Home > Notice of Letting > Contract Detail

April 28, 2023 Letting 12:00 PM
135-97787

Bulletin Description

Reconstruction of clay Street from North Main Street to North Dewey Street in Troy.
Region District DBE % VBP % Federal Project #
5 8 20.00 0.00 WWA3(248)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Madison
  • MUN 1070
  • CLAY STREET
  • 17-00031-01-PV (TROY)
  • C-98-004-21
  • 8-10667-0000
  • 8-10667-0010
Contract Specifics
95 Working Days
Previously advertised on January 20, 2023 (Item 129).
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of April 18, 2023 04:30 PM.

  • Special provisions page 4 includes a section on delayed start for the project. Are these utilities relocations mentioned in the delayed start clause completed or will the contract still be delayed due to these utilities?
    The utility relocations mentioned in the delayed start clause on page 4 will be completed by next week. A delayed start is no longer expected. (04/18/2023)

Authorized Bidders

  • 0338 Baxmeyer Construction, Inc.
    1034 Floraville Road
    Waterloo, IL 62298
    Phone: (618) 939-3000 Fax: (618) 939-4299 Email: estimator@baxmeyerconstruction.com
    $1,536,287.77

  • 1487 DMS Contracting, Inc.
    10243 Fuesser Road
    Mascoutah, IL 62258
    PO Box 122
    Mascoutah, IL 62258
    Phone: (618) 566-9114 Fax: (618) 566-3145 Email: estimating@dmscontracting.com
    $1,549,201.23

  • 2308 Hank's Excavating & Landscaping, Inc.
    5825 West State Route 161
    Belleville, IL 62223
    Phone: (618) 398-5556 Fax: (618) 398-2729 Email: No Record

  • 3108 Keller Construction, Inc.
    22 Illini Drive
    Glen Carbon, IL 62034
    Phone: (618) 656-0033 Fax: (618) 656-7134 Email: dan.walker@kellerconstruction.com

  • 3163 Kinney Contractors, Inc.
    19342 E. Frontage Rd.
    Raymond, IL 62560
    Phone: (217) 229-3322 Fax: (217) 229-3609 Email: kinney@roadbuilder.net

  • 5802 Stutz Excavating, Inc.
    3837 Fosterburg Road
    Alton, IL 62002
    Phone: (618) 259-2485 Fax: (618) 259-2465 Email: No Record
    $1,656,250.80

  • 3157 The Kilian Corporation
    608 South Independence Street
    Mascoutah, IL 62258
    P.O. Box A
    Mascoutah, IL 62258
    Phone: (618) 566-2000 Fax: (618) 566-2314 Email: sharon.weier@kiliancorp.com

Non Bidders

  • 1034 Christ Bros. Asphalt, Inc.
    820 s fritz st.
    P.O. Box 158
    Lebanon, IL 62254
    Phone: (618) 537-6174 Fax: (618) 537-6199 Email: No Record

Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 24.000
20200100 CU YD EARTH EXCAVATION Base items 3,870.000
20201200 CU YD REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL Base items 43.000
20800150 CU YD TRENCH BACKFILL Base items 717.000
21101615 SQ YD TOPSOIL FURNISH AND PLACE, 4" Base items 2,420.000
25000100 ACRE SEEDING, CLASS 1 Base items 0.500
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 46.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 46.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 46.000
25100115 ACRE MULCH, METHOD 2 Base items 0.500
25100630 SQ YD EROSION CONTROL BLANKET Base items 729.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 50.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 111.000
28000500 EACH INLET AND PIPE PROTECTION Base items 44.000
31100100 TON SUBBASE GRANULAR MATERIAL, TYPE A Base items 2,903.000
35100300 SQ YD AGGREGATE BASE COURSE, TYPE A 4" Base items 651.000
40201000 TON AGGREGATE FOR TEMPORARY ACCESS Base items 201.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 2,939.000
40603085 TON HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70 Base items 1,097.000
40604052 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 Base items 731.000
42300200 SQ YD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH Base items 651.000
42400100 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH Base items 15,526.000
42400800 SQ FT DETECTABLE WARNINGS Base items 312.000
44000100 SQ YD PAVEMENT REMOVAL Base items 195.000
44000200 SQ YD DRIVEWAY PAVEMENT REMOVAL Base items 514.000
44000300 FOOT CURB REMOVAL Base items 12.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 1,204.000
44000600 SQ FT SIDEWALK REMOVAL Base items 7,431.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 133.000
54210182 EACH PIPE ELBOW, 12" Base items 1.000
54213663 EACH PRECAST REINFORCED CONCRETE FLARED END SECTIONS 18" Base items 1.000
54248510 CU YD CONCRETE COLLAR Base items 0.900
550A0340 FOOT STORM SEWERS, CLASS A, TYPE 2 12" Base items 1,387.000
550A0380 FOOT STORM SEWERS, CLASS A, TYPE 2 18" Base items 307.000
550A0410 FOOT STORM SEWERS, CLASS A, TYPE 2 24" Base items 22.000
55100300 FOOT STORM SEWER REMOVAL 8" Base items 76.000
55100500 FOOT STORM SEWER REMOVAL 12" Base items 92.000
55100700 FOOT STORM SEWER REMOVAL 15" Base items 87.000
55101200 FOOT STORM SEWER REMOVAL 24" Base items 45.000
60100905 FOOT PIPE DRAINS 4" Base items 78.000
60218500 EACH MANHOLES, TYPE A, 4'-DIAMETER, TYPE 3 FRAME AND GRATE Base items 2.000
60219540 EACH MANHOLES, TYPE A, 4'-DIAMETER, TYPE 24 FRAME AND GRATE Base items 2.000
60235700 EACH INLETS, TYPE A, TYPE 3 FRAME AND GRATE Base items 1.000
60236200 EACH INLETS, TYPE A, TYPE 8 GRATE Base items 7.000
60237460 EACH INLETS, TYPE A, TYPE 23 FRAME AND GRATE Base items 2.000
60237470 EACH INLETS, TYPE A, TYPE 24 FRAME AND GRATE Base items 5.000
60240220 EACH INLETS, TYPE B, TYPE 3 FRAME AND GRATE Base items 3.000
60240327 EACH INLETS, TYPE B, TYPE 23 FRAME AND GRATE Base items 7.000
60240328 EACH INLETS, TYPE B, TYPE 24 FRAME AND GRATE Base items 8.000
60255500 EACH MANHOLES TO BE ADJUSTED Base items 6.000
60260100 EACH INLETS TO BE ADJUSTED Base items 2.000
60265700 EACH VALVE VAULTS TO BE ADJUSTED Base items 11.000
60500060 EACH REMOVING INLETS Base items 5.000
60600605 FOOT CONCRETE CURB, TYPE B Base items 35.000
60604400 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18 Base items 1,002.000
60605000 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 Base items 2,704.000
67100100 L SUM MOBILIZATION Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 203.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 68.000
70300221 FOOT TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT Base items 5,828.000
70300281 FOOT TEMPORARY PAVEMENT MARKING - LINE 24"- PAINT Base items 871.000
72000100 SQ FT SIGN PANEL - TYPE 1 Base items 136.000
72400100 EACH REMOVE SIGN PANEL ASSEMBLY - TYPE A Base items 18.000
72800100 FOOT TELESCOPING STEEL SIGN SUPPORT Base items 324.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 5,828.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 871.000
78300201 SQ FT PAVEMENT MARKING REMOVAL - GRINDING Base items 860.000
X0323389 EACH STORM SEWER CONNECTION Base items 10.000
X0325405 CU YD FILL EXISTING STORM SEWERS Base items 2.000
X0327235 FOOT LOCATING UNDERGROUND UTILITIES Base items 176.000
X1200108 EACH INLET BOX (SPECIAL) Base items 7.000
X1700067 SQ FT STAMPED COLORED PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH Base items 896.000
X6026634 EACH METER VAULTS TO BE ADJUSTED Base items 2.000
X6040171 EACH GRATES (SPECIAL) Base items 1.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
X7240300 EACH SIGN REMOVAL Base items 4.000
Z0004518 SQ YD HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 5" Base items 213.000
Z0056668 FOOT STORM SEWERS, TYPE 2, WATER MAIN QUALITY PIPE, 12" Base items 533.000
Z0056670 FOOT STORM SEWERS, TYPE 2, WATER MAIN QUALITY PIPE, 18" Base items 54.000
Z0076600 HOUR TRAINEES Base items 500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items