001-62F39
|
Executed
|
07/16/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Drainage Improvement (reinstating roadside berms, storm sewer, PS 17 improvements), Retaining Wall, Standard Overlay Location: IL 58, from West of US 45 (West Hospital Entrance) to East River Road, in the City of Des Plaines.
|
002-62F72
|
Executed
|
07/07/2021
|
|
|
1
|
1
|
Various
|
|
This is a guardrail, guardrail end-section replacement and traffic signal signal modernization project on US 20 from IL 47 to Ontarioville Rd. in City of Elgin and Villages of Bartlett, Hanover Park, Pingree Grove, and Streamwood.
|
003-62L07
|
Executed
|
07/08/2021
|
|
1 |
1
|
1
|
Cook
|
|
This improvement consists of design overlay resurfacing on Oak Park Avenue approximately 85 feet south of 31S1 St. and extends in a northerly direction approximately 10,920 feet (2.07 miles) to Approximately 190 feet north of Roosevelt Rd.
|
004-62L20
|
Executed
|
07/13/2021
|
|
1 |
1
|
1
|
Cook
|
|
This is a Standard Overlay and ADA Pedestrian Ramps project on Avenue L (FAP 29 from 116 feet southeast of Indianapolis Ave and extends northwest toward Avenue L and then north toward 95th Street for a total distance of 0.85 miles. The project is located within Hyde Park Township.
|
005-62L21
|
Executed
|
07/14/2021
|
|
|
1
|
1
|
Cook
|
|
The Project includes standard overlay and ADA improvements on Dempster St. from Ridge Ave. to Chicago Ave. The gross and the net length is equal to 2061.4 ft 0.39 mile. The project is located within the City of Evanston.
|
006-62L63
|
Executed
|
07/13/2021
|
|
1 |
1
|
1
|
Cook
|
|
This improvement consists of smart overlay resurfacing on US 41/ Foster Avenue approximately 260 feet west of Ashland Avenue and extends in an easterly direction approximately 5640 feet (1.068 miles) to Approximately 160 feet east of US 41 (Lake Shore Dr.). Location in the City of Chicago.
|
007-62L64
|
Executed
|
07/13/2021
|
2 / 2 |
|
1
|
1
|
Lake
|
|
(1.91-Mile) Improvement of US 41 (Skokie Hwy) from IL 21 (Riverside Dr) to North of Dorchester Ave consists of Smart Overlay improvement in the Village of Gurnee, Warren Township.
|
008-62L66
|
Executed
|
07/08/2021
|
|
1 |
1
|
1
|
Will
|
|
This is a 2.93 mile SMART overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA improvements and thermoplastic pavement marking on IL 53 (Bolingbrook Dr.) from DuPage County Line to I-55 within the Village of Bolingbrook.
|
009-62L80
|
Executed
|
07/13/2021
|
|
|
1
|
1
|
Cook
|
|
(1.73-Mile) SMART overlay and ADA improvements on US 14 (Peterson Avenue) from US 41 to Ridge Avenue. The project is located in the City of Chicago.
|
010-64L45
|
Executed
|
07/15/2021
|
|
|
2
|
2
|
Ogle, Winnebago
|
|
Guardrail and Traffic Barrier Terminal Improvement, 0.1 mile North of Luther Drive in Byron to 0.1 mile South of Beltline Road South of Rockford.
|
011-64M18
|
Executed
|
07/09/2021
|
7 / 7 |
1 |
2
|
2
|
Winnebago
|
|
Cold milling and hot-mix asphalt resurfacing on US 20 from 0.2 mile West of Falconer Road to Simpson Road.
|
012-64N38
|
Executed
|
07/12/2021
|
2 / 2 |
|
2
|
2
|
Whiteside
|
|
Reconstruction of Westbound IL 2 (E. 4th Street) From 4th Ave to 2nd Ave. in Sterling.
|
013-64N49
|
Executed
|
07/16/2021
|
2 / 2 |
1 |
2
|
2
|
Winnebago
|
|
Retaining Wall Repair 0.3 Miles North of Auburn St/Spring Creek Road.
|
014-64N50
|
Executed
|
07/09/2021
|
2 / 2 |
|
2
|
2
|
Carroll
|
|
Slope stabilization and culvert repairs along US 52/ IL 64 that is located 0.3 miles East of Dauphin Road at Station 259+15.
|
015-64P49
|
Executed
|
09/07/2021
|
|
|
2
|
2
|
Jo Daviess
|
|
1.705 miles; Application of a CRF Restorative Seal as a pavement preservation treatment over the IL 84 roadway centerline rumble strip; from 0.8 mile North to 0.9 mile South of Crazy Hollow Road.
|
016-64P75
|
Executed
|
07/27/2021
|
|
|
2
|
2
|
Henry
|
|
Cleaning and painting structural steel on SN-s 037-0013 and 037-0014 carrying I-74 over Edwards River.
|
017-64P86
|
Executed
|
07/09/2021
|
|
1 |
2
|
2
|
Whiteside
|
|
Patching, resurfacing and drainage improvement at the Rock Fall maintenance yard.
|
018-64P87
|
Executed
|
07/12/2021
|
1 / 1 |
|
2
|
2
|
Boone
|
|
Milling and resurfacing the Belvidere Maintenance Yard.
|
019-64R03
|
Executed
|
07/13/2021
|
|
|
2
|
2
|
Winnebago
|
|
Pavement patching from 0.1 mile South of Pierce Ave. to Bauer Parkway in Rockford.
|
020-64R04
|
Executed
|
07/15/2021
|
|
|
2
|
2
|
Rock Island, Whiteside
|
|
Pavement patching from 0.7 miles North to 1.2 miles South of Rock Rock Island/Whiteside County line.
|
021-64R09
|
Executed
|
07/27/2021
|
2 / 2 |
|
2
|
2
|
Rock Island
|
|
Crack and Joint Sealing 0.8 Mi N to 1 Mi S of IL5/IL92/I 88 Interchange.
|
022-66A96
|
Executed
|
07/07/2021
|
1 / 0 |
|
2
|
3
|
Bureau
|
|
3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on US 6 from IL 26 South in Princeton to IL 89 North in Spring Valley.
|
023-66D51
|
Executed
|
07/14/2021
|
|
|
2
|
3
|
Kendall
|
|
3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 607 (US 52) from Townhouse road north to IL 47.
|
024-66D68
|
Executed
|
07/07/2021
|
|
|
2
|
3
|
LaSalle
|
|
Work consists of milling and resurfacing 3.75" HMA on mainline of FAP 619 (IL 351/IL 71) in Oglesby and FAP 627 (IL 71) in Jonesville in LaSalle County. The work includes ADA improvements in Oglesby and guardrail replacement in Jonesville. The job length is 1.2 miles.
|
025-66K19
|
Executed
|
07/07/2021
|
|
|
2
|
3
|
LaSalle
|
|
This project consists of 5.86 miles of shoulder widening and rumble strip installation on_US 34 from E 12th Rd to 0.18 miles West of IL 23 (South leg) in LaSalle County.
|
026-66K40
|
Executed
|
07/14/2021
|
1 / 1 |
1 |
2
|
3
|
Iroquois
|
|
3P MILLING AND RESURFACING (DESIGNED OVERLAY) EXTENDING 6.41 MILES FROM THE FORD CO LINE TO 0.2 MI E OF I-57 IN GILMAN.
|
027-66K86
|
Executed
|
07/27/2021
|
1 / 1 |
3 |
2
|
3
|
Livingston
|
|
3P Milling and Resurfacing (SMART Overlay) ADA improvement and minor drainage improvement, from IL 116 in Saunemin to US 24 in Forrest.
|
028-66L02
|
Executed
|
07/14/2021
|
3 / 3 |
1 |
2
|
3
|
LaSalle
|
|
Spot improvement. Latex overlay and expansion joint replacement on SN 050-0165 carrying US 34 over I-39 in LaSalle county.
|
029-66L31
|
Executed
|
07/14/2021
|
|
|
2
|
3
|
Kendall
|
|
This project consists of 3.94 miles of shoulder widening and rumble strip installation on_US 52 from 0.16 miles East of IL 17 to Grove Rd in Kendall County.
|
030-66L42
|
Executed
|
07/07/2021
|
1 / 1 |
1 |
2
|
3
|
DeKalb, LaSalle
|
|
3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement drainage improvement on FAP 68 (IL 23) from US 30 in Waterman to US 34.
|
031-66L59
|
Executed
|
07/09/2021
|
|
|
2
|
3
|
Grundy
|
|
Pavement Patching on IL 47 located 3.5 miles South of Minooka Road (SN 032-0123) and 0.4 miles North of Nelson Road (SN 032-0122) North of Morris.
