001-60K78
|
Executed
|
06/20/2018
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Replace bridge SN 016-1302 carrying US Route 6/IL 83 over the little Calumet River.
|
002-60V18
|
Executed
|
06/06/2018
|
|
|
1
|
1
|
Will
|
|
Resurfacing and pedestrian ramps on US 30 from Collins Street to I-80 in the City of Joliet.
|
003-60V55
|
Deleted
|
03/20/2018
|
|
|
1
|
1
|
Lake
|
|
Widening, resurfacing and traffic signal modernization in the Village of Lindenhurst.
|
004-60Y83
|
Executed
|
06/11/2018
|
|
|
1
|
1
|
Lake
|
|
Resurfacing, pedestrian ramps and drainage work in the villages of Island Lake and Wauconda.
|
005-62A14
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Lake
|
|
ADA ramp improvement on various routes in the villages of Deerfield and Lake Bluff and the cities of Highland park and Lake Forest.
|
006-62B13
|
Executed
|
06/20/2018
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Joint reconstruction and repair of the bridge structure SN 016-0153 carrying NB I-94 over SB Stony Island Avenue in the City of Chicago.
|
007-62B84
|
Executed
|
06/06/2018
|
|
|
1
|
1
|
Lake
|
|
Repair culvert carrying IL 22 over East Tributary to Flint Creek, 1.2 miles West of IL 59.
|
008-62B94
|
Executed
|
06/08/2018
|
|
|
1
|
1
|
McHenry
|
|
Rehabilatation of the existing culvert structures over unnamed ditches in the townships of Dunham and Hartland.
|
009-62C17
|
Executed
|
06/11/2018
|
2 / 2 |
|
1
|
1
|
Kane
|
|
Resurfacing, centerline rumble strips and pedestrian ramp upgrades on IL 72 from Reinking Road to Van Buren Street in the Villages of Pingree Grove, Gilberts, River West Dundee, Elgin and Sleepy Hollow.
|
010-62C24
|
Executed
|
06/12/2018
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
Remove and replace bridge structure SN 022-0103 carrying I-290 over Salt Creek.
|
011-62C67
|
Executed
|
06/06/2018
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing and pedestrian ramp improvement of IL 38 in the villages of Lombard and Villa Park.
|
012-62C75
|
Executed
|
06/07/2018
|
2 / 2 |
|
1
|
1
|
Lake
|
|
Resurfacing IL 132 through the villages of Lake Villa and Lindenhurst.
|
013-62D13
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps onTouhy Avenue in the villages of Niles, Skokie and Lincolnwood.
|
014-62D18
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps through the cities of Park Ridge and Chicago.
|
015-62D19
|
Executed
|
06/11/2018
|
|
|
1
|
1
|
Lake
|
|
Resurfacing and pedestrian ramp improvement on US 14 through the Village of Barrington.
|
016-62D20
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on Central Road in villages of Arlington Heights and Mount Prospect.
|
017-62D57
|
Executed
|
06/06/2018
|
|
|
1
|
1
|
Will
|
|
Pedestrian ramp improvement on IL 53, IL 113, IL 102 and IL 1 in the cities of Beecher, Wilmington and the Village of Crete.
|
018-62D74
|
Executed
|
06/07/2018
|
|
1 |
1
|
1
|
McHenry
|
|
HMA resurfacing along IL 176 in the city of Marengo.
|
019-62D75
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
McHenry
|
|
Resurfacing and pedestrian ramps on IL 47 in the City of Woodstock.
|
020-62F24
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on Fullerton Avenue in the Village of River Grove.
|
021-62F26
|
Executed
|
06/12/2018
|
3 / 3 |
1 |
1
|
1
|
Lake
|
|
Resurfacing on IL 132 in the villages of Gurnee and Lake Villa.
|
022-62F28
|
Executed
|
06/06/2018
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Resurfacing and pedestrian ramp improvements on IL 38 in the villages of Wheaton and Glen Ellyn.
|
023-62F53
|
Executed
|
06/06/2018
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing on IL 59 in the City of Warrenville.
|
024-62F55
|
Executed
|
06/07/2018
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
Resurfacing and shoulder improvement on IL 120 in the villages of Grayslake, Gurnee, Libertyville and the city of Waukegan.
|
025-62F56
|
Executed
|
06/06/2018
|
1 / 1 |
1 |
1
|
1
|
Cook, DuPage
|
|
Resurfacing and pedestrian ramps on US 34 in the Village of Hinsdale.
|
026-62F62
|
Executed
|
06/22/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on 79th Street in the City of Chicago.
|
027-62F63
|
Executed
|
06/08/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on 107th Street in the City of Palos and in the villages of Lemont and Willow Springs.
|
028-62F65
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on IL 72 in the City of Des Plaines and the Village of Rosemont.
|
029-62F68
|
Executed
|
06/11/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian ramps on IL 56 in the Villages of Berkley and Hillside.
|
030-62F98
|
Executed
|
06/20/2018
|
|
|
1
|
1
|
Cook
|
|
Bridge joint repairs on structure SN 016-0147 carrying SB I-94 over I-57 in the City of Chicago.
|
031-62F99
|
Executed
|
06/18/2018
|
|
|
1
|
1
|
Kane
|
|
Repair bridge structure SN 045-2018 carrying IL 64 over Fox River in the City of St. Charles.
|
032-72J20
|
Executed
|
06/13/2018
|
|
|
4
|
6
|
Sangamon
|
|
Deck repair and microsilica overlay on bridge structures SN 084-0107 and SN 084-0108 carrying I-55 over Brush Creek.
|
033-72K22
|
Executed
|
06/13/2018
|
|
|
4
|
6
|
Macoupin, Montgomery, Sangamon
|
|
Class A patching on I-55 from the Lake Springfield bridge in Sangamon County to the Macoupin County line
|
034-72K32
|
Executed
|
06/08/2018
|
|
|
4
|
6
|
Logan, Sangamon
|
|
Bituminous surface treatment on I-55 East Frontage Road from Pine Street in Williamsville to 0.8 mile south of Elkhart.
