001-60N21
|
Executed
|
05/21/2019
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
Replacement of bridge superstructure and substructure repairs on SN 016-2417 carrying Glenwood Road over Thorn Creek in Chicago Heights.
|
001X-68B46
|
Executed
|
05/31/2019
|
46 / 46 |
3 |
3
|
4
|
Peoria, Tazewell
|
Voluntary
|
Bridge replacement of the existing eastbound US 150 (McClugage) bridge over the Illinois River. Project includes interchange improvements at the US 150/IL 29 interchange and the US 15/US 24/IL 116 interchange.
|
002-60R42
|
Executed
|
05/21/2019
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
3P resurfacing on US 45 from IL 83 to West Creek Road in Palos Park.
|
003-60R52
|
Executed
|
06/04/2019
|
5 / 5 |
1 |
1
|
1
|
Will
|
|
Approximately 3 miles of roadway reconstruction, resurfacing, replacement of bridge structures carrying US 6 over Marley Creek, drainage improvement, pavement markings, and aesthetic landscaping from Cedar Rd to Will-Cook Rd in Homer Glen.
|
004-60R74
|
Executed
|
05/23/2019
|
4 / 4 |
1 |
1
|
1
|
Will
|
|
Bridge deck overlay and bridge joint repair of the bridge carrying IL 50 over rock creek in unincorporated Wilton Township.
|
005-60T21
|
Executed
|
06/04/2019
|
15 / 12 |
2 |
1
|
1
|
Kane
|
|
Reconstruction of IL 47 at Main Street intersection including raising the profile, removal and replacement of 2 structures (IL 47 over Blackberry Creek and Main St over Blackberry Creek), and traffic signal installation.
|
006-60V17
|
Executed
|
05/29/2019
|
|
|
1
|
1
|
DuPage
|
|
2.42 miles of resurfacing on IL 56 from I-355 to 22nd Street in Lombard, Oak Brook and Downers Grove.
|
007-60V94
|
Executed
|
05/20/2019
|
|
|
1
|
1
|
Cook
|
|
0.26 mile resurfacing on California Avenue from Cermak Road to 19th Street in the City of Chicago.
|
008-62G23
|
Executed
|
05/29/2019
|
2 / 2 |
1 |
1
|
1
|
DuPage
|
|
2.29 miles of resurfacing consisting of HMA surface removal, pavement patching, HMA resurfacing, ADA sidewalk repair, and thermoplastic pavement marking on IL 53 from I-88 to 59th St in Lisle.
|
009-62G42
|
Rejected
|
05/24/2019
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
0.46 mile 3P resurfacing, pedestrian ramps, storm sewer repair, and drainage on Lawrence Ave from 471 ft east of Manheim Centerline to Rose St through Schiller Park, and east of Canfield Ave in Norridge.
|
010-62G52
|
Deleted
|
03/20/2019
|
|
|
1
|
1
|
Will
|
|
Resurfacing (3P), pedestrian ramps, and pedestrian traffic signal on IL 53 from Belmont Dr to Joliet Rd in Romeoville.
|
011-62G76
|
Deleted
|
03/21/2019
|
|
|
1
|
1
|
Cook
|
|
1.775 miles of 3P resurfacing and pedestrian ramps on Niles Center Road from Touhy Ave to Church Street in Skokie.
|
012-62G77
|
Deleted
|
03/20/2019
|
|
|
1
|
1
|
Cook
|
|
2.03 miles of resurfacing, milling and pedestrian ramps on Elston Avenue from I-94 to Central Park Avenue in Chicago.
|
013-62G97
|
Executed
|
05/21/2019
|
1 / 1 |
|
1
|
1
|
Will
|
|
Jack column retrofitting, repairing bascule girders, modification of center and tail lock, repairing steel grid deck and railings, and painting of Brandon Rd over the Des Plaines River in Joliet.
|
014-62H12
|
Executed
|
05/21/2019
|
|
1 |
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on IL 58 from the intersection of IL 58 and Meijer Dr Easterly for 4.58 miles to the west leg of the intersection with Broadway St.
|
015-62H20
|
Withdrawn
|
04/16/2019
|
1 / 1 |
|
1
|
1
|
Will
|
|
Intersection channelization consisting of pavement removal, traffic signal removal, and shoulder reconstruction on IL 53 at Walter Strawn Dr in Elwood.
|
016-62H22
|
Executed
|
05/21/2019
|
|
1 |
1
|
1
|
Cook
|
|
6.00 miles of resurfacing, milled rumble strips, and pedestrian ramp improvements on US 6 from 94th Ave to west of Pulaski Rd/Crawford Ave in Oak Forest.
|
017-62H23
|
Executed
|
05/23/2019
|
|
|
1
|
1
|
Cook
|
|
Bridge repairs, structural steel repair, and deck slab repairs for the bridge carrying IL 43 over Cal Sag Channel in Palos Township.
|
018-62H28
|
Executed
|
05/23/2019
|
|
|
1
|
1
|
Lake
|
|
Routing, cleaning and sealing longitudinal cracks on IL 137 from IL 83 to O'Plaine Road in Libertyville and Green Oaks.
|
019-62H36
|
Executed
|
05/23/2019
|
3 / 3 |
1 |
1
|
1
|
Lake
|
|
1.9 miles of resurfacing, pedestrian ramp improvements and culvert repairs on US 41 from West Park Avenue to Chantilly Boulevard in the City of Highland Park.