|
032-66L60
|
Executed
|
07/09/2021
|
|
|
2
|
3
|
Bureau
|
|
This work is location on FAI 80 ( I-80) beginning at the I -80 and I -180 Interchange and ending at the I -80 and IL 89 Interchange. This work consists of Class B pavement patching and pavement striping.
|
033-66L68
|
Executed
|
07/16/2021
|
|
|
2
|
3
|
Iroquois, Kankakee
|
|
Tree Removal at Chabanse interchange as describe in the plans and special provisions.
|
034-66L69
|
Executed
|
07/08/2021
|
|
|
2
|
3
|
Various
|
|
Tree Removal at various locations as described in the plans and special provisions.
|
035-66L71
|
Executed
|
07/14/2021
|
|
|
2
|
3
|
LaSalle
|
|
This work is located at M.M. 42.6 and M.M. 42.9 in the northbound and southbound lanes of FAI Route 39 ( I -39) approximately 1.25 mi. and 1.55 mi. North of IL Route 18 (near Lostant ) in LaSalle County. This project consists of Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement.
|
036-66L76
|
Executed
|
07/09/2021
|
|
|
2
|
3
|
Grundy, Livingston
|
|
This work is located on FAI 55 ( I-55) beginning at M.M. 17 ( just south of IL 17) in Livingston County and ending at M.M. 221 (1.0 mi. NE of IL 47) in Grundy County. This project consists of Class A pavement patching and pavement striping.
|
037-66L77
|
Executed
|
07/14/2021
|
|
|
2
|
3
|
Grundy
|
|
This work is located on FAI Route 80 beginning at the LaSalle/Grundy County Line and ending at the Grundy/Will County Line. This project consists of Class A, Class B Pavement Patching, Subgrade removal and replacement, pavement striping and other related items to complete this work.
|
038-66L84
|
Deleted
|
05/04/2021
|
|
|
2
|
3
|
Bureau
|
|
Bridge Deck Overlay (SN 006-0117), bridge carrying TR82-C over 1-80 located 2.5 miles West of IL 40.
|
039-66L85
|
Executed
|
07/27/2021
|
|
|
2
|
3
|
Livingston
|
|
Bridge Deck Overlay (SN 053-0149), bridge carrying IL 23 over Vermillion River and AT and SF RR, located 0.2 miles south of Adams street south of Streator.
|
040-66L86
|
Executed
|
07/27/2021
|
|
|
2
|
3
|
Kankakee
|
|
Milling and resurfacing 3.75" of HMA on the EB lanes of IL 17 and US 45/US 52 intersection in Kankakee at night. Existing intersection will be re-striped with new pavement marking.
|
041-68503
|
Executed
|
07/13/2021
|
4 / 4 |
2 |
3
|
4
|
Henderson
|
|
Carman Road from 0.5 mile North of 750N to IL Route 96 and IL Route 96 from East of Carman Road to West of Benton Street in Lomax. 5. 75 miles of resurfacing and other collateral work in Henderson County.
|
042-68C58
|
Executed
|
07/07/2021
|
2 / 2 |
|
3
|
4
|
Peoria
|
|
Superstructure replacement to S.N. 072-0076 carrying Maher Road over 1-74 (S.N. 072-0076) near Brimfield in Peoria County.
|
043-68E48
|
Executed
|
07/14/2021
|
4 / 4 |
1 |
3
|
4
|
Peoria
|
|
This project is approximately 0.6 mile in length and consist of crossover construction to maintain traffic, superstructure replacement, and other minor substructure repairs on S.N. 072-0008, located 1.0 mile West of Mapleton in Peoria County.
|
044-68G12
|
Rejected
|
08/10/2021
|
|
|
3
|
4
|
Various
|
|
Distressed tree removal at various locations within District Four.
|
045-68G13
|
Executed
|
07/09/2021
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
This project is approximately 0.06 mile in length, consisting of slope repair and drainage improvements along IL Route 40, between North Mt. Hawley Road and Northmoor Road in Peoria.
|
046-68G17
|
Executed
|
07/01/2021
|
|
|
3
|
4
|
Marshall, Woodford
|
|
Class A and B patching on 1-39 from 1 mile North of IL Route 116 to 2 miles South of IL Route 17 and ramps at the Minonk Interchange.
|
047-68G54
|
Executed
|
07/16/2021
|
|
|
3
|
4
|
Peoria
|
|
Traffic signal mast arm replacement at various locations throughout Peoria County.
|
048-70B02
|
Executed
|
07/14/2021
|
|
|
3
|
5
|
Edgar
|
|
1.702 Miles Total/11.113 Miles Net of 3P Policy Standard Overlay, Misc. Roadway Work, New Shoulders, Milled Rumble Strip from 1800th RD N of Brocton to Kansas NCL.
|
049-70F03
|
Executed
|
07/15/2021
|
|
|
3
|
5
|
McLean
|
|
The project is to replace four light towers with twelve new LED highway light poles at the interchange of I-74 and FAS 1478 (Chestnut St) in LeRoy, IL in McLean County.
|
050-70F17
|
Rejected
|
08/10/2021
|
|
|
3
|
5
|
Various
|
|
District-Wide On-Call Tree Removal.
|
051-70F22
|
Executed
|
07/12/2021
|
|
|
3
|
5
|
Various
|
|
Installation of new Advances Traffic Management System (ATMS) on various routes throughout District 3.
|
052-72L80
|
Executed
|
07/14/2021
|
|
|
4
|
6
|
Christian
|
|
2 miles of standard overlay on US 51 from the Shelby County line to just south of Cold Springs Road in Pana.
|
053-72L99
|
Executed
|
07/15/2021
|
|
|
4
|
6
|
Christian
|
|
0.5 miles of standard overlay on McAdam Drive from west of IL 48 to north of IL 29 in Taylorville.
|
054-72M60
|
Executed
|
07/27/2021
|
|
|
4
|
6
|
Adams
|
|
Vertical realignment on I-57 in the city of Marblehead.
|
055-72M77
|
Executed
|
07/14/2021
|
|
|
4
|
6
|
Pike
|
|
Deck patching on SN 075-0098 and SN 075 075-0099 carrying I-72 over Norfolk Southern Railroad, 1.5 miles west of the Barry Interchange.
|
056-72M84
|
Executed
|
07/09/2021
|
|
|
4
|
6
|
Macoupin
|
|
Superstructure and substructure repairs on SN 059-0016 carrying IL 111 over Macoupin Creek, 3.5 miles northeast of IL 267 near Medora.
|
057-72M85
|
Executed
|
07/14/2021
|
|
|
4
|
6
|
Sangamon
|
|
Deck patching on SN 084-0510 carrying eastbound Sangamon Avenue over Illinois Central Railroad, 0.25 miles west of I-55.
|
058-74456
|
Deleted
|
04/29/2021
|
|
|
4
|
7
|
Effingham
|
|
3 miles of designed overlay and ADA improvements on US 40 from Salt Creek to 1500th Avenue in Teutopolis. , 3 miles of designed overlay and ADA improvements on US 40 from Salt Creek to 1500th Avenue in Teutopolis.
|
059-74898
|
Executed
|
07/14/2021
|
|
|
4
|
7
|
Various
|
|
4.6 miles of new shoulder and safety improvements on IL 128 from 1550E south of Cowden to IL 33.
|
060-74989
|
Executed
|
07/27/2021
|
|
|
4
|
7
|
Fayette
|
|
Bridge deck overlay and bridge deck repairs on SN 026-0051 carrying IL 185 over Hurricane Creek Branch, 0.5 miles southeast of the Montgomery County line.
|
061-76K85
|
Executed
|
07/12/2021
|
1 / 1 |
|
5
|
8
|
Jersey
|
|
3.2 miles of resurfacing on IL 16 from Grange Hall Road to the Macoupin County line.
|
062-76N14
|
Executed
|
07/07/2021
|
1 / 1 |
1 |
5
|
8
|
Marion
|
|
6.4 miles of microsurfacing and ADA improvements on US 50 from US 51 to 0.1 miles east of Selmaville Road.
|
063-76N60
|
Rejected
|
06/25/2021
|
|
|
5
|
8
|
Various
|
|
Delivery, setup and pickup of traffic control devices throughout District 8.
|
064-76N62
|
Executed
|
07/16/2021
|
|
|
5
|
8
|
Various
|
|
Patching at various locations throughout District 8.
|
065-76N63
|
Executed
|
07/16/2021
|
|
|
5
|
8
|
Various
|
|
Weed spraying along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8.
|
066-76N70
|
Executed
|
07/13/2021
|
1 / 1 |
|
5
|
8
|
Randolph
|
|
Bituminous surface treatment with fog seal on IL 154 from Burns Avenue to the Perry County line.
