Home > Notice of Letting > Contract Detail

April 26, 2019 Letting 10:00 AM
139-61F68

Bulletin Description

Intersection improvement on US 52 at Gougar Road in the Village of Manhattan.
Region District DBE % VBP % Federal Project #
1 1 24.00 0.00 Q8QM(489)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Will
  • FAP 852
  • 13-00011-00-CH (MANHATTAN)
  • C-91-007-17
  • 1-22032-0000
Contract Specifics
50 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of April 16, 2019 04:30 PM.

  • The plans show Agg Base Course, 8" being installed under the multi-use path, but the only pay item is for Agg Base Course, 6". Which is correct?
    An addendum will be issued. (04/15/2019)

Authorized Bidders

  • 1750 P. T. Ferro Construction Co.
    700 South Rowell Ave.
    Joliet, IL 60433
    P.O. Box 156
    Joliet, IL 60434
    Phone: (815) 726-6284 Fax: (815) 726-5614 Email: estimating@ptferro.com
    $874,334.88

  • 6117 Austin Tyler Construction, Inc.
    23343 S Ridge Road
    Elwood, IL 60421
    Phone: (815) 726-1090 Fax: (815) 726-1171 Email: info@austin-tyler.com
    $1,165,633.00

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com
    $1,167,940.40

  • 1950 Gallagher Asphalt Corporation
    18100 South Indiana Avenue
    Thornton, IL 60476
    Phone: (708) 877-7160 Fax: (708) 877-5222 Email: bids@gallagherasphalt.com
    $1,299,376.05

  • 2880 Iroquois Paving Corporation
    1889 E US Hwy 24
    PO Box 466
    Watseka, IL 60970
    PO Box 466
    Watseka, IL 60970
    Phone: (815) 432-5211 Fax: (815) 432-5234 Email: estimating@iroqpavcorp.com
    $1,255,249.35

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 2,930.000
20201200 CU YD REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL Base items 425.000
20800150 CU YD TRENCH BACKFILL Base items 100.000
21001000 SQ YD GEOTECHNICAL FABRIC FOR GROUND STABILIZATION Base items 1,265.000
21101505 CU YD TOPSOIL EXCAVATION AND PLACEMENT Base items 1,030.000
21101615 SQ YD TOPSOIL FURNISH AND PLACE, 4" Base items 3,815.000
21400100 FOOT GRADING AND SHAPING DITCHES Base items 200.000
25000210 ACRE SEEDING, CLASS 2A Base items 2.500
25000312 ACRE SEEDING, CLASS 4A Base items 0.500
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 270.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 270.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 270.000
25100630 SQ YD EROSION CONTROL BLANKET Base items 13,475.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 300.000
28000305 FOOT TEMPORARY DITCH CHECKS Base items 420.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 1,775.000
28100105 SQ YD STONE RIPRAP, CLASS A3 Base items 60.000
28200200 SQ YD FILTER FABRIC Base items 60.000
30300001 CU YD AGGREGATE SUBGRADE IMPROVEMENT Base items 425.000
30300112 SQ YD AGGREGATE SUBGRADE IMPROVEMENT 12" Base items 8,000.000
31101200 SQ YD SUBBASE GRANULAR MATERIAL, TYPE B 4" Base items 3,000.000
35101600 SQ YD AGGREGATE BASE COURSE, TYPE B 4" Base items 25.000
35102000 SQ YD AGGREGATE BASE COURSE, TYPE B 8" Base items 165.000
35501324 SQ YD HOT-MIX ASPHALT BASE COURSE, 10" Base items 615.000
35600716 SQ YD HOT-MIX ASPHALT BASE COURSE WIDENING, 10" Base items 1,050.000
40200900 CU YD AGGREGATE SURFACE COURSE, TYPE B Base items 30.000
40201000 TON AGGREGATE FOR TEMPORARY ACCESS Base items 210.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 7,110.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 7,315.000
40603080 TON HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 Base items 1,165.000
40603335 TON HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 Base items 425.000
40603340 TON HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N70 Base items 195.000
42400200 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH Base items 200.000
42400800 SQ FT DETECTABLE WARNINGS Base items 40.000
44000100 SQ YD PAVEMENT REMOVAL Base items 2,300.000
44000200 SQ YD DRIVEWAY PAVEMENT REMOVAL Base items 110.000
44201785 SQ YD CLASS D PATCHES, TYPE I, 12 INCH Base items 25.000
44201789 SQ YD CLASS D PATCHES, TYPE II, 12 INCH Base items 50.000
44201794 SQ YD CLASS D PATCHES, TYPE III, 12 INCH Base items 50.000
44201796 SQ YD CLASS D PATCHES, TYPE IV, 12 INCH Base items 100.000
48100500 SQ YD AGGREGATE SHOULDERS, TYPE A 6" Base items 870.000
48203021 SQ YD HOT-MIX ASPHALT SHOULDERS, 6" Base items 800.000
48203029 SQ YD HOT-MIX ASPHALT SHOULDERS, 8" Base items 2,210.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 25.000
54001001 EACH BOX CULVERT END SECTIONS, CULVERT NO. 1 Base items 2.000
54010403 FOOT PRECAST CONCRETE BOX CULVERTS 4' X 3' Base items 60.000
54213660 EACH PRECAST REINFORCED CONCRETE FLARED END SECTIONS 15" Base items 6.000
542A0220 FOOT PIPE CULVERTS, CLASS A, TYPE 1 15" Base items 150.000
60108204 FOOT PIPE UNDERDRAINS, TYPE 2, 4" Base items 3,920.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 750.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 4.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901002 CAL DA ON-SITE MONITORING OF REGULATED SUBSTANCES Base items 10.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 3.000
67100100 L SUM MOBILIZATION Base items 1.000
70300210 SQ FT TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS Base items 215.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 9,865.000
70300240 FOOT TEMPORARY PAVEMENT MARKING - LINE 6" Base items 505.000
70300260 FOOT TEMPORARY PAVEMENT MARKING - LINE 12" Base items 275.000
70300280 FOOT TEMPORARY PAVEMENT MARKING - LINE 24" Base items 40.000
72000100 SQ FT SIGN PANEL - TYPE 1 Base items 160.000
72400100 EACH REMOVE SIGN PANEL ASSEMBLY - TYPE A Base items 14.000
72400600 EACH RELOCATE SIGN PANEL ASSEMBLY - TYPE B Base items 1.000
72900100 FOOT METAL POST - TYPE A Base items 135.000
72900200 FOOT METAL POST - TYPE B Base items 175.000
73000100 FOOT WOOD SIGN SUPPORT Base items 20.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 215.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 9,865.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 505.000
78000600 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 12" Base items 275.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 40.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 126.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 48.000
X0322936 EACH REMOVE EXISTING FLARED END SECTION Base items 2.000
X0327980 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 2,015.000
X0350805 EACH FOLD DOWN BOLLARDS Base items 2.000
X0350810 EACH BOLLARD REMOVAL Base items 10.000
X1200050 FOOT BOX CULVERT REMOVAL Base items 65.000
X2511630 SQ YD EROSION CONTROL BLANKET (SPECIAL) Base items 2,200.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 3,600.000
XX003668 L SUM PRECONSTRUCTION VIDEO TAPING Base items 1.000
Z0004002 EACH BOLLARDS Base items 8.000
Z0017400 EACH DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED Base items 1.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 105.000
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 5,125.000
Z0076600 HOUR TRAINEES Base items 500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.