck overlay on SN 039-0057 carrying IL 149 over Little Muddy River, 2 miles east of Desoto.
073-78968 Executed 05/30/2023 5 9 Johnson, Massac Bridge superstructure repair on SN 064-0029 carrying US 45 over I-24, 3.5 miles east of Metropolis and bridge joint repair on SN 044-0051 carrying Central Hill Road over I-24, 1.8 miles north of the Massac County line.
074-78984 Executed 05/30/2023 5 9 White Upgrading the traffic signal communication systems at 8 signalized intersections on IL 1 / IL 14 in Carmi.
075-78991 Executed 06/02/2023 1 / 1 1 5 9 Hamilton Placement of riprap on the fore slope of the east roadside ditch on IL 242 at Blairesville Road, approximately 3.3 miles north of McLeansboro.
076-78993 Executed 05/30/2023 1 / 1 5 9 Alexander Patching and ADA improvements on US 51 (Washington Avenue) at 14th Street in Cairo.
077-61J22 Executed 08/01/2023 1 1 DuPage Resurfacing Harger Road from Spring Road to the Westbound I-88 Ramp in Oak Brook.
078-61J27 Executed 06/02/2023 1 1 DuPage Resurfacing Covington Drive from Schick Road to Brighton Drive; Brighton Drive from Covington Drive to Army Trail Road; Comden Drive from Covington Drive to Gazy Avenue; Fox Court from Covington Drive to Gary Avenue; all in Bloomingdale.
079-61J34 Executed 06/13/2023 1 1 Cook Resurfacing Devon Avenue from west of Spruce Avenue to East of Busse Road in Elk Grove Village.
080-61J37 Executed 06/02/2023 1 1 DuPage Resurfacing, patching, sidewalks and sod restoration along 71st Street from the west coporate limits to Dunham road in Downers Grove.
081-61J41 Executed 05/30/2023 1 1 DuPage Resurfacing Woodwar Avenue from the south village limits to 63rd Street in Downers Grove.
082-61J43 Executed 06/09/2023 2 / 2 1 1 Cook Superstructure replacement with substructure repairs, with concrete approach slabs on Parkview Drive over Addison Creek and on Palmer Avenue over Addison Creek in Northlake
083-61J46 Executed 07/14/2023 1 1 Kendall Resurfacing on Concord Drive from Gordon Road to Galena Road in Montgomery.
084-61J47 Executed 07/14/2023 1 1 Kane Resurfacing, patching, sidewalks, curb and gutter along Norris Road from the north corporate limits to the south corporate limits of Sugar Grove.
085-61J50 Executed 06/13/2023 1 1 Kane Resurfacing, patching, sidewalks, curb and gutter, and landscaping along Edgelawn Drive from Garfield Avenue to Jericho Road in Aurora.
086-61J51 Executed 06/23/2023 4 / 3 1 1 1 McHenry Traffic signal modernization, ADA improvements, and pavement markings on Walkup Road/Crystal Lake Road from Bull Valley to Hillside.
087-61J56 Executed 06/09/2023 1 1 1 DuPage Resurfacing Burlington Avenue from the west village limit to Prospect Avenue in Clarendon Hills
088-74C18 Rejected 05/11/2023 1 / 1 1 4 7 Various Repairing, replacing, servicing and maintaining various electrical systems throughout District 7.
089-76R41 Rejected 05/11/2023 5 8 Marion 1.5 miles of pavement patching with ultra-thin bonded wearing course on IL 161 from Beech Street to Pleasant Avenue.
090-78992 Executed 06/16/2023 5 9 Various Deck sealing on various bridges in Jackson, Perry and Jefferson Counties.
091-85740 Executed 06/06/2023 2 2 Rock Island Resurfacing 7th Street from 12th Avenue to 16th Avenue in Moline.
092-87797 Executed 06/06/2023 2 3 Bureau HMA overlay with aggregate shoulders on CH 8 from CH 12 to US 6.
093-91621 Executed 06/06/2023 1 / 1 3 5 McLean Resurfacing, Base course widening, concrete curb and gutter and rumble strips on CH 18 from State Street in Donvers to US 150.
094-91629 Executed 06/13/2023 2 / 2 1 3 5 Piatt Sidewalk replacement, ADA Ramps, Drainage improvements, on Moultsie Street from South Washington to Piatt Steet and at the intersectionof IL 105/Wing Street in Bement.
