Home > Notice of Letting > Contract Detail

April 28, 2023 Letting 12:00 PM
06A-QI066

Bulletin Description

Reconstruct Runway 4/22 (Construction: Phase 4)
Region District DBE % VBP % Federal Project #
4 6 16.00 0.00 3170085TBD
County(s) IL Project # Airport Sponsor City
  • Adams
UIN 5051 Quincy Regional City of Quincy Quincy
Contract Specifics
A voluntary pre-bid meeting will be held on Wednesday, April 5, 2023 at 01:30 PM in the teleconference mode via phone or computer. Location Notes - This meeting will be held by teleconference only. Meeting Description - Contact Wes Ioerger at CMT (wioerger@cmtengr.com) to request an invitation and the pre-bid meeting agenda.
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
201 Calendar Days
This project is currently unfunded but actively seeking discretionary funds. 

WARNING:  FAA Buy American Preference provisions apply to this contract.  Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive.
No More Contract Specifics

Ask Subscribe Questions and Answers (5 Submitted / 5 Answered ) Questions not accepted as of April 18, 2023 04:30 PM.

  • Plan Sheet 8 shows Runway Safety Area Delineator utilizing barrels and rope. Could clarification be given as to the location/limits this will be required.
    An Addendum is forthcoming. (04/18/2023)

  • There is no Style listed for the RDR signs. They are located on the Rwy 4-22 circuit, which is getting a new 5-Step Regulator, but so is Sign GS-20 and it’s listed as a Style2. Can you verify the Style of the RDR signs?
    Runway Distance Remaining signs are Style 3. Sign GS-20 is on the Taxiway Circuit (see sheet EL101). See forthcoming Addendum A. (04/17/2023)

  • Page 167 paragraph 701-3.5-2 Placement of embedment the first sentence read brought up one foot above topod pie or to natural ground level, whichever is greater. sheet 42 of plans detail 1 shows one foot above top of pipe, due tio the depth of this pipe which is correct?
    Pipe embedment shall be as shown in the trench installation details on sheet 42 of the plans. (04/14/2023)

  • If there is not enough material(dirt, concrete pavement, asphalt millings) to build the embankment what would we do?
    If necessary, additional soil material may be obtained from the cut slopes on Runway 4/22 L & R generally between stations 114+00 and 118+00. (04/12/2023)

  • Pay Item AW 801502 18" RCP CL IV - Underpavement and Item AW 801503 24" RCP CL IV - Underpavement there isnt a section 801 in the special provisions that refers to what is required for this Item. Appears one of the runs is under Runway 4/22 is this required to be Bored and Jacked? Other run looks to be under Taxiway B can this be open cut?
    The backfill requirements are different for storm sewer installation under pavement. The AW80150# storm sewer pay items were added to differentiate between the two backfill methods (see sheet CU501). All storm sewer construction will be performed in accordance with item D-701. The new storm sewers crossing Runway 4/22 and Taxiway B are under pavements that are to be removed and reconstructed. No jack and bore storm sewer construction will be necessary. (04/11/2023)

Authorized Bidders

  • 2825 Illinois Valley Paving, a div of UCM, Inc.
    3151 Robbins Road
    Springfield, IL 62704
    P.O. Box 13420
    Springfield, IL 62791
    Phone: (217) 546-6192 Fax: (217) 546-1904 Email: IVP@ucm.biz
    Base $12,553,326.55
    Additive 1 $1,129,193.75
    Additive 2 $1,157,597.01

