Home > Notice of Letting > Contract Detail

April 28, 2023 Letting 12:00 PM
028-68H13

Bulletin Description

Centerline joint repair on IL 8/US 150 (Washington/Camp Streets) from east of Main Street to east of Rosedale Street in East Peoria in Tazewell County.
Region District DBE % VBP % Federal Project #
3 4 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Tazewell
  • FAP 399
  • IL 8/ US 150
  • 50-I-2;(36,37)I-4
  • C-94-051-22
  • 0-02177-4011
Contract Specifics
25 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of April 18, 2023 04:30 PM.

Authorized Bidders

  • 0674 Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company
    13940 St. Charles Rock Road
    Bridgeton, MO 63044
    Phone: (314) 989-9001 Fax: (314) 567-1828 Email: NRuholl@byrneandjones.com
    $355,407.87

  • 0031 A. C. Pavement Striping Co.
    695 Church Road
    Elgin, IL 60123
    Phone: (847) 214-9500 Fax: (847) 214-9078 Email: wbrinati@acpavement.net
    $533,344.16

Non Bidders

  • 5672 Stark Excavating, Inc.
    (Pending Authorization)
    1805 W Washington St.
    Bloomington, IL 61701
    Phone: (309) 828-5034 Fax: (309) 829-3897 Email: estimating@starkcompanies.com

Pay Item # UOM Description Type Quantity Unit Price
40400001 FOOT FIBER-MODIFIED ASPHALT CRACK SEALING Base items 14,157.000
40400118 SQ YD MICRO-SURFACING, SINGLE PASS Base items 7,982.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 6,229.000
40600400 TON MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS Base items 30.000
67100100 L SUM MOBILIZATION Base items 1.000
70102632 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701602 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 21.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 18,303.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 5,853.000
78009000 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 2,372.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 20,958.000
78009006 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 6" Base items 4,916.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 8,198.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 538.000
78009024 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24" Base items 506.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 401.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 401.000
78300202 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 8,230.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.