001-62B87
|
Executed
|
04/20/2022
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(1,284-Ft) Bridge girders cleaning and painting of the Ida B. Wells Drive (formerly: Congress Parkway) viaduct in the City of Chicago along I-290 Expressway.
|
002-62G72
|
Executed
|
04/04/2022
|
3 / 3 |
|
1
|
1
|
Cook
|
|
(4,591-Ft) Standard Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK etc. Central Avenue from Devon Ave to Elston Ave in the City of Chicago.
|
003-62J65
|
Executed
|
04/14/2022
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
This project consists of Standard Overlay along Franklin Street from Cermak Road to 1-90 for a total length of 4280.1 ft (.81 Miles) in the City of Chicago
|
004-62L90
|
Executed
|
04/04/2022
|
4 / 4 |
2 |
1
|
1
|
Kane
|
|
(1.017-Mile) SMART Overlay and Drainage on US 20 (Grant Hwy) from McHenry County Line to I-90 (Jane Addams Memorial Tollway) in the Village of Hampshire.
|
005-62M44
|
Executed
|
04/05/2022
|
4 / 4 |
|
1
|
1
|
Cook
|
|
(1.51-Mile) Standard overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA improvements and thermoplastic pavement marking on Ogden Avenue from Kedzie Avenue to Taylor Street in the City of Chicago.
|
006-62M45
|
Executed
|
04/04/2022
|
|
|
1
|
1
|
Cook, Lake
|
|
(1.830-Mile) Designed Overlay improvement along Lake-Cook Road from Ela Road to Rue Touraine in the Villages of Deer Park and Lake Zurich.
|
007-62M47
|
Executed
|
04/04/2022
|
|
1 |
1
|
1
|
Cook, Lake
|
|
(2.60-Mile) Designed Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements, PMK. FAP 1270: Main Street from West of Hart Rd to Ela Rd in the Village of Barrington + Unincorp. areas in Cook and Lake Counties.
|
008-62M50
|
Executed
|
03/29/2022
|
3 / 3 |
1 |
1
|
1
|
Will
|
|
(315-Ft) Bridge Preservation Project including bridge deck patching and overlay expansion joint replacement, bearings, piers, and beams repair. Location: Bridge carrying Black Road over I-55 in the Village of Shorewood and City of Joliet.
|
009-62M51
|
Executed
|
04/14/2022
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
(293-Ft) Bridge deck overlay and bridge joint repair of the US 14/Peterson Ave. bridge over I-94 located in the City of Chicago.
|
010-62M55
|
Executed
|
04/04/2022
|
1 / 1 |
|
1
|
1
|
Will
|
|
(1029-Ft) Bridge Preservation Project including partial bridge deck patching, median removal, expansion joints replacement and deck scarification and overlay located on the bridge carrying IL 7 over EJ and E Railroad in the City of Lockport.
|
011-62M64
|
Executed
|
04/05/2022
|
3 / 3 |
2 |
1
|
1
|
DuPage
|
|
(1000-Ft) Bridge deck overlay and joint replacement and beam repairs with fiber wrap located on a bridge carrying Clarendon Hills Road over 1-55 in unincorporated DuPage County.
|
012-62N11
|
Executed
|
04/04/2022
|
|
|
1
|
1
|
Various
|
|
Weed spray in Various locations in District 1.
|
013-62N34
|
Executed
|
04/05/2022
|
2 / 1 |
1 |
1
|
1
|
Cook
|
|
(643-Ft) Bridge deck overlay, expansion joint repairs, and approach slab replacement for the bridge carrying IL 83 over US 45 located in the Palos Township in Unincorporated Cook County.
|
014-62N45
|
Executed
|
04/05/2022
|
6 / 6 |
1 |
1
|
1
|
McHenry
|
|
(5.91-Mile) SMART overlay along US 14 from Hughes/Hartland Rd to IL 47 including the installation of 2 dry wells at the intersection of Hughes/ Hartland Road and US 14 located in the City of Woodstock in McHenry County.
|
015-62N74
|
Executed
|
04/04/2022
|
|
|
1
|
1
|
Cook
|
|
(5,002-Ft) Designed Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK. FAU2766: Harlem Avenue FAU 2766 from Oakton St. to Dempster St. in the Village of Niles.
|
016-62N76
|
Executed
|
04/07/2022
|
|
|
1
|
1
|
Cook
|
|
(3,184-Ft) Overlay, ADA improvements, milled rumble strips. Location: Kean Road from IL-83 to 119th Street in the Village of Palos Park in Cook County.
|
017-62P19
|
Executed
|
04/12/2022
|
|
|
1
|
1
|
Cook
|
|
(1.647-Mile) 3P standard overlay project on Glenwood Dyer Road from Gledwood Lansing to Stony Island Avenue that includes ADA curb ramp improvements, located in Village of Lynwood and Village of Glenwood.
|
018-62P55
|
Deleted
|
02/01/2022
|
|
|
1
|
1
|
Cook
|
|
(2007.6-Ft) Structural rehabilitation and substructure repairs of three bridges earring 1-94 over Little Calumet River and over CSXTand IHB Railroad in the City of Dolton and the City of Calumet City. , (2007.6-Ft) Structural rehabilitation and substructure repairs of three bridges earring 1-94 over Little Calumet River and over CSXTand IHB Railroad in the City of Dolton and the City of Calumet City.
|
019-62P60
|
Executed
|
04/19/2022
|
1 / 1 |
|
1
|
1
|
Cook
|
|
This is a site spot improvement (parking lot improvement), consisting of pavement, curb and gutter, sidewalk removal and replacement, drainage structures adjustment, subbase gran. material and HMA surface/ binder course Located at the Kennedy Maintenance Yard E-24, 5027 N. Central Ave in the City of Chicago.