|
067-76N72
|
Executed
|
07/12/2021
|
|
|
5
|
8
|
Madison
|
|
2.7 miles of SMART overlay along IL 111/IL 267/US 67 from the Jersey County line to 0.1 miles north of Airport Road in Godfrey.
|
068-76P12
|
Deleted
|
04/21/2021
|
|
|
5
|
8
|
Madison
|
|
Bridge painting on I-255 southbound ramp 1 and roadway B just north of I-55/70. (SN 060-0253)
|
069-76P14
|
Deleted
|
04/27/2021
|
|
|
5
|
8
|
Various
|
|
Guardrail and cable median replacement at various locations in District 8. , Guardrail and cable median repair at various locations in District 8.
|
070-76P25
|
Executed
|
07/14/2021
|
1 / 0 |
1 |
5
|
8
|
Greene
|
|
3.2 miles of SMART overlay resurfacing and pavement patching on IL 108 from IL 267 to the Macoupin County line.
|
071-76P33
|
Executed
|
07/14/2021
|
|
1 |
5
|
8
|
Madison
|
|
Traffic signal modernization on IL 111/US 67/ IL 143 from Lars Hoffman Crossing to IL 143.
|
072-76P45
|
Executed
|
07/15/2021
|
|
|
5
|
8
|
St. Clair
|
|
0.3 miles of patching, mainline and interchange resurfacing, and HMA shoulders on US 50 from EB I-64 ramps to 0.1 miles west of Schantz Road in O-Fallon.
|
073-76P49
|
Executed
|
07/13/2021
|
|
|
5
|
8
|
St. Clair
|
|
2.7 miles of patching on westbound I-55/64 from the Mississippi River to the I-64 Tri-Level.
|
074-76P52
|
Executed
|
07/12/2021
|
|
1 |
5
|
8
|
Madison
|
|
Traffic signal cabinet replacement at multiple locations: 1) IL 3/IL 111 at Seminary Street in Alton, 2) IL 3 at IL 143 in Wood River, 3) IL 111 at IL 140 in Bethalto, 4) IL 111 at Horseshoe Lake Pond in Pontoon Beach, 5) IL 143 / IL 157 at Buchanan Street in Edwardsville.
|
075-78612
|
Executed
|
07/13/2021
|
1 / 1 |
1 |
5
|
9
|
Jackson
|
|
Removal and reconstruction of concrete pavement, ADA ramp improvements and minor signal modifications on IL 149/127 at the intersections of IL 149 (Walnut Street) and IL 127 (5th Street).
|
076-78680
|
Executed
|
07/13/2021
|
3 / 3 |
1 |
5
|
9
|
Saline
|
|
Replacing the existing two-span deck beam bridge with a new triple opening, cast in place box culvert on IL 34/145, approximately 0.5 miles south of Harrisburg. (SN 083-0017)
|
077-78684
|
Executed
|
07/13/2021
|
2 / 2 |
|
5
|
9
|
Jefferson
|
|
Replacing the 3-span bridge with a new triple, cast in place box culvert on IL 37, 1.2 miles south of IL 148. (SN 041-0031)
|
078-78842
|
Executed
|
07/13/2021
|
|
|
5
|
9
|
Gallatin
|
|
0.42 miles of patching at the intersection of IL 13 and IL 1.
|
079-78846
|
Executed
|
07/14/2021
|
1 / 1 |
|
5
|
9
|
Alexander, Jefferson
|
|
Replacing diaphragms on SN 041-0039 carrying IL 37 over Southern Railroad, 3 miles south of Dix and plating floor beams on SN 002-0009 on Old IL 3 over Sexton Creek in Gale.
|
080-78847
|
Executed
|
07/13/2021
|
|
|
5
|
9
|
White
|
|
Installation of weigh-in-motion system on I-64 in the westbound lanes, 2 miles west of IL 1.
|
081-78852
|
Executed
|
07/16/2021
|
3 / 3 |
|
5
|
9
|
Pulaski
|
|
Milling, resurfacing, guardrail and drainage work on IL 37 from Feather Trail to 0.2 miles south of Mounds Road.
|
082-78854
|
Executed
|
07/16/2021
|
|
|
5
|
9
|
Jefferson
|
|
Patching on IL 15 in Mount Vernon from Zachery Street to 44th Street, I-57 NB and SB exit ramps at IL 15, and I-57 at MM 83 in the SB driving lane.
|
083-78855
|
Executed
|
07/16/2021
|
|
|
5
|
9
|
Pulaski
|
|
Replace the existing pipe culvert with a 36- pipe culvert on IL 37 just south of the Johnson County line, near Goines Lane.
|
084-78856
|
Executed
|
07/14/2021
|
|
|
5
|
9
|
Perry, Saline
|
|
Signal and highway lighting upgrades at the intersection of IL 154 and IL 150 in Perry County and the intersection of US 45 and Old IL 13 in Saline County.
|
085-78870
|
Executed
|
07/13/2021
|
1 / 1 |
|
5
|
9
|
Jefferson, Williamson
|
|
PPC I-beam repair and substructure repairs on SN 041-0096 carrying IL 148 over over the Big Muddy River east of Waltonville in Jefferson County and PPC I-beam repair, deck patching and substructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek south of Marion in Williamson County.
|
086-78877
|
Rejected
|
06/25/2021
|
|
1 |
5
|
9
|
Alexander
|
|
Joint replacement on SN 002-0005 carrying US 60/62 over the Mississippi River.
|
087-61G38
|
Executed
|
07/27/2021
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing, sidewalk, curb and gutter replacement on Chicago Avenue from IL 83 to Garfield Street and on 3rd. Street from Grant Street to Washington Street in Hinsdale.
|
088-61G53
|
Executed
|
07/30/2021
|
3 / 3 |
1 |
1
|
1
|
Will
|
|
Replace the bridge carrying Garnsey Avenue over Spring Creek, south of Columbia St. in the City of Joliet.
|
089-61G98
|
Executed
|
08/06/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Installation of a wireless interconnect system and traffic signal modificatons on 143rd St. from Wolf Rd. to LaGrange Rd. in Orland Park.
|
090-61H05
|
Executed
|
07/09/2021
|
2 / 1 |
|
1
|
1
|
DuPage
|
|
Replace the culverts carrying Brickvale Drive over Willow Creek with precast concrete box culvert, 0.10 mile south of Devon Ave. in Elk Grove Village.
|
091-61H10
|
Executed
|
07/13/2021
|
|
|
1
|
1
|
Kane
|
|
Resuface Sleepy Hollow Road from 0.3 mile south of Crane Dr. to IL 72 in Sleepy Hollow.
|
092-61H11
|
Executed
|
07/27/2021
|
|
|
1
|
1
|
Cook
|
|
Resurface East Fullerton Ave. from North Worlf Rd. to Geneva Ave. in Northlake.
|
093-61H13
|
Executed
|
07/30/2021
|
|
|
1
|
1
|
Cook
|
|
Construction of a multi-use path and traffic signal modifications along Wolf Road from the Bemis Woods Trial to Ogden Avenue in Western Springs.
|
094-62L65
|
Executed
|
07/09/2021
|
|
1 |
1
|
1
|
McHenry
|
|
Smart Overlay, Class D patching. This improvement of IL 47 begins 800 ft north of Ware Rd. and proceeds approximately 47350.5 ft (8.96 miles) in a northerly direction to IL Rte. 173 in the Village of Hebron and Township of Greenwood and Hebron.
|
095-62L87
|
Executed
|
07/13/2021
|
|
|
1
|
1
|
Cook
|
|
(5,213-Feet) SMART overlay and ADA improvements on Wolf Road from IL 38 (Roosevelt Road) to Cermak Road located in the Village of Hillside and Westchester.
|
096-62L91
|
Executed
|
07/13/2021
|
|
|
1
|
1
|
Cook
|
|
(4.40-Mile) Smart overlay and ADA improvements project on IL 43 (Waukegan Rd.) from Ammer Rd. to Lake-Cook Rd. within the Villages of Glenview, Northfield, Northbrook and Deerfield. There is an omission within the project limits.
|
097-62L92
|
Executed
|
07/16/2021
|
|
|
1
|
1
|
Cook
|
|
(5.89-Mile) SMART Overlay project and it begins on IL 43 (Harlem Ave.) at 111th Street and continues in a northerly direction for 33,426 (6.33 mile) feet to 62nd Street. The project is within the City of Chicago, Villages of Bedford Park, Bridgeview, Burbank, Chicago Ridge, Palos Hills, Summit and Worth.
