20100110
|
UNIT
|
TREE REMOVAL (6 TO 15 UNITS DIAMETER)
|
Base items
|
14.000
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
1,400.000
|
|
20300100
|
CU YD
|
CHANNEL EXCAVATION
|
Base items
|
560.000
|
|
25000200
|
ACRE
|
SEEDING, CLASS 2
|
Base items
|
0.900
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
81.000
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
81.000
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
81.000
|
|
25100115
|
ACRE
|
MULCH, METHOD 2
|
Base items
|
0.900
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
180.000
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
116.000
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
4.000
|
|
28100207
|
TON
|
STONE RIPRAP, CLASS A4
|
Base items
|
570.000
|
|
28200200
|
SQ YD
|
FILTER FABRIC
|
Base items
|
634.000
|
|
28300400
|
TON
|
AGGREGATE DITCH
|
Base items
|
245.000
|
|
35100100
|
TON
|
AGGREGATE BASE COURSE, TYPE A
|
Base items
|
1,636.000
|
|
40600275
|
POUND
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
4,897.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
524.000
|
|
40603080
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50
|
Base items
|
282.000
|
|
40604050
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
223.000
|
|
44004000
|
FOOT
|
PAVED DITCH REMOVAL
|
Base items
|
420.000
|
|
48101200
|
TON
|
AGGREGATE SHOULDERS, TYPE B
|
Base items
|
348.000
|
|
50100100
|
EACH
|
REMOVAL OF EXISTING STRUCTURES
|
Base items
|
1.000
|
|
50201121
|
EACH
|
COFFERDAM (TYPE 2) (LOCATION - 1)
|
Base items
|
1.000
|
|
50201122
|
EACH
|
COFFERDAM (TYPE 2) (LOCATION - 2)
|
Base items
|
1.000
|
|
50300225
|
CU YD
|
CONCRETE STRUCTURES
|
Base items
|
50.200
|
|
50300280
|
CU YD
|
CONCRETE ENCASEMENT
|
Base items
|
31.200
|
|
50400305
|
SQ FT
|
PRECAST PRESTRESSED CONCRETE DECK BEAMS (17" DEPTH)
|
Base items
|
3,024.000
|
|
50800205
|
POUND
|
REINFORCEMENT BARS, EPOXY COATED
|
Base items
|
5,790.000
|
|
50901050
|
FOOT
|
STEEL RAILING, TYPE SM
|
Base items
|
215.000
|
|
51200957
|
FOOT
|
FURNISHING METAL SHELL PILES 12" X 0.250"
|
Base items
|
1,470.000
|
|
51202305
|
FOOT
|
DRIVING PILES
|
Base items
|
1,470.000
|
|
51203200
|
EACH
|
TEST PILE METAL SHELLS
|
Base items
|
2.000
|
|
51500100
|
EACH
|
NAME PLATES
|
Base items
|
1.000
|
|
542D0220
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 1 15"
|
Base items
|
36.000
|
|
542D0223
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 1 18"
|
Base items
|
78.000
|
|
542D0229
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 1 24"
|
Base items
|
40.000
|
|
58100200
|
SQ YD
|
WATERPROOFING MEMBRANE SYSTEM
|
Base items
|
341.000
|
|
58300100
|
FOOT
|
PORTLAND CEMENT MORTAR FAIRING COURSE
|
Base items
|
162.000
|
|
58600101
|
CU YD
|
GRANULAR BACKFILL FOR STRUCTURES
|
Base items
|
60.000
|
|
59100100
|
SQ YD
|
GEOCOMPOSITE WALL DRAIN
|
Base items
|
39.000
|
|
60146304
|
FOOT
|
PIPE UNDERDRAINS FOR STRUCTURES 4"
|
Base items
|
112.000
|
|
63100087
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 6A
|
Base items
|
4.000
|
|
63100167
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT
|
Base items
|
4.000
|
|
63200310
|
FOOT
|
GUARDRAIL REMOVAL
|
Base items
|
100.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
72501000
|
EACH
|
TERMINAL MARKER - DIRECT APPLIED
|
Base items
|
4.000
|
|