|
020-62P80
|
Executed
|
04/05/2022
|
|
|
1
|
1
|
Cook
|
|
(200-Ft) Partial and full depth deck repairs to the structure that carries Wayman St over 1-90/94. Also included are longitudinal joint closure, application of protective coat, cleaning and sealing of transverse joints, and installation of temporary protective shield located in the City of Chicago.
|
021-62P81
|
Executed
|
04/20/2022
|
|
|
1
|
1
|
Will
|
|
Cleaning and painting designated steel surfaces of bridge structures carrying 1-55 over US-30 (SN 099-0016 and 0017); 1-55 over RR (SN 099-0018, 0019): 1-55 over Abandoned RR (SN 099-0022 and 0023); in the villages of Romeoville, Plainfield and in the city of Joliet.
|
022-62P83
|
Executed
|
04/20/2022
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of cleaning and painting designated steel surfaces of bridge structures carrying 130th St over RR (SN 016-2434) and over 1-94 (SN 016-2600) in the City of Chicago, Hyde Park Township, Cook Co.
|
023-62R33
|
Executed
|
04/26/2022
|
|
|
1
|
1
|
Cook
|
|
(251-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-57expressway from I-94 (Dan Ryan Expwy) to I-80.
|
024-62R35
|
Executed
|
04/12/2022
|
|
|
1
|
1
|
Cook, Lake
|
|
(130.8-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-94 (Edens Expwy)/ US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy).
|
025-62R37
|
Executed
|
04/12/2022
|
|
|
1
|
1
|
Cook, DuPage
|
|
(209-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-290 expressway from Lake Cook Rd to IL 83 (Kingery Hwy).
|
026-62R38
|
Executed
|
04/05/2022
|
|
|
1
|
1
|
Various
|
|
This improvement consists of removing and replacing signs along various district One expressways and arterials routes in the counties of Cook, DuPage, Kane, Lake, McHenry and Will.
|
027-64M17
|
Deleted
|
02/04/2022
|
|
|
2
|
2
|
|
|
|
028-64M24
|
Executed
|
04/05/2022
|
6 / 6 |
1 |
2
|
2
|
Rock Island
|
|
Traffic signal upgrades along Andalusia Rd at the intersection with IL 92 and Ridgewood Rd in Rock Island.
|
029-64P09
|
Executed
|
03/31/2022
|
|
|
2
|
2
|
Henry
|
|
Remove and replace pipe culverts that drain the roadway ditches through the levees into SN 037-0130 over Coal Creek at 2 miles North of Annawan.
|
030-64R10
|
Executed
|
04/04/2022
|
1 / 1 |
|
2
|
2
|
Winnebago
|
|
1.86 miles Stephenson County line to 0.2 miles W of Pecatonica Rd. SMART Overlay with longitudinal joint repair.
|
031-64R33
|
Executed
|
04/04/2022
|
6 / 6 |
1 |
2
|
2
|
Ogle
|
|
Approach pavement repair and resurfacing on SN 071-0015.
|
032-64R34
|
Executed
|
04/04/2022
|
4 / 4 |
1 |
2
|
2
|
Ogle
|
|
Bridge deck patching on SN's 071-0077, 071-0084, 071-0088.
|
033-64R41
|
Executed
|
04/20/2022
|
|
|
2
|
2
|
Carroll
|
|
Partial cleaning and painting of structural steel of SN 008-0015 carrying IL 84 over Rush Creek 3.1 miles South of JoDaviess County Line.
|
034-64R43
|
Executed
|
04/04/2022
|
|
1 |
2
|
2
|
Whiteside
|
|
Deck patching with scarification and polymer concrete wearing surface on SN 098-0051 carrying Avenue "G" over the North branch of the Rock River in Sterling.
|
035-66H54
|
Executed
|
04/07/2022
|
4 / 4 |
2 |
2
|
3
|
Kankakee
|
|
This project is located on FAP 330 (US 45/52) 1.5 miles North of Manteno Road. The work consists of replacing SN 046-0046 with SN 046-0160, carrying FAP 330 (US45/52) over the North Branch of Rock Creek.
|
036-66K31
|
Executed
|
04/04/2022
|
|
|
2
|
3
|
Iroquois
|
|
Work begins East of Sugar Creek on US 24 and goes East 3.08 miles including a 3P milling and resurfacing of US 24 including drainage and ADA improvements. The project terminates at East end of Watseka city limit.
|
037-66L57
|
Executed
|
04/05/2022
|
|
|
2
|
3
|
Bureau
|
|
Work begins in Ohio, Illinois at the intersection of IL 26 and IL 92 and goes West 9.9 miles including a 3P milling and resurfacing of IL 92, drainage improvements, and guardrail improvements. The project terminates at the junction of US 34 and IL 89 in La Moille, Illinois.
|
038-66L74
|
Executed
|
04/12/2022
|
4 / 4 |
1 |
2
|
3
|
LaSalle
|
|
Microsilica overlay, expansion joint replacement and deck repairs on the structures SN 050-0173 and SN 050-0174 carrying I-39 over Tomahawk Creek, 3.5 miles north of I-80 in LaSalle County.
|
039-66M32
|
Executed
|
04/07/2022
|
|
|
2
|
3
|
LaSalle
|
|
Tree and shrub planting from mile marker 88 to mile marker 89 on the North side (WB).
|
040-66M36
|
Executed
|
04/05/2022
|
|
|
2
|
3
|
Various
|
|
Weed Spray Districtwide (I-80, I-180, I-39, I-55, and I-57 including all interchanges).
|
041-68F32
|
Executed
|
04/05/2022
|
|
|
3
|
4
|
Tazewell
|
|
This project will be .10 miles long and will consist of drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St. in the city of East Peoria.