095-93801 Executed 06/09/2023 3 / 3 4 6 Hancock Replace the bridge carrying CH 12 over Mallard Creek, 5 miles south of Warsaw.
096-93802 Executed 06/23/2023 4 6 Adams Resurfacing CH 11 from north of W2100th Avenue to south of SN 001-3303.
097-95928 Executed 06/30/2023 4 7 Fayette Replace the bridge carrying TR 178 over Steve Branch of Shobonier.
098-95930 Executed 05/23/2023 1 / 1 4 7 Wayne Resurfacing IL 161 Extension from the Marion County line to CH 12.
099-95932 Executed 06/16/2023 1 / 1 4 7 Lawrence Replace existing pipe culverts with a single span precast deck beam bridge to carry 220 East Road over a tributary to Muddy Creek.
100-97782 Executed 06/16/2023 1 / 1 5 8 Washington Replace existing structure with a single span precast, prestressed concrete deck beam bridge with approach to carry Hoover Road over Archie Creek.
101-97798 Executed 07/14/2023 1 / 1 5 8 Monroe Construct a shared-use path along Centerville Road from Main Street to Ferkel Street to Cherry in Columbia.
102-99691 Executed 06/13/2023 1 / 1 5 9 Perry Resurfacing with HMA shoulders, Aggregate Shoulders, Signage, and Guardrail upgrades along Pyatt-Cutler Road from Union school Road to IL 131127.
103-74B46 Executed 06/23/2023 4 7 Macon Patching and partial width resurfacing at 2 locations: 1) IL 105 from 0.1 miles east of 26th Street to Bender Drive in Decatur; 2) IL 121 at the Garfield overpass in Decatur.
104-68F26 Executed 06/23/2023 3 4 Peoria Shoulder reconstruction and slope stabilization along US 24, 0.7 mile North of IL 9 in Peoria County.
105-70E17 Executed 06/06/2023 3 5 McLean 10.67 Miles of Designed Overlay Resurfacing from Logan Co. Line to 1.8 Miles S. of Shirley.
106-66M45 Executed 05/30/2023 2 3 Ford This work is located on FAS Route 340 (IL 115) beginning at the intersection of IL 115 and IL 54 in Roberts (Log Mile 0.00) and ending at the intersection of IL 115 and IL 9 (Log Mile 10.57). This work consists of Class B pavement patching and related construction work. , This work is located on FAP Route 340 (IL 115) beginning at the Intersection of IL 115 and IL 54 (L.M. 0.00) and ending at the Intersection of IL 115 and IL 9 (Log Mile 10.57). This work consists of Class B Pavement patching and other related construction work.
107-62U46 Executed 05/30/2023 1 1 Cook Trombone Mast Arm Replacement at various locations in District 1.
108-62P67 Executed 06/13/2023 1 1 Will (1,300-Ft) Improvement consists of the full replacement of the existing bridge along River Road over I-80 in Troy Township in Will County, IL. Work includes pavement reconstruction, shoulder reconstruction, guardrail replacement, retaining wall construction, construction of a multi-use path, and traffic control.
109-64S14 Executed 06/06/2023 1 / 1 2 2 Stephenson Bridge painting on SN's 089-0050, 089-0061 and 089-0044.
110-74A94 Executed 06/16/2023 2 / 2 4 7 Cumberland, Shelby Routing and sealing cracks at the centerline and edge of pavement on I-57 from the Effingham County line to US 45.
111-62U37 Executed 05/30/2023 1 1 Will This improvement consists of bridge painting of structure 099-9904 on US 6/ US 52 (McDonough St) over the Des Plaines River in the city of Joliet in Will County.
112-62U52 Executed 06/02/2023 1 1 Cook, Will This contract consists of debris and litter cleaning along I-80 from I-294 (Tri-State Tollway) to I-355.
113-62R93 Executed 06/13/2023 1 1 1 Will (1.20-Mile) Designed Overlay, ADA Improvements project on IL 7/ 53, 0.1-Mile N. of Caton Farm Road to IL 7 (Theodore St) and Bridge deck overlay, expansion joints repair/ replace) on IL 7/ 53 at Rock Run Creek Tributary, located in the Cities of Crest Hill and Joliet in Will County.
114-74B54 Executed 05/19/2023 4 7 Clark, Wabash Bridge painting at various locations in Clark and Wabash Counties.
