| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 21.00 | 0.00 | NHPPLGYL(394) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 25 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 20200100 | CU YD | EARTH EXCAVATION | Base items | 85.000 | |||
| 20400800 | CU YD | FURNISHED EXCAVATION | Base items | 550.000 | |||
| 21101615 | SQ YD | TOPSOIL FURNISH AND PLACE, 4" | Base items | 2,272.000 | |||
| 25000310 | ACRE | SEEDING, CLASS 4 | Base items | 0.500 | |||
| 25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 30.000 | |||
| 25000500 | POUND | PHOSPHORUS FERTILIZER NUTRIENT | Base items | 30.000 | |||
| 25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 30.000 | |||
| 25100115 | ACRE | MULCH, METHOD 2 | Base items | 0.500 | |||
| 28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 210.000 | |||
| 28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 1,139.000 | |||
| 28100107 | SQ YD | STONE RIPRAP, CLASS A4 | Base items | 14.000 | |||
| 28200200 | SQ YD | FILTER FABRIC | Base items | 14.000 | |||
| 48101500 | SQ YD | AGGREGATE SHOULDERS, TYPE B 6" | Base items | 378.000 | |||
| 50104400 | EACH | CONCRETE HEADWALL REMOVAL | Base items | 4.000 | |||
| 50105220 | FOOT | PIPE CULVERT REMOVAL | Base items | 64.000 | |||
| 54213669 | EACH | PRECAST REINFORCED CONCRETE FLARED END SECTIONS 24" | Base items | 2.000 | |||
| 54213681 | EACH | PRECAST REINFORCED CONCRETE FLARED END SECTIONS 36" | Base items | 4.000 | |||
| 542A1069 | FOOT | PIPE CULVERTS, CLASS A, TYPE 2 24" | Base items | 83.000 | |||
| 542A1081 | FOOT | PIPE CULVERTS, CLASS A, TYPE 2 36" | Base items | 162.000 | |||
| 59300100 | CU YD | CONTROLLED LOW-STRENGTH MATERIAL | Base items | 168.000 | |||
| 63200310 | FOOT | GUARDRAIL REMOVAL | Base items | 358.000 | |||
| 66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 84.000 | |||
| 66900450 | L SUM | SPECIAL WASTE PLANS AND REPORTS | Base items | 1.000 | |||
| 66900530 | EACH | SOIL DISPOSAL ANALYSIS | Base items | 3.000 | |||
| 67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 6.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| X0326390 | SQ YD | CONCRETE SLAB REMOVAL | Base items | 14.000 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| Z0005305 | FOOT | BOX CULVERTS TO BE CLEANED | Base items | 151.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 192.000 | |||
| No More Pay Items | |||||||