|
042-68F73
|
Executed
|
04/07/2022
|
1 / 1 |
|
3
|
4
|
Knox
|
|
Bridge deck overlay, bridge joint replace//repair, bridge repair to SN 048-0009 and -0010 carrying over East Main Street in Galesburg.
|
043-68F77
|
Executed
|
04/05/2022
|
|
2 |
3
|
4
|
Putnam
|
|
Chip seal A-2 with fog seal on IL 26 South of IL 71 to IL 18.
|
044-68G28
|
Executed
|
04/21/2022
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights.
|
045-68G29
|
Executed
|
04/07/2022
|
1 / 1 |
1 |
3
|
4
|
Henderson, McDonough
|
|
Crack and joint sealing on US 34 from PD Creek to West end of Biggsville Bypass and on IL 9 from Hancock CL to W of US 67.
|
046-68G61
|
Executed
|
04/05/2022
|
|
|
3
|
4
|
Various
|
|
Districtwide pavement markings.
|
047-68G70
|
Executed
|
04/05/2022
|
|
|
3
|
4
|
McDonough
|
|
This project is 0.26 miles in length. It is located at the structure carrying IL 41 over KJRY Railway and BNSF Railway (SN 055-0008), 2.8 miles South of Bushnell. Work includes bridge repair (structural repairs) and shoulder repair.
|
048-70988
|
Executed
|
04/05/2022
|
|
1 |
3
|
5
|
McLean
|
|
3P Policy Standard Overlay and Culvert Replacement on US 24 from Woodford Co. Line to McLean St. in Gridley, McLean County.
|
049-70B03
|
Executed
|
04/12/2022
|
1 / 1 |
1 |
3
|
5
|
Douglas
|
|
8.257 Miles of Smart Resurfacing from ECL of Arthur to US 45 at Arcola.
|
050-70C22
|
Executed
|
04/07/2022
|
1 / 1 |
1 |
3
|
5
|
Champaign
|
|
4.317 miles of Smart Overlay from 2350E at St. Joseph to Vermilion County line and ADA Improvements in Ogden.
|
051-70E19
|
Executed
|
04/05/2022
|
|
|
3
|
5
|
McLean
|
|
Resurfacing on Old 66 from S of Veterans Parkway to 1.7 Mi SW of Towanda, McLean County.
|
052-70F57
|
Executed
|
04/05/2022
|
|
|
3
|
5
|
McLean
|
|
Bridge deck repairs Southbound FAI 55 (I-55) SN 057-0154 over US 136 at McLean.
|
053-70F58
|
Executed
|
04/12/2022
|
|
|
3
|
5
|
Champaign, Douglas
|
|
Class A Pavement patching in East Field Area for a total length of 30.54 Mi.
|
054-70F59
|
Executed
|
04/12/2022
|
3 / 3 |
|
3
|
5
|
Champaign
|
|
0.488 miles, Class B patching, at I-74 North of Mahomet on ILL 47.
|
055-70F60
|
Executed
|
04/12/2022
|
|
|
3
|
5
|
Champaign
|
|
Patching on Market St from Ford Harris Rd to Hensley Rd North of Champaign, Champaign County. , Patching on Market St from Ford Harris Rd to Hensley Rd North of Champaign, Champaign County.
|
056-70F67
|
Executed
|
04/12/2022
|
|
|
3
|
5
|
DeWitt, McLean
|
|
1) 5.36 miles on FAI 55 (I-55), Class A special patching from SW of Bloomington to S of Shirley. 2) 0.92 mile on FAU 6406 (US 150), Class B patching from Veteran's PKWY to just S of Woodrig Rd. 3) 0.28 mile on FAP 708 (US 51 BUSN), Class B patching from US 51 to 0.3 mile S of US 51.
|
057-70F70
|
Executed
|
04/12/2022
|
|
|
3
|
5
|
DeWitt
|
|
0.657 miles, patching, ILL 10 to Chestnut St in Weldon.
|
058-70F85
|
Executed
|
04/05/2022
|
|
|
3
|
5
|
Various
|
|
567.5 miles of spraying, approximately 2004 acres on state right of way along US 51 and interstate routes including interchanges in Champaign, Dewitt, Mclean, Piatt, and Vermilion Counties.
|
059-70F86
|
Executed
|
04/04/2022
|
|
|
3
|
5
|
Various
|
|
Districtwide smart work zone technology.
|
060-72M21
|
Executed
|
04/04/2022
|
|
|
4
|
6
|
Hancock
|
|
0.6 miles of resurfacing on IL 96 from south of US 36 to north of the Keokuk Junction Railroad in Hamilton.
|
061-72M23
|
Executed
|
04/12/2022
|
4 / 4 |
|
4
|
6
|
Cass
|
|
8.9 miles of cape and fog seal, bump grinding and patching on IL 78 from the Mason County line, through Chandlerville, to 0.1 miles north of IL 125 in Virginia.
|
062-72M24
|
Executed
|
04/12/2022
|
1 / 1 |
|
4
|
6
|
Hancock
|
|
10.8 miles of cape and fog seal and bump grinding on IL 96 from 0.3 miles south of Warsaw Road to the Adams County line.
|
063-72M28
|
Executed
|
04/07/2022
|
1 / 1 |
1 |
4
|
6
|
Macoupin
|
|
Bridge overlay of SN 059-0500 carrying IL 111 over the Otter Creek overflow, approximately 2.2 miles north of IL 108.
|
064-72M35
|
Executed
|
04/07/2022
|
|
|
4
|
6
|
Christian
|
|
4.5 miles of crack and joint sealing on US 51 from 1.4 miles south of Assumption to 2.7 miles north of IL 16.
|
065-72M48
|
Executed
|
04/05/2022
|
2 / 2 |
1 |
4
|
6
|
Morgan
|
|
Bridge overlay on I-72 over IL 104 and the BandN Railroad, east of Jacksonville.