115-61J33 Executed 06/13/2023 1 1 DuPage Resurfacing Batavia Road from east of the CN Railroad tracks to IL 159 in Warrenville.
116-61J48 Executed 06/13/2023 4 / 3 1 1 1 Cook Remove and replace the bridge carrying 19th/Broadway Avenue over Silver Creek. Includes HMA approach pavement, curb and gutter, ADA improvements, storm sewer, and traffic signal improvements in Melrose Park
117-61J55 Executed 06/13/2023 3 / 3 1 1 1 Kane Curb and gutter, sidewalks, ADA ramps, pavment widening, shared path construction and parkway restoration on various routes in Elgin.
118-62N86 Executed 06/13/2023 1 1 1 Various Spot improvements at 4 (four) distinct locations. Includes: Drainage Improvements.: ditch grading and shaping/ regrading, culvert replacement, proposed V-shape gutters etc. 1) 175th St: Western Ave to Dixmoor Ave in the Village of Homewood, Cook County 2) Dixie Hwy: S. of Heather Rd to Birch Rd in the Village of Homewood, Cook Co. 3) IL 113: W. of West River Rd, Unincorporated Custer Township, Will County. 4) IL 53 at Joann Ln, Village of Woodridge, DuPage County.
119-64P59 Executed 06/13/2023 2 2 Rock Island ADA Improvements from 2nd Avenue to 5th Avenue in Rock Island.
120-64P93 Executed 06/23/2023 2 2 Whiteside Intersection Reconstruction of IL 40 at Science Ridge Road North of Sterling into a modern roundabout.
121-66J65 Executed 06/13/2023 6 / 6 3 2 3 Bureau 9.49 miles of designed overlay with bridge repairs from the Henry county Line to IL 40 on Interstate 80.
122-68666 Executed 06/13/2023 3 4 Putnam Replace structures carrying IL 89 over Clear Creek ESN 078-0025 (PSN 078-2011) and Clear Creek Tributary ESN 078-0024 (PSN 078-2012)Ù, 1.4 and 2.8 miles north of IL 18 in Putnam County.
123-68E54 Executed 06/13/2023 3 4 Fulton Headwall removal and replacement, culvert ext., and slope repair at 3 locations along IL 41 from S of Avon to N of Capp Rd.
124-68F79 Executed 06/02/2023 1 / 1 1 3 4 Peoria 1.3 miles of resurfacing with ADA improvements on IL 29 from N. of Truitt Avenue to S. of Cloverdale Road.
125-70944 Executed 06/13/2023 3 5 Champaign 6.085 Miles, 3P Policy Standard Overlay, ADA Improvements from Maplewood Dr_in Rantoul to E of Main St in Gifford. Bridge deck overlay at E Branch Salt Fork River 3 miles east of Rantoul ECL.
126-74842 Executed 05/19/2023 4 7 Clark Bridge deck replacement on SN 012-0052 carrying I-70 over Mill Creek, 5.5 miles west of IL 1.
127-74B55 Executed 05/19/2023 4 7 Macon Bridge painting at various locations in Macon County.
128-74B56 Executed 05/19/2023 4 7 Effingham, Fayette Bridge painting at various locations in Fayette and Effingham Counties.
129-76M81 Withdrawn 04/20/2023 6 / 6 5 8 Randolph 6.5 miles of designed overlay with ADA improvements on IL 13 / IL 153 from IL 4 to the Perry County line.
130-85734 Executed 06/13/2023 6 / 6 3 2 2 Whiteside Mandatory Replace the bridge carrying Dixon Avenue over Howland Creek, 2/6 miles east of Rock Falls.
131-85742 Executed 06/06/2023 2 2 Stephenson Remove existing structure and replace with a single span PPC deck beam bridge with HMA approach, and traffic barrier terminals on Cedarville Road over a Branch of Brown Creek, 3 miles southeast of Dakota.
132-87793 Executed 06/13/2023 2 3 Iroquois Remove existing structure and replace with a single span PPC deck beam bridge with aggregate approach on 1100 E Road over Branch of Prairie Creek, 2.9 miles southeast of Ashkum.
133-87836 Deleted 03/23/2023 2 3 LaSalle Resurface Chartres Street Raccuglia Drive to 24th Street in La Salle.
