Home > Notice of Letting > Contract Detail

June 11, 2021 Letting 12:00 PM
06A-WA075

Bulletin Description

Rehabilitate Airfield Lighting, Phase 1 and 2 (Runway 5/23, 14/32, Taxiway A, B and C) and Airfield Lighting Control and Monitoring System (ALCMS)
Region District DBE % VBP % Federal Project #
1 1 2.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Lake
UGN 4824 Waukegan National Waukegan Port District Waukegan
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
185 Calendar Days
This project is currently unfunded, but actively seeking discretionary funds
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of June 01, 2021 04:30 PM.

  • Is the contractor required to remove the existing #8 5KV UG CABLE IN UD between light bases?
    The contractor is required to remove the existing #8 5KV UG CABLE IN UD between light bases, when possible, as called out in Note 3 of Existing Conditions and Removals – Sheet 1. (06/02/2021)

  • Is an existing raceway available from the existing old vault to the handhole location where temporary jumpers will be installed for power to runway 5/23 circuit?
    There are existing underground conduits/ducts between old vault and existing high voltage handhole. However, the condition and availability cannot be confirmed. Addendum A will be issued to clarify. (06/02/2021)

  • Will a backup generator and automatic transfer switch be required at the existing old vault as a redundant power source for the regulator and radio controller?
    The contractor will be required to temporarily reestablish power, by means of a backup generator, within 2 hours of being notified of a power outage by the Airport or Resident Engineer. Addendum A will be issued to clarify. (06/02/2021)

  • Is a site walk possible to determine the condition and available service and distribution equipment in the existing old vault? In lieu of a sitewalk, please provide pictures of the above items including available breakers.
    A site visit can be coordinated through the Waukegan Airport’s Deputy Director. Photos are unavailable. Addendum A will be issued to clarify. (06/02/2021)

Authorized Bidders

  • 2475 Hecker and Company, Inc.
    250 Industrial Lane
    Wheeling, IL 60090
    Phone: (847) 459-9222 Fax: (847) 459-9250 Email: dan@heckerco.com
    $3,800,776.00

  • 0080 Aldridge Electric, Inc.
    844 E. Rockland Rd.
    Libertyville, IL 60048
    Phone: (847) 680-5200 Fax: (847) 680-5233 Email: hcullen@aldridgegroup.com
    $3,905,472.60

  • 3011 J. Ranck Electric, Inc.
    1993 Gover Parkway
    MT. Pleasant, MI 48858
    Phone: (989) 775-7393 Fax: (989) 775-7393 Email: ajranck@jranck.com
    $4,549,472.50

  • 3948 Meade Inc.
    625 Willowbrook Center Pkwy
    Wilowbrook, IL 60527
    Phone: (708) 588-2500 Fax: (708) 588-2501 Email: infraestimating@meade100.com
    $6,318,150.95

Non Bidders

  • 0733 John Burns Construction Company
    999 Oakmont Plaza Drive, Suite 400
    Westmont, IL 60559
    Phone: (708) 638-7642 Fax: (708) 326-3499 Email: lmartinez@jbcco.com

Pay Item # UOM Description Type Quantity Unit Price
AR107920 EACH REPLACE WIND CONE Base items 2.000
AR108108 FOOT 1/C #8 5 KV UG CABLE Base items 17,800.000
AR108158 FOOT 1/C #8 5 KV UG CABLE IN UD Base items 87,500.000
AR108706 FOOT 1/C #6 COUNTERPOISE Base items 60,100.000
AR109210 L SUM VAULT MODIFICATIONS Base items 1.000
AR109331 EACH 15 KW REGULATOR, STYLE 1 Base items 6.000
AR109342 EACH 20 KW REGULATOR, STYLE 2 Base items 2.000
AR109810 EACH GENERATOR Base items 1.000
AR109908 L.S. REMOVE GENERATOR Base items 1.000
AR110012 FOOT 2" DIRECTIONAL BORE Base items 180.000
AR110013 FOOT 3" DIRECTIONAL BORE Base items 150.000
AR110024 L.F. 2-4" DIRECTIONAL BORE Base items 3,100.000
AR110202 FOOT 2" PVC DUCT, DIRECT BURY Base items 600.000
AR110502 FOOT 2-WAY CONCRETE ENCASED DUCT Base items 175.000
AR110504 FOOT 4-WAY CONCRETE ENCASED DUCT Base items 1,110.000
AR110610 EACH ELECTRICAL HANDHOLE Base items 1.000
AR110615 EACH ELECTRICAL HANDHOLE, HIGH VOLTAGE Base items 8.000
AR125410 EACH MITL-STAKE MOUNTED Base items 566.000
AR125415 EACH MITL-BASE MOUNTED Base items 144.000
AR125442 EACH TAXI GUIDANCE SIGN, 2 CHARACTER Base items 8.000
AR125443 EACH TAXI GUIDANCE SIGN, 3 CHARACTER Base items 14.000
AR125444 EACH TAXI GUIDANCE SIGN, 4 CHARACTER Base items 4.000
AR125445 EACH TAXI GUIDANCE SIGN, 5 CHARACTER Base items 6.000
AR125446 EACH TAXI GUIDANCE SIGN, 6 CHARACTER Base items 6.000
AR125510 EACH MIRL, BASE MOUNTED Base items 32.000
AR125515 EACH HIRL, BASE MOUNTED Base items 52.000
AR125525 EACH HIRL, INPAVEMENT Base items 8.000
AR125545 EACH MI THRESHOLD LIGHT BASE MTD Base items 18.000
AR125550 EACH HI THRESHOLD LIGHT BASE MTD Base items 16.000
AR125565 EACH SPLICE CAN Base items 2.000
AR125901 EACH REMOVE STAKE MOUNTED LIGHT Base items 479.000
AR125902 EACH REMOVE BASE MOUNTED LIGHT Base items 179.000
AR125903 EACH REMOVE INPAVEMENT LIGHT Base items 5.000
AR125904 EACH REMOVE TAXI GUIDANCE SIGN Base items 35.000
AR125906 EACH REMOVE SPLICE CAN Base items 71.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR156510 FOOT SILT FENCE Base items 600.000
AR156520 EACH INLET PROTECTION Base items 10.000
AR401910 SQ YD REMOVE & REPLACE BIT. PAVEMENT Base items 75.000
AR800003 FOOT 2 - 1/C #8 5KV UG CABLE IN UD Base items 910.000
AR800018 L.F. 4 - 4" DIRECTIONAL BORE Base items 280.000
AR800067 L.F. 2 - 4" PVC DUCT - DIRECT BURY Base items 400.000
AR800068 EACH REPLACE ISOLATION TRANSFORMER Base items 29.000
AR800178 FOOT FIBER OPTIC CABLE Base items 1,200.000
AR800192 L SUM INSTALL ALCMS L-890 Base items 1.000
AR901515 SQ YD SEEDING Base items 2,090.000
AR905530 SQ YD TOPSOILING Base items 2,090.000
AR908516 SQ YD MULCHING Base items 2,090.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.