September 20, 2019 Letting 10:00 AM
02A-TR010

Bulletin Description

Install Precision Approach Path Indicator (PAPI) Units at Both Runway Ends
Region District DBE % VBP % Federal Project #
2 2 2.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Carroll
SFY 4668 Tri-Township Tri-Township Airport Authority Savanna
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
31 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of September 10, 2019 04:30 PM.

Authorized Bidders

  • 6037 Tri-City Electric Company of Iowa
    6225 N. Brady Street
    Davenport, IA 52806
    Phone: (563) 322-7181 Fax: (563) 322-1643 Email: No Record
    $194,377.25

  • 0972 William Charles Construction Co, LLC (d/b/a) William Charles Electric
    833 Featherstone Road
    Rockford, IL 61107
    P.O. Box 2071
    Loves Park, IL 61130
    Phone: (815) 877-0550 Fax: (815) 637-9123 Email: estimating@williamcharlesconstruction.com
    $255,743.05

Non Bidders

  • 9026 Avlite
    61 Business Park Drive
    Tilton, NH 03106
    Phone: (603) 737-1325 Fax: (603) 737-1320 Email: No Record

Pay Item # UOM Description Type Quantity Unit Price
AR108258 FOOT 2/C #8 5 KV UG CABLE IN UD Base items 4,204.000
AR108706 FOOT 1/C #6 COUNTERPOISE Base items 3,545.000
AR109200 L SUM INSTALL ELECTRICAL EQUIPMENT Base items 1.000
AR109302 EACH 4 KW REGULATOR, STYLE 2 Base items 1.000
AR109903 EACH REMOVE REGULATOR Base items 1.000
AR110014 FOOT 4" DIRECTIONAL BORE Base items 530.000
AR115610 EACH ELECTRICAL HANDHOLE Base items 1.000
AR125565 EACH SPLICE CAN Base items 1.000
AR125620 EACH ABBREVIATED PAPI (L-881 SYSTEM) Base items 2.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR152410 CU YD UNCLASSIFIED EXCAVATION Base items 32.000
AR800985 EACH FIELD LIGHTNING ARRESTOR Base items 6.000
AR901510 ACRE SEEDING Base items 0.100
AR905520 CU YD TOPSOILING (FROM OFF SITE) Base items 20.000
AR908510 ACRE MULCHING Base items 0.100
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.