134-95912 Executed 05/19/2023 4 7 Macon Remove and replace two structures carrying Reas Bridge Road over lake Decatur.
135-97787 Executed 06/16/2023 1 / 1 5 8 Madison Reconstruction of clay Street from North Main Street to North Dewey Street in Troy.
136-97795 Executed 06/16/2023 5 8 St. Clair HMA resurfacing with ADA improvements on Lebanon Avenue from F Street to IL 161 in Belleville.
137-97802 Executed 06/23/2023 5 8 Washington HMA resurfacing with reflective crack control treatment on CH 10 from IL 153 to the east corporate limits of Elkton.
138-72403 Executed 05/23/2023 1 4 6 Sangamon Construction of a new parking lot and internal access road at the new IDOT District 6 Facility and Central Office Headquarters in Springfield.
139-46925 Executed 06/16/2023 2 / 2 5 9 Jackson Bituminous surface treatment on existing roads and parking lots in Burning Star State Fish and Wildlife Area.
140-60N11 Executed 06/13/2023 4 / 4 1 1 1 Lake (1.86-Mile) Roadway reconstruction and realignment; building removal and site clearing; installation of a new traffic signal; drainage improvement; cul-de- sac both north and south legs of Ivanhoe Road (existing IL 83); new signage and pavement markings; and aesthetic landscaping to IL 83 from IL 120 to IL 137 and at Atkinson Road, located in Lake County, IL.
141-64P63 Deleted 03/21/2023 2 2 Whiteside Expansion joint replacement, deck patching and concrete overlay, and other miscellaneous repairs on SN 098-0095 and 098-0096.
142-64S13 Executed 05/30/2023 2 2 Rock Island Bridge painting on SN's 081-0121, 081-0007 and 081-0008.
143-64S48 Executed 07/11/2023 2 2 Rock Island Intermittent Resurfacing on IL 92 from Turkey Hollow Rd. to IL 192.
144-68G52 Executed 05/30/2023 1 / 1 3 4 Various Bridge deck sealing at various locations within District 4.
145-72111 Executed 06/02/2023 4 6 Sangamon Painting SN 084-0143 carrying Link Road over I-72, 1.2 miles east of the New Berlin interchange.
146-74B37 Withdrawn 04/24/2023 4 7 Wabash Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel.
147-76J97 Deleted 03/23/2023 5 8 Washington 0.29 miles; Bridge replacement over Lunte Creek, 3.6 miles west of IL 127.
148-76L29 Withdrawn 05/03/2023 5 8 Marion 2.8 miles of ADA improvements on IL 161 from Beech Street to Pleasant Avenue in Centralia.
149-76N16 Withdrawn 04/20/2023 2 / 2 5 8 Madison Bridge repairs, flood wall work and pavement reconstruction on IL 111 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270.
150-76N43 Withdrawn 04/20/2023 2 / 2 5 8 Madison Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City.
151-61H93 Executed 06/23/2023 1 / 1 1 1 Cook Pavement reconstruction and streetscape improvements on Main Street from Maple Avenue to Hinman Avenue in Evanston.
152-61J39 Rejected 08/21/2023 1 / 1 1 1 1 Cook Traffic signal modernization, roadway widening, and sidewalk construction at the intersection of Milwaukee Avenue and Zenith Drive/Castilian Court in Glenview.
153-85739 Executed 06/13/2023 2 / 2 1 2 2 Winnebago Resurfacing, guardrail replacement, grading and shaping ditches, centerline and shoulder rumble strips, streetlighting on Belvidere Road from Main Street in Roscoe to IL 173
154-87814 Executed 06/23/2023 2 3 Iroquois Resurfacing CH 10 from the Ford County line to US 45.
155-89805 Executed 06/09/2023 10 / 9 2 3 4 Tazewell Roadway extension of Freedom Parkway from east of IL 8 to Cummings Lane in Washington.
156-95929 Executed 06/30/2023 4 7 Fayette Replace the bridge carrying TR 78 over Raccoon Creek, 4 miles southwest of Vandalia.
157-97747 Executed 06/16/2023 5 8 St. Clair Intersection reconstruction to add two right turn lanes at IL 3 in Sauget.
158-99681 Executed 06/16/2023 1 / 1 1 5 9 Saline Replace existing structure with a single-span PPC Deck Beam Bridge with Aggregate approaches on Tuller Road over a drainage ditch 1.6 miels south of Carrier Mills.