|
020-62H44
|
Executed
|
05/21/2019
|
|
1 |
1
|
1
|
Cook
|
|
3.1 miles of resurfacing and pedestrian ramps on IL 62 (Algonquin Road) from IL 58 to IL 83 through Rolling Meadows, Des Plaines, Mount Prospect and Arlington Heights.
|
021-62H45
|
Executed
|
05/23/2019
|
|
1 |
1
|
1
|
Cook
|
|
2.5 miles of resurfacing and pedestrian ramps on IL 58 (Dempster Avenue) from IL 43 (Waukegan Avenue) to US 41 (Skokie Boulevard) in the Villages of Skokie and Martin Grove.
|
022-62H53
|
Executed
|
05/21/2019
|
5 / 2 |
|
1
|
1
|
Various
|
|
Repairing damaged concrete barrier wall, bridge parapet, bridge rail post, pipe handrail and wooden sound at various locations in Cook, Lake, and DuPage Counties.
|
023-62H72
|
Executed
|
05/21/2019
|
|
|
1
|
1
|
Cook
|
|
Concrete bridge deck sealing upon the entire bridge deck surface, sidewalks, inside and top of parapets of various structures within Cook County.
|
024-62H73
|
Executed
|
05/20/2019
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Removing a portion of existing retaining wall, construction of new stem, temporary soil retention system, structural repair of concrete, pavement patching, coring weep holes and cleaning drainage structures on 1-90 in the City of Chicago.
|
025-62H75
|
Executed
|
05/28/2019
|
4 / 3 |
1 |
1
|
1
|
McHenry
|
|
5.7 miles of ultra-thin bonded wearing surface on IL 31 from US 31 from US 12 to Johnsburg Road in the villages of Johnsburg, Richmond and Ringwood.
|
026-62H76
|
Executed
|
05/29/2019
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
3 miles of ultra-thin bonded wearing course overlay on IL 176 from east of Smith Road to the Fox River in the City of Crystal Lake and Village of Prarie Grove.
|
027-62H78
|
Deleted
|
03/19/2019
|
|
|
1
|
1
|
Various
|
|
Concrete bridge deck sealing upon the entire top surface of the deck, top of sidewalks and inside and top of parapets at various locations throughout District 1.
|
028-62H81
|
Rejected
|
05/07/2019
|
6 / 6 |
2 |
1
|
1
|
Lake
|
|
1.9 miles of ultra thin wearing course and ADA upgrades on US 41 from Ferndale Street to IL 21 in the Village of Gurnee.
|
029-64L08
|
Executed
|
05/23/2019
|
|
|
2
|
2
|
Carroll
|
|
Removal and replacement of box culvert SN 008-1046, ditch reshaping, removal and replacement of field entrances on IL 40, just east of Stransky Road, east of Chadwick.
|
030-64L59
|
Executed
|
05/23/2019
|
5 / 5 |
2 |
2
|
2
|
Ogle
|
|
HMA resurfacing on IL 251 from Lakeview Dr to Veterans Parkway in Rochelle.
|
031-64M39
|
Executed
|
05/21/2019
|
|
2 |
2
|
2
|
Jo Daviess
|
Voluntary
|
Cold milling, pavement patching, and HMA resurfacing on US 20/IL 84 from Mt. Hope Rd to Tippett Rd., southeast of Galena.
|
032-64N52
|
Executed
|
05/31/2019
|
|
|
2
|
2
|
Various
|
|
Washing nineteen bridges at various locations within District 2.
|
033-64N53
|
Executed
|
05/21/2019
|
1 / 1 |
|
2
|
2
|
Winnebago
|
|
Washing ten bridges at various locations in District 2.
|
034-64N54
|
Executed
|
06/07/2019
|
|
|
2
|
2
|
Various
|
|
Washing 12 bridges at various locations within District 2.
|
035-66879
|
Executed
|
05/23/2019
|
1 / 1 |
|
2
|
3
|
Iroquois
|
|
Replace SN 038-0165 with a double box culvert (SN 038-2023) carrying IL 1 over Gay Creek, 2.3 miles south of Wellington.
|
036-66E67
|
Rejected
|
05/07/2019
|
4 / 4 |
1 |
2
|
3
|
Kankakee
|
|
3.43 miles of 3R resurfacing, patching, and bridge repairs on I-57 from north of the Kankakee River bridge to south of the IL 50 interchange in Bourbonnais.
|
037-66J66
|
Executed
|
06/04/2019
|
|
|
2
|
3
|
Grundy, LaSalle
|
|
Intermittent milling and resurfacing on IL 47 from Illinois Ave. to south of Jefferson Street in Morris and on IL 170 from US 6 to just south of the CSX Railroad crossing in Seneca.
|
038-68E37
|
Executed
|
05/29/2019
|
1 / 1 |
1 |
3
|
4
|
Tazewell
|
|
Bridge painting at various locations in Taxewell County. (SN 090-0117, 0116, 0102, 0118, and 090-0119).
|
039-70D14
|
Executed
|
05/21/2019
|
|
|
3
|
5
|
McLean
|
|
Replace piers, joints and place surface treatment on deck of SN 057-6301 carrying US 51 Business S.B. (S. Center Street) in downtown Bloomington.
|
040-70D32
|
Executed
|
05/20/2019
|
|
|
3
|
5
|
Champaign, Piatt
|
|
Microsurfacing 2 pass and crack and joint sealing on IL 47 from the Ford County Line to US 136, and on IL 105 south of Bement to south of Monticello.
