Home > Notice of Letting > Contract Detail

April 28, 2023 Letting 12:00 PM
14A-MV067

Bulletin Description

Replace Medium Intensity Taxiway Lights (MITL) on all taxiways on the airfield
Region District DBE % VBP % Federal Project #
5 9 3.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Jefferson
MVN 4950 Mt. Vernon Mt. Vernon Airport Authority Mt. Vernon
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
120 Calendar Days
Previously advertised on August 05, 2022 (Item 12A); June 17, 2022 (Item 08A).
This project is currently unfunded but actively seeking discretionary funds. 

WARNING:  FAA Buy American Preference provisions apply to this contract.  Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive.
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of April 18, 2023 04:30 PM.

Authorized Bidders

  • 0644 Brown Electric, Inc.
    437 Route 37
    Goreville, IL 62939
    PO Box 220
    Goreville, IL 62939
    Phone: (618) 995-2870 Fax: (618) 995-2506 Email: No Record
    $1,491,803.61

  • 1630 J. F. Edwards Construction Company
    220 SOUTH CHICAGO STREET
    Geneseo, IL 61254
    220 S Chicago St
    Geneseo, IL 61254
    Phone: (309) 944-4681 Fax: No Record Email: kelliott@jfecc.net
    $1,755,815.04

  • 3011 J. Ranck Electric, Inc.
    1993 Gover Parkway
    MT. Pleasant, MI 48858
    Phone: (989) 775-7393 Fax: (989) 775-7393 Email: ajranck@jranck.com
    $1,934,853.75

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR108108 FOOT 1/C #8 5 KV UG CABLE Base items 18,950.000
AR108158 FOOT 1/C #8 5 KV UG CABLE IN UD Base items 32,725.000
AR109200 L SUM INSTALL ELECTRICAL EQUIPMENT Base items 1.000
AR110012 FOOT 2" DIRECTIONAL BORE Base items 4,950.000
AR110202 FOOT 2" PVC DUCT, DIRECT BURY Base items 1,180.000
AR110506 FOOT 6-WAY CONCRETE ENCASED DUCT Base items 1,150.000
AR115610 EACH ELECTRICAL HANDHOLE Base items 9.000
AR125400 EACH REPLACE ISOLATION TRANSFORMER Base items 27.000
AR125411 EACH MITL-STAKE MOUNTED-LED Base items 316.000
AR125416 EACH MITL-BASE MOUNTED-LED Base items 66.000
AR125565 EACH SPLICE CAN Base items 12.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR800476 L SUM REMOVE AIRFIELD LIGHTING Base items 1.000
AR800545 EACH MITL-BASE MOUNTED SIZE D Base items 16.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.