|
035-72K40
|
Executed
|
06/08/2018
|
|
|
4
|
6
|
Adams
|
|
Insertion culvert liner on I-172 under Ellington Road.
|
036-72K41
|
Executed
|
06/07/2018
|
|
|
4
|
6
|
Scott
|
|
Drainage repairs on I-72 0.6 miles west of the Morgan/Scott county line.
|
037-74436
|
Withdrawn
|
05/09/2018
|
|
|
4
|
7
|
Moultrie
|
|
Patching, riprap, earthwork, removal of a one span bridge and replacing with a box culvert on IL 133, 2.5 miles east of Lovington (SN 070-0027)
|
038-74652
|
Executed
|
07/09/2018
|
|
|
4
|
7
|
Coles
|
|
Replacement of SN 015-0013 carrying IL 16 over Little Wabash River 2 miles west of Mattoon.
|
039-74810
|
Executed
|
06/14/2018
|
|
|
4
|
7
|
Coles
|
|
3.2 miles of patching and detector loops on IL 16 from Lerna Road to 1200E, west of Charleston.
|
040-76F80
|
Executed
|
06/06/2018
|
|
|
5
|
8
|
Randolph
|
|
6.3 miles of resurfacing on IL 150 from Briarhill Rd to 0.2 mile east of IL 4.
|
041-76H00
|
Executed
|
06/11/2018
|
|
|
5
|
8
|
Madison
|
|
4.9 miles of resurfacing on IL 4 from the Macoupin county line to 0.3 mile south of I-55.
|
042-76H13
|
Executed
|
06/08/2018
|
|
|
5
|
8
|
St. Clair
|
|
2 miles of patching, milling and HMA resurfacing on US 50 from IL 4 in Lebanon to 0.3 mile west of Old US 50.
|
043-76J79
|
Executed
|
06/18/2018
|
|
1 |
5
|
8
|
St. Clair
|
|
Extension of culvert SN 082-2406 on IL 4 from Jefferson Road to Moeller Road.
|
044-76J88
|
Executed
|
06/07/2018
|
|
|
5
|
8
|
St. Clair
|
|
1654' of pavement widening to accommodate new left turn lane at the intersection of IL 158/IL 177 and Plum Hill Road.
|
045-76K31
|
Executed
|
06/08/2018
|
|
2 |
5
|
8
|
Greene
|
|
6.2 miles of resurfacing from 0.1 mile south of McCarthy Avenue to 0.1 mile north of Cemetary Road.
|
046-76K32
|
Executed
|
06/06/2018
|
2 / 2 |
1 |
5
|
8
|
Randolph
|
|
6.9 miles of patching and resurfacing on IL 3 from 0.2 miles south of South Prairie Road to 0.1 miles north of Roots Road.
|
047-76K77
|
Withdrawn
|
04/18/2018
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
2.3 miles of resurfacing and ADA upgrades on IL 157 from Petroff Drive in Caseyville to Conrail Bridge.
|
048-76K98
|
Executed
|
06/12/2018
|
|
1 |
5
|
8
|
Madison
|
|
6.5 miles of oil and chip and four locations: 1)Possum Hill Road from IL 4 to Bowles Street, 2)West Frontage Road from IL 140 to Possum Hill Road, 3)I-55/70 South Frontage Road at IL 159, 4)Troy Road and Maryville Road off of Fairlane Drive.
|
049-76L00
|
Executed
|
06/08/2018
|
|
1 |
5
|
8
|
Madison
|
|
Patching, HMA removal and HMA resurfacing on the I-255 exit ramps onto Horshoe Lake Road.
|
050-76L01
|
Executed
|
06/07/2018
|
|
|
5
|
8
|
Washington
|
|
1.3 miles of microsurfacing on Oakdale/Dubois Road from Rice Road to IL 127.
|
051-76L05
|
Withdrawn
|
04/16/2018
|
1 / 1 |
|
5
|
8
|
Various
|
|
Replace steel plate beam guardrail and terminal end sections at various locations.
|
052-76L06
|
Executed
|
06/11/2018
|
|
|
5
|
8
|
Various
|
|
Replace steel plate beam guardrail and terminal end sections at various locations.
|
053-76L36
|
Executed
|
06/07/2018
|
2 / 2 |
1 |
5
|
8
|
Washington
|
|
Joint repair and deck waterproofing on bridge SN 095-0023 carrying IL 127 over Crooked Creek Overflow; 5 miles north of IL 177.
|
054-76L37
|
Executed
|
06/12/2018
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Deck repair, joint repair and deck waterproofing of bridge SN 060-0088 carrying IL 157 over Burdick Branch, 3.5 miles north of I-70.
|
055-76L43
|
Executed
|
06/06/2018
|
|
|
5
|
8
|
Bond
|
|
Replace deck on bridge SN 003-0042 carrying Baumann Road over I-70.
|
056-78080
|
Executed
|
06/06/2018
|
1 / 1 |
1 |
5
|
9
|
Hamilton
|
|
Removal and replacement of bridge SN 033-0024 carrying Blairsville Road over an unnamed stream just off IL 242, 3.46 miles north of McLeansboro.
|
057-78166
|
Executed
|
06/18/2018
|
2 / 2 |
1 |
5
|
9
|
Saline
|
|
Replacement of two single span bridges on IL 34, 0.5 mile west of Galatia and one mile east of Galatia (SN 083-0026 and 083-0027).
|
058-78590
|
Rejected
|
05/09/2018
|
|
|
5
|
9
|
Saline
|
|
16.3 miles of tree pruning along US 34 and US 45.
|
059-78626
|
Executed
|
06/11/2018
|
|
|
5
|
9
|
Jackson
|
|
Replace traffic signal controllers at two locations; 1) IL 27 at IL 149; 2) IL 13/127 at IL 149.
|
060-78640
|
Executed
|
06/06/2018
|
|
|
5
|
9
|
Jackson
|
|
2.8 miles of 4' HMA safety shoulders, shoulder rumble strips, grading and seeding on IL 3 north of Grand Tower, from just north of Power Plant Road to just south of Gorham Road.