|
066-72M69
|
Executed
|
04/14/2022
|
1 / 1 |
|
4
|
6
|
Logan
|
|
3.9 miles of patching, milling, resurfacing and guardrail updates on IL 121 from south of Pulaski Street in Lincoln to 0.3 miles south of Chestervale Crossing.
|
067-72M70
|
Executed
|
04/07/2022
|
2 / 2 |
|
4
|
6
|
Logan
|
|
5.9 miles of patching, resurfacing, shoulders, guardrail and entrance improvements on IL 121 from 0.3 miles south of 1200 Street (Chestervale Crossing) to 0.1 miles south of ICRR in Mt. Pulaski.
|
068-72N07
|
Executed
|
04/04/2022
|
|
1 |
4
|
6
|
Sangamon
|
|
Bridge painting on portions of SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR, 0.4 miles south of Sangamon Avenue in Springfield.
|
069-72N09
|
Executed
|
04/12/2022
|
|
|
4
|
6
|
Adams
|
|
Bridge painting on SN 001-0013 carrying IL 57 over Curtis Creek, 1.6 miles south of US 24 in Quincy.
|
070-72N17
|
Executed
|
04/12/2022
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
Parking lot improvements at the District 6 Sign Shop located at 701 North MacArthur Boulevard in Springfield.
|
071-72N20
|
Executed
|
04/12/2022
|
|
|
4
|
6
|
Macoupin, Montgomery
|
|
Patching on I-55 from the Madison/Macoupin County line to the Montgomery/ Sangamon County line.
|
072-72N21
|
Executed
|
04/07/2022
|
|
|
4
|
6
|
Logan
|
|
Patching on I-55 from the Sangamon County line to the McLean County line.
|
073-72N24
|
Executed
|
04/07/2022
|
|
|
4
|
6
|
Adams
|
|
Patching on IL 57 from just south of Marblehead to just north of the I-172 interchange.
|
074-72N30
|
Executed
|
04/12/2022
|
|
|
4
|
6
|
Sangamon
|
|
Patching on I-55 Business/9th Street/Peoria Road from South Grand Avenue to Sangamon Avenue in Springfield.
|
075-72N35
|
Executed
|
04/05/2022
|
|
|
4
|
6
|
Sangamon
|
|
Miscellaneous bridge repairs to four bridges on I-72 in eastern Sangamon County. (SN084-0155, 0157, 0158, and 0162)
|
076-74360
|
Executed
|
04/07/2022
|
|
|
4
|
7
|
Clark
|
|
Removal and replacement of SN 012-0021 located on US 40, 2 miles west of the City of Marshall.
|
077-74434
|
Executed
|
04/15/2022
|
6 / 6 |
1 |
4
|
7
|
Moultrie
|
|
Superstructure replacement and new approach pavements on SN 070-0038 located on IL 128, approximately 3.1 miles south of Dalton City.
|
078-74797
|
Deleted
|
02/04/2022
|
|
|
4
|
7
|
|
|
|
079-74960
|
Executed
|
04/04/2022
|
|
|
4
|
7
|
Shelby
|
|
10.5 miles of designed overlay with guardrail improvements and culvert replacement on IL 16 / IL 128 from the Christian County line to Shelby County Airport Road.
|
080-74964
|
Executed
|
04/12/2022
|
|
|
4
|
7
|
Moultrie
|
|
2.3 miles of standard overlay on IL 32 from 0.4 miles north to 0.1 miles north of Bruce-Findlay Road and from 0.1 miles south of Bruce-Findlay Road to the Shelby County line.
|
081-74A19
|
Executed
|
04/12/2022
|
1 / 1 |
1 |
4
|
7
|
Cumberland
|
|
Resurfacing, aggregate wedge shoulders, aggregate surface course and patching on IL 130 from Mary Lane in Greenup to the Jasper County line.
|
082-74A22
|
Executed
|
04/05/2022
|
1 / 1 |
|
4
|
7
|
Moultrie
|
|
7.4 miles of patching, HMA surface removal and resurfacing on IL 32 from IL 133 in Lovington to IL 121 west of Sullivan.
|
083-74A82
|
Executed
|
04/12/2022
|
|
|
4
|
7
|
Coles
|
|
Placing 8.3 miles of aggregate shoulders on US 45 from the Douglas County line to Donnelly Road.
|
084-76P23
|
Executed
|
03/31/2022
|
|
|
5
|
8
|
Madison
|
|
1.6 miles of resurfacing on IL 143 from US 40 to the Bond County line.
|
085-76P50
|
Executed
|
03/31/2022
|
6 / 5 |
2 |
5
|
8
|
Bond
|
|
Joint repairs, bridge repairs and bridge deck overlay on IL 127 over Little Beaver Creek, 4.2 miles south of I-70. (SN 003-0049)
|
086-76P85
|
Executed
|
04/04/2022
|
|
|
5
|
8
|
Greene
|
|
Pavement patching on IL 108 from 0.1 miles west of 11th Street to 1st Street in Carrollton.
|
087-76P90
|
Executed
|
04/05/2022
|
|
|
5
|
8
|
St. Clair
|
|
Installation of security system at the Missouri Avenue Pump Station along I-55/64.
|
088-78890
|
Executed
|
04/05/2022
|
1 / 1 |
|
5
|
9
|
Saline
|
|
Patching on US 45 from IL 13 to IL 34/145 in Harrisburg.
|
089-78891
|
Executed
|
04/05/2022
|
2 / 2 |
1 |
5
|
9
|
Jackson
|
|
Patching on at various locations on US 51 and IL 13 in Jackson County.