|
098-62M09
|
Executed
|
07/15/2021
|
|
|
1
|
1
|
Cook
|
|
Crack and joint sealing pavement preservation project. Includes renewal of pavement markings. Location: FAU 1581: 111th Street, from Central Ave to Pulaski Rd in the Village of Oak Lawn and the City of Chicago, in Cook County.
|
099-62M17
|
Executed
|
07/13/2021
|
|
|
1
|
1
|
Cook
|
|
This project consists of Smart Overlay/Pedestrian ramp (ADA) improvements along IL 83 (Elmhurst Road) from Oakton Street to IL 58 (Golf Road) spanning a total length of 8,778 ft (1.66 Miles) in the Village of Mt. Prospect and the City of Des Plaines.
|
100-62M41
|
Executed
|
07/13/2021
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
The improvement consists of bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 130th Street over 1-94 and at CSSS and IHB RR in Cook County, IL. Gross and net length is 785 FT (0.15 Miles).
|
101-62M73
|
Executed
|
07/16/2021
|
|
|
1
|
1
|
Kane
|
|
The improvement consists of culvert repairs for the structure earring on IL 38 MiII Creek in the Village of Campton Hills, Kane County, IL. Gross length is 388 FT (0.073 Miles), Net length is 37.5 FT (0.007 Miles).
|
102-62N24
|
Executed
|
07/15/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
The improvement consists of bridge deck patching on a bridge carrying IL 53 over US 14 (Northwest Highway) in Cook County. IL. Gross length is 4044 FT (0. 77 Miles). Net length is 516 FT (0.10 Miles).
|
103-62N82
|
Executed
|
07/13/2021
|
|
|
1
|
1
|
Lake
|
|
(1. 71-Mile) Standard Overlay, Designed Overlay, Patching, and ADA improvements Location: IL 60 (Townline Rd) from East of Des River to Riverwoods Rd, in the Village of Mettawa, in Lake County.
|
104-62N90
|
Executed
|
07/12/2021
|
|
1 |
1
|
1
|
Cook, McHenry
|
|
This improvement consists of cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR; 2) US 14 (Northwest Hwy) over Fox River; 3) IL62 (Algonquin Rd) over Fox River in the Villages of Hoffman Estates, Fox River Grove and Algonquin in Barrington and Algonquin Townships.
|
105-62N93
|
Executed
|
07/16/2021
|
1 / 1 |
|
1
|
1
|
Various
|
|
Ecological Restoration of Wetland areas in various locations within District One.
|
106-66997
|
Deleted
|
04/27/2021
|
|
|
2
|
3
|
Kankakee
|
|
The project consists of the structure replacement carrying Maple St/Waldron Rd over I-57 in Kankakee along with construction of adjacent retaining walls. The project includes the reconstruction of portions of Maple St, Waldron Rd, construction of shared-use path and realigning/reconstructing County RD S89E. , The project consists of the structure replacement carrying Maple St/Waldron Rd over I-57 in Kankakee along with construction of adjacent retaining walls. The project includes the reconstruction of portions of Maple St, Waldron Rd, construction of shared-use path and realigning/reconstructing County RD S89E.
|
107-68G55
|
Executed
|
07/15/2021
|
|
|
3
|
4
|
Knox
|
|
1.2 miles of patching on US 150 (Henderson Street) from Home Boulevard to West North Street in Galesburg in Knox County.
|
108-66L78
|
Executed
|
07/13/2021
|
|
1 |
2
|
3
|
DeKalb, Kendall
|
|
Class B pavement patching and pavement striping on FAP 591 (US 34) within the City limits of Sandwich beginning at Pearl St. in Dekalb County and ending at Duvick Ave. in Kendall County.
|
109-66L80
|
Executed
|
07/15/2021
|
|
|
2
|
3
|
Various
|
|
One-year contract repair damaged High Tension Cable Median Barrier, Guard Rail, Attenuators, etc., along various routes in Bureau, LaSalle, DeKalb, Kendall, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties.
|
110-68G14
|
Executed
|
07/09/2021
|
|
|
3
|
4
|
Fulton
|
|
Pavement patching on IL 9 from Big Creek to Avenue A in Canton.
|
111-68G15
|
Executed
|
07/09/2021
|
|
|
3
|
4
|
Peoria
|
|
Slope stabilization and landscaping along WB Interstate 74 between Ellis Street and North Street in Peoria County.
|
112-68G16
|
Executed
|
07/09/2021
|
5 / 5 |
|
3
|
4
|
McDonough
|
|
Resurfacing on US Route 67, North of Industry from 2.2 miles South of US Route 136 to Grindstone Creek in McDonough County.
|
113-68G25
|
Executed
|
07/27/2021
|
1 / 1 |
1 |
3
|
4
|
Tazewell, Woodford
|
|
Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills.
|
114-68G26
|
Executed
|
07/09/2021
|
|
|
3
|
4
|
Tazewell
|
|
Patching on US 24/US 150 from the East end of the McClugage Bridge to East of Hollands Grove Road in Tazewell County.
|
115-68G56
|
Executed
|
07/12/2021
|
|
|
3
|
4
|
Tazewell
|
|
Highway lighting improvements along WB I-74 between I-474 and I-155 and US 24/BUS 24 interchange near Washington in Tazewell County.
|
116-70F33
|
Rejected
|
06/25/2021
|
|
|
3
|
5
|
Various
|
|
District Wide On-call Guardrail and Fence Repairs.
|
117-72G88
|
Executed
|
07/16/2021
|
|
|
4
|
6
|
Sangamon
|
|
Patching on Sangamon Ave. in Springfield.
|
118-72M86
|
Executed
|
07/16/2021
|
|
|
4
|
6
|
Montgomery
|
|
Deck and substructure repairs on SN 068-0018 carrying IL 48/127 over West Fork of Shoal Creek, at the west edge of Raymond.
|
119-74942
|
Executed
|
07/16/2021
|
|
|
4
|
7
|
Clay
|
|
10.1 miles of patching, milling, resurfacing and aggregate wedge shoulders on Kinmundy Road from the Marion County line to US 45 in Louisville.
|
120-74990
|
Executed
|
07/27/2021
|
2 / 2 |
|
4
|
7
|
Fayette
|
|
Replacing expansion joints, bearings and constructing a bridge deck overlay on SN 026-0035 carrying US 51 over Sandy Run Creek, located 1.5 miles south of US 40.
|
121-74A30
|
Executed
|
07/13/2021
|
|
|
4
|
7
|
Fayette
|
|
Bridge joint and bearing replacement on SN 026-0089 carrying IL 140 over Hurricane Creek, 0.9 miles southeast of US 40.
|
122-74A42
|
Executed
|
07/14/2021
|
1 / 1 |
|
4
|
7
|
Various
|
|
1.3 miles of smart inlay under overhead structures in Fayette, Effingham and Cumberland Counties.
|
123-74A50
|
Executed
|
07/16/2021
|
1 / 1 |
|
4
|
7
|
Various
|
|
11.6 miles of seal coat on various routes in Wayne, Edwards and Wabash Counties.
|
124-76L09
|
Executed
|
07/15/2021
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
3.6 miles of resurfacing on IL 3 from 0.8 miles north of Monsanto Avenue to 0.1 miles south of Ruby Street in Cahokia.
|
125-76N61
|
Executed
|
07/14/2021
|
|
|
5
|
8
|
Various
|
|
Highway lighting and traffic signal repair and maintenance at various locations throughout District 8.
|
126-76P04
|
Executed
|
07/16/2021
|
|
|
5
|
8
|
St. Clair
|
|
Bridge deck, joint replacement and approach roadway repairs at 2 locations: 1) SN 082-0192 and 082-0193 carrying I-64 over IL 161, 1.5 miles west of New Baden; 2) SN 082-0194 and 082-0195 carrying I-64 over Norfolk Southern Railroad, 1.4 miles south of the county line.
|
127-76P47
|
Executed
|
07/14/2021
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Railroad interconnect at 4 locations: 1) US 67 at Ridge, 2) US 67 at Henry, 3) US 40 at Douglas, 4) Lebanon Avenue at West Boulevard.
|
128-76P48
|
Executed
|
07/12/2021
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Bridge painting at the Poplar Street Complex on I-55/64 westbound CD over Trendly Avenue. (SN 082-0254)
|
129-78812
|
Executed
|
07/13/2021
|
|
|
5
|
9
|
Franklin, Williamson
|
|
Retrofitting ADA ramps, relocating and installing pedestrian push buttons and signal heads at the intersection of IL 149 and Jefferson Street in West Frankfort and the intersections of IL 37 and 4th Street, Broadway Boulevard, and 8th Street in Johnston City.
|
130-78867
|
Executed
|
07/16/2021
|
|
|
5
|
9
|
Various
|
|
Electrical repair and/or replacement on various routes in various counties in District 9.
