Home > Notice of Letting > Contract Detail

April 26, 2019 Letting 10:00 AM
120-93725

Bulletin Description

Resurfacing CH 4 from North 200th Avenue to North 400th Avenue.
Region District DBE % VBP % Federal Project #
4 6 4.00 0.00 H20C(085)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Adams
  • FAS 593
  • 16-00052-02-FP
  • C-96-019-19
  • 6-10744-0000
Contract Specifics
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of April 16, 2019 04:30 PM.

Authorized Bidders

  • 1465 Diamond Construction Company
    2000 North 18th
    Quincy, IL 62301
    PO Box 3486
    Quincy, IL 62305
    Phone: (217) 222-3532 Fax: (217) 222-3080 Email: office@diamond1946.com
    $472,774.06

  • 0640 Chester Bross Construction Company
    6739 County Rd 423
    Palmyra, MO 63461
    P.O. Box 430
    Hannibal, MO 63401
    Phone: (573) 221-5958 Fax: (573) 221-1892 Email: jhamilton@cbrossgroup.com
    $631,164.59

  • 2825 Illinois Valley Paving, a div of UCM, Inc.
    3151 Robbins Road
    Springfield, IL 62704
    P.O. Box 13420
    Springfield, IL 62791
    Phone: (217) 546-6192 Fax: (217) 546-1904 Email: IVP@ucm.biz
    $589,597.18

Non Bidders

  • 4741 Phoenix Corporation of the Quad Cities
    1006 Rosehill Rd
    Port Byron, IL 61275
    PO Box 445
    Rapids City, IL 61278
    Phone: (309) 523-3687 Fax: (309) 523-3752 Email: mdecap@phoenixcorp.org

Pay Item # UOM Description Type Quantity Unit Price
35101400 TON AGGREGATE BASE COURSE, TYPE B Base items 90.000
35800100 SQ YD PREPARATION OF BASE Base items 425.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 16,650.000
40600625 TON LEVELING BINDER (MACHINE METHOD), N50 Base items 1,450.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 223.000
40600990 SQ YD TEMPORARY RAMP Base items 65.000
40603510 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, MIX "C", N50 Base items 2,250.000
40800029 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 56.000
40800050 TON INCIDENTAL HOT-MIX ASPHALT SURFACING Base items 110.000
48101200 TON AGGREGATE SHOULDERS, TYPE B Base items 1,900.000
60255500 EACH MANHOLES TO BE ADJUSTED Base items 3.000
67100100 L SUM MOBILIZATION Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 1,064.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 355.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 12,384.000
X0327979 SQ FT PAVEMENT MARKING REMOVAL - GRINDING Base items 4,103.000
X2020410 CU YD EARTH EXCAVATION (SPECIAL) Base items 56.000
X4401198 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH Base items 1,128.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
Z0033700 FOOT LONGITUDINAL JOINT SEALANT Base items 11,844.000
Z0076600 HOUR TRAINEES Base items 500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00