|
041-70D57
|
Executed
|
05/28/2019
|
|
|
3
|
5
|
Various
|
|
Traffic signal backplate replacements on various routes in District 5.
|
042-72K65
|
Executed
|
05/21/2019
|
|
|
4
|
6
|
Pike
|
|
Painting portions of two bridges on I-72, 1.8 miles west of Barry. (SN 075-0098 and 075-0099).
|
043-72L04
|
Executed
|
05/28/2019
|
|
1 |
4
|
6
|
Adams
|
|
Installation of fiber optic cables at various locations in Quincy.
|
044-72L06
|
Executed
|
05/29/2019
|
|
|
4
|
6
|
Logan
|
|
14 miles of seal centerline joints and route and seal isolated transverse cracks on I-55 from Kickapoo Creek to the McLean County line, includes the interchange ramps at I-155.
|
045-72L07
|
Executed
|
05/17/2019
|
|
1 |
4
|
6
|
Hancock
|
|
5.7 miles of micro-surfacing, cape seal of pavement and fog seal of shoulders on IL 110/336.
|
046-72L09
|
Executed
|
05/29/2019
|
1 / 0 |
1 |
4
|
6
|
Scott
|
|
Deck patching and expansion joint repairs on four structures on I-72. (SN 086-0040, 0041, 0042, 0043)
|
047-72L11
|
Executed
|
05/20/2019
|
1 / 1 |
|
4
|
6
|
Montgomery
|
|
Centerline microsurfacing on I-55 from IL 48 to milemarker 6.74.
|
048-72L12
|
Executed
|
05/29/2019
|
1 / 1 |
|
4
|
6
|
Montgomery
|
|
Centerline microsurfacing on I-55 from Macoupine Creek, southeast of Farmersville, to IL 48.
|
049-74880
|
Deleted
|
03/20/2019
|
|
|
4
|
7
|
Various
|
|
District-wide repair/replace steel plate beam guardrail damaged by vehicles.
|
050-74886
|
Executed
|
05/29/2019
|
1 / 1 |
1 |
4
|
7
|
Crawford
|
|
Culvert extension on IL 1 at Duncanville Road, 3.6 miles south of IL 33.
|
051-76H14
|
Executed
|
05/23/2019
|
2 / 2 |
|
5
|
8
|
Clinton
|
|
3.8 miles of resurfacing on IL 160 from IL 161 to IL 177.
|
052-76K57
|
Rejected
|
05/07/2019
|
1 / 1 |
1 |
5
|
8
|
Greene
|
|
Replace bridge deck of SN 031-0016 carrying IL 267 over Lick Creek, south of CH-9.
|
053-76K88
|
Executed
|
05/29/2019
|
|
2 |
5
|
8
|
Madison
|
|
5.7 miles of resurfacing and 3 foot shoulders in IL 160 from the Clinton County line to Highland Rd./Broadway in Highland.
|
054-76L16
|
Executed
|
05/23/2019
|
|
1 |
5
|
8
|
Madison
|
|
2.1 miles of resurfacing on IL 162 from 0.1 mile east of IL 159 to 0.3 mile east of Gliddon Boulevard in Troy.
|
055-76M11
|
Executed
|
05/20/2019
|
|
|
5
|
8
|
Madison
|
|
3.8 miles of single pass microsurfacing on IL 255 from just north of Seminary road to 0.5 mile north of IL 111/267.
|
056-76M12
|
Executed
|
05/20/2019
|
|
|
5
|
8
|
St. Clair
|
|
5.3 miles of single-pass microsurfacing on IL 158 from Anglers club Road to Atlanta Drive in Belleville.
|
057-76M13
|
Executed
|
06/12/2019
|
|
|
5
|
8
|
Madison
|
|
3.2 miles of micro-surfacing from Blue Spruce Lane to the St. Clair County line
|
058-78520
|
Deleted
|
03/08/2019
|
|
|
5
|
9
|
Jefferson
|
|
Safety shoulders, crown and superelevation correction, earthwork and drainage improvements on IL 37 from the Casey Fork structure to Campground Road, just north of Bonnie.
|
059-78694
|
Executed
|
06/12/2019
|
|
|
5
|
9
|
Williamson
|
|
Single pass microsurfacing, bump removal and fiber-modified asphalt crack sealing on IL 13 eastbound lane from west of Main Street to East Crab Orchard Road.
|
060-78702
|
Executed
|
05/23/2019
|
|
|
5
|
9
|
Jackson
|
|
1.9 miles of milling and resurfacing on US 51 from Old US 51 South Connector to Old Us 51 North connector, south of Carbondale.
|
061-62C01
|
Executed
|
05/23/2019
|
|
|
1
|
1
|
Lake
|
|
1.433 miles of 3P resurfacing and milled rumble strips on US 41 from IL 120 to Dorchester Avenue in Parck City and Gurnee.
|
062-62H13
|
Executed
|
05/23/2019
|
|
|
1
|
1
|
Kendall, Will
|
|
Clean and paint SN 099-0083 carrying US 52 over Hickory Creek in Joliet, and SN 047-0006 carrying IL 31 over BNSF RR in Oswego.
|
063-62H80
|
Executed
|
05/20/2019
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
Substructure bridge repair on the structure carrying Highland Avenue and IL 83 (Kingery Highway) over IL 56 (Butterfield Road) in the Villages of Lombard/Downers grove and City of Oak Brook Terrace. (SN 022-0154, 0117, 0118)
|
064-62H94
|
Withdrawn
|
04/25/2019
|
|
|
1
|
1
|
Cook, DuPage
|
|
Expressway sweeping on I-55 (Stevenson Expressway) from I-355 to I-90/94 and on I-94, US 41 from US 14 (Dempster Street) to IL 68 (Dundee Road).