|
131-78868
|
Executed
|
07/15/2021
|
|
1 |
5
|
9
|
Various
|
|
Repairing or fixing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a workorder basis throughout District 9.
|
132-85706
|
Executed
|
07/27/2021
|
4 / 3 |
2 |
2
|
2
|
Winnebago
|
|
Construction of the Perryville Bike Path Extension on the east side of Perryville Road from Hart Road to IL 173 in Loves Park.
|
133-87741
|
Executed
|
07/14/2021
|
1 / 1 |
1 |
2
|
3
|
Grundy
|
|
Replace the bridge carrying Grand Ridge Road over Murry Slough, 2 miles east of Mazon.
|
134-89785
|
Executed
|
07/14/2021
|
1 / 1 |
1 |
3
|
4
|
Peoria
|
|
Sidewalk construction on Allen Road from 0.6 mile north of Wilhelm Rd. to Whilhelm Rd. and on Orange Prairie Road from Landens Way to War Memorial Drive in Peoria
|
135-89801
|
Executed
|
07/27/2021
|
3 / 3 |
1 |
3
|
4
|
Peoria
|
|
Rehabilitate the bridge carrying Truitt Road over Hollow Creek. Remove and replace superstructure, backwalls at the abutments and repair piers.
|
136-89808
|
Executed
|
07/16/2021
|
|
|
3
|
4
|
Henderson
|
|
HMA removal and rubbilization of the PCC base on Roseville Road from CH 9 to IL 116.
|
137-91602
|
Executed
|
07/27/2021
|
6 / 6 |
1 |
3
|
5
|
McLean
|
|
Resurfacing, shoulder rumble strips, guardrail, traffic barrier terminals and pavement markings on CH 37 from north of Northtown Road to CH 12 in Hudson.
|
138-91605
|
Executed
|
07/30/2021
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
Construction of trail amenities including PCC paths, parking facility, signing, bicycle repair station and bicycle racks. Project begins at Main Street in Urbana to 7th St. in St. Joseph.
|
139-93765
|
Executed
|
07/21/2021
|
|
|
4
|
6
|
Adams
|
|
Cold-in-place recycling and HMA overlay on Ch 48 from East 1900th St. to East 2200th Street.
|
140-93766
|
Executed
|
07/14/2021
|
|
|
4
|
6
|
Adams
|
|
Cape Seal and Pavement markings on CH 7 from North 1850th Ave. to Westpoint Pleasant Rd.
|
141-93770
|
Executed
|
07/13/2021
|
1 / 1 |
|
4
|
6
|
Christian
|
|
Cold-in-place recycling, resufacing, pavement patching and shoulder widening on CH 12 from South County Road to IL 29.
|
142-97753
|
Executed
|
07/27/2021
|
|
|
5
|
8
|
Madison
|
|
Resurface Seiler Road from Bivens Rd. to IL 159.
|
143-97754
|
Executed
|
07/16/2021
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Pavement reconstruction on Wood River Ave. from 3rd Street to south of 1st Street in Alton.
|
144-97755
|
Executed
|
07/27/2021
|
1 / 1 |
2 |
5
|
8
|
Madison
|
|
Replace the bridge carrying Troy-Fallon Road over Mill Creek, 0.3 mile north of Lebanon Road.
|
145-99612
|
Deleted
|
04/29/2021
|
|
|
5
|
9
|
Gallatin
|
|
Replace the bridge carrying Eldorado Blactop Road over North Fork of Saline River, 1.8 miles west of IL 1. , Replace the bridge carrying Eldorado Blactop Road over North Fork of Saline River, 1.8 miles west of IL 1.
|
146-99661
|
Executed
|
07/16/2021
|
|
|
5
|
9
|
Saline
|
|
Resurface Johnston City Road from the Williamson County line to Harco Road.
|
147-99664
|
Executed
|
07/13/2021
|
|
|
5
|
9
|
Franklin
|
|
Resurface South Thompsonville Road from IL 34 to the Williamson County Line.
|
148-99667
|
Executed
|
07/30/2021
|
|
|
5
|
9
|
Williamson
|
|
Resurface Lake Egypt Road from South Market Road to IL 166.
|
149-46568
|
Executed
|
07/16/2021
|
|
|
2
|
3
|
Various
|
|
This work is located on various interstate, multi-lane non-interstate and 2L-2W routes in Bureau, LaSalle, Dekalb, and Kendall Counties. This work shall consist of raised reflective pavement marker removal, installing raised reflective pavement markers and replacement of raised reflective pavement marker reflectors.
|
150-46569
|
Executed
|
07/13/2021
|
|
|
3
|
4
|
Various
|
|
Removing damaged raised reflective pavement markers and perplacing them with new raised reflective pavement markers within the limits shown in the plans.
|
151-46570
|
Executed
|
07/27/2021
|
|
|
3
|
4
|
Various
|
|
Placing epoxy and modified urethane pavement marking lines, letters and symbols, and the removal of existing pavement markings within the limits specified on each individual work order.
|
152-46571
|
Executed
|
07/27/2021
|
|
|
1
|
1
|
McHenry
|
|
This work shall consist of removing reflectors, replacing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limit shown.
|
153-46572
|
Executed
|
07/16/2021
|
|
|
1
|
1
|
Lake, Will
|
|
This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width.
|
154-60T15
|
Executed
|
08/05/2021
|
2 / 2 |
1 |
1
|
1
|
McHenry
|
|
Intersection Improvement (channelization, traffic signal installation). Includes left and right turn lanes, re-alignment of Wright Rd, re-alignment of leg of Nish Rd and building demolition. Location: Intersection of IL 176 and Nish Road in unincorporated Nunda Township in McHenry County.
|
155-62H03
|
Executed
|
07/14/2021
|
17 / 17 |
2 |
1
|
1
|
Will
|
|
(1.02-Mile) Improvement consists of deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconstruct a retaining wall at 1-55 and IL 53 and substructure repair for both the bridges located in the Village of Bolingbrook.
|
156-62K79
|
Executed
|
07/14/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
The improvement consists of bridge deck overlay, expansion joint replacement, cleaning and resealing, bridge substructure repair and traffic signal replacement at the bridge located on IL 394 over Glenwood Dyre Road in the Villages of Glenwood and Lynwood, in Cook County. IL. Gross and net length is 1,160 FT (0.22 Miles).
|
157-62M69
|
Executed
|
07/14/2021
|
5 / 4 |
2 |
1
|
1
|
DuPage
|
|
The improvement consists of removal of existing single cell box culvert and with proposed triple cell box culvert, ditch regrading and constructing a new retaining wall located on ll 83 over Drainage Ditch in DuPage County, IL.
|
158-62N08
|
Executed
|
07/14/2021
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
The improvement consists of bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the bridge located on l-55 over Kankakee River in the City of Wilmington in Will County Gross and net length is 1,067 FT (0.2 Miles).
|
159-62N17
|
Executed
|
07/12/2021
|
|
|
1
|
1
|
Cook
|
|
Improvements consists of cleaning and painting existing steel structures at 3 locations. 1st location is located on Grand Avenue over Des Plaines River {SN 016-0 855), in the Village of River Grove; 2nd and 3rd location is located on US 64 (North Avenue) at RR-CN (SN 016-0500 and SN 016-1126), in the Village of River Grove.
|
160-62N38
|
Executed
|
07/13/2021
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of bridge repair for the structures on 1-94/90 at various locations in the City of Chicago, Cook County, IL. Gross length is 5808 FT (1. 10 Miles).
|
161-64P94
|
Executed
|
07/09/2021
|
|
1 |
2
|
2
|
Whiteside
|
|
Bridge deck overlay, expansion joint replacement and other bridge repairs on SN 098-0084 and 098-0085 carrying I-88 over the Hennepin Feeder Canal, 1 mile South of Rock Falls.
|
162-66F11
|
Deleted
|
04/29/2021
|
|
|
2
|
3
|
Kankakee
|
|
Removal and replacement of SN 046-0063 carrying Armour Road over Illinois Central Railroad located 0.3 miles west of IL 50. , Removal and replacement of SN 046-0063 carrying Armour Road over Illinois Central Railroad located 0.3 miles west of IL 50.
|
163-66F88
|
Executed
|
07/16/2021
|
2 / 2 |
1 |
2
|
3
|
Kankakee
|
|
Bridge Replacement (SN 046-0030) at Granary Creek, 1.3 miles East of Essex Rd. and Bridge Replacement (SN 046-0032) at E Branch of Horse Creek, 0.2 mile East of Herscher Road.
|
164-66H91
|
Executed
|
07/14/2021
|
|
|
2
|
3
|
LaSalle
|
|
This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items.
