April 24, 2020 Letting 12:00 PM
056-72K45

Bulletin Description

ADA improvements at various locations along IL 16 and IL 127 in Hillsboro.
Region District DBE % VBP % Federal Project #
4 6 5.00 0.00 NHPPD26F(035)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Montgomery
  • FAP 325
  • FAP 42A
  • (21, 104, 105) SW
  • C-96-053-18
  • 6-00784-0500
Contract Specifics
40 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of April 14, 2020 04:30 PM.

  • The plans call for 80' of pipe handrail. We can only find 2 small stairs that get pipe handrail on sheet 24. Where does the balance of the rail get installed?
    An addendum will be issued to address this. (04/13/2020)

  • Can IDOT provide copies of any Preliminary Environmental Site Assessments (PESA) or Preliminary Site Investigations (PSI) as it applies to regulated substance special provision to this item-contract.
    The requested information is available to Authorized bidders in ICX. (04/13/2020)

  • 1. Page 5 of the job special provisions indicate the Portland Cement Concrete Sidewalk 4 Inch, Special includes all excavation, furnishing and placing backfill, course aggregate, reinforcement bars and side curb in accordance with 424 of the Standard Specifications, as shown in the plans, and as directed by the Engineer. Please note no plan detail was provided regarding the course aggregate thickness or type nor was any detail provided regarding rebar size or spacing. If the course aggregate an
    The special provision is intended to convey that should a contractor's means and methods include the use of course aggregate or reinforcement during the construction of the sidewalk and side curb, these materials will not be paid for separately but should be included in the price for Portland Cement Concrete Sidewalk 4 Inch, Special. It is not intended to specify that the contractor must use these materials in the construction of the sidewalk and side curb, as there is no detail for this work. (04/08/2020)

  • Will an approximate location/address be provided for the location of the underground storage tank
    Because this is a risk managed project, no PSI was completed. Because of that, the exact locations of the Underground Storage Tanks (UST’s) are unknown. So the Underground Storage Tank Removal pay item is provided in case one is encountered in construction. (04/08/2020)

Authorized Bidders

  • 5802 Stutz Excavating, Inc.
    3837 Fosterburg Road
    Alton, IL 62002
    Phone: (618) 259-2485 Fax: (618) 259-2465 Email: No Record
    $344,460.10

  • 3108 Keller Construction, Inc.
    22 Illini Drive
    Glen Carbon, IL 62034
    Phone: (618) 656-0033 Fax: (618) 656-7134 Email: dan.walker@kellerconstruction.com
    $409,661.56

  • 3163 Kinney Contractors, Inc.
    19342 E. Frontage Rd.
    Raymond, IL 62560
    Phone: (217) 229-3322 Fax: (217) 229-3609 Email: kinney@roadbuilder.net
    $369,323.00

  • 4928 RCS Construction, Inc.
    960 E. Airline Drive
    East Alton, IL 62024
    Phone: (618) 254-3816 Fax: (618) 254-3841 Email: heather@rcs-construction.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
25000200 ACRE SEEDING, CLASS 2 Base items 0.250
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 1.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 1.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 1.000
25000700 TON AGRICULTURAL GROUND LIMESTONE Base items 0.500
25100115 ACRE MULCH, METHOD 2 Base items 0.250
35400300 SQ YD PORTLAND CEMENT CONCRETE BASE COURSE WIDENING 8" Base items 107.000
42400800 SQ FT DETECTABLE WARNINGS Base items 627.000
44000300 FOOT CURB REMOVAL Base items 5.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 617.000
44000600 SQ FT SIDEWALK REMOVAL Base items 5,566.000
50901760 FOOT PIPE HANDRAIL Base items 12.000
60255500 EACH MANHOLES TO BE ADJUSTED Base items 2.000
60266600 EACH VALVE BOXES TO BE ADJUSTED Base items 3.000
60603800 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 Base items 143.000
60604400 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18 Base items 21.000
60605000 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 Base items 453.000
66900105 EACH UNDERGROUND STORAGE TANK REMOVAL Base items 1.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 110.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 6.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
66901006 CAL DA REGULATED SUBSTANCES MONITORING Base items 12.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 12.000
67100100 L SUM MOBILIZATION Base items 1.000
70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000
70102640 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 Base items 1.000
X0327008 EACH REMOVE AND RELOCATE SIGN (SPECIAL) Base items 1.000
X4240420 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH (SPECIAL) Base items 6,426.000
X5030225 CU YD CONCRETE STRUCTURES (SPECIAL) Base items 13.000
X6061005 FOOT CONCRETE CURB, TYPE B (SPECIAL) Base items 143.000
Z0012450 CU YD CONCRETE STEPS Base items 0.500
Z0012455 EACH CONCRETE STEP REMOVAL Base items 3.000
No More Pay Items