|
061-78642
|
Executed
|
06/08/2018
|
|
|
5
|
9
|
Jackson
|
|
4.4 miles of microsurfacing on IL 149 from US 51 in Desoto to the Williamson County line.
|
062-64K22
|
Executed
|
06/14/2018
|
|
|
2
|
2
|
Jo Daviess
|
|
HMA resurfacing on US 20 from 0.1 mile west of Powder House Hill Road east of Galena to Mount Hope Road.
|
063-64K24
|
Rejected
|
05/08/2018
|
|
1 |
2
|
2
|
Jo Daviess
|
|
HMA resurfacing on IL 84 from US 20 to Duke Creek north of Hanover.
|
064-64M33
|
Executed
|
06/05/2018
|
|
|
2
|
2
|
Jo Daviess
|
|
Replacing non-compliant guardrail end sections along US 20 from the Mississippi River to NB IL 84.
|
065-64L46
|
Executed
|
06/14/2018
|
1 / 1 |
2 |
2
|
2
|
Rock Island
|
|
Structural steel and deck repairs along with replacement of expansion joints on bridges SN 081-0038, 081-0039 and 081-0040 carrying US 67 over the Rock River between Rock Island and Milan.
|
066-64M48
|
Executed
|
06/06/2018
|
|
|
2
|
2
|
Rock Island
|
|
clean and paint bridge SN 081-0133 carrying 122nd Avenue north over I-88, 0.2 mile north of the Whiteside County line.
|
067-64M49
|
Executed
|
06/06/2018
|
|
|
2
|
2
|
Ogle
|
|
Clean and paint bridge SN 071-0045 carrying McNeal Road over I-39, 1.0 mile south of the Winnebago County line.
|
068-64M50
|
Executed
|
06/06/2018
|
|
|
2
|
2
|
Winnebago
|
|
clean and paint bridge SN 101-0144 carrying Rotary Road over I-39, 1.5 miles north of the Ogle County line.
|
069-64M51
|
Executed
|
06/06/2018
|
|
|
2
|
2
|
Winnebago
|
|
clean and paint bridge SN 101-0127 and SN 101-0128 carrying IL 2 over the DME(CP) Railroad and Old River Road in the Village of Rockton.
|
070-64M52
|
Executed
|
06/06/2018
|
|
|
2
|
2
|
Lee
|
|
clean and paint bridge SN 052-0058 carrying Shady Oaks Road over I-39, 3.0 miles north of the LaSalle County line.
|
071-64M62
|
Executed
|
06/11/2018
|
1 / 1 |
1 |
2
|
2
|
Henry
|
|
Expansion joint replacement and other bridge repairs on SN 037-001, SN 037-002 carrying I-74/280 over Mosquito Creek, 3.8 miles west of Junction I-80.
|
072-64M63
|
Executed
|
06/11/2018
|
1 / 1 |
1 |
2
|
2
|
Henry
|
|
Expansion joint replacment, concrete overlay and other bridge repairs on SN 037-0029 and Sn 037-0030 carrying I-80 over Mineral Creek, 0.7 mile north of Junction US 6.
|
073-64M65
|
Executed
|
06/14/2018
|
1 / 1 |
2 |
2
|
2
|
Boone
|
|
expansion joint replacement and other bridge repairs on SN 004-0005, 004-0006 carrying US 20 over S. Appleton Road and railroad tracks, south of Belvidere.
|
074-64M86
|
Executed
|
07/09/2018
|
|
1 |
2
|
2
|
Boone, Carroll
|
|
Apply concrete sealer to bridge decks at various locations.
|
075-64M87
|
Executed
|
07/09/2018
|
|
1 |
2
|
2
|
Henry
|
|
Apply concrete sealer to bridge decks at various locations.
|
076-64M88
|
Executed
|
06/12/2018
|
|
1 |
2
|
2
|
Various
|
|
Apply concrete sealer to bridge decks at various locations.
|
077-64M89
|
Executed
|
06/11/2018
|
1 / 0 |
|
2
|
2
|
Various
|
|
Repair, replace, maintain, and service all of the Intelligent Tranportation System equipment in Districts 2 and 3 as described by individual work orders.
|
078-66A21
|
Withdrawn
|
04/03/2018
|
|
|
2
|
3
|
Bureau
|
|
Remove structure SN 006-0106 and replace with a 70' 3-span structure to carry IL 89 over Brush Creek, 1.2 miles south of Arlington.
|
079-66D24
|
Withdrawn
|
04/20/2018
|
1 / 1 |
1 |
2
|
3
|
Kendall
|
|
Reconstruct IL 71 to 4 lanes with a 22' median from IL 47 to IL 126 (1.7 miles) includes replacement of all drainage structures, installation of traffic signals and relocation of water main and sanitary sewer.
|
080-66D65
|
Executed
|
06/14/2018
|
1 / 1 |
|
2
|
3
|
Kankakee
|
|
1.88 miles of 3P milling and resurfacing, 0.5 mile north of St George Road to 0.2 mile north of I-57 in Bradley.
|
081-66E24
|
Rejected
|
05/18/2018
|
|
|
2
|
3
|
Iroquois
|
|
Replace bridge SN 038-0116 carrying Us 45/52 over Langan Creek Tributary, 3 miles east of Clifton.
|
082-66H70
|
Executed
|
06/11/2018
|
|
|
2
|
3
|
Bureau
|
|
Intall 6.1 miles of high tensin cable median barrier on I-80 from 0.42 mile west of 600 E Street to the 1200 E Street overpass.
|
083-66H93
|
Executed
|
06/12/2018
|
|
|
2
|
3
|
DeKalb
|
|
Install flashing red beacon at each Stop Controlled Approach to the intersection of IL 23 and Chicago Road, and install flashing yellow beacon at the Advanced Intersection Warning Signs on the free flow state route.
|
084-66J18
|
Executed
|
06/14/2018
|
|
|
2
|
3
|
Grundy, Livingston
|
|
2 applications of spary mixtures, spring and summer of 2018, along various routes in Grundy and Livingston /counties.