|
065-72J94
|
Executed
|
05/09/2019
|
5 / 5 |
3 |
4
|
6
|
Sangamon
|
|
Patching, milling, paving and structure work on I-72 from from east of the MacArthur Boulevard interchange to the I-55/I-55 BUS (6th Street) interchange and on I-55/I-55 BUS from just south of the 6th Street interchange to south of Hazel Dell Road.
|
066-74419
|
Executed
|
05/21/2019
|
|
|
4
|
7
|
Clark
|
|
2 1/4" inlay of the existing pavement and ADA ramp improvements on IL 49 in Casey, from just south of Tyler Avenue to just north of the I-70 interchange.
|
067-74896
|
Deleted
|
03/20/2019
|
|
|
4
|
7
|
Wayne
|
|
Removal and replacement of the bridge deck and parapet wall over the damaged beam, and removal and replacement of the damaged PCC I-beam on SN 096-0031 on I-64 approximately 3.5 miles east of IL 242.
|
068-74908
|
Executed
|
05/28/2019
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems within Fayette, Effingham, Jasper, Crawford, Lawrence, Richland, Clay, Wayne, Edwards and Wabash Counties.
|
069-74909
|
Executed
|
05/28/2019
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems within Macon, Moultrie, Shelby, Clark, Cumberland and Coles and Effingham counties.
|
070-76J85
|
Deleted
|
03/15/2019
|
|
|
5
|
8
|
St. Clair
|
|
ADA improvements on US 50 from 3rd Street to Seven Hills Road in O'Fallon.
|
071-76L07
|
Executed
|
05/23/2019
|
1 / 1 |
|
5
|
8
|
Randolph
|
|
3.6 miles of resurfacing on IL 150 from Murphysboro Road to Briar Hill Road.
|
072-76L91
|
Deleted
|
03/14/2019
|
|
|
5
|
8
|
Madison
|
|
ADA improvements on IL 3 from 20th Street to Niedrinhaus Ave. in Granite City.
|
073-76M00
|
Executed
|
05/28/2019
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing on 20th Street from Central Avenue to Reed Avenue and from 47th Street to St. Claire Avenue in Summit,
|
074-76M09
|
Executed
|
05/20/2019
|
|
|
5
|
8
|
Madison
|
|
Microsurfacing on Old US 40 (St. Louis Road) from just east of Collinsville Road to National Terrace in Collinsville.
|
075-76M15
|
Executed
|
05/28/2019
|
1 / 1 |
1 |
5
|
8
|
Clinton
|
|
Slab on slab repair and culvert maintenance at SN 014-2005 carrying IL 127 over Mid Trib Flat Branch, 1.2 miles south of the Bond County line.
|
076-76M24
|
Executed
|
05/29/2019
|
|
|
5
|
8
|
St. Clair
|
|
Cleaning and painting SN 082-0143 and SN 082-0205 at the Poplar Street Complex
|
077-78029
|
Executed
|
05/23/2019
|
2 / 2 |
|
5
|
9
|
Johnson
|
|
Replacement of SN 044-0004 carrying US 45 over Little Cache Creek, just south of IL 146.
|
078-78461
|
Executed
|
05/29/2019
|
3 / 3 |
1 |
5
|
9
|
Jefferson
|
|
Replacement of 2 structures on 1-57 over Atchison Creek, 2 miles north of Ina (SN 041-0001 and 041-0002)
|
079-78635
|
Deleted
|
03/08/2019
|
|
|
5
|
9
|
Jackson
|
|
Box culvert replacement (SN 039-7061) carrying US 51 over an unnamed creek, adjacent to the Elkville Resevoir, 0.9 mile south of Hallidayboro Road, south of Elkville.
|
080-78690
|
Executed
|
05/29/2019
|
|
|
5
|
9
|
White
|
|
Removing the four way flashing beacon installation suspended by spanwire at the intersection of IL 14 and US 45 and replacing it with a new four way flashing beacon suspended by mast arm.
|
081-64M08
|
Executed
|
06/10/2019
|
|
|
2
|
2
|
Rock Island
|
|
HMA resurfacing on IL 192 from IL 92 to 0.3 mile west of 140th Street in Edgington; and on IL 92 from 0.1 mile west to 0.2 mile north of IL 192.
|
082-66428
|
Deleted
|
03/12/2019
|
|
|
2
|
3
|
Kankakee
|
|
6.530 miles of 3P milling and resurfacing from IL 17 to the north city limits of St. Anne; and traffic signal improvements at the intersection of IL 17 and IL 1.
|
083-66J07
|
Executed
|
06/03/2019
|
|
|
2
|
3
|
Kankakee
|
|
Installation of approximately 2.37 miles of high tension cable median barrier from 6000N RD to 0.7 mile south of 9000N Rd.
|
084-66J09
|
Executed
|
05/23/2019
|
|
|
2
|
3
|
Iroquois
|
|
2.91 miles of shoulder widening and rumble strips on US 24 from IL 1 to 2580E Road.
|
085-66J10
|
Executed
|
05/23/2019
|
|
|
2
|
3
|
Iroquois
|
|
3.97 miles of shoulder widening and rumble strips on IL 49 from E 2600 Rd to E 2200N Rd.
