Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
5 | 9 | 1.00 | 0.00 | 317SBGPTBD |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
MVN 4951 | Mt. Vernon | Mt. Vernon Airport Authority | Mt. Vernon |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
85 Calendar Days |
Previously advertised on August 05, 2022 (Item 13A); June 17, 2022 (Item 09A). |
This project is currently unfunded but actively seeking discretionary funds. WARNING: FAA Buy American Preference provisions apply to this contract. Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive. |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR108108 | FOOT | 1/C #8 5 KV UG CABLE | Base items | 31,150.000 | |||
AR109200 | L SUM | INSTALL ELECTRICAL EQUIPMENT | Base items | 1.000 | |||
AR110012 | FOOT | 2" DIRECTIONAL BORE | Base items | 2,400.000 | |||
AR110202 | FOOT | 2" PVC DUCT, DIRECT BURY | Base items | 24,600.000 | |||
AR115610 | EACH | ELECTRICAL HANDHOLE | Base items | 6.000 | |||
AR125400 | EACH | REPLACE ISOLATION TRANSFORMER | Base items | 15.000 | |||
AR125511 | EACH | MIRL, BASE MOUNTED-LED | Base items | 28.000 | |||
AR125512 | EACH | MIRL, INPAVEMENT | Base items | 1.000 | |||
AR125515 | EACH | HIRL, BASE MOUNTED | Base items | 59.000 | |||
AR125525 | EACH | HIRL, INPAVEMENT | Base items | 5.000 | |||
AR125546 | EACH | MI THRESHOLD LIGHT BASE MTD-LED | Base items | 16.000 | |||
AR125550 | EACH | HI THRESHOLD LIGHT BASE MTD | Base items | 22.000 | |||
AR125565 | EACH | SPLICE CAN | Base items | 43.000 | |||
AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AR150530 | L SUM | TRAFFIC MAINTENANCE | Base items | 1.000 | |||
AR800476 | L SUM | REMOVE AIRFIELD LIGHTING | Base items | 1.000 | |||
No More Pay Items |