|
085-68215
|
Executed
|
06/12/2018
|
1 / 1 |
|
3
|
4
|
McDonough
|
|
Reconstruction of two-lane SN 055-0015 carrying IL 9 over the north fork of the LaMoine River, 2.0 miles west of Bushnell.
|
086-68637
|
Executed
|
06/05/2018
|
1 / 1 |
2 |
3
|
4
|
Henry
|
|
Remove and replace bridge SN 037-0072 carrying IL 78 over Indian Creek, 0.4 mile south of US 34 near Kewanee.
|
087-68895
|
Executed
|
06/12/2018
|
1 / 1 |
1 |
3
|
4
|
Stark
|
|
Replace bridge SN 088-0001 carrying IL 17 over Indian Creek, 0.3 mil west of Toulon.
|
088-68D69
|
Rejected
|
05/09/2018
|
|
|
3
|
4
|
Tazewell
|
|
0.97 mile of patching, milling and resurfacing on US 24/IL 29 from Margaret Drive to north of Lasalle Boulevard in Creve Coeur.
|
089-68D81
|
Executed
|
07/09/2018
|
|
|
3
|
4
|
Various
|
|
Bridge deck sealing on various structures in various counties in District 4.
|
090-68E05
|
Executed
|
06/18/2018
|
|
|
3
|
4
|
Stark, Tazewell
|
|
Pollinator habitat restoration and preservation in Stark and Tazewell Counties.
|
091-68E07
|
Executed
|
06/18/2018
|
|
|
3
|
4
|
Various
|
|
Pavement marking on various routes in various counties in District 4.
|
092-70B77
|
Executed
|
06/12/2018
|
|
|
3
|
5
|
DeWitt
|
|
Repair deck of bridge SN 020-0020 carrying IL 54 over Salt Creek, 2 miles west of Kenney.
|
093-70C85
|
Executed
|
06/05/2018
|
9 / 9 |
|
3
|
5
|
Various
|
|
Guardrail improvements on various routes in various counties in District 5.
|
094-70C98
|
Executed
|
06/12/2018
|
|
|
3
|
5
|
Piatt
|
|
Repair bridge SN 074-0015 carrying IL 48 over Friends Creek Ditch, south of Weldon.
|
095-70C99
|
Rejected
|
05/09/2018
|
|
|
3
|
5
|
McLean
|
|
Bridge joint repair on various structures along I-55/I-74 in Bloomington/Normal.
|
096-70D06
|
Executed
|
06/08/2018
|
|
|
3
|
5
|
Vermilion
|
|
980 feet of HMA resurfacing with aggregate shoulders and pavement markings on Catlin Tilton Road.
|
097-70D09
|
Executed
|
06/12/2018
|
|
|
3
|
5
|
Champaign
|
|
Repair bridge SN 010-0132 carrying Neil Street over I-74 in Champaign.
|
098-70D10
|
Executed
|
06/12/2018
|
|
|
3
|
5
|
McLean
|
|
Deck repair on bridge SN 057-0188 carrying US 51 over Sugar Creek.
|
099-70D11
|
Executed
|
06/08/2018
|
|
|
3
|
5
|
Champaign
|
|
5.287 miles of new HMA shoulders on Broadlands Road from Longview Road to IL 49.
|
100-70D22
|
Executed
|
06/14/2018
|
|
|
3
|
5
|
DeWitt
|
|
Tree removal for EAB control in DeWitt County.
|
101-70D25
|
Executed
|
06/06/2018
|
|
|
3
|
5
|
Champaign
|
|
Paint bridge SN 010-0171 carrying Prospect Avenue over I-57, just north of Champaign.
|
102-72F40
|
Executed
|
06/06/2018
|
1 / 1 |
1 |
4
|
6
|
Sangamon
|
|
Intersection improvement at IL 29 and Main Street in Rochester. Includes addition of 2 right turn lanes, curb and gutter, bike trail re-alignment, traffic signal modernization, earthwork and storm sewers.
|
103-72K21
|
Executed
|
06/06/2018
|
|
|
4
|
6
|
Various
|
|
Safety lighting, crosswalk signage and striping upgrades at various locations in District 6.
|
104-74801
|
Rejected
|
05/09/2018
|
3 / 3 |
|
4
|
7
|
Various
|
|
Repair or replace existing guardrail and traffic barrier terminals in District 7 on a work order basis.
|
105-74814
|
Executed
|
06/05/2018
|
1 / 1 |
|
4
|
7
|
Wayne
|
|
10.6 miles of HMA safety shoulder on IL 15 from Shoe Creek, north of Wayne City to US 45, west of Fairfield.
|
106-74822
|
Executed
|
06/11/2018
|
|
|
4
|
7
|
Clay, Effingham, Fayette
|
|
Replacing non-crash-worthy traffic barrier end-sections and steel plate beam guardrail at various locations in District 7.
|
107-74841
|
Executed
|
06/13/2018
|
|
|
4
|
7
|
Crawford, Wayne
|
|
Painting 5 bridges at 3 locations in Crawford and Wayne Counties (SN 017-0021, 096-0043, 096-0044, 096-0045 and 096-0046).
|
108-74843
|
Executed
|
06/14/2018
|
|
|
4
|
7
|
Macon
|
|
Patching on IL 121 from University Avenue to north of Beardsale Road in Decatur.
|
109-76K72
|
Executed
|
06/14/2018
|
|
|
5
|
8
|
Various
|
|
Weed spraying along interstate routes in various counties in District 8.
|
110-76L03
|
Executed
|
06/13/2018
|
|
1 |
5
|
8
|
Madison, St. Clair
|
|
Replacement of ITS cameras and associated mounting systems in District 8.
|
111-60C48
|
Executed
|
06/07/2018
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
Relocation of Pump station 8 on US 14 in the City of Des Plaines.
|
112-62C15
|
Executed
|
06/11/2018
|
|
|
1
|
1
|
Cook
|
|
Fiber optic cable and PTZ camera installation in Schaumburg.