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AW108108 FOOT 1/C #8 5 KV UG CABLE Base items 90.000
AW108158 FOOT 1/C #8 5 KV UG CABLE IN UD Base items 3,720.000
AW108208 FOOT 2/C #8 5 KV UG CABLE Base items 1,530.000
AW108258 FOOT 2/C #8 5 KV UG CABLE IN UD Base items 480.000
AW108706 FOOT 1/C #6 COUNTERPOISE Base items 3,390.000
AW109210 L SUM VAULT MODIFICATIONS Base items 1.000
AW109332 EACH 15 KW REGULATOR, STYLE 2 Base items 1.000
AW110102 EACH DUCT MARKER - IN PAVEMENT Base items 4.000
AW110504 FOOT 4-WAY CONCRETE ENCASED DUCT Base items 940.000
AW115610 EACH ELECTRICAL HANDHOLE Base items 3.000
AW125401 EACH REPLACE LIGHT FIXTURE Base items 54.000
AW125442 EACH TAXI GUIDANCE SIGN, 2 CHARACTER Base items 1.000
AW125515 EACH HIRL, BASE MOUNTED Base items 16.000
AW125551 EACH HI THRESHOLD LIGHT BASE MTD-LED Base items 8.000
AW125561 EACH RUNWAY DISTANCE REMAINING SIGN-LED Base items 6.000
AW125565 EACH SPLICE CAN Base items 1.000
AW125901 EACH REMOVE STAKE MOUNTED LIGHT Base items 31.000
AW125902 EACH REMOVE BASE MOUNTED LIGHT Base items 26.000
AW125903 EACH REMOVE INPAVEMENT LIGHT Base items 3.000
AW125904 EACH REMOVE TAXI GUIDANCE SIGN Base items 2.000
AW125964 EACH RELOCATE TAXI GUIDANCE SIGN Base items 13.000
AW127905 L SUM REMOVE MALSR Base items 1.000
AW150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AW150520 L SUM MOBILIZATION Base items 1.000
AW150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AW150550 L SUM CONSTRUCTION ACCESS Base items 1.000
AW150552 L SUM RESTORE CONSTRUCTION ACCESS Base items 1.000
AW152419 CU YD UNCLASSIFIED DISPOSAL OFFSITE Base items 2,000.000
AW152455 CU YD EMBANKMENT IN PLACE Base items 68,800.000
AW152461 ACRE TOPSOIL STRIPPING Base items 41.000
AW154506 SQ YD GRANULAR SUBBASE - 6" Base items 19,700.000
AW156510 FOOT SILT FENCE Base items 4,000.000
AW156514 FOOT DITCH CHECK Base items 4,000.000
AW156520 EACH INLET PROTECTION Base items 19.000
AW209606 SQ YD CRUSHED AGG. BASE COURSE - 6" Base items 20,125.000
AW401010 L SUM CONTRACTOR QUALITY CONTROL PROGRAM (CQCP ) Base items 1.000
AW401610 TON BITUMINOUS SURFACE COURSE Base items 6,325.000
AW401630 EACH BITUMINOUS SURFACE TEST SECTION Base items 1.000
AW401640 SQ YD BITUMINOUS PAVEMENT GROOVING Base items 23,775.000
AW401650 SQ YD BITUMINOUS PAVEMENT MILLING Base items 36,825.000
AW403610 TON BITUMINOUS BASE COURSE Base items 4,575.000
AW403630 EACH BITUMINOUS BASE TEST SECTION Base items 1.000
AW501120 SQ YD RUBBLIZE PAVEMENT Base items 29,975.000
AW501905 SQ YD REMOVE PAVEMENT Base items 9,375.000
AW603510 GALLON BITUMINOUS TACK COAT Base items 7,100.000
AW620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 36,875.000
AW620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 6,950.000
AW701518 FOOT 18" RCP, CLASS IV Base items 2,100.000
AW701524 FOOT 24" RCP, CLASS IV Base items 660.000
AW701530 FOOT 30" RCP, CLASS IV Base items 620.000
AW701536 FOOT 36" RCP, CLASS IV Base items 30.000
AW701900 FOOT REMOVE PIPE Base items 1,650.000
AW705524 FOOT 4" PERFORATED UNDERDRAIN W/SOCK Base items 3,210.000
AW705544 FOOT 4" NON PERFORATED UNDERDRAIN Base items 360.000
AW705635 EACH UNDERDRAIN COLLECTION STRUCTURE Base items 2.000
AW705640 EACH UNDERDRAIN CLEANOUT Base items 6.000
AW705645 EACH UNDERDRAIN CONNECTION Base items 1.000