|
086-66J68
|
Active
|
03/21/2019
|
|
|
2
|
3
|
Iroquois, Livingston
|
|
Installing back up generators at 2 pump stations, and removal and replacement of all electrical, plumbing, HVAC, and mechanical equipment at the Reading pump station.
|
087-68D77
|
Executed
|
05/29/2019
|
1 / 1 |
|
3
|
4
|
Tazewell
|
|
Rehabilitation of SN 090-0047 carrying IL 29/IL 116/IL 8/US 24 over Farm Creek west of Camp Street in East Peoria.
|
088-68D98
|
Executed
|
05/21/2019
|
2 / 2 |
1 |
3
|
4
|
Peoria
|
|
Surfacing maintenance including pavement patching, HMA surface removal, HMA surface course, and the construction of ADA ramps at various locations on IL Rte 40.
|
089-68E73
|
Deleted
|
03/15/2019
|
|
|
3
|
4
|
Tazewell
|
|
Resurfacing ramp from Washington St to IL Rte 40 in East Peoria.
|
090-70790
|
Executed
|
05/21/2019
|
6 / 6 |
1 |
3
|
5
|
Champaign, Vermilion
|
|
5.4 miles of resurfacing on I-74 from 2 miles east of St. Joseph interchange to IL 49 N.
|
091-70D50
|
Rejected
|
05/07/2019
|
|
|
3
|
5
|
Edgar
|
|
New PCC shoulder with inlet and curb, and new pipe drains at US 150 east of Paris.
|
092-70D53
|
Executed
|
07/08/2019
|
|
|
3
|
5
|
Various
|
|
District-wide on-call guardrail and fence repairs.
|
093-72K99
|
Executed
|
05/17/2019
|
|
|
4
|
6
|
Logan, Sangamon
|
|
Patching on I-55 in Sangamon and Logan Counties and on I-72 in Sangamon County
|
094-76J86
|
Rejected
|
05/07/2019
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Construction of ADA accessible ramps on IL 159 from Park Street in Edwardsville to Glen Crossing Road in glen Carbon and on IL 157 from Vandalia Street/St. Louis Street in Edwardsville to Meridian Road in Glen Carbon.
|
095-76L56
|
Rejected
|
05/07/2019
|
3 / 3 |
|
5
|
8
|
Jersey
|
|
Serpentine and parking lot resurfacing, ADA upgrades, lighting, and roadway ramp reconstruction on both the Jersey and Calhoun County sides, and dredging at the Brussels Ferry.
|
096-72K77
|
Deleted
|
03/21/2019
|
|
|
4
|
6
|
Macoupin, Montgomery
|
|
Painting three bridges on 1-55 in Macoupin and Montgomery counties (SN 068-0052, 059-0037, 059-0038)
|
097-72K78
|
Rejected
|
05/07/2019
|
|
|
4
|
6
|
Scott
|
|
Painting portions of two bridges on IL 100 and Hillview Road (SN 086-0016, 086-0039).
|
098-74694
|
Deleted
|
03/20/2019
|
|
|
4
|
7
|
Coles
|
|
3.9 miles of resurfacing, ADA improvements, and traffic signals on IL 16 from 0.2 mile west of Douglas Drive to 0.4 mile east of Madison Street in Charleston.
|
099-76J17
|
Rejected
|
05/07/2019
|
2 / 2 |
1 |
5
|
8
|
Calhoun
|
|
Deck replacement on SN 007-0014 carrying IL 96 over an unnamed creek in Kampsville.
|
100-76M16
|
Deleted
|
03/12/2019
|
|
|
5
|
8
|
Madison
|
|
Deck waterproofing and joint and beam end repair on SN 060-0226 carrying IL 140 over UPRR 3.1 miles west of I-55 and on SN 060-0227 carrying IL 140 over NandWRR 2.9 miles miles west of I-55.
|
101-78704
|
Executed
|
06/06/2019
|
|
1 |
5
|
9
|
Pulaski, Union
|
|
HMA resurfacing, shoulder upgrades and patching on Old US 51 beginning at the south limits of Dongola and proceeding south for 3.7 miles
|
102-76J82
|
Deleted
|
03/14/2019
|
|
|
5
|
8
|
Jersey
|
|
ADA improvements on US 67 from Oak Street to County Road in Jerseyville.
|
103-76L98
|
Executed
|
05/23/2019
|
|
|
5
|
8
|
St. Clair
|
|
Bridge painting on SN 082-0039 carrying IL 15 over Hardin Ditch and on SN 082-0040 carrying IL 15 over IL 157.
|
104-61D48
|
Executed
|
06/24/2019
|
1 / 0 |
|
1
|
1
|
Will
|
|
Construction of a multi-use path and sidewalk replacement algon the west parkway of Farrell Road from Division Street to south of 7th Street in the City of Lockport.
|
105-61E74
|
Executed
|
05/29/2019
|
|
1 |
1
|
1
|
Kane
|
|
Modifications at 27 intersections in Aurora, Batavia, Geneva, North Aurora and unincorporated Kane County.
|
106-61F26
|
Executed
|
05/28/2019
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Spring Road from Vallette Street to St. Charles Road in the City of Elmhurst.
|
107-61F29
|
Executed
|
05/29/2019
|
7 / 5 |
1 |
1
|
1
|
DuPage
|
|
Sidewalk construction on County Line Road from 60th Street to Longwood Drive in the Village of Burr Ridge.
|
108-61F46
|
Executed
|
05/28/2019
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Roy Avenue from North Avenue to Winters Drive in the City of Northlake.
