March 11, 2022 Letting 12:00 PM
031-64R33

Bulletin Description

Approach pavement repair and resurfacing on SN 071-0015.
Region District DBE % VBP % Federal Project #
2 2 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Ogle
  • FAP 17A
  • (102BR)RS
  • C-92-006-22
  • 0-02176-2011
Contract Specifics
25 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (6 Submitted / 6 Answered ) Questions not accepted as of March 01, 2022 04:30 PM.

  • Please confirm you want N90 HMA Surface and not N50
    The project should be bid according to the plans and specifications available online. (03/02/2022)

  • In Pre Stage Phase 1 & 2 the plans call out for installing a 8" HMA Shoulder. Is the intent to then remove 2 3/4" of the 8" shoulder and overlay with Binder and Surface?
    An addendum will be issued to address this. (02/23/2022)

  • On sheet 10 of 13 "Pavement Removal Plan" it calls out for removal of 2 3/4" of existing pavement but there is no pay item for 2 3/4" milling./removal. There also is not pay item for Bit Mat Tack Coat. Will the tack coat be incidental?
    An addendum will be issued to address this. (02/23/2022)

  • On sheet 2 of 13 under the Pre Stage MOT Sequencing the plans call for HMA Shoulders 8". This item also shows up on sheet 5 of 9 "Replace with HMA in accordance with IDOT Standard 482006. Cost included in item "HMA Shoulders, 8". There is no pay item for this HMA Shoulders 8" in the SOQ.
    An addendum will be issued to address this. (02/23/2022)

  • Pre-Stage Phase 1 Sta 588+20-589+50 Rt & Lt and Sta 589+95-59140 Rt & Lt - Mill existing shoulder 8" and Replace with HMA Shoulder 8", Does the pay item HMA Shoulder 8" need to be added?
    An addendum will be issued to address this. (02/23/2022)

  • Mix Table has N50 FG. Pay item has N50 Surface. what do you want?
    The Summary of Quantities is correct. (02/17/2022)

Authorized Bidders

  • 3706 Martin & Company Excavating
    2456 E. Pleasant Grove Road
    Oregon, IL 61061
    P.O. Box 443
    Oregon, IL 61061
    Phone: (815) 732-2422 Fax: (815) 732-2092 Email: info@martincoinc.net
    $238,026.66

  • 0103 Alliance Contractors, Inc.
    1166 Lake Avenue
    Woodstock, IL 60098
    Phone: (815) 338-5900 Fax: (815) 338-9109 Email: estimating@alliancecontractors.com
    $281,172.64

  • 1045 Civil Constructors, Inc. d/b/a/ Helm Civil
    2283 Bus Hwy 20 East
    Freeport, IL 61032
    PO Box 750
    Freeport, IL 61032
    Phone: (815) 235-2200 Fax: (815) 235-2219 Email: civilestimating@helmgroup.com
    $263,165.11

  • 3702 Martam Construction Incorporated
    1200 Gasket Dr
    Elgin, IL 60120
    Phone: (847) 608-6800 Fax: (847) 608-6804 Email: No Record
    $316,210.40

  • 5570 Sjostrom & Sons, Inc.
    1129 Harrison Ave.
    Rockford, IL 61104
    Phone: (815) 226-0330 Fax: (815) 226-8868 Email: heavyhighway@sjostromconstruction.com
    $283,817.40

Non Bidders

  • 1305 Curran Contracting Company
    286 Memorial Court
    Crystal Lake, IL 60014
    Phone: (815) 455-5100 Fax: (815) 455-7894 Email: estimating@currancontracting.com

Pay Item # UOM Description Type Quantity Unit Price
20200600 UNIT EXCAVATING AND GRADING EXISTING SHOULDER Base items 5.200
40602978 TON HOT-MIX ASPHALT BINDER COURSE, IL- 9.5, N50 Base items 30.000
40604064 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N90 Base items 36.000
44000160 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4" Base items 427.000
48203029 SQ YD HOT-MIX ASPHALT SHOULDERS, 8" Base items 482.000
50300225 CU YD CONCRETE STRUCTURES Base items 4.200
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 79.800
50300300 SQ YD PROTECTIVE COAT Base items 188.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 16,080.000
50800515 EACH BAR SPLICERS Base items 59.000
67100100 L SUM MOBILIZATION Base items 1.000
70100405 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701321 Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100500 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701326 Base items 1.000
70103815 CAL DA TRAFFIC CONTROL SURVEILLANCE Base items 14.000
70106500 EACH TEMPORARY BRIDGE TRAFFIC SIGNALS Base items 1.000
70107006 FOOT PAVEMENT MARKING BLACKOUT TAPE, 6" Base items 640.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 996.000
70307120 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE Base items 1,880.000
70307210 FOOT TEMPORARY PAVEMENT MARKING - LINE 24"- TYPE IV TAPE Base items 24.000
70400100 FOOT TEMPORARY CONCRETE BARRIER Base items 500.000
70400200 FOOT RELOCATE TEMPORARY CONCRETE BARRIER Base items 500.000
70600250 EACH IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3 Base items 2.000
70600350 EACH IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE), TEST LEVEL 3 Base items 2.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 720.000
78200005 EACH GUARDRAIL REFLECTORS, TYPE A Base items 30.000
Z0004552 SQ YD APPROACH SLAB REMOVAL Base items 188.000
No More Pay Items