|
113-62C54
|
Executed
|
06/06/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing on Indiana Avenue within the villages of Riverdale, Dolton and South Holland.
|
114-62D51
|
Executed
|
06/07/2018
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Resurfacing on IL 72 to include ADA pedestrian ramp upgrade in the cities of Des Plaines and Rosemont.
|
115-62D58
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
DuPage
|
|
Pedestrian ramps at various location.
|
116-62G06
|
Executed
|
06/06/2018
|
|
|
1
|
1
|
Will
|
|
Repair bridge SN 099-0271 carrying Wolf Road over Hickory Creek in the Village of Mokena.
|
117-64H59
|
Executed
|
06/08/2018
|
1 / 1 |
1 |
2
|
2
|
Lee, Ogle
|
|
Removal and replacement of two concrete box culverts carrying IL 38 over drainage ditches. SN 052-1107 is 0.1 mile east of of Daysville Road in Franklin Grove and SN 071-1191 is 0.2 mile east of Center Rd west of Rochelle.
|
118-64H61
|
Rejected
|
05/09/2018
|
3 / 3 |
2 |
2
|
2
|
Ogle
|
|
HMA resurfacing on IL 251 from the Winnebago county line to 0.3 mile north of Flagg Road.
|
119-64M69
|
Executed
|
06/12/2018
|
|
|
2
|
2
|
Rock Island
|
|
Wash bridge SN 081-0011 carrying I-80 over the Mississippi River.
|
120-64M73
|
Executed
|
07/09/2018
|
|
|
2
|
2
|
Whiteside
|
|
Apply concrete sealer to bridge deck of SN 098-6003 carrying US 30 over the Mississippi River.
|
121-68B59
|
Deleted
|
03/20/2018
|
|
|
3
|
4
|
Knox, Peoria
|
|
Guardrail removal and culvert extensions at various locations on IL 8 and US 150, culvert replacement at Location 18 on US 150.
|
122-72K37
|
Executed
|
06/06/2018
|
|
|
4
|
6
|
Christian
|
|
Resurfacing on Mt. Auburn Road from south of Arch Street in Mount Auburn to 0.4 mile north of Buckhart Creek.
|
123-72K49
|
Executed
|
07/16/2018
|
|
|
4
|
6
|
Logan
|
|
Paint bridges SN 054-0048 and 054-0049 carrying NB and SB I-55 over Kickapoo Creek, 0.5 mil north of IL 10 in Lincoln.
|
124-76L40
|
Executed
|
06/20/2018
|
|
|
5
|
8
|
St. Clair
|
|
Bridge painting at 3 locations: 1) SN 082-0094, IL 161 over Silver Creek Overflow, 1.8 miles east of IL 158; 2) SN 082-0219, I-255 over McBride Avenue, 0.5 mile south of IL 157; 3) SN 082-0263, I-255 ramp E over Blue Water Ditch, 0.5 mile south of Doris Avenue in Cahokia.
|
125-46494
|
Executed
|
06/12/2018
|
|
|
3
|
4
|
Various
|
|
Placing epoxy and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings as specified by individual work orders.
|
126-46495
|
Rejected
|
05/09/2018
|
|
|
3
|
4
|
Various
|
|
Replacing damaged raised reflective pavement markers on various highways throughout Districts 4 and as directed by the Engineer.
|
127-46901
|
Executed
|
06/06/2018
|
|
|
4
|
6
|
Cass
|
|
Site preparation, oil and chip treatment, and other miscellaneous items at Jim Edgar Panther Creek State Fish and Wildlife Area (IDNR)
|
128-46912
|
Executed
|
06/12/2018
|
1 / 1 |
|
5
|
8
|
Jersey
|
|
Site preparation, oil and chip treatment, and other miscellaneous items at Pere Marquette State Park. (IDNR)
|
129-66H80
|
Rejected
|
05/18/2018
|
|
|
2
|
3
|
DeKalb
|
|
Clean and paint bridge SN 019-0012 carrying IL-64 over the Kishwaukee River, 1.5 miles west of IL 23 near Sycamore.
|
130-66H98
|
Executed
|
06/08/2018
|
|
|
2
|
3
|
Kankakee
|
|
Microsurfacing along centerline on northbound and southbound lanes of I-57 from north of IL 50 interchange to the Will County line.
|
131-68E01
|
Executed
|
06/08/2018
|
|
|
3
|
4
|
Marshall, Mason, Tazewell
|
|
Wash 9 bridges over the Illinois River.
|
132-70C80
|
Executed
|
06/07/2018
|
|
|
3
|
5
|
DeWitt, McLean
|
|
Replacing light towers with new LED highway lighting at seven intersections along US 51.
|
133-61E47
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Will
|
|
Intersection improvement at West 167th Street and Gougar Road in the City of Lockport.
|
134-61E51
|
Executed
|
06/08/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing with curb and gutter on Custer Avenue from 47th Avenue to Ogden Avenue in the Village of Brookfield.
|
135-61E55
|
Executed
|
06/13/2018
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Resurfacing, sidewalk construction and roadway reconstruction on Railroad Avenue from York Avenue to Addison Street in the Village of Bensenville.
|
136-61E62
|
Executed
|
07/09/2018
|
|
1 |
1
|
1
|
DuPage
|
|
Resurfacing and ADA improvements on York Street from North Avenue to First Street in the City of Elmhurst.
|
137-63858
|
Executed
|
06/13/2018
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
Intersection improvement at Huntley Road and Galligan Road near the Village of Gilberts.
|
138-87676
|
Executed
|
06/07/2018
|
|
|
2
|
3
|
Kankakee
|
|
Resurfacing on CH 37 from 2500 East Road to 4000 East Road.
|
139-91552
|
Executed
|
06/08/2018
|
|
|
3
|
5
|
Champaign
|
|
Resurfacing on CH 16 from US 45 to IL Route 130.