|
109-61F51
|
Executed
|
06/04/2019
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Roadway reconstruction on Arlington Heights Road from Pierce Road to Thorndale Road in the village of Itasca.
|
110-61F53
|
Executed
|
05/23/2019
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Illinois Street from Orchard Drive to Western Avenue in the Village of Park Forest.
|
111-61F65
|
Executed
|
06/21/2019
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
Reconstruction of Orchard Lane from Monaville Road to Rollins Road, and resurfacing of Hook Lane from Orchard Lane to Rollins Road in the Village of Round Lake Beach.
|
112-61F67
|
Executed
|
06/17/2019
|
1 / 1 |
|
1
|
1
|
Will
|
|
Resurfacing University Parkway from Steger-Monee Road to Western Avenue in the Village of University Park.
|
113-61F69
|
Executed
|
06/20/2019
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
Resurfacing Grand Avenue from Nippersink Boulevard to Illinois Route 59 in the Village of Fox Lake.
|
114-61F70
|
Executed
|
05/17/2019
|
|
|
1
|
1
|
DuPage
|
|
Resurface Collins Avenue from Swift Road to Rohwling Road, and resurface Fullerton Avenue from Rohwling Road to Addison Road in the village of Addison.
|
115-61F72
|
Executed
|
06/14/2019
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Resurfacing Janes Avenue from 75th Street to Center Drive in the Village of Woodridge.
|
116-61F77
|
Executed
|
05/23/2019
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Burr Ridge Parkway from County Line Road to Bridewall Drive in the Village of Burr Ridge.
|
117-85679
|
Executed
|
05/17/2019
|
9 / 8 |
|
2
|
2
|
Winnebago
|
|
Remove existing pedestrian superstructure and construct a steel truss pedestrian superstructure, includes rehabilitation of existing bridge ramp structural members. Located beneath the Jefferson Street (US Business Route 20) bridge over the Rock River in the Rockford.
|
118-87699
|
Executed
|
07/01/2019
|
|
|
2
|
3
|
Livingston
|
|
Replace the bridge carrying TR 245A over the south fork of Vermilion River, 4 miles south of chatsworth.
|
119-93723
|
Executed
|
05/23/2019
|
|
|
4
|
6
|
Macoupin
|
|
Remove and replace guardrail and terminals at various locations in Macoupin County.
|
120-93725
|
Executed
|
05/29/2019
|
|
|
4
|
6
|
Adams
|
|
Resurfacing CH 4 from North 200th Avenue to North 400th Avenue.
|
121-97684
|
Executed
|
05/20/2019
|
|
|
5
|
8
|
Madison
|
|
Resurfacing Clifton Terrace Road from south of IL 3 to Rosenberg Lane in the Village of Godfrey.
|
122-99575
|
Executed
|
05/20/2019
|
|
|
5
|
9
|
Saline
|
|
Replace the bridge carrying DeNeal Road over an unnamed creek, 3 miles east of Mitchellsville.
|
123-99607
|
Executed
|
05/28/2019
|
|
|
5
|
9
|
Massac
|
|
Replace the bridge carrying Portland Road over an unnamed stream, 2 miles northwest of Joppa.
|
124-99613
|
Executed
|
06/06/2019
|
|
|
5
|
9
|
Williamson
|
|
Resurfacing CH 18 from Stonefort Road to East Boundary Road north of Creal Springs.
|
125-99616
|
Executed
|
05/23/2019
|
|
|
5
|
9
|
Jackson
|
|
Resurfacing Ava Road from IL 4 to South of Francis Lane.
|
126-99618
|
Executed
|
06/06/2019
|
|
|
5
|
9
|
Jefferson
|
|
Resurfacing Marlow Road from IL 15 to Opdyke Road
|
127-99619
|
Executed
|
06/12/2019
|
|
|
5
|
9
|
White
|
|
Resurfacing CH 7 from 650 North Road to IL 141.
|
128-62G96
|
Executed
|
05/23/2019
|
3 / 3 |
1 |
1
|
1
|
Lake
|
|
0.947 mile of 3P resurfacing and overlaying including pedestrian curb improvements on US 41 from Lake-Cook Road to south of Chantilly Boulevard in Highland Park.
|
129-62G51
|
Executed
|
05/29/2019
|
|
1 |
1
|
1
|
DuPage
|
|
Bridge deck and approach overlay and repairs, reconstrution of deck joint, and repair of substructure for 022-0034 carrying US 34 over St. Josepth Creek in Lisle.
|
130-62H29
|
Executed
|
06/10/2019
|
|
|
1
|
1
|
Cook, Lake
|
|
A total of 10.2 miles of routing, cleaning, and sealing of longitudinal cracks at 3 locations on IL 21/US 45 in Niles, Glenview, Vernon Hills, Libertyville and Gurnee.
|
131-46915
|
Executed
|
05/28/2019
|
1 / 1 |
1 |
5
|
8
|
Randolph
|
|
Reconstruction of 0.4 mile HMA pavement, oil and chip existing roads and cart paths, and seal and strip the parking lot at the World Shooting Complex in Sparta.
|
132-46902
|
Withdrawn
|
04/17/2019
|
2 / 2 |
|
2
|
3
|
Grundy
|
|
Remove and replace three span structures SN 032-7004 and SN 032-7099 carrying Price street over the IandM Canal, seal and stripe parking lots, and other associatd work at the William G. Stratton State Park in Morris.
|
133-61F01
|
Executed
|
06/14/2019
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Resurfacing with sidewalk, curb and gutter work on Riverside Drive from Harlem Avenue to Cermak Road in the City of Berwyn.
