| 20800150 | CU YD | TRENCH BACKFILL | Base items | 80.000 |  | 
                
                    | 21400100 | FOOT | GRADING AND SHAPING DITCHES | Base items | 1,792.000 |  | 
                
                    | 25000200 | ACRE | SEEDING, CLASS  2 | Base items | 0.250 |  | 
                
                    | 25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 4.000 |  | 
                
                    | 25000500 | POUND | PHOSPHORUS FERTILIZER NUTRIENT | Base items | 4.000 |  | 
                
                    | 25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 4.000 |  | 
                
                    | 25000700 | TON | AGRICULTURAL GROUND LIMESTONE | Base items | 4.000 |  | 
                
                    | 25100125 | ACRE | MULCH, METHOD 3 | Base items | 0.250 |  | 
                
                    | 28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 70.000 |  | 
                
                    | 28000500 | EACH | INLET AND PIPE PROTECTION | Base items | 10.000 |  | 
                
                    | 35800100 | SQ YD | PREPARATION OF BASE | Base items | 72.000 |  | 
                
                    | 40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 3,245.000 |  | 
                
                    | 40600982 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT | Base items | 1,554.000 |  | 
                
                    | 40600990 | SQ YD | TEMPORARY RAMP | Base items | 33.000 |  | 
                
                    | 40604050 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 | Base items | 860.000 |  | 
                
                    | 40800029 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 700.000 |  | 
                
                    | 40800050 | TON | INCIDENTAL HOT-MIX ASPHALT SURFACING | Base items | 217.000 |  | 
                
                    | 44000200 | SQ YD | DRIVEWAY PAVEMENT REMOVAL | Base items | 95.000 |  | 
                
                    | 48102100 | TON | AGGREGATE WEDGE SHOULDER, TYPE B | Base items | 89.000 |  | 
                
                    | 50104400 | EACH | CONCRETE HEADWALL REMOVAL | Base items | 3.000 |  | 
                
                    | 50105220 | FOOT | PIPE CULVERT REMOVAL | Base items | 375.000 |  | 
                
                    | 542D0220 | FOOT | PIPE CULVERTS, CLASS D, TYPE 1    15" | Base items | 550.000 |  | 
                
                    | 67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 6.000 |  | 
                
                    | 67100100 | L SUM | MOBILIZATION | Base items | 1.000 |  | 
                
                    | 70100460 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 | Base items | 1.000 |  | 
                
                    | 70300100 | FOOT | SHORT TERM PAVEMENT MARKING | Base items | 561.000 |  | 
                
                    | 70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 94.000 |  | 
                
                    | 78001120 | FOOT | PAINT PAVEMENT MARKING - LINE  5" | Base items | 6,867.000 |  | 
                
                    | 78100100 | EACH | RAISED REFLECTIVE PAVEMENT MARKER | Base items | 36.000 |  | 
                
                    | 78300200 | EACH | RAISED REFLECTIVE PAVEMENT MARKER REMOVAL | Base items | 36.000 |  | 
                
                    | X2020110 | UNIT | GRADING AND SHAPING SHOULDERS | Base items | 10.000 |  | 
                
                    | X4401198 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH | Base items | 7,089.000 |  | 
                
                    | Z0005300 | EACH | BOX CULVERTS TO BE CLEANED | Base items | 2.000 |  | 
                
                    | Z0033700 | FOOT | LONGITUDINAL JOINT SEALANT | Base items | 2,774.000 |  |