AR101510
|
EACH
|
AIRPORT ROTATING BEACON
|
Base items
|
1.000
|
|
AR103970
|
L.S.
|
REFURBISH & RELOCATE BEACON TOWER
|
Base items
|
1.000
|
|
AR108060
|
L.S.
|
BEACON POWER CABLE INSTALLATION
|
Base items
|
1.000
|
|
AR108158
|
FOOT
|
1/C #8 5 KV UG CABLE IN UD
|
Base items
|
4,365.000
|
|
AR108706
|
FOOT
|
1/C #6 COUNTERPOISE
|
Base items
|
3,720.000
|
|
AR108960
|
FOOT
|
REMOVE CABLE
|
Base items
|
4,150.000
|
|
AR110014
|
FOOT
|
4" DIRECTIONAL BORE
|
Base items
|
40.000
|
|
AR110102
|
EACH
|
DUCT MARKER - IN PAVEMENT
|
Base items
|
10.000
|
|
AR110551
|
FOOT
|
EXTEND DUCT
|
Base items
|
144.000
|
|
AR110900
|
FOOT
|
REMOVE DUCT
|
Base items
|
58.000
|
|
AR125411
|
EACH
|
MITL-STAKE MOUNTED-LED
|
Base items
|
36.000
|
|
AR125416
|
EACH
|
MITL-BASE MOUNTED-LED
|
Base items
|
37.000
|
|
AR125901
|
EACH
|
REMOVE STAKE MOUNTED LIGHT
|
Base items
|
36.000
|
|
AR125902
|
EACH
|
REMOVE BASE MOUNTED LIGHT
|
Base items
|
17.000
|
|
AR125964
|
EACH
|
RELOCATE TAXI GUIDANCE SIGN
|
Base items
|
2.000
|
|
AR150510
|
L SUM
|
ENGINEER'S FIELD OFFICE
|
Base items
|
1.000
|
|
AR150520
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
AR152410
|
CU YD
|
UNCLASSIFIED EXCAVATION
|
Base items
|
685.000
|
|
AR152480
|
SQ YD
|
SHOULDER ADJUSTMENT
|
Base items
|
1,200.000
|
|
AR156520
|
EACH
|
INLET PROTECTION
|
Base items
|
8.000
|
|
AR201660
|
FOOT
|
BITUMINOUS CRACK REPAIR
|
Base items
|
950.000
|
|
AR201670
|
SQ YD
|
CRACK CONTROL FABRIC
|
Base items
|
430.000
|
|
AR209610
|
SQ YD
|
CRUSHED AGG. BASE COURSE - 10"
|
Base items
|
1,630.000
|
|
AR401610
|
TON
|
BITUMINOUS SURFACE COURSE
|
Base items
|
1,030.000
|
|
AR401650
|
SQ YD
|
BITUMINOUS PAVEMENT MILLING
|
Base items
|
9,765.000
|
|
AR401655
|
SQ YD
|
BUTT JOINT CONSTRUCTION
|
Base items
|
340.000
|
|
AR401900
|
SQ YD
|
REMOVE BITUMINOUS PAVEMENT
|
Base items
|
2,360.000
|
|
AR403610
|
TON
|
BITUMINOUS BASE COURSE
|
Base items
|
1,710.000
|
|
AR602510
|
GALLON
|
BITUMINOUS PRIME COAT
|
Base items
|
410.000
|
|
AR603510
|
GALLON
|
BITUMINOUS TACK COAT
|
Base items
|
3,175.000
|
|
AR620520
|
SQ FT
|
PAVEMENT MARKING-WATERBORNE
|
Base items
|
18,600.000
|
|
AR620525
|
SQ FT
|
PAVEMENT MARKING-BLACK BORDER
|
Base items
|
5,550.000
|
|
AR620900
|
SQ FT
|
PAVEMENT MARKING REMOVAL
|
Base items
|
350.000
|
|
AR705524
|
FOOT
|
4" PERFORATED UNDERDRAIN W/SOCK
|
Base items
|
3,540.000
|
|
AR705544
|
FOOT
|
4" NON PERFORATED UNDERDRAIN
|
Base items
|
975.000
|
|
AR705635
|
EACH
|
UNDERDRAIN COLLECTION STRUCTURE
|
Base items
|
7.000
|
|
AR705640
|
EACH
|
UNDERDRAIN CLEANOUT
|
Base items
|
14.000
|
|
AR705645
|
EACH
|
UNDERDRAIN CONNECTION
|
Base items
|
7.000
|
|
AR901510
|
ACRE
|
SEEDING
|
Base items
|
1.600
|
|
AR904510
|
SQ YD
|
SODDING
|
Base items
|
1,074.000
|
|
AR908510
|
ACRE
|
MULCHING
|
Base items
|
1.600
|
|
AS108108
|
FOOT
|
1/C #8 5 KV UG CABLