Home > Notice of Letting > Contract Detail

March 07, 2025 Letting 12:00 PM
06A-ED022

Bulletin Description

Install Primary Windcone on Airfield and Supplemental Windcones on Each Runway End
Region District DBE % VBP % Federal Project #
3 5 0.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Edgar
PRG 5189 Edgar County County of Edgar Paris
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
30 Calendar Days

WARNING:  FAA Buy American Preference provisions apply to this contract.  Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive.

No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of February 25, 2025 04:30 PM.

Authorized Bidders

  • 0936 Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC
    1414 W. Anthony Drive
    Urbana, IL 61802
    PO Box 1730
    Champaign, IL 61824
    Phone: (217) 356-2518 Fax: (217) 356-1539 Email: kyleb@champaignasphalt.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR107508 EACH L-806 W C 8' INTERNALLY LIT Base items 4.000
AR107812 EACH L-807 W C-12' INTERNALLY LIT Base items 1.000
AR107901 L.S. REMOVE WIND TEE Base items 1.000
AR108088 FOOT 1/C #8 XLP-USE Base items 3,000.000
AR108108 FOOT 1/C #8 5 KV UG CABLE Base items 2,400.000
AR109200 L SUM INSTALL ELECTRICAL EQUIPMENT Base items 1.000
AR110202 FOOT 2" PVC DUCT, DIRECT BURY Base items 1,500.000
AR125565 EACH SPLICE CAN Base items 4.000
AR150520 L SUM MOBILIZATION Base items 1.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.