|
140-93712
|
Executed
|
06/07/2018
|
|
|
4
|
6
|
Hancock
|
|
Microsurfacing on CH 11 from TR 72 to the west corporate limits of Basco, and on CH 12 from CH 25 to the Adams County line.
|
141-95818
|
Executed
|
06/14/2018
|
|
|
4
|
7
|
Fayette
|
|
Replace the bridge carrying TR 434 over Hog Creek located 2.5 miles northwest of Wrights Corner.
|
142-95830
|
Executed
|
06/05/2018
|
|
|
4
|
7
|
Moultrie
|
|
Resurfacing on Ch 4 from 3.47 miles west of IL 32 easterly for 1.23 miles.
|
143-95831
|
Executed
|
06/05/2018
|
|
|
4
|
7
|
Coles
|
|
Aggregate shoulders, rumble strips and pavement marking on CH 18 from CH 20 to US 45.
|
144-99589
|
Executed
|
06/07/2018
|
|
|
5
|
9
|
Pulaski
|
|
Resurfacing and aggregate shoulders on Perks Road from 2.4 miles east of Old US 51 to the Johnson County line.
|
145-99596
|
Executed
|
06/07/2018
|
1 / 1 |
1 |
5
|
9
|
Jackson
|
|
HMA shoulders with rumble strips on Elkville Road from IL Route 127 to the Elkville Village limits.
|
146-99598
|
Executed
|
06/18/2018
|
|
|
5
|
9
|
Jefferson
|
|
Resurfacing on CH 9 from I-64 to IL Route 15.
|
147-61C48
|
Executed
|
06/07/2018
|
5 / 5 |
|
1
|
1
|
Lake
|
|
Reconstruction, drainage improvements, and bike/pedestrian path construction on Sayton Road from US 12 to Rollins Road, and from Rollins Road to Industrial Avenue in the Village of Fox Lake.
|
148-61D92
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing on Central Avenue from Gary Avenue to Roselle Road in the Village of Roselle.
|
149-61E22
|
Executed
|
06/13/2018
|
3 / 3 |
1 |
1
|
1
|
Lake
|
|
Reconstruction and widening to add one thru lane in each direction and bicycle/pedestrian accommodations on Quentin Road from IL 22 to White Pine Road.
|
150-61E42
|
Executed
|
06/07/2018
|
|
1 |
1
|
1
|
DuPage
|
|
Resurfacing on Army Trail Bouldevard from Mill Road to Rohlwing Road in the Village of Addison.
|
151-61E71
|
Executed
|
06/07/2018
|
|
1 |
1
|
1
|
Cook
|
|
Intersection improvement at North Avenue and US 20 (Lake Street) in the Village of Streamwood.
|
152-62C61
|
Executed
|
06/07/2018
|
|
1 |
1
|
1
|
Kendall
|
|
Resurfacing on IL 31 and East Frontage Road in the Village of Oswego.
|
153-62D40
|
Deleted
|
03/20/2018
|
|
|
1
|
1
|
Cook
|
|
Removal and replacement of the existing culverts on Kean Avenue in Palos Township.
|
154-62F34
|
Executed
|
06/18/2018
|
|
1 |
1
|
1
|
Lake
|
|
Joint and deck repairs on bridge SN 049-0170 carrying IL 137 over US 45 in the Village of Libertyville.
|
155-72K50
|
Executed
|
06/08/2018
|
1 / 1 |
1 |
4
|
6
|
Pike, Scott
|
|
Class D and partial depth HMA patching on I-72 from east of Hull to west of Barry in Pike County, and from east of the Illinois River Bridges to IL 100 in Scott County.
|
156-72K51
|
Executed
|
06/14/2018
|
|
|
4
|
6
|
Logan, Sangamon
|
|
Class A and B patching on I-55 from Clear Lake Avenue to Elkhart.
|
157-46467
|
Rejected
|
05/09/2018
|
|
|
2
|
2
|
Various
|
|
Replacing reflectorized guardrail markers, prismatic curb reflectors, barrier wall markers, and placing linear delineator panels as specified by indivisual work orders.
|
158-68A79
|
Executed
|
06/04/2018
|
12 / 10 |
2 |
3
|
4
|
McLean, Tazewell, Woodford
|
|
10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange.
|
159-60P55
|
Rejected
|
05/08/2018
|
1 / 1 |
1 |
1
|
1
|
Will
|
Mandatory
|
Local centralized control and operation of the six movable bridges from Ruby Street to Brandon Road in the City of Joliet
|
160-60T75
|
Executed
|
06/07/2018
|
10 / 10 |
2 |
1
|
1
|
Lake
|
|
Reconstruct US 45 on a new alignment and re-align Grass Lake Road to create a four-legged intersection with US 45 and Millburn Road in the Villages of Old Mill Creek and Lindenhurst.
|
161-61B91
|
Executed
|
06/12/2018
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Sidewalk construction adjacent to Ballard Road, from Bender Road to Good Avenue in the City of Des Plaines.
|
162-61E34
|
Executed
|
06/11/2018
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
Resurface Pearl Street from IL 31 to North River Road, and resurfacing Lincoln Road from North River Road to Chapel Hill Road in the City of McHenry.
|
163-61E54
|
Executed
|
06/11/2018
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Chicago Avenue from Thatcher Avenue to Harlem Avenue in the Village of River Forest.
|
164-61E59
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Lake
|
|
Resurfacing Golf Road from Butterfield road to Milwaukee Avenue in the Village of Libertyville.
|
165-61E60
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Cook
|
|
Construction of a multi-use trail, located east of Stony Island, from 97th Street to 103rd Street in the City of Chicago.
|
166-61E63
|
Executed
|
07/02/2018
|
4 / 2 |
|
1
|
1
|
Cook
|
|
Resurfacing Wolf Road from North Avenue to Winters Drive in the City of Northlake.
|
167-61E66
|
Executed
|
06/19/2018
|
|
1 |
1
|
1
|
Lake
|
|
Construction of a multi-use path adjacent to Molidor Road, from 0.5 mile west of Fish Lake Road to Fish Lake Road in Grant Township.