|
165-66L38
|
Rejected
|
06/23/2021
|
|
1 |
2
|
3
|
LaSalle
|
|
This project includes 5400' of milling and resurfacing and reconstruction of curves of the Mattheissen State Park main entrance and parking lot area off IL 178 South of the IL 71 and IL 178 intersection.
|
166-66L55
|
Executed
|
07/14/2021
|
|
1 |
2
|
3
|
LaSalle
|
|
This work is located at Structure No. 050-0180 carrying FAP 68 (IL 23/71) over the Illinois River and access road and at Structure No. 050-0182 carrying LaSalle St. over a parking lot, 1.0 mile South of US 6 in Ottawa. This work consists of expansion joint replacement, deck patching, parapet patching, structural steel repairs.
|
167-68G03
|
Executed
|
07/14/2021
|
|
|
3
|
4
|
Peoria
|
|
Bridge deck waterproofing and deck overlay to Structure No. 072-0134 carrying US 24 over Kickapoo Creek near Bartonville in Peoria County.
|
168-72J40
|
Executed
|
07/27/2021
|
|
|
4
|
6
|
Adams
|
|
3.8 miles of patching, milling, resurfacing, bridge joint repair and guardrail replacement on IL 96 from south of Birch Street in Ursa to Bear Creek.
|
169-72M88
|
Executed
|
07/27/2021
|
|
|
4
|
6
|
Adams
|
|
Bridge bearing replacement and steel repairs on SN 001-0048 carrying Columbus Road over I-172, 1.4 miles north of IL 104.
|
170-72M89
|
Executed
|
07/09/2021
|
|
|
4
|
6
|
Adams
|
|
Deck patching on SN 001-0077 carrying IL 61 over Big Neck Creek, 1 mile west of IL 61/IL 94 JCT.
|
171-72M90
|
Executed
|
07/15/2021
|
|
|
4
|
6
|
Sangamon
|
|
Bridge bearing replacement and steel repairs on two I-55 overhead bridges South of Springfield. (SN 084-0081 and 084-0099)
|
172-72M95
|
Executed
|
07/14/2021
|
|
|
4
|
6
|
Sangamon
|
|
Weed spraying along various routes in Sangamon County.
|
173-72M96
|
Executed
|
07/12/2021
|
|
|
4
|
6
|
Sangamon
|
|
Tree removal and seeding at the District 6 Sign Shop on MacArthur Boulevard in Springfield.
|
174-72M97
|
Executed
|
07/16/2021
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
Seeding on the infields of the East Lake Shore Drive and I-55 interchange.
|
175-74462
|
Executed
|
07/14/2021
|
1 / 1 |
|
4
|
7
|
Macon
|
|
0.7 miles of patching, milling, HMA resurfacing and longitudinal joint sealant on IL 121 from 0.1 miles south of Kile Street to the Garfield Avenue Underpass in Decatur.
|
176-74A20
|
Executed
|
07/16/2021
|
|
|
4
|
7
|
Effingham
|
|
4.2 miles of SMART inlay of mainline, shoulders and median crossovers and installation of traffic counter equipment on I-57 from the North Tri-level to the Shelby County line, north of Effingham.
|
177-74A51
|
Executed
|
07/16/2021
|
1 / 1 |
1 |
4
|
7
|
Various
|
|
18.7 miles of patching and A-2 surface treatment on various routes in Clay, Richland and Lawrence Counties.
|
178-74A52
|
Executed
|
07/09/2021
|
|
|
4
|
7
|
Macon, Shelby
|
|
2.3 miles of chip seal at various locations in Macon and Shelby Counties.
|
179-74A57
|
Executed
|
07/15/2021
|
|
|
4
|
7
|
Various
|
|
Repairs of location-specific motorist caused guardrail damage and on-call repairs of guardrail damage throughout District 7.
|
180-76G57
|
Executed
|
07/27/2021
|
8 / 7 |
1 |
5
|
8
|
Madison
|
|
4.8 miles of resurfacing and ADA improvements on IL 111/3 from Alby Street to Broadway in Alton.
|
181-76L14
|
Executed
|
07/27/2021
|
4 / 3 |
|
5
|
8
|
St. Clair
|
|
4.9 miles of design overlay resurfacing and ADA improvements on IL 15 from 0.1 miles west of Bluebird Lane to 1st Street in Fayetteville, and HMA overlay with JT replacement on SN 082-0295 and SN 082-0106.
|
182-76M36
|
Executed
|
07/27/2021
|
2 / 2 |
|
5
|
8
|
Madison
|
|
Discharge box culvert replacement at the Collinsville Pump Station #2 east of I-255, south of I-55/70.
|
183-76N41
|
Executed
|
07/12/2021
|
|
|
5
|
8
|
St. Clair
|
|
Storm water pump station rehab at the 25th Street Pump Station, south of I-64.
|
184-76N85
|
Executed
|
07/27/2021
|
|
|
5
|
8
|
St. Clair
|
|
Parking lot improvements at the District 8 T/M Building in Fairview Heights.
|
185-76P02
|
Executed
|
07/28/2021
|
|
1 |
5
|
8
|
St. Clair
|
|
Culvert repair on IL 161 over Ash Creek, 2.7 miles west of IL 4 (SN 082-2003).
|
186-76P06
|
Executed
|
07/14/2021
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Traffic signal repair and replacement at various locations: 1) IL 3 at Monsanto Avenue; 2) IL 3 at IL 157; 3) IL 15 at Racehorse Road; 4) IL 157 at Kazilek; 5) IL 140 at Stanley Road; 6) US 50 at Smiley Street.
|
187-78660
|
Executed
|
07/13/2021
|
|
|
5
|
9
|
Jackson
|
|
Conversion of 2 intersections to Restricted Crossing U-Turn intersections: 1) IL 13/127 and Ava Road; 2) IL 13/127 and Grange Hall Road.
|
188-78550
|
Withdrawn
|
06/02/2021
|
2 / 0 |
1 |
5
|
9
|
Jefferson
|
|
Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange. , Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange.
|
189-78788
|
Executed
|
07/16/2021
|
|
|
5
|
9
|
Saline
|
|
Construction of a RCUT intersection at the intersection of IL 13 and Carrier Mills Road and resurfacing IL 13 from the Williamson County line to West Poplar Street in Harrisburg.
|
190-78810
|
Executed
|
07/13/2021
|
2 / 2 |
1 |
5
|
9
|
Hamilton
|
|
10.9 miles of HMA surface removal, HMA surfacing, pavement patching and ADA ramp improvements on IL 14 from Marshall Avenue in McLeansboro to the Franklin County line and IL 142 from Golf Course Road to Randolph Street (IL 14) in McLeansboro.
|
191-87747
|
Executed
|
07/14/2021
|
1 / 1 |
1 |
2
|
3
|
Iroquois
|
|
Resurfacing CH 4 from the Ford County line to 500 E Road.
|
192-87748
|
Executed
|
08/06/2021
|
|
|
2
|
3
|
Kankakee
|
|
Resurfacing CH 47 from CH 6 to IL 17.
|
193-87751
|
Executed
|
07/16/2021
|
|
|
2
|
3
|
Livingston
|
|
PCC pavement reconstruction, storm sewers, curb and gutter, sidewalks and pavement markings on Indiana Avenue from Illini Avenue to the east corporate limits of Pontiac.
|
194-87762
|
Executed
|
08/12/2021
|
|
|
2
|
3
|
Bureau
|
|
Replace the bridge carrying TR 130 over Silver Creek, 7.0 miles southeast of Buda.
|
195-89681
|
Executed
|
07/27/2021
|
|
|
3
|
4
|
Tazewell
|
|
Realignment, pavement reconstruction, culvert extensions, culverts and pavement markings on Allentown Road from 1000 feet east of Court Street and extending 1,000 feet into the city of Pekin.
|
196-89725
|
Rejected
|
06/25/2021
|
|
|
3
|
4
|
Tazewell
|
|
Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road to IL 8 in Washington.
|
197-95894
|
Executed
|
08/10/2021
|
|
|
4
|
7
|
Lawrence
|
|
Replace the existing double barrel box culvert carrying CH 11 over a tributary to Raccoon Creek with a one span precast concrete deck beam bridge, located 6.0 miles southwwest of Bridgeport.
|
198-95896
|
Executed
|
07/30/2021
|
|
|
4
|
7
|
Shelby
|
|
Replace the bridge carrying TR 176 over Swafford Creek, 1 mile southwest of Shelbyville.
|
199-95903
|
Executed
|
07/27/2021
|
1 / 1 |
|
4
|
7
|
Wayne
|
|
Replace the bridge carrying TR 558 over Pond Creek drainage ditch, 3 miles southwest of Golden Gate.
