20400800
|
CU YD
|
FURNISHED EXCAVATION
|
Base items
|
6,206.000
|
|
21101615
|
SQ YD
|
TOPSOIL FURNISH AND PLACE, 4"
|
Base items
|
15,766.000
|
|
21400100
|
FOOT
|
GRADING AND SHAPING DITCHES
|
Base items
|
58.000
|
|
25000200
|
ACRE
|
SEEDING, CLASS 2
|
Base items
|
2.000
|
|
25000314
|
ACRE
|
SEEDING, CLASS 4B
|
Base items
|
0.250
|
|
25000350
|
ACRE
|
SEEDING, CLASS 7
|
Base items
|
1.250
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
176.000
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
176.000
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
176.000
|
|
25100115
|
ACRE
|
MULCH, METHOD 2
|
Base items
|
2.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
325.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
2,100.000
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
5.000
|
|
35101800
|
SQ YD
|
AGGREGATE BASE COURSE, TYPE B 6"
|
Base items
|
5,584.000
|
|
35102100
|
SQ YD
|
AGGREGATE BASE COURSE, TYPE B 9"
|
Base items
|
3,993.000
|
|
40200800
|
TON
|
AGGREGATE SURFACE COURSE, TYPE B
|
Base items
|
180.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
1,034.000
|
|
40604050
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
771.000
|
|
42300400
|
SQ YD
|
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH
|
Base items
|
67.000
|
|
42400300
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH
|
Base items
|
620.500
|
|
42400800
|
SQ FT
|
DETECTABLE WARNINGS
|
Base items
|
160.000
|
|
44000100
|
SQ YD
|
PAVEMENT REMOVAL
|
Base items
|
50.000
|
|
44000600
|
SQ FT
|
SIDEWALK REMOVAL
|
Base items
|
368.000
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
292.000
|
|
50104400
|
EACH
|
CONCRETE HEADWALL REMOVAL
|
Base items
|
1.000
|
|
54213663
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 18"
|
Base items
|
2.000
|
|
54213669
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 24"
|
Base items
|
1.000
|
|
54213675
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 30"
|
Base items
|
1.000
|
|
54248510
|
CU YD
|
CONCRETE COLLAR
|
Base items
|
0.600
|
|
542A0223
|
FOOT
|
PIPE CULVERTS, CLASS A, TYPE 1 18"
|
Base items
|
24.000
|
|
542A0229
|
FOOT
|
PIPE CULVERTS, CLASS A, TYPE 1 24"
|
Base items
|
16.000
|
|
542A0235
|
FOOT
|
PIPE CULVERTS, CLASS A, TYPE 1 30"
|
Base items
|
8.000
|
|
66300105
|
TON
|
CALCIUM CHLORIDE APPLIED
|
Base items
|
2.300
|
|
66900200
|
CU YD
|
NON-SPECIAL WASTE DISPOSAL
|
Base items
|
218.000
|
|
66900530
|
EACH
|
SOIL DISPOSAL ANALYSIS
|
Base items
|
1.000
|
|
66901001
|
L SUM
|
REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN
|
Base items
|
1.000
|
|
66901003
|
L SUM
|
REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT
|
Base items
|
1.000
|
|
66901006
|
CAL DA
|
REGULATED SUBSTANCES MONITORING
|
Base items
|
2.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
72000100
|
SQ FT
|
SIGN PANEL - TYPE 1
|
Base items
|
246.000
|
|
72800100
|
FOOT
|
TELESCOPING STEEL SIGN SUPPORT
|
Base items
|
167.000
|
|
72900200
|
FOOT
|
METAL POST - TYPE B
|
Base items
|
475.000
|
|
78009000
|
SQ FT
|
MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
152.000
|
|
78009004
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 4"
|
Base items
|
240.000
|
|
78009012
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 12"
|
Base items
|
80.000
|
|
X0322936
|
EACH
|
REMOVE EXISTING FLARED END SECTION
|
Base items
|
3.000
|
|
X0326802
|
EACH
|
UTILITY STRUCTURE REMOVAL
|
Base items
|
3.000
|
|
X0350805
|
EACH
|
FOLD DOWN BOLLARDS
|
Base items
|
8.000
|
|
X2010310
|
UNIT
|
TREE REMOVAL (SPECIAL)
|
Base items
|
1,204.000
|
|
X2010350
|
ACRE
|
TREE REMOVAL, ACRES (SPECIAL)
|
Base items
|
1.000
|
|
X7010216
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
|
Base items
|
1.000
|
|
XX000882
|
FOOT
|
WOOD FENCE
|
Base items
|
1,480.000
|
|
XX002007
|
SQ YD
|
AGGREGATE BICYCLE PATH
|
Base items
|
3,993.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0018500
|
EACH
|
DRAINAGE STRUCTURES TO BE CLEANED
|
Base items
|
3.000
|
|