|
168-62B45
|
Executed
|
06/20/2018
|
|
|
1
|
1
|
Will
|
|
Shoulder widening, milled rumble strips and guardrail replacement on US 52 from Spencer Road to US 45 in the village of Manhattan and unincorporated Will County.
|
169-62F27
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Kane
|
|
Resurfacing of US 30 through the Village of Montgomery.
|
170-87678
|
Executed
|
06/07/2018
|
|
|
2
|
3
|
LaSalle
|
|
Resurfacing Commercial Street from Walbridge Creek to Spicer Street in the City of Marseilles.
|
171-87681
|
Withdrawn
|
05/09/2018
|
|
|
2
|
3
|
Livingston
|
|
Painting and tuckpointing at the historic Train Depot in the Village of Dwight.
|
172-95827
|
Executed
|
06/14/2018
|
|
|
4
|
7
|
Shelby
|
|
Replace the bridge carrying TR 425 over Green Creek, located 2.5 miles northwest of Sigel.
|
173-99588
|
Executed
|
06/14/2018
|
|
|
5
|
9
|
White
|
|
Replace the bridge carrying TR 403 over an unnamed creek, located 4 miles southeast of Norris City.
|
174-64K60
|
Executed
|
06/14/2018
|
|
|
2
|
2
|
Jo Daviess
|
|
1.73 miles of milling and resurfacing frm just west of Derinda Road to just east of Galena.
|
175-64L92
|
Executed
|
06/04/2018
|
|
|
2
|
2
|
Rock Island
|
|
Structural steel repair, hangar repair and other items to repair bridge SN 081-9905 carrying US 67 over the Mississippi River in the City of Rock Island.
|
176-68E08
|
Executed
|
06/26/2018
|
|
|
3
|
4
|
Various
|
|
Guardrail and cable guardrail repairs at various locations in District Four.
|
177-46473
|
Withdrawn
|
04/13/2018
|
1 / 0 |
|
1
|
1
|
Cook
|
|
Repair or replace sign structures, components and supports at various locations in District 1.
|
178-60Y26
|
Executed
|
06/14/2018
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
Intersection improvement, horizontal realignment and culvert replacement at US 6 and 179th Street in the village of Orland Park.
|
179-61E57
|
Executed
|
06/14/2018
|
|
|
1
|
1
|
Cook
|
|
Reconstruction of Oak Park Avenue from 167th Street to 159th Street in the Village of Tinley Park.
|
180-61E65
|
Executed
|
06/18/2018
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing, curb, gutter and sidewalks on North Main Street from Seminary Avenue to Cole Avenue in the City of Wheaton.
|
181-61E68
|
Executed
|
06/13/2018
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Construction of a multi-use path adjacent to Roselle Road from Hillcrest Boulevard to Central Road in the Village of Schaumburg. A new structure will be constructed to carry the path over Central Road.
|
182-61E70
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Lake
|
|
Sidewalk construction algon Clavey Road from Barberry Road to the Skokie Valley Bike Path in the City of Highland Park.
|
183-87685
|
Executed
|
06/26/2018
|
|
|
2
|
3
|
DeKalb
|
|
Construction of a multi-use trail along the north side of Kishwaukee River from Brickville Road to Main Street and along the west side of Main Street from the South Branch/East Branch of the Kishwaukee River north to Maplewood Drive.
|
184-89733
|
Executed
|
06/11/2018
|
|
|
3
|
4
|
Knox
|
|
Traffic Signal modernization at nine intersections in the City of Galesburg.
|
185-91529
|
Executed
|
06/05/2018
|
1 / 1 |
|
3
|
5
|
Edgar
|
|
Widening and resurfacing on CH 33 from Cherry Point Road to Sprinfield Road in Paris.
|
186-95829
|
Executed
|
06/14/2018
|
1 / 1 |
1 |
4
|
7
|
Coles
|
|
Reconstruction of Marshall Avenue from 14th Street to 9th Street in the City of Mattoon.
|
187-97655
|
Executed
|
06/08/2018
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Resurfacing with sidewalk improvements on Main Street from St. Louis Road to Lebanon Road in the City of Collinsville.
|
188-97666
|
Executed
|
06/13/2018
|
|
|
5
|
8
|
Madison
|
|
Resurfacing St. Louis Street from Elm Street to IL 157 in the City of Edwardsville.
|
189-97669
|
Executed
|
06/05/2018
|
|
|
5
|
8
|
Madison
|
|
Resurfacing Moro Road from Main Street to IL 159.
|
190-97671
|
Rejected
|
05/02/2018
|
|
|
5
|
8
|
Madison
|
|
Resurfacing Berkshire Boulevard from 0.05 mile west of Tomlinson Street to 0.04 mile east of Valley Drive in the City of East Alton.
|
191-99591
|
Executed
|
06/18/2018
|
|
|
5
|
9
|
Johnson
|
|
Resurfacing Tunnel Hill Road from Parrish Ridge Road to Larkins Creek Road.
|
192-99592
|
Executed
|
06/11/2018
|
1 / 1 |
|
5
|
9
|
White
|
|
Replace the bridge carrying TR 267 over drainage ditch, 3.5 miles north of Emma.
|
193-61C86
|
Executed
|
06/11/2018
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
Widening and reconstruction of Huntley Road from Sleepy Hollow Road to Elm Avenue in the Village of West Dundee.
|
194-61E40
|
Executed
|
06/07/2018
|
6 / 6 |
|
1
|
1
|
DuPage
|
|
Construction of a multi-use trail along Taylor Avenue from Walnut Street to Willis Street, and the Construction of a tunnel under the Union Pacific Railroad, in the Village of Glen Ellyn.
|
195-61E58
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Internationale Parkway from Beaudin Boulevard to Woodward Avenue in the Village of Woodridge.
|
196-61E61
|
Executed
|
06/14/2018
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Main Street from Franklin Street to Ogden Avenue in the Village of Downers Grove.
|
197-61E72
|
Executed
|
06/07/2018
|
|
|
1
|
1
|
Cook
|
|
Intersection improvement, signal replacement, channelization, and reconstruction of East Avenue in the Village of Streamwood.