|
200-97756
|
Executed
|
08/30/2021
|
|
|
5
|
8
|
St. Clair
|
|
Resurface Seibert Road from Main Street to Johnson Road in Shiloh.
|
201-97759
|
Executed
|
07/28/2021
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing, sidewalk replacement, curb and gutter replacement and pavement markings on Collinsville Avenue from Summit Avenue to Martin Luther King Drive in East St. Louis.
|
202-46573
|
Executed
|
07/12/2021
|
|
|
1
|
1
|
Lake
|
|
This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limits shown.
|
203-46574
|
Executed
|
07/16/2021
|
|
|
1
|
1
|
DuPage, McHenry
|
|
This work shall consist of applying water borne, lead free, white and yellow paint marking lines of 4, 6, and 8 inches in width.
|
204-46578
|
Executed
|
07/27/2021
|
|
|
5
|
9
|
Various
|
|
Repairing various widths and various types of pavement markings on a work order basis throughout District 9.
|
205-46579
|
Executed
|
07/13/2021
|
|
|
3
|
5
|
Various
|
|
Pavement marking repair at various locations in Dewitt, Champaign, Vermilion, and District wide.
|
206-62G39
|
Executed
|
07/14/2021
|
8 / 8 |
1 |
1
|
1
|
DuPage
|
|
(990.33-Ft) Removal of existing bridge along 1-55 over Lemont Road and replacement with a 4-span 200'-00" long, 197'-10" out-to-out wide bridge; roadway reconstruction and resurfacing; safety, drainage, lighting, signing, pavement marking and landscaping improvements in the City of Darien.
|
207-66K46
|
Executed
|
07/14/2021
|
|
|
2
|
3
|
LaSalle
|
|
The work is 2.79 miles long, extending from 0.4 miles south of I-80 to South of Canal St in LaSalle, consisting of 3P Milling and Resurfacing (Designed Overlay), also including ADA ramps.
|
208-68C45
|
Executed
|
07/12/2021
|
9 / 8 |
1 |
3
|
4
|
Peoria
|
|
Resurfacing and bridge deck overlays and repairs to various structures on Interstate 474 from Interstate 474 to the Illinois River in Peoria County.
|
209-68D34
|
Executed
|
07/13/2021
|
2 / 2 |
1 |
3
|
4
|
Fulton
|
|
Replacement of existing S.N. 029-0001 carrying US 24/IL 9 over Copperas Creek, and associated roadway work. at the east end of Banner.
|
210-68E52
|
Executed
|
07/27/2021
|
2 / 2 |
2 |
3
|
4
|
Peoria
|
|
Bridge Rehabilitation to six (6) structures at the I-74/I-474/IL 6 interchange in Peoria.
|
211-68E82
|
Executed
|
07/14/2021
|
|
|
3
|
4
|
Peoria
|
|
0.17 mile. Sidewalk replacement, railing repairs, and miscellaneous drainage improvements along US Route 150 (War Memorial Drive) from Grand Avenue to Harvard Avenue in Peoria.
|
212-68G01
|
Executed
|
07/09/2021
|
|
|
3
|
4
|
Warren
|
|
Patching and pavement repairs to US Route 67 from North of the Roseville Bypass to Roseville South of the Roseville Bypass.
|
213-68G08
|
Executed
|
07/15/2021
|
|
|
3
|
4
|
Various
|
|
District-wide weed spraying (off road) in various counties on various routes.
|
214-70F31
|
Rejected
|
06/23/2021
|
|
|
3
|
5
|
Various
|
|
On-Call lighting repairs in the District West Field Area consisting of DeWitt, McLean, and Piatt Counties.
|
215-74A31
|
Executed
|
07/14/2021
|
|
|
4
|
7
|
Clay
|
|
1.1 miles of milling, resurfacing and aggregate wedge shoulders on Old US 50 west of Industrial Drive to east of US 45.
|
216-74A54
|
Executed
|
08/17/2021
|
1 / 1 |
1 |
4
|
7
|
Clark
|
|
Bridge deck repairs and joint replacement on SN 012-0014 carrying IL 1 over CSX Railroad, 0.5 miles north of US 40 at Marshall.
|
217-61B89
|
Executed
|
07/28/2021
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
Reconstruct the intersection of Cedar Road at Laraway Road in New Lenox.
|
218-62F84
|
Executed
|
07/13/2021
|
2 / 2 |
2 |
1
|
1
|
Cook
|
|
(1.811-Mile) Pavement widening project on Glenwood Dyer Road from Stony Island Avenue to Torrence Avenue that includes standard overlay, traffic signal modification, and ADA improvement work It is located in the Village of Lynwood and unincorporated Cook County.
|
219-64H08
|
Executed
|
07/13/2021
|
1 / 1 |
1 |
2
|
2
|
Winnebago
|
|
Reconstruction of roadway, modernize traffic signals and improve intersections along US Business Route 20 (West State Street) in Rockford from Day Avenue to Independence Avenue.
|
220-66B93
|
Executed
|
07/13/2021
|
|
|
2
|
3
|
DeKalb, LaSalle
|
|
This is a 3P milling and resurfacing project of 3 3/4" on US 34 from IL 23 to East of Somonauk Road in Somonauk. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking and raised reflectors.
|
221-70B99
|
Executed
|
07/27/2021
|
13 / 11 |
1 |
3
|
5
|
Champaign
|
|
Interchange Reconstruction: 1-57 improvements from South of Norfolk Southern RR to Olympian Dr. (+/-1.95 mi.); 1-74 improvements from Duncan Rd. to Prospect Ave. (+/-2.66 mi.)
|
222-72823
|
Executed
|
07/14/2021
|
3 / 2 |
1 |
4
|
6
|
Scott
|
|
5.5 miles of patching, resurfacing, ramp improvements and bridge repairs on I-72 from west of IL 100 to 0.5 miles west of Old US 36 and on IL 100 from 0.5 miles north of I-72 to 0.3 miles south of I-72.
|
223-74A38
|
Executed
|
07/16/2021
|
|
|
4
|
7
|
Effingham
|
|
0.5 miles of patching along US 45 from north of Rickleman Avenue to north of Technology Drive in Effingham.
|
224-74A43
|
Executed
|
07/16/2021
|
2 / 2 |
1 |
4
|
7
|
Clark
|
|
Scale replacement at the Marshall Weigh Station on I-70.
|
225-76L96
|
Executed
|
07/13/2021
|
|
|
5
|
8
|
Calhoun, Greene
|
|
Ramp work and parking lot resurfacing along IL 108 at the Kampsville Ferry.
|
226-76N59
|
Withdrawn
|
06/10/2021
|
|
1 |
5
|
8
|
Various
|
|
Maintain and service all ITS equipment at various locations throughout District 8. , Maintain and service all ITS equipment at various locations throughout District 8.
|
227-76N84
|
Executed
|
07/27/2021
|
|
|
5
|
8
|
Clinton
|
|
0.8 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road.
|
228-85708
|
Executed
|
07/30/2021
|
|
|
2
|
2
|
Winnebago
|
|
On-Street bike routes on various roadways in South Beloit. Project includes signing, pavement markings, sidewalk replacement, curb and gutter replacement, HMA surfce course, and pdestrian signals.
|
229-87725
|
Rejected
|
07/16/2021
|
|
|
2
|
3
|
Iroquois
|
|
Replace the bridge carrying CH 4 over Pike Creek, 3.3 miles west of IL Rt 1.
|
230-91594
|
Executed
|
07/27/2021
|
1 / 1 |
|
3
|
5
|
Douglas
|
|
Replace the bridge carrying CH6 of the Kaskaskia River, 4.65 miles north of Garrett.
|
231-95897
|
Executed
|
07/27/2021
|
2 / 2 |
1 |
4
|
7
|
Fayette
|
|
Remove two concrete culverts and replace with two concrete box culverts, steel sheet piling and HMA pavement on CH23 at Little Creek Tributary, 4 miles west of St. Peter.
|
232-95902
|
Executed
|
07/28/2021
|
1 / 1 |
|
4
|
7
|
Wabash
|
|
Resurface 5th Street from Oak St. to North Mulberry St., and resurface Oak St. from College Dr. to Poplar St., and from IL 15 to West 3rd St. in Mt. Carmel.
|
233-97717
|
Executed
|
08/06/2021
|
5 / 5 |
1 |
5
|
8
|
Monroe
|
|
Pavement reconstruction, storm sewers, retaining wall, sidewalks, curb and gutter and pavement markings on Moore St. from south of IL 3 to Columbia Ave., including the reconstruction of the intersection of Moore and Columbia in Waterloo.