159-99695 Executed 06/16/2023 5 9 Williamson PCC Pavement, Curb and Gutter, sidewalk replacement, concrete median, decorative lighting, and landscaping on Park Avenue from Adams Street to Herrin Street in Herrin.
160-68G38 Executed 06/13/2023 3 4 Stark Bridge deck overlay to 088-0021 and 088-0022-0022 carrying IL 93 over West and East Fork Spoon River west of Bradford.
161-68H00 Executed 05/30/2023 3 4 Peoria Landscaping I-74 in the City of Peoria. , Landscaping on I-74 in the City of Peoria.
162-72G06 Executed 06/16/2023 4 6 Christian Bridge replacement on IL 29 over a drainage ditch approximately 1.8 miles northwest of Pana (SN 011-0013).
163-70G28 Executed 06/30/2023 1 / 1 3 5 DeWitt Bridge Joint Repair/Repair Miscellaneous Over US-150 and Norfolk S. RR and FAS 2495 North of Farmer City.
164-72136 Rejected 05/11/2023 4 6 Scott Bridge deck microsilica overlay on 4 structures on I-72 east of the Illinois River (SN 086-0040, 086-0041, 086-0042 and 086-0043).
165-72A75 Rejected 05/11/2023 4 6 Sangamon 5.1 miles of overlay on I-55 from 0.5 miles north of I-72 (Clearlake Avenue) to 0.5 miles north of Sangamon Avenue and 1.2 miles of resurfacing on IL 54 (Sangamon Avenue) from 0.3 miles west of I-55 to 0.1 miles east of Colt Road in Springfield.
166-87807 Withdrawn 04/28/2023 2 3 LaSalle Resurface Chartres Street from 24th Street to Pershing Road in LaSalle.
01A-DK063 Executed 01/03/2024 2 / 2 3 2 3 DeKalb Remove and replace a portion of the aircraft parking apron
02A-DU090 Executed 09/22/2023 1 1 1 DuPage Airport Perimeter Road Resurfacing - W. Tower Road. and DuPage Drive
03A-TR013 Executed 10/10/2023 2 2 2 Carroll Modify Aircraft Hangar Area Drainage
04A-TI001 Executed 01/26/2024 2 / 2 2 1 1 Cook Voluntary Helistop Aircraft Pavement Improvements
05A-RA018 Executed 12/21/2023 1 / 1 3 3 5 Champaign Rehabilitate Runway 18-36
06A-QI066 Executed 09/20/2023 5 / 5 2 4 6 Adams Voluntary Reconstruct Runway 4/22 (Construction: Phase 4)
07A-DU091 Executed 12/04/2023 1 1 1 DuPage Construct New Automobile Parking Lot
08A-MO007 Executed 09/28/2023 1 3 4 Warren Construct new entrance road and parking lot
09A-DU092 Rejected 07/03/2023 2 1 1 DuPage Reconfiguration of Taxiway E between Runway 15-33 and Taxiway B
10A-DI034 Executed 12/26/2023 1 2 2 Lee Rehabilitate Airport Access Road and Auto Parking
11A-PA065 Executed 10/30/2023 2 1 1 Cook Expand Airport East Quadrant General Aviation Aircraft Parking Apron
12A-ED020 Executed 04/09/2024 2 3 5 Edgar Rehabilitate Runway 9/27
13A-FL034 Executed 03/22/2024 1 / 1 1 4 7 Clay Maintain and Remark Runway 3-21 and other Airfield Pavements
14A-MV067 Executed 11/28/2023 1 5 9 Jefferson Replace Medium Intensity Taxiway Lights (MITL) on all taxiways on the airfield
15A-MV068 Executed 11/28/2023 1 5 9 Jefferson Replace High Intensity Runway Lights (HIRL) on primary runway and replace Medium Intensity Runway Lights (MIRL) on crosswind runway
16A-GR012 Executed 11/04/2023 1 / 1 1 5 8 Bond Replace existing weather observation equipment with AWOS-II equipment
17A-JA040 Executed 03/20/2024 1 4 6 Morgan Replace Medium Intensity Lights on Runway 13/31 and 4/22, All Taxiways, and Apron
18A-CI008 Executed 12/04/2023 1 5 9 Alexander Install 8' Class E Fence and Gates, Phase 4
No More Data