AW751410 EACH INLET Base items 6.000
AW751540 EACH MANHOLE 4' Base items 3.000
AW751550 EACH MANHOLE 5' Base items 2.000
AW751560 EACH MANHOLE 6' Base items 2.000
AW751580 EACH MANHOLE 8' Base items 1.000
AW751900 EACH REMOVE INLET Base items 9.000
AW752418 EACH PRECAST REINFORCED CONC. FES 18" Base items 1.000
AW801501 EACH SIGN BASE Base items 1.000
AW801502 FOOT 18" RCP, CLASS IV - UNDER PAVEMENT Base items 110.000
AW801503 FOOT 24" RCP, CLASS IV - UNDER PAVEMENT Base items 160.000
AW801517 L SUM ADJUST PAPI Base items 1.000
AW801518 FOOT STEEL ENCASED DUCT BANK Base items 70.000
AW901510 ACRE SEEDING Base items 41.000
AW904510 SQ YD SODDING Base items 1,500.000
AW908515 ACRE HEAVY-DUTY HYDRAULIC MULCH Base items 41.000
AX108108 FOOT 1/C #8 5 KV UG CABLE Additive 1 210.000
AX108158 FOOT 1/C #8 5 KV UG CABLE IN UD Additive 1 2,480.000
AX108208 FOOT 2/C #8 5 KV UG CABLE Additive 1 790.000
AX108258 FOOT 2/C #8 5 KV UG CABLE IN UD Additive 1 400.000
AX108706 FOOT 1/C #6 COUNTERPOISE Additive 1 2,890.000
AX110102 EACH DUCT MARKER - IN PAVEMENT Additive 1 2.000
AX110504 FOOT 4-WAY CONCRETE ENCASED DUCT Additive 1 65.000
AX125415 EACH MITL-BASE MOUNTED Additive 1 33.000
AX125442 EACH TAXI GUIDANCE SIGN, 2 CHARACTER Additive 1 1.000
AX125565 EACH SPLICE CAN Additive 1 1.000
AX154506 SQ YD GRANULAR SUBBASE - 6" Additive 1 5,900.000
AX209606 SQ YD CRUSHED AGG. BASE COURSE - 6" Additive 1 6,225.000
AX401610 TON BITUMINOUS SURFACE COURSE Additive 1 1,375.000
AX403610 TON BITUMINOUS BASE COURSE Additive 1 1,375.000
AX603510 GALLON BITUMINOUS TACK COAT Additive 1 1,825.000
AX620520 SQ FT PAVEMENT MARKING-WATERBORNE Additive 1 1,500.000
AX620525 SQ FT PAVEMENT MARKING-BLACK BORDER Additive 1 1,575.000
AX705524 FOOT 4" PERFORATED UNDERDRAIN W/SOCK Additive 1 1,810.000
AX705544 FOOT 4" NON PERFORATED UNDERDRAIN Additive 1 130.000
AX705635 EACH UNDERDRAIN COLLECTION STRUCTURE Additive 1 2.000
AX705640 EACH UNDERDRAIN CLEANOUT Additive 1 4.000
AX705645 EACH UNDERDRAIN CONNECTION Additive 1 1.000
AX904510 SQ YD SODDING Additive 1 825.000
AY110810 EACH JUNCTION BOX Additive 2 4.000
AY127450 L SUM MALSR INSTALLATION Additive 2 1.000
AY800335 L SUM MALSR THRESHOLD LIGHT BAR Additive 2 1.000
AY801504 L SUM SHELTER INSTALLATION Additive 2 1.000
AY801505 SQ YD CRUSHED ROCK PLOT Additive 2 4,475.000
AY801506 FOOT 2-1/C #4 USE, 1/C #6 BARE COPPER GROUND IN 2'' PVC CONDUIT Additive 2 600.000
AY801507 FOOT 4-1/C #4 USE, 1/C #6 BARE COPPER GR IN 2" PVC CONDUIT Additive 2 660.000
AY801508 FOOT 2-1/C #6 USE, 1/C #6 BARE COPPER GROUND IN 2" PVC CONDUIT Additive 2 450.000
AY801509 FOOT 2-1/C #8 USE, 1/C #6 BARE COPPER GROUND IN 2" PVC CONDUIT Additive 2 530.000
AY801510 FOOT 4-1/C #4/0 USE, 1/C #2 BARE COPPER GROUND IN 3" PVC CONDUIT Additive 2 1,110.000
AY801511 FOOT 3-1/C #2/0 USE, 1/C #2 BARE COPPER GROUND IN 2-1/2" PVC CONDUIT Additive 2 590.000
AY801512 FOOT 3-1/C #2 USE, 1/C #6 BARE COPPER GROUND IN 2" PVC CONDUIT Additive 2 1,370.000
AY801513 FOOT 3-1/C #4 USE, 1/C #6 BARE COPPER GROUND IN 2" PVC CONDUIT Additive 2 770.000
AY801514 FOOT #1/0 BARE COPPER GUARD WIRE Additive 2 4,270.000
AY801515 FOOT 6 PAIR FLASHER CONTROL CABLE IN 2" PVC CONDUIT Additive 2 2,130.000
AY801516 EACH MALSR HANDHOLE Additive 2 6.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.