Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 3 | 7.00 | 0.00 | 317SBGPTBD |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
DKB 4924 | DeKalb Taylor Municipal | City of DeKalb | DeKalb |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
47 Calendar Days |
WARNING: FAA Buy American Preference provisions apply to this contract. Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive. |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 850.000 | |||
AR152480 | SQ YD | SHOULDER ADJUSTMENT | Base items | 600.000 | |||
AR208515 | CU YD | POROUS GRANULAR EMBANKMENT | Base items | 225.000 | |||
AR209606 | SQ YD | CRUSHED AGG. BASE COURSE - 6" | Base items | 5,350.000 | |||
AR401610 | TON | BITUMINOUS SURFACE COURSE | Base items | 50.000 | |||
AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 5,300.000 | |||
AR403610 | TON | BITUMINOUS BASE COURSE | Base items | 250.000 | |||
AR501510 | SQ YD | 10" PCC PAVEMENT | Base items | 4,950.000 | |||
AR501530 | EACH | PCC TEST BATCH | Base items | 1.000 | |||
AR501900 | SQ YD | REMOVE PCC PAVEMENT | Base items | 35.000 | |||
AR510900 | EACH | REMOVE TIE DOWN | Base items | 7.000 | |||
AR510901 | EACH | REMOVE TIE DOWN-TYPE A | Base items | 5.000 | |||
AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 110.000 | |||
AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 80.000 | |||
AR620900 | SQ FT | PAVEMENT MARKING REMOVAL | Base items | 1,450.000 | |||
AR705526 | FOOT | 6" PERFORATED UNDERDRAIN W/SOCK | Base items | 1,250.000 | |||
AR705610 | EACH | CONCRETE HEADWALL FOR UNDERDRAIN | Base items | 1.000 | |||
AR705640 | EACH | UNDERDRAIN CLEANOUT | Base items | 8.000 | |||
AR705900 | FOOT | REMOVE UNDERDRAIN | Base items | 100.000 | |||
AR705904 | EACH | REMOVE UNDERDRAIN CLEANOUT | Base items | 2.000 | |||
AR901510 | ACRE | SEEDING | Base items | 0.150 | |||
AR908515 | ACRE | HEAVY-DUTY HYDRAULIC MULCH | Base items | 0.150 | |||
No More Pay Items |