|
090-78895
|
Executed
|
04/05/2022
|
1 / 1 |
|
5
|
9
|
Jefferson, Williamson
|
|
Bridge deck HMA overlay and joint replacement on SN 100-0054 carrying Cedar Grove Road over I-57, north of Marion; and pier repair and approach slab patching on SN041-0032 carrying IL 37 over Casey Fork, 2 miles south of IL 148.
|
091-78903
|
Executed
|
04/05/2022
|
|
|
5
|
9
|
White
|
|
Culvert rehabilitation for a field entrance on IL 1 approximately 1.5 miles south of US 45.
|
092-78919
|
Executed
|
04/05/2022
|
2 / 2 |
1 |
5
|
9
|
Perry
|
|
Patching on US 51 from Park Street to Stacy Street in DuQuoin.
|
093-78931
|
Executed
|
04/12/2022
|
|
|
5
|
9
|
Various
|
|
Weed spraying for Johnson grass along I-57 at various locations in various counties.
|
094-78932
|
Executed
|
04/05/2022
|
|
|
5
|
9
|
Various
|
|
Weed spraying for broadleaf weeds along I-57, I-24 and I-64 at various locations in various counties.
|
095-90868
|
Executed
|
04/07/2022
|
|
1 |
3
|
5
|
Champaign
|
|
4.111 miles of 3" Cold-In-Place Recycling with 1-1/2" Hot-Mix Asphalt Surface overlay from Main Street in Sidney to Block Road.
|
096-61H39
|
Executed
|
04/05/2022
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Fairview Avenue from Ogden Avenue to 55th Street in Downers Grove.
|
097-61H45
|
Executed
|
03/31/2022
|
|
|
1
|
1
|
Lake
|
|
Pavement reconstruction, curb and gutter, Sidewalk replacement, storm sewer, drainage structures and pavment marking on Brandywyn Lane from Deerfield Pkwy to Thompson Boulevard, and on Thompson Boulevard from Arlington Heights Road to Brandywyn Lane in Buffalo Grove.
|
098-61H50
|
Executed
|
04/12/2022
|
4 / 4 |
1 |
1
|
1
|
McHenry
|
|
Modifications at eight intersections in Algonquin, Huntley, Lake in the Hills, Lakewood, and Spring Grove.
|
099-61H58
|
Executed
|
05/12/2022
|
|
|
1
|
1
|
McHenry
|
|
Construction of a multi-use path adjacent to Winn Road, from English Prarie Road to North of Brentwood Drive in Spring Grove.
|
100-61H61
|
Executed
|
04/12/2022
|
|
|
1
|
1
|
DuPage
|
|
Traffic signal modernization at the intersection of 63rd Street and Main Street in Downers Grove.
|
101-61H62
|
Executed
|
04/20/2022
|
14 / 13 |
1 |
1
|
1
|
Cook
|
|
Replace the bridge carrying Gladstone Street over Addison Creek, east of US 45 in Westchester.
|
102-62N61
|
Executed
|
04/05/2022
|
|
1 |
1
|
1
|
Will
|
|
(2.36-Mile) SMART overlay, ADA improvements, and illuminated street name signs on IL 53 (Independence Dr) from 135th St/Romeo Rd to 135th St/Romeo Road, located in the Village of Romeoville in Will County.
|
103-62N78
|
Executed
|
04/12/2022
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(3.04-Mile) SMART overlay and ADA improvements on Ogden Avenue from IL 43 to 50th Avenue located in the City of Berwyn and Town of Cicero.
|
104-62R36
|
Executed
|
04/12/2022
|
|
|
1
|
1
|
Cook, DuPage
|
|
(185.6-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-290 expressway from IL 83 (Kingery Hwy) to Austin Blvd.
|
105-64J65
|
Withdrawn
|
03/07/2022
|
|
|
2
|
2
|
Rock Island
|
|
Landscaping from Mississippi River to 0.9 mi S of Avenue of the Cities in Moline. , Landscaping from Mississippi River to 0.9 mi S of Avenue of the Cities in Moline.
|
106-64R39
|
Executed
|
04/12/2022
|
|
|
2
|
2
|
Rock Island
|
|
Full cleaning and painting of structural steel of SN 081-0074 carrying IL 92 over Hills Creek.
|
107-66K77
|
Rejected
|
03/23/2022
|
1 / 1 |
|
2
|
3
|
Iroquois
|
|
This project is located on FAP 71/FAS 323 (IL 54) from 0.4 mile west of I-57 to US 45/52 in Onarga. The work consists of HMA milling and resurfacing, shoulder work, ADA ramps, pavement marking, and raised reflective markers.
|
108-66L75
|
Rejected
|
03/23/2022
|
1 / 1 |
|
2
|
3
|
Livingston
|
|
Latex overlay, expansion joint replacement and deck repairs on the structures structures SN 053-0124 and SN 053-0125 carrying I-55 over Rooks creek, 3 miles southwest of Pontiac in Livingston County.
|
109-66M20
|
Executed
|
04/07/2022
|
2 / 2 |
|
2
|
3
|
LaSalle
|
|
This project is located at three structures in LaSalle County. Structure No. 050-0-166 carrying N36th Rd. over I-39, 1.0 mile South of US 34. Structure No. 050-0172 carrying N42nd Rd. over I-39, 1.0 mile South of US 52. Stucture No. 050-0218 carrying IL 351/71 over the Lone Star Cement Co. Railroad. 2.6 miles South of US 6 (in Oglesby). This project consists of cleaning and painting all structural steel and other steel components of the structures.
|
110-68F75
|
Executed
|
04/05/2022
|
|
|
3
|
4
|
Tazewell
|
|
Bridge joint replace/repair, bridge deck repairs, bridge repair on S.N. 090-0136 on Townline Road over 1-155, 3 miles South of IL Route 9.
