Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
3 | 5 | 3.00 | 0.00 | N/A |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
CMI 5043 | University of Illinois-Willard | University of Illinois | Savoy |
Contract Specifics |
---|
A voluntary pre-bid meeting will be held on Monday, February 24, 2025 at 10:00 AM in the Willard Airport Terminal Building at 11 Airport Road, Savoy, IL 62874. Location Notes - Meeting will be held in the conference room on the second floor, left of the stairs. Meeting Description - For engineering information, contact Chris Groth 217-572-1101. |
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
54 Calendar Days |
Previously advertised on November 08, 2024 (Item 07A). |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AR401610 | TON | BITUMINOUS SURFACE COURSE | Base items | 190.000 | |||
AR401650 | SQ YD | BITUMINOUS PAVEMENT MILLING | Base items | 1,275.000 | |||
AR401655 | SQ YD | BUTT JOINT CONSTRUCTION | Base items | 350.000 | |||
AR501509 | SQ YD | 9" PCC PAVEMENT | Base items | 1,800.000 | |||
AR501510 | SQ YD | 10" PCC PAVEMENT | Base items | 625.000 | |||
AR501530 | EACH | PCC TEST BATCH | Base items | 1.000 | |||
AR501900 | SQ YD | REMOVE PCC PAVEMENT | Base items | 2,425.000 | |||
AR501922 | SQ FT | PCC SPALL REPAIR | Base items | 60.000 | |||
AR510901 | EACH | REMOVE TIE DOWN-TYPE A | Base items | 9.000 | |||
AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 250.000 | |||
AR620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Base items | 2,375.000 | |||
AS150520 | L SUM | MOBILIZATION | Additive 1 | 1.000 | |||
AS501510 | SQ YD | 10" PCC PAVEMENT | Additive 1 | 400.000 | |||
AS501900 | SQ YD | REMOVE PCC PAVEMENT | Additive 1 | 400.000 | |||
AT150520 | L SUM | MOBILIZATION | Additive 2 | 1.000 | |||
AT501510 | SQ YD | 10" PCC PAVEMENT | Additive 2 | 150.000 | |||
AT501900 | SQ YD | REMOVE PCC PAVEMENT | Additive 2 | 150.000 | |||
AU501922 | SQ FT | PCC SPALL REPAIR | Additive 3 | 160.000 | |||
AU510511 | EACH | TIE DOWN-TYPE A | Additive 3 | 9.000 | |||
AU605510 | FOOT | JOINT SEALING FILLER | Additive 3 | 11,800.000 | |||
No More Pay Items |