Home > Notice of Letting > Contract Detail

March 10, 2023 Letting 12:00 PM
058-62R68

Bulletin Description

(575-Ft) Improvements consist of bridge joint replace/repairs of structure carrying Arsenal Road (SN 099-3392) over BNSF Railroad and Jackson Creek in the Village of Elwood, Will County.
Region District DBE % VBP % Federal Project #
1 1 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Will
  • FAP 532
  • ARSENAL ROAD
  • FAP 532 22 BRIDGE
  • C-91-218-22
  • 0-02177-1003
Contract Specifics
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of February 28, 2023 04:30 PM.

  • The proposed Impact Attenuator – Item 64300370 – appears to be the wrong pay item. It seems that the intent is for a Temporary Attenuator. Please advise if it is the intent to install temporary attenuators, that will be removed at the end of the contract.
    The Department is in the process of issuing an addendum, please monitor the website for the addendum. (03/01/2023)

Authorized Bidders

  • 1750 P. T. Ferro Construction Co.
    700 South Rowell Ave.
    Joliet, IL 60433
    P.O. Box 156
    Joliet, IL 60434
    Phone: (815) 726-6284 Fax: (815) 726-5614 Email: estimating@ptferro.com
    $258,286.80

  • 0204 Areatha Construction Co., Inc.
    410 E. North Avenue
    Streamwood, IL 60107
    Phone: (630) 830-9853 Fax: (630) 830-9856 Email: areathaconstco@sbcglobal.net
    $314,106.23

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com
    $316,570.00

  • 1552 Dunnet Bay Construction Company
    115 N. Brandon Drive
    Glendale Heights, IL 60139
    Phone: (630) 539-1200 Fax: (630) 539-4171 Email: estimating@dunnetbay.net

  • 2520 HERLIHY MID-CONTINENT COMPANY
    1306 MARQUETTE DRIVE
    ROMEOVILLE, IL 60446
    Phone: (630) 378-1000 Fax: (630) 378-1002 Email: becky@hmcco.net
    $290,214.00

  • 3505 Lorig Construction Company
    250 East Touhy Avenue
    Des Plaines, IL 60018
    Phone: (847) 298-0360 Fax: (847) 298-2689 Email: estimating@lorigconstruction.com
    $322,198.50

  • 3574 MYS, Incorporated
    12416 S. Harlem Ave
    Palos Heights, IL 60463
    Phone: (708) 448-0983 Fax: (708) 448-8098 Email: tyelnick@mysincorporated.com

  • 4677 Path Construction Company, Inc.
    125 E. Algonquin Road
    Arlington Heights, IL 60005
    Phone: (847) 997-9147 Fax: (847) 398-7101 Email: PSowa@pathcc.com
    $309,029.80

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
50102400 CU YD CONCRETE REMOVAL Base items 10.400
50157300 SQ YD PROTECTIVE SHIELD Base items 176.000
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 10.400
50300300 SQ YD PROTECTIVE COAT Base items 70.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 1,450.000
50800515 EACH BAR SPLICERS Base items 14.000
52000110 FOOT PREFORMED JOINT STRIP SEAL Base items 162.000
67100100 L SUM MOBILIZATION Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 60.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 7,680.000
70307120 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE Base items 23,040.000
70400100 FOOT TEMPORARY CONCRETE BARRIER Base items 1,125.000
70400125 EACH PINNING TEMPORARY CONCRETE BARRIER Base items 25.000
70400200 FOOT RELOCATE TEMPORARY CONCRETE BARRIER Base items 1,125.000
70600260 EACH IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 2.000
70600327 EACH IMPACT ATTENUATORS, RELOCATE (FULLY REDIRECTIVE, WIDE), TEST LEVEL 3 Base items 2.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 2,600.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 350.000
78100300 EACH REPLACEMENT REFLECTOR Base items 50.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 50.000
78300202 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 1,350.000
X6700407 CAL MO ENGINEER'S FIELD OFFICE, TYPE A (D1) Base items 6.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 51.400
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.