|
111-68G60
|
Executed
|
06/07/2022
|
|
|
3
|
4
|
Various
|
|
Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (High tension cable barrier) at various locations in District 4.
|
112-68G68
|
Executed
|
04/15/2022
|
|
|
3
|
4
|
Tazewell
|
|
Bridge repairs to SN 090-0104 Springfield Rd; 090-0105 Cole St; 090-0119 EB Ramp to WB I-74 (replace rocker bearings, misc. structural steel and substructure repairs).
|
113-70951
|
Executed
|
04/14/2022
|
|
|
3
|
5
|
Piatt
|
|
3P Policy Designed Overlay on FAS 1531 (Old IL 47) from ILL 32 to 600E W. of Monticello, Piatt County.
|
114-74962
|
Executed
|
04/07/2022
|
|
|
4
|
7
|
Richland
|
|
Milling, surfacing, PCC pavement, storm sewer cleaning and replacement of corrugated metal pipe with concrete pipe on IL 130 and IL 250 from south of West North Street to 0.1 miles north of US 50 in Olney.
|
115-85714
|
Executed
|
04/04/2022
|
|
|
2
|
2
|
Ogle
|
|
Resurfacing Mt. Morris Road from IL 72 to the north city limits of Mt. Morris.
|
116-85720
|
Executed
|
04/04/2022
|
1 / 1 |
|
2
|
2
|
Ogle
|
|
Resurfacing Montague Road from Conger Road to Tower Road
|
117-87785
|
Executed
|
04/26/2022
|
|
|
2
|
3
|
Bureau
|
|
Sidewalk replacement at various locations in DePue.
|
118-91608
|
Executed
|
04/05/2022
|
1 / 1 |
|
3
|
5
|
McLean
|
|
Resurfacing White Oak Road from US 150 to Locust Street.
|
119-91612
|
Executed
|
04/05/2022
|
|
|
3
|
5
|
Vermilion
|
|
Resurfacing East Thompson Avenue from east of the CSX Railroad to 9th Street in Hoopeston.
|
120-91615
|
Executed
|
04/15/2022
|
|
|
3
|
5
|
Champaign
|
|
Construction of a 10 foot wide aggregate trail from CR2650 through Ogden to the Vermilion County line.
|
121-93691
|
Rejected
|
04/26/2022
|
4 / 4 |
|
4
|
6
|
Sangamon
|
|
Reconstruction of Stanford Avenue from 11th Street to Fox Bridge Road including the construction of a pedestrian path, in Springfield.
|
122-93754
|
Executed
|
04/14/2022
|
3 / 2 |
|
4
|
6
|
Schuyler
|
|
Guardrail replacement at various locations in Schuyler County.
|
123-93777
|
Executed
|
04/20/2022
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
Replace the bridge carrying Churchill Road over Jacsonville Branch in Springfield.
|
124-95907
|
Executed
|
04/07/2022
|
1 / 1 |
|
4
|
7
|
Shelby
|
|
Replace the bridge carrying CH 41 over Robinson Creek 0.50 miles south of Westervelt.
|
125-95908
|
Executed
|
04/12/2022
|
1 / 1 |
|
4
|
7
|
Shelby
|
|
Pavement widening, resurfacing, box culverts, pipe culverts, pavement markings, on CH 5 from North 12th Street in Shelbyville to 1600N Road.
|
126-95913
|
Executed
|
04/12/2022
|
|
|
4
|
7
|
Coles
|
|
Resurfacing CH 27 from Country Club Road to Old State Road.
|
127-97766
|
Executed
|
04/07/2022
|
|
|
5
|
8
|
St. Clair
|
|
Reconstruction of Shiloh Station Road from 0.4 mile north of Johnson Road to 0.2 mile north of Johnson Road in Shiloh.
|
128-99665
|
Executed
|
04/07/2022
|
|
|
5
|
9
|
Williamson
|
|
Sidewalk construction along IL 13 from State Street to Fair Street in Marion.
|
129-99670
|
Executed
|
04/26/2022
|
|
|
5
|
9
|
Union
|
|
Replace the structure carrying TR 112 over Mill Creek, 1.75 miles northeast of Mill Creek.
|
130-61B94
|
Executed
|
06/01/2022
|
3 / 3 |
1 |
1
|
1
|
Will
|
|
Replace the bridge carrying Cedar Road over Spring Creek, 1.1 miles north of US 6.
|
131-61H14
|
Executed
|
05/12/2022
|
14 / 14 |
1 |
1
|
1
|
Cook
|
|
Reconstruction of Franklin Avenue from Runge Street to Mannheim Road in Franklin Park.
|
132-61H46
|
Executed
|
04/07/2022
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Pavement reconstruction, storm sewer, pipe culverts, curb and gutter, sidewalk, and pavement markings on Bloomingdale Road from Rohlwing Road to Irving Park Road in Itasca.
|
133-62D30
|
Executed
|
04/04/2022
|
9 / 9 |
|
1
|
1
|
Cook
|
|
(3,470-Ft) Intersection improvement: channelization, PCC and HMA widening, traffic signal modernization, drainage and ADA improvements. Intersection of FAP 338: IL 59 and West Bartlet Road in the Village of Bartlett.
|
134-62H38
|
Executed
|
04/18/2022
|
|
1 |
1
|
1
|
Cook
|
|
(2,600-Ft) Resurfacing, drainage improvement, and retaining wall construction from Nicholas Drive to Western Avenue, also includes HMA milling and paving, PCC pavement removal and placement, and storm sewer and drainage structure installation located in the City of Des Plaines.
|
135-62H69
|
Executed
|
04/04/2022
|
5 / 5 |
1 |
1
|
1
|
Lake
|
|
(1.86-Mile) Designed Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK etc. IL 137 (Buckley Road) from West of Frontenac St to IL 137 (Bobby Thompson Expwy) in the City of North Chicago in Lake Co.
