| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 5 | 8 | 12.00 | 0.00 | A89V(102) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 15 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 20200100 | CU YD | EARTH EXCAVATION | Base items | 797.000 | |||
| 25000100 | ACRE | SEEDING, CLASS 1 | Base items | 0.750 | |||
| 25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 60.000 | |||
| 25000500 | POUND | PHOSPHORUS FERTILIZER NUTRIENT | Base items | 60.000 | |||
| 25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 60.000 | |||
| 25100115 | ACRE | MULCH, METHOD 2 | Base items | 0.750 | |||
| 28000250 | POUND | TEMPORARY EROSION CONTROL SEEDING | Base items | 130.000 | |||
| 28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 12.000 | |||
| 28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 3,159.000 | |||
| 28000500 | EACH | INLET AND PIPE PROTECTION | Base items | 1.000 | |||
| 28100105 | SQ YD | STONE RIPRAP, CLASS A3 | Base items | 9.000 | |||
| 35101400 | TON | AGGREGATE BASE COURSE, TYPE B | Base items | 702.000 | |||
| 40600275 | POUND | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 4,118.000 | |||
| 40603310 | TON | HOT-MIX ASPHALT SURFACE COURSE, MIX "C", N50 | Base items | 300.000 | |||
| 42400300 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH | Base items | 344.000 | |||
| 42400800 | SQ FT | DETECTABLE WARNINGS | Base items | 40.000 | |||
| 44000500 | FOOT | COMBINATION CURB AND GUTTER REMOVAL | Base items | 11.000 | |||
| 44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 120.000 | |||
| 542C1057 | FOOT | PIPE CULVERTS, CLASS C, TYPE 2 12" | Base items | 44.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 72000100 | SQ FT | SIGN PANEL - TYPE 1 | Base items | 13.000 | |||
| 72800100 | FOOT | TELESCOPING STEEL SIGN SUPPORT | Base items | 50.000 | |||
| 78000200 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 4" | Base items | 552.000 | |||
| 78000400 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 6" | Base items | 53.000 | |||
| X0301797 | EACH | GATE REMOVAL | Base items | 1.000 | |||
| X0322881 | EACH | TREE TRIMMING | Base items | 26.000 | |||
| X0350805 | EACH | FOLD DOWN BOLLARDS | Base items | 2.000 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| Z0004002 | EACH | BOLLARDS | Base items | 3.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| Z0076600 | HOUR | TRAINEES | Base items | 500.000 | $0.80 | ||
| Z0076604 | HOUR | TRAINEES TRAINING PROGRAM GRADUATE | Base items | 500.000 | $15.00 | ||
| No More Pay Items | |||||||