Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
5 | 9 | 14.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
65 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20100210 | UNIT | TREE REMOVAL (OVER 15 UNITS DIAMETER) | Base items | 202.000 | |||
20200100 | CU YD | EARTH EXCAVATION | Base items | 177.000 | |||
20300100 | CU YD | CHANNEL EXCAVATION | Base items | 848.000 | |||
20400800 | CU YD | FURNISHED EXCAVATION | Base items | 105.000 | |||
28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 9.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 404.000 | |||
28100109 | SQ YD | STONE RIPRAP, CLASS A5 | Base items | 794.000 | |||
28200200 | SQ YD | FILTER FABRIC | Base items | 794.000 | |||
35100700 | SQ YD | AGGREGATE BASE COURSE, TYPE A 8" | Base items | 658.000 | |||
40600275 | POUND | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 1,481.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 297.000 | |||
40602978 | TON | HOT-MIX ASPHALT BINDER COURSE, IL- 9.5, N50 | Base items | 64.000 | |||
40604000 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5FG, MIX "C", N50 | Base items | 64.000 | |||
42001300 | SQ YD | PROTECTIVE COAT | Base items | 452.000 | |||
48100300 | SQ YD | AGGREGATE SHOULDERS, TYPE A 4" | Base items | 108.000 | |||
50100100 | EACH | REMOVAL OF EXISTING STRUCTURES | Base items | 1.000 | |||
50200100 | CU YD | STRUCTURE EXCAVATION | Base items | 29.000 | |||
50200300 | CU YD | COFFERDAM EXCAVATION | Base items | 104.000 | |||
50201101 | EACH | COFFERDAM (TYPE 1) (LOCATION - 1) | Base items | 1.000 | |||
50201102 | EACH | COFFERDAM (TYPE 1) (LOCATION - 2) | Base items | 1.000 | |||
50300225 | CU YD | CONCRETE STRUCTURES | Base items | 148.000 | |||
50300255 | CU YD | CONCRETE SUPERSTRUCTURE | Base items | 127.000 | |||
50300260 | SQ YD | BRIDGE DECK GROOVING | Base items | 371.000 | |||
50400805 | FOOT | FURNISHING AND ERECTING PRECAST PRESTRESSED CONCRETE I-BEAMS, 36 IN. | Base items | 626.000 | |||
50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 45,540.000 | |||
51201800 | FOOT | FURNISHING STEEL PILES HP14X73 | Base items | 1,700.000 | |||
51202305 | FOOT | DRIVING PILES | Base items | 1,700.000 | |||
51203800 | EACH | TEST PILE STEEL HP14X73 | Base items | 4.000 | |||
51204650 | EACH | PILE SHOES | Base items | 26.000 | |||
51500100 | EACH | NAME PLATES | Base items | 1.000 | |||
58600101 | CU YD | GRANULAR BACKFILL FOR STRUCTURES | Base items | 104.000 | |||
59100100 | SQ YD | GEOCOMPOSITE WALL DRAIN | Base items | 36.000 | |||
63100085 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 6 | Base items | 4.000 | |||
63100167 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT | Base items | 4.000 | |||
63200310 | FOOT | GUARDRAIL REMOVAL | Base items | 64.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
78001110 | FOOT | PAINT PAVEMENT MARKING - LINE 4" | Base items | 436.000 | |||
X2110104 | SQ YD | TOPSOIL FURNISH AND PLACE, 4" (SPECIAL) | Base items | 537.000 | |||
X2300023 | FOOT | TIMBER RAILING | Base items | 257.000 | |||
Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
Z0046304 | FOOT | PIPE UNDERDRAINS FOR STRUCTURES 4" | Base items | 136.000 | |||
No More Pay Items |