|
136-62L19
|
Executed
|
04/07/2022
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(1.987-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements etc. Loc.: FAU 2714: 25th Ave, I-290 (Eisenhower Expwy) to 26th St in the Villages of Broadview and Forest Park.
|
137-62M53
|
Executed
|
04/21/2022
|
|
2 |
1
|
1
|
Will
|
|
(13.06-Mile) Interstate 57 (I-57) between Kankakee County Line and Steger Rd. (Including rest areas and weigh stations). Scope includes standard overlay, Class A patching, rest area improvements, weigh station repairs, bridge deck sealing located within Villages of Peotone, Monee and University Park.
|
138-62P45
|
Deleted
|
02/02/2022
|
|
|
1
|
1
|
Cook
|
|
(3.05-Mile) Water main replacement, intersection reconstruction, roadway reconstruction of Wood St / Ashland Ave from north of Thornton Rd to 138th St, bridge rehabilitation, sidewalk, shared-use path roadway lighting, and aesthetic landscaping located in the City of Harvey, Villages of Dixmoor and Riverdale. , (3.05-Mile) Water main replacement, intersection reconstruction, roadway reconstruction of Wood St / Ashland Ave from north of Thornton Rd to 138th St, bridge rehabilitation, sidewalk, shared-use path roadway lighting, and aesthetic landscaping located in the City of Harvey, Villages of Dixmoor and Riverdale.
|
139-62P68
|
Executed
|
04/05/2022
|
|
1 |
1
|
1
|
Cook
|
|
(1,900-Ft) Dry land bridge extension; replacement of existing sidewalk and shared-use path; and aesthetic landscaping of US 6 / IL 7 (159th St) from 104th Ave to east located in the Village of Orland Park.
|
140-62R34
|
Executed
|
04/12/2022
|
|
|
1
|
1
|
Cook, Will
|
|
(133.2-Mile) The improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-80 expressway from I-294 to I-355.
|
141-64D78
|
Executed
|
04/04/2022
|
3 / 3 |
|
2
|
2
|
Whiteside
|
|
0.86 Mi along IL 40 - Standard overlay, milling and ADA Improvements from 0.1 Mi N of Lynn Blvd and 0.1 Mi N to 0.1 Mi S of LeFevre Rd; reconstruction and ADA improvements from Lynn Blvd to 0.1 Mi N of LeFevre Rd in Sterling.
|
142-64R37
|
Executed
|
04/12/2022
|
4 / 2 |
|
2
|
2
|
Henry
|
|
Cleaning and painting of structural steel of SN 037-0080 carrying IL 84 over Green River and SN 037-0114 carrying TR 330 over I-80.
|
143-66H63
|
Executed
|
04/04/2022
|
8 / 8 |
2 |
2
|
3
|
Iroquois
|
|
Project consists on milling and resurfacing I-57 interstate and Buckley interchange ramps in Iroquois County. The project length is 6.9 miles. The work also includes structural upgrades, underdrain removal / replacement, guardrail upgrades and grading/shaping ditches. Resurfacing on Buckley Interchange ramps shall be accomplished at night.
|
144-68G58
|
Executed
|
04/26/2022
|
|
|
3
|
4
|
Marshall, Mason, Tazewell
|
|
Bridge washing of nine (9) bridges over the Illinois River in Tazewell, Mason, and Marshall Counties.
|
145-72M32
|
Executed
|
04/27/2022
|
|
|
4
|
6
|
Logan, Sangamon
|
|
Sealing the decks, parapets and concrete bridge approach pavement on multiple structures on various routes in Logan and Sangamon Counties.
|
146-74A58
|
Executed
|
04/26/2022
|
|
|
4
|
7
|
Various
|
|
Sealing the bridge decks on 90 structures on various routes in Effingham, Fayette and Macon Counties.
|
147-87760
|
Executed
|
04/27/2022
|
7 / 7 |
|
2
|
3
|
Iroquois
|
|
Roadway reconstruction, Curb and gutter, storm sewers, landscaping, streetscape, lighting, and pavement markings on North Central Street, from Crescent St. to East 3rd. Street, and on East 2nd Street from the IC Railroad to North Central Street, and on East Front Street from North Central St. to North Main Street in Gilman.
|
148-87773
|
Executed
|
04/07/2022
|
|
|
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 70 over Mud Creek, 2.5 miles southeast of Manville.
|
149-87774
|
Executed
|
04/18/2022
|
|
|
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 244 over Gooseberry Creek, 2.5 miles north of Emington.
|
150-87775
|
Executed
|
04/07/2022
|
|
|
2
|
3
|
Livingston
|
|
Resurfacing Weston Road from 900N Road/McLean County Line to 1650N Road.
|
151-87784
|
Executed
|
04/26/2022
|
1 / 0 |
|
2
|
3
|
Bureau
|
|
Sidewarlk construction and replacemnt at various locations within Princeton.
|
152-93779
|
Executed
|
04/14/2022
|
|
|
4
|
6
|
Brown
|
|
Pavement removal, curb and gutter, brick pavers, sidewalks, resurfacing, streetscape, lighting, and pavement markings on Capital Avenue from North Street to South Street in Mt. Sterling.
|
153-95909
|
Executed
|
04/05/2022
|
|
|
4
|
7
|
Coles
|
|
Resurfacing, sidewalks, curb and gutter, patching, and pavement markings on Dewitt Avenue, from east of 14th Street to Logan Street in Mattoon.
|
154-95910
|
Executed
|
04/05/2022
|
1 / 0 |
|
4
|
7
|
Effingham
|
|
Replace the bridge carrying CH 16 over Bishop Creek, 3.0 miles west of Dieterich.