|
198-61E73
|
Executed
|
06/26/2018
|
3 / 3 |
3 |
1
|
1
|
Kane
|
|
Intersection reConstruction at Huntley Road and IL 31 in the Village of Carpentersville.
|
199-85653
|
Executed
|
06/14/2018
|
|
1 |
2
|
2
|
Jo Daviess
|
|
Bridge rehabilitation with approach roadwork on CH 1 (West Council Hill Road) over the Galena River, 3 miles north of Galena.
|
200-87664
|
Executed
|
06/22/2018
|
1 / 1 |
|
2
|
3
|
DeKalb
|
|
Widening, traffic signals and intersection lighting on Annie Glidden Road at Fairview Drive in the City of DeKalb.
|
201-97667
|
Executed
|
06/11/2018
|
|
|
5
|
8
|
Monroe
|
|
Intersection improvement on Gall Road at IL 3 in the City of Columbia.
|
202-61E45
|
Executed
|
07/11/2018
|
3 / 3 |
|
1
|
1
|
Cook
|
|
Platform and ramp improvements, sidewalks and pedestrian lighting at the Stone Avenue METRA Station in the Village of La Grange.
|
203-85657
|
Executed
|
06/07/2018
|
|
|
2
|
2
|
Rock Island
|
|
Milling and resurfacing with ADA ramp improvements on 12th Avenue from 34th Street to 53rd Street, and on 16th Street from 52nd Avenue to John Deere Road in the City of Moline.
|
204-91500
|
Executed
|
06/18/2018
|
2 / 2 |
|
3
|
5
|
Vermilion
|
|
Construct a new Bike Trail from West of Oakwood Avenue in Oakwood to Grays Siding Road.
|
205-91562
|
Executed
|
06/18/2018
|
|
2 |
3
|
5
|
Vermilion
|
|
Reconstruction on IL 1 from 14th Street and Southgate Drive in the Village of Tilton to include pavement widening, curb and gutter replacement, resurfacing, raised median, roadway lighting anhd traffic signals.
|
206-95765
|
Rejected
|
05/09/2018
|
2 / 2 |
1 |
4
|
7
|
Macon
|
|
Construction of a multi-use path along Baltimore Avenue from East Lost Bridge Road to Harryland Road in Decatur.
|
207-97653
|
Executed
|
06/18/2018
|
3 / 2 |
1 |
5
|
8
|
Madison
|
|
Sidewalk replacement, paver border, street lighting and pavement markings at various locations in Granite City.
|
208-97657
|
Executed
|
06/18/2018
|
|
|
5
|
8
|
St. Clair
|
|
Reconstruct the intersection of Green Mount Road at Central Park Drive in the City of O'Fallen.
|
209-97662
|
Executed
|
06/18/2018
|
|
|
5
|
8
|
Madison
|
|
Reconstruction of Fehling Road from 0.2 mile west of IL Route 203 to IL Route 203 in Granite City.
|
210-97665
|
Executed
|
06/13/2018
|
|
|
5
|
8
|
Bond
|
|
Widening and resurfacing on Idler Lane from Samuel W. Andews Drive to IL 127 in the City of Greenville.
|
211-97668
|
Executed
|
07/30/2018
|
|
|
5
|
8
|
St. Clair
|
|
Construction of a multi-use path along the berm of the Hog River, from County Road to 10th Street in the City of Mascoutah.
|
212-97670
|
Executed
|
06/19/2018
|
|
|
5
|
8
|
Madison
|
|
Turn lane construction on Center Grove Road at IL 157 in the City of Edwardsville.
|
213-97674
|
Executed
|
06/22/2018
|
|
|
5
|
8
|
St. Clair
|
|
Construction of a multi-use path along the Mascoutah Surface Water Protection Districts "Big Ditch" from Sixth Street to Illinois Route 4 in the City of Mascoutah.
|
214-62A93
|
Executed
|
06/20/2018
|
|
|
1
|
1
|
Cook
|
|
Landscaping along FAI Route 55 (Stevenson Expressway) from just east of FAI Route I-94 (Dan Ryan Expressway) near Prairie Avenue to US 41 (Lake Shore Drive), in the city of Chicago.
|
215-62F40
|
Withdrawn
|
05/09/2018
|
|
|
1
|
1
|
Cook
|
|
Replace the existing Programmable Logic Controllers for the Kennedy Expressway Reversible Lane Control system.
|
216-62F70
|
Withdrawn
|
05/09/2018
|
|
|
1
|
1
|
Cook
|
|
Pavement grooving of existing PCC pavement on Kennedy Expressway from south of Kimball Avenue to north of Addison Street in the city of Chicago.
|
01A-MB030
|
Rejected
|
06/07/2018
|
|
1 |
3
|
4
|
McDonough
|
|
Install PAPIs on Runway 9-27
|
02A-SA031
|
Executed
|
07/25/2018
|
|
1 |
5
|
8
|
Marion
|
|
Phase 1 - Reconstruct Main PCC Apron
|
03A-SA032
|
Executed
|
07/26/2018
|
|
2 |
5
|
8
|
Marion
|
|
Widen and Rehabilitate Airport Entrance Road and Automobile Parking Lot
|
04A-CA020
|
Executed
|
08/13/2018
|
|
3 |
4
|
6
|
Sangamon
|
|
Terminal Parking Lot, Sidewalk Reconfiguration and Rehab., and Terminal Access Road Modifications
|
05A-AU067
|
Executed
|
08/23/2018
|
|
1 |
1
|
1
|
Kane
|
|
Install New Airfield Lighting Control and Monitoring System (ALCMS) Including Removing Existing System
|
06A-AU068
|
Executed
|
09/20/2018
|
|
1 |
1
|
1
|
Kane
|
|
Overlay Southeast Quadrant Perimeter Roadways
|
01W-FR441
|
Active
|
03/21/2018
|
|
|
3
|
5
|
Vermilion
|
|
Danville Dam Removal and Bank Stabilization, Vermilion County.
|