Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 2 | 0.00 | 0.00 | HSIPFLTI(993) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
45 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20400800 | CU YD | FURNISHED EXCAVATION | Base items | 345.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 960.000 | |||
48102100 | TON | AGGREGATE WEDGE SHOULDER, TYPE B | Base items | 266.000 | |||
60600605 | FOOT | CONCRETE CURB, TYPE B | Base items | 10.000 | |||
63000003 | FOOT | STEEL PLATE BEAM GUARDRAIL, TYPE A, 9 FOOT POSTS | Base items | 10,272.000 | |||
63000350 | FOOT | LONG-SPAN GUARDRAIL OVER CULVERT, 12 FT 6 IN SPAN | Base items | 75.000 | |||
63100045 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 2 | Base items | 15.000 | |||
63100070 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 5 | Base items | 1.000 | |||
63100085 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 6 | Base items | 2.000 | |||
63100167 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT | Base items | 13.000 | |||
63100169 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) FLARED | Base items | 3.000 | |||
63200310 | FOOT | GUARDRAIL REMOVAL | Base items | 10,967.000 | |||
63500105 | EACH | DELINEATORS | Base items | 16.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100310 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 | Base items | 1.000 | |||
70100700 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 | Base items | 1.000 | |||
70100800 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701401 | Base items | 1.000 | |||
72501000 | EACH | TERMINAL MARKER - DIRECT APPLIED | Base items | 16.000 | |||
78200005 | EACH | GUARDRAIL REFLECTORS, TYPE A | Base items | 98.000 | |||
Z0052410 | EACH | REPAIR TRAFFIC BARRIER TERMINAL, TYPE 1 SPECIAL (TANGENT) | Base items | 1.000 | |||
No More Pay Items |