|
234-99650
|
Executed
|
07/13/2021
|
3 / 3 |
1 |
5
|
9
|
Jackson
|
|
Pavement removal, construction of 8" PCC pavement, curb and gutter, sidewalks, storm sewer, water main and sewer relocation, and pavement markings on North 7th Street from 0.4 mile south of Industrial Park Road to Bost Lane in Murphysboro.
|
235-99662
|
Executed
|
07/16/2021
|
|
|
5
|
9
|
Gallatin
|
|
Resurfacing, aggregate shoulders and pavement markings on Ridgeway/New Haven Road from Jackson/New Hope to Road to Shawneetown/New Haven Road.
|
236-46580
|
Withdrawn
|
06/07/2021
|
|
|
4
|
7
|
Clark
|
|
Various lengths of pavement marking rehabilitation throughout District 7. , Various lengths of pavement marking rehabilitation throughout District 7.
|
237-46581
|
Executed
|
07/16/2021
|
1 / 1 |
|
4
|
6
|
Various
|
|
Pavement markings on various routes throughout the western part of District 6.
|
238-46582
|
Executed
|
07/14/2021
|
1 / 1 |
|
4
|
6
|
Various
|
|
Pavement markings on various routes throughout the eastern part of District 6.
|
239-46905
|
Rejected
|
06/23/2021
|
1 / 1 |
1 |
4
|
6
|
Sangamon
|
|
Removal and reconstruction of the concrete retaining wall and walkway from the tomb to the receiving vault and parking lot repairs at the Lincoln-s Tomb State Historic Site in Springfield.
|
240-46920
|
Executed
|
07/13/2021
|
|
|
5
|
8
|
St. Clair
|
|
Site preparation and oil and chip treatment at Peabody River King State Fish and Wildlife Area.
|
241-46926
|
Executed
|
07/13/2021
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
Removal of the three 36-inch diameter culverts and replacing them witha 54-inch diameter culvert, and other drainage and signage work at Jubilee College State Park in Peoria County.
|
242-46929
|
Executed
|
09/07/2021
|
|
|
3
|
4
|
McDonough
|
|
These proposed improvements consist of the slope failure repairs and pavement repairs of Argyle Park road and parking area, pavement markings, and all other necessary work to complete the project within the Argyle Lake State Park in McDonough County. net length 280' (0.053 mi.).
|
243-62N29
|
Executed
|
07/12/2021
|
|
1 |
1
|
1
|
Cook
|
|
(1.17-Mile) Noise wall repairs. Location: IL-53, from IL-68 (Dundee Road) to Lake-Cook Road in the Villages of Palatine and Arlington Heights, in Palatine Township in Cook County.
|
244-70F32
|
Executed
|
07/15/2021
|
|
|
3
|
5
|
Various
|
|
On-Call lighting repairs in the District West Field Area consisting of Champaign, Vermilion, Douglas, and Edgar Counties.
|
245-74A47
|
Executed
|
07/15/2021
|
|
|
4
|
7
|
Various
|
|
35 miles of pavement patching on US 50 from Flora to Sumner.
|
246-74A53
|
Executed
|
07/09/2021
|
|
|
4
|
7
|
Fayette
|
|
1 mile of pavement patching on eastbound I-70 at the Brownstown Weigh Station.
|
247-76M78
|
Executed
|
07/14/2021
|
|
|
5
|
8
|
St. Clair
|
|
Well treatment at various locations in East St. Louis.
|
248-78883
|
Executed
|
07/15/2021
|
|
|
5
|
9
|
Jefferson
|
|
Patching on I-64 from the Washington County line to the I-57 / I-64 Tri-Level, north of Mt. Vernon.
|
249-99663
|
Executed
|
07/16/2021
|
1 / 0 |
|
5
|
9
|
Saline
|
|
Sidewalk Construction along US 45 from IL 142 to 300' east, along IL 142 from Locust Street to US 45, and pedestrian traffic signal improvements at the intersection of IL 142 and US 45 in Eldorado.
|
250-46567
|
Executed
|
07/16/2021
|
|
|
2
|
3
|
Various
|
|
This work is located at various locations in Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. Work shall consist of installing and replacement of raised reflective pavement markers and reflectors.
|
251-87752
|
Withdrawn
|
06/08/2021
|
|
|
2
|
3
|
LaSalle
|
|
Realign and reconstruct the intersection of Commercial Street, Broadway Street, and Main Street in Marseilles.
|
252-95641
|
Executed
|
07/27/2021
|
|
|
4
|
7
|
Edwards
|
|
Earth Excavation, processing soil-cement bse course, aggregate surfce, A-3 bituminous surfce treatment and pipe culverts on CH1 from 2.3 miles north of IL 15 for 1.00 mile.
|
253-95899
|
Executed
|
08/20/2021
|
|
|
4
|
7
|
Crawford
|
|
Replace the bridge carrying TR 245 over Freeport Creek, 0.6 mile east of Freeport.
|
254-97716
|
Executed
|
07/30/2021
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
HMA pavement, sidewalk construction, curb and gutter and pavement markings along Washington Street from Monroe Street to Jefferson Street in Millstadt.
|
255-97742
|
Executed
|
07/16/2021
|
|
1 |
5
|
8
|
St. Clair
|
|
Construction of a roundabout at the intersecton of Market Place and Commercial Lane in Fairview Heights.
|
256-97757
|
Executed
|
07/13/2021
|
|
|
5
|
8
|
Randolph
|
|
Aggregate bse repair, HMA surface removal and resurfacing, and pavement markings on Liberty Street from Church Street to Jackson Street in Evansville.
|
257-74A34
|
Executed
|
07/14/2021
|
|
|
4
|
7
|
Moultrie
|
|
3.4 miles of underdrains at various locations in District 7.
|
258-46563
|
Executed
|
07/27/2021
|
|
|
2
|
2
|
Various
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown on the plans.
|
259-74A36
|
Executed
|
07/15/2021
|
|
|
4
|
7
|
Shelby
|
|
1.56 miles of partial depth resurfacing at various locations on US 40, IL 32 and IL 33.
|
260-74A46
|
Executed
|
07/14/2021
|
|
|
4
|
7
|
Macon
|
|
Milling and resurfacing at 2 locations: 1) US 51 at IL 48; 2) I-72 at SN 058-0063/64.
|
261-89799
|
Executed
|
07/09/2021
|
1 / 1 |
1 |
3
|
4
|
Fulton
|
|
Remove and replace guardrail at various locations in Fulton County.
|
01A-CA022
|
Executed
|
01/03/2022
|
|
1 |
4
|
6
|
Sangamon
|
Voluntary
|
Runway 18/36 Removal and Associated Improvements, Phase 2
|
02A-VE055
|
Deleted
|
05/06/2021
|
|
|
3
|
5
|
|
|
Realign Taxiway A, Phase 1
|
03A-SE006
|
Executed
|
02/22/2022
|
|
|
4
|
7
|
Shelby
|
|
Airfield Pavement Maintenance and Marking
|
04A-SR095
|
Rejected
|
09/10/2021
|
|
|
5
|
8
|
Madison
|
|
Rehabilitate Runway 17/35 Pavement and Lighting
|
05A-LW030
|
Rejected
|
04/07/2022
|
|
|
4
|
7
|
Lawrence
|
|
Rehabilitate the Runway 18-36 pavement
|
06A-WA075
|
Executed
|
01/03/2022
|
4 / 4 |
1 |
1
|
1
|
Lake
|
|
Rehabilitate Airfield Lighting, Phase 1 and 2 (Runway 5/23, 14/32, Taxiway A, B and C) and Airfield Lighting Control and Monitoring System (ALCMS)
|
07A-WA076
|
Rejected
|
07/29/2022
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
Construct Perimeter Fencing - Phase 5 (Northwest Area)
|
1LR-M2006
|
Active
|
05/07/2021
|
|
|
0
|
0
|
Franklin
|
|
The Peabody Coal Company #18 Reclamation Project is for the elimination of public health and safety hazards by the Illinois Department of Natural Resources using federal abandoned mined lands funds. The hazards include exposed coal slurry and a hazardous structure. The reclamation will consolidate the coal slurry and cover with earthen material. The hazardous structure will be demolished. Erosion prevention measures will include establishment of vegetation on the disturbed area. The project site is located approximately one mile north of West Frankfort, Illinois, in Section 16, Township 7 South, Range 3 East, Franklin County.
|
01W-FR438
|
Active
|
05/07/2021
|
4 / 4 |
1 |
0
|
0
|
Cook
|
|
Removal of Dam 4 on the Des Plaines River and bank stabilization in the vicinity of the dam
|
02W-FR439
|
Active
|
05/07/2021
|
3 / 3 |
1 |
0
|
0
|
Cook
|
|
Removal of Touhy Dam on the Des Plaines River and bank stabilization in the vicinity of the dam
|