Home > Notice of Letting > Contract Detail

June 13, 2025 Letting 12:00 PM
151-78B05

Plans and Special Provisions are not available at this time

Bulletin Description

Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale.
Region District DBE % VBP % Federal Project #
5 9 Pending Pending N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Jackson
  • FAP 331
  • IL 149/IL 13
  • D9 TRAFFIC SIGNAL 2025-1
  • C-99-038-25
  • 0-02179-9011
Contract Specifics
15 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of June 03, 2025 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
This list of pay items is subject to change until the Plans and Special Provisions have been published.
Pay Item # UOM Description Type Quantity Unit Price
67100100 L SUM MOBILIZATION Base items 1.000
70102630 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701601 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70102640 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 28.000
81028350 FOOT UNDERGROUND CONDUIT, PVC, 2" DIA. Base items 65.000
81028390 FOOT UNDERGROUND CONDUIT, PVC, 4" DIA. Base items 420.000
87301900 FOOT ELECTRIC CABLE IN CONDUIT, EQUIPMENT GROUNDING CONDUCTOR, NO. 6 1C Base items 6,485.000
87900200 EACH DRILL EXISTING HANDHOLE Base items 14.000
XP000179 EACH GROUND ROD, 8', COPPER CLAD Base items 68.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.