|
155-97767
|
Executed
|
04/12/2022
|
1 / 1 |
1 |
5
|
8
|
Monroe
|
|
Construction of a roundabout at Palmer Creek Road and Quarry Road in Columbia.
|
156-99674
|
Executed
|
04/07/2022
|
1 / 1 |
1 |
5
|
9
|
Jackson
|
|
Resurfacing, HMA shoulders, pavement markings, and raised reflective markers on Elkville Road from IL 127 to Haulage Road.
|
157-61G85
|
Executed
|
05/12/2022
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
Pavement reconstruction, resurfacing, curb and gutter replacement, sidewalk replacement, storm sewer, traffic signal improvements and pavement markings on Clavey Road, from 0.4 miles east of US 41 to Green Bay Road in Highland Park.
|
158-62N60
|
Executed
|
04/04/2022
|
|
|
1
|
1
|
Kane
|
|
(3.26-Mile) Resurfacing HMA pavement and shoulders, restriping pavement marking lines, making existing curb ramps ADA compliant, and described herein along IL-47, from Burlington Rd to IL-64 (North Ave) in the villages of Lily Lake and Campton Hills, Kane County.
|
159-72E46
|
Withdrawn
|
03/08/2022
|
2 / 2 |
2 |
4
|
6
|
Logan
|
|
Milling and resurfacing on IL 10 from 0.1 miles east of the Mason County line to 2.5 miles east of New Holland and culvert replacement at a ditch 0.8 miles east of the Mason County line. (SN 054-7009) , Milling and resurfacing on IL 10 from 0.1 miles east of the Mason County line to 2.5 miles east of New Holland and culvert replacement at a ditch 0.8 miles east of the Mason County line. (SN 054-7009)
|
160-74963
|
Executed
|
04/12/2022
|
1 / 1 |
1 |
4
|
7
|
Fayette
|
|
7.5 miles of designed overlay and culvert replacement on US 40 / IL 185 from Kaskaskia River Bridge to 0.1 miles east of US 51 and US 51 from US 40 / IL 185 east of Vandalia to 0.2 miles south of Shobonier Road.
|
161-93776
|
Executed
|
04/05/2022
|
|
|
4
|
6
|
Logan
|
|
Replace the bridge carrying CH 12 over Lake Fork Creek, 1 mile east of Broadwell.
|
162-95912
|
Rejected
|
04/26/2022
|
3 / 3 |
2 |
4
|
7
|
Macon
|
|
Remove and replace two strucures to carry Reas Bridge Road over Lake Decatur.
|
163-97752
|
Executed
|
04/07/2022
|
8 / 8 |
1 |
5
|
8
|
St. Clair
|
|
Pavement widening, HMA and PCC pavement, storm sewer, curb and gutter, replace the deck on the structure over the tributary to Richland Creek, pipe culverts, guardrail, pavement markings, and traffic signal improvements on Frank Scott Parkway from west of Old Collinsville Road to west of Green Mount Road.
|
164-72A26
|
Executed
|
04/07/2022
|
|
|
4
|
6
|
Christian
|
|
Bridge deck replacement on SN 011-0010 and full bridge replacement of SN 011-0011, both located on IL 29 southeast of Taylorville.
|
165-74637
|
Executed
|
04/21/2022
|
1 / 1 |
1 |
4
|
7
|
Macon
|
|
2.6 miles of resurfacing, median curb repair, ADA upgrades, signal improvements and bridge joint replacement and repairs on Old US 51 Business from IL 121 to I-72.
|
166-70D64
|
Executed
|
04/05/2022
|
3 / 3 |
1 |
3
|
5
|
McLean
|
|
Bridge deck overlay on I-55 from N of Lexington to Livingston Co. line for a gross length of 9.96 miles.
|
01A-WH016
|
Executed
|
12/22/2022
|
|
1 |
2
|
2
|
Whiteside
|
|
Construct, light, and mark parallel taxiway to Runway 36 End: South End Connector
|
02A-SH030
|
Rejected
|
11/30/2022
|
5 / 5 |
2 |
1
|
1
|
Cook, DuPage
|
|
Airfield Lighting Rehabilitation: MIRLs, PAPIs, REILs
|
03A-CR007
|
Executed
|
09/12/2022
|
|
|
5
|
9
|
White
|
|
Maintenance Rehabilitation of Runway and Taxiway: Crack Seal, Emulsified Asphalt Seal Coat and Remarking
|
1LR-M2105
|
Active
|
01/25/2022
|
1 / 1 |
|
0
|
0
|
Saline
|
|
The Ledford Strip Mine Reclamation Project is for the elimination of public health and safety hazards by the Illinois Department of Natural Resources using federal abandoned mined lands funds. The project site is located approximately 1.5 miles southwest of the City of Harrisburg in Section 5, Township 10 South, Range 6 East, Saline County, Illinois. This site can be reached by traveling from Harrisburg southwest on Illinois Route 45 for approximately 1.2 miles and then south on Blue Hole Road for approximately 1.5 miles. The site is primarily located on the west side of Blue Hole Road. A voluntary pre-bid meeting is scheduled for this project at 1:00 p.m., Tuesday, February 22, 2022. All interested prime and subcontractors are encouraged to attend. In accordance with the requirements of the Project Labor Agreement Act (30 ILCS 571), this project contains a Project Labor Agreement.
|
01W-FR444
|
Active
|
01/28/2022
|
|
1 |
0
|
0
|
Kendall
|
|
Work will involve installing temporary causeways to facilitate installation of riprap to stabilize the banks of a channel and islands which are adjacent to a run of the river dam, removing and replacing concrete sidewalks, and repairing undermined sidewalks with non-shrink grout. The upper divider island acts integrally with the main river dam. The dam is located on the Fox River in Yorkville, Illinois, Kendall County. The channel and Divider island were constructed in 2010.
|