|
134-61F39
|
Executed
|
06/24/2019
|
|
|
1
|
1
|
Cook
|
|
Roadway Reconstruction on Braga Drive from 25th Avenue to West 16th Street and on West 16th Street from Braga Drive to 21st Avenue in the Village of Broadview.
|
135-61F50
|
Executed
|
06/14/2019
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Resurfacing Blanchard Street from south of Tara Court to President Street and President Street from Blanchard Street to IL 38 in the City of Wheaton.
|
136-61F52
|
Executed
|
05/31/2019
|
|
|
1
|
1
|
DuPage
|
|
Channelization improvements on Diehl Road from Davis Parkway to Winfield Road in the City of Warrenville.
|
137-61F56
|
Executed
|
06/05/2019
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Harrison Avenue from Gary Avenue to College Avenue in the City of Wheaton.
|
138-61F66
|
Executed
|
05/23/2019
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
Intersection and traffic signal improvements at 75th Street and Naper Boulevard in the City of Naperville.
|
139-61F68
|
Executed
|
05/21/2019
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
Intersection improvement on US 52 at Gougar Road in the Village of Manhattan.
|
140-61F73
|
Executed
|
06/19/2019
|
2 / 2 |
|
1
|
1
|
DuPage
|
|
Rehabilitate the bridge carrying St. Charles Road over Salt Creek, 0.2 mile west of IL 83 in Villa Park.
|
141-61F75
|
Executed
|
06/12/2019
|
5 / 5 |
2 |
1
|
1
|
Lake
|
|
Roadway reconstruction on Rockland Road from IL 21 to the Des Plaines River in Libertyville.
|
142-85681
|
Executed
|
05/23/2019
|
|
|
2
|
2
|
Whiteside
|
|
Cold-In-Place recycling and resurfacing on Fulfs Road from Coleta Road to IL 40
|
143-85682
|
Executed
|
05/20/2019
|
|
|
2
|
2
|
Stephenson
|
|
Cold-In-Place recycling lon Loran Road from Kent Road to IL 73.
|
144-87698
|
Executed
|
06/11/2019
|
4 / 4 |
1 |
2
|
3
|
Bureau
|
|
Replace the bridge carrying TR 281 over East Bureau Creek, 3.5 miles west of Depue.
|
145-87704
|
Executed
|
05/30/2019
|
3 / 2 |
2 |
2
|
3
|
DeKalb
|
|
Reconstruct the intersection of Peace Road at IL 64.
|
146-87708
|
Executed
|
05/21/2019
|
|
|
2
|
3
|
LaSalle
|
|
Replace the bridges carrying TR 469 and TR 382 over Covel Creek, 6 miles east of Grand Ridge.
|
147-87714
|
Executed
|
05/20/2019
|
|
|
2
|
3
|
LaSalle
|
|
Resurfacing and intersection improvements on FAS Route 263 (CH 5) at Illinois Route 23.
|
148-89474
|
Executed
|
05/29/2019
|
3 / 3 |
2 |
3
|
4
|
Knox
|
|
Replace the bridge carrying CH 4 over Walnut Creek, 0.5 mile west of Altona.
|
149-95846
|
Executed
|
05/28/2019
|
|
|
4
|
7
|
Wabash
|
|
Replace the bridge carrying TR 173 over a drainage ditch, 1.5 miles south of Keensburg.
|
150-95847
|
Executed
|
05/21/2019
|
|
|
4
|
7
|
Moultrie
|
|
Resurface CH 13 from County Road 1500 North to County Road 1400 North.
|
151-97690
|
Executed
|
05/29/2019
|
|
|
5
|
8
|
Madison
|
|
Resurfacing Wanda Road from IL 143 to New Poag Road.
|
152-97692
|
Deleted
|
03/18/2019
|
|
|
5
|
8
|
St. Clair
|
|
Reconstruction of Shiloh Station Road from south of Timberline Court to 0.5 mile north of Johnson Road in Shiloh.
|
153-97695
|
Executed
|
06/06/2019
|
|
1 |
5
|
8
|
Madison
|
|
Resurfacing Washington Avenue from north of Salu Street to College Avenue in Alton.
|
154-97696
|
Executed
|
05/29/2019
|
|
|
5
|
8
|
Randolph
|
|
Resurfacing Baldwin Road from Wirth Lane to Ridge Road and from the St. Clair County line to north city limits of Baldwin.
|
155-61D85
|
Executed
|
05/23/2019
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Pavement widening, resurfacing, curb and gutter, sidewalk, traffic signal modernization and street lighting at the intersection of Pulaski Road and 183rd Street in Country Club Hills.
|
156-61E24
|
Executed
|
05/30/2019
|
5 / 4 |
|
1
|
1
|
Lake
|
|
Pavement reconstruction, sidewalks, HMA pedestrian path, box culvert, water main relacation, traffic signal and street lighting on Weiland Road from Deerfield Parkway to Lake Cook Road.
|
157-61E94
|
Executed
|
05/29/2019
|
|
|
1
|
1
|
Cook
|
|
Sidewalk improvements at various locations within the the Village of Barrington
|
158-61E96
|
Rejected
|
05/14/2019
|
4 / 2 |
1 |
1
|
1
|
DuPage
|
|
Construction of an HMA pedestrian path, sidewalks, storm sewer and the extension of Church Road from Grove Avenue to IL 19 in Bensenville.
|
159-61F09
|
Executed
|
05/17/2019
|
|
1 |
1
|
1
|
Cook
|
|
Pavement removal, storm sewers, HMA pavement, curb and gutter, sidewalks, traffic signals, street lighting and pavement markings on Woodfiled Road, from Martingale Road to the East Frontage Road in Schaumburg.
|
160-61F10
|
Executed
|
05/17/2019
|
|
1 |
1
|
1
|
Cook
|
|
Pavement removal, storm sewers, HMA pavement, curb and gutter, sidewalks, traffic signals, street lighting and pavement markings on Woodfiled Road, from Meacham Road to Martingale Road in Schaumburg.
|
161-61F12
|
Executed
|
05/23/2019
|
1 / 1 |
|
1
|
1
|
Will
|
|
Rehabilitate the bridge carrying IL 7 Frontage Road over the Des Plaines River in the City of Lockport.
|
162-61F55
|
Executed
|
06/05/2019
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Resurfacing, curb and gutter, sidewalks, Street lighting and pavement markings on Forest Avenue from Joliet Street to IL 59 in West Chicago.
|
163-61F71
|
Executed
|
06/21/2019
|
|
|
1
|
1
|
DuPage
|
|
Pavement reconstruction, resurfacing, add curb islands, storm sewer, water main adjustments, sidewalks and pavement markings at various locations in Bensenville.
|
164-87689
|
Executed
|
05/28/2019
|
5 / 5 |
1 |
2
|
3
|
DeKalb
|
|
Replace the bridge carrying Base Line Road over Coon Creek, located 0.25 mile west of the Kane County Line.
|
165-87705
|
Executed
|
05/29/2019
|
1 / 1 |
1 |
2
|
3
|
DeKalb
|
|
Shoulder widening, resurfacing, extend a culvert and street lighting on Plank Road from Lindgren Road to East County Line Road.
|
166-95798
|
Executed
|
05/31/2019
|
7 / 4 |
1 |
4
|
7
|
Macon
|
|
Replace the bridge carrying CH 57 over a tributary to Big Creek, 0.2 mile south of Lehman Road.
|
167-97694
|
Executed
|
06/10/2019
|
|
|
5
|
8
|
St. Clair
|
|
Pavement reconstrcution, curb and gutter, storm sewer, sidewalks, and pavement markings on Simmons Road from Milburn School Road to Porter Road in O'Fallon.
|
168-61F64
|
Executed
|
06/17/2019
|
3 / 3 |
|
1
|
1
|
Will
|
|
Reconstruct the intersection of Rodeo Drive at Kings Road in Bolingbrook.
|
169-97654
|
Executed
|
07/11/2019
|
11 / 9 |
1 |
5
|
8
|
St. Clair
|
|
Reconstruction of Cargill Elevator Road from the Mississippi River bridge_docks to IL 3 in Cahokia.
|
170-70D46
|
Executed
|
05/28/2019
|
|
|
3
|
5
|
Piatt
|
|
400 feet of bridge repairs at SN 074-0082 to mainline FAP 760 (IL-48) over Friends Creek ditch three miles north of I-72
|
171-72K79
|
Executed
|
05/29/2019
|
|
|
4
|
6
|
Montgomery
|
|
Painting SN 068-0058 which carries IL 127 over the West Fork Shoal Creek Tributary, 1.6 miles south of IL 48.
|
172-72K90
|
Executed
|
05/23/2019
|
|
|
4
|
6
|
Morgan
|
|
Bituminous surface treatment on Mound Road in the City of Jacksonville
|
01A-LI038
|
Executed
|
08/12/2019
|
|
|
4
|
6
|
Montgomery
|
|
Airfield Pavement Maintenance
|
02A-UN057
|
Executed
|
11/15/2019
|
|
|
3
|
5
|
Champaign
|
|
Rehabilitate Airport Entrance Road
|
03A-UN058
|
Withdrawn
|
04/22/2019
|
1 / 0 |
|
3
|
5
|
Champaign
|
|
Reconstruct Taxiway A5/A6 (RSAT Requirement)
|
04A-SP025
|
Executed
|
11/15/2019
|
|
|
5
|
8
|
Randolph
|
|
Mill and Overlay Existing T-Hangar Site Taxilanes; Construct New T-Hangar Building and New Taxiway Approaches; Rehabilitate Hangar 1: Repaint Hangar Roof , Exterior Walls, and Upgrade Building Wiring
|
05A-RA017
|
Executed
|
09/25/2019
|
|
|
3
|
5
|
Champaign
|
|
Phase 3: Construct Wildlife Deterrent Fence
|
06A-AU069
|
Rejected
|
03/09/2020
|
2 / 1 |
|
1
|
1
|
Kane
|
|
Phase 2: Airfield Pavement Rehabilitation Including General Aviation Apron and Taxiway P
|
07A-PL016
|
Executed
|
10/31/2019
|
|
|
5
|
9
|
Perry
|
|
Replace PAPI, Wind Cone, Rotating Beacon and Tower, and Construct REILS
|
08A-CS007
|
Executed
|
09/25/2019
|
|
|
4
|
7
|
Clark
|
|
Re-mark Runway and Taxiways
|
09A-CI007
|
Rejected
|
06/05/2019
|
|
1 |
5
|
9
|
Alexander
|
|
Install Perimeter Fence, Phase 3: East and North Perimeter
|
10A-LW029
|
Executed
|
10/01/2019
|
|
1 |
4
|
7
|
Lawrence
|
|
Repair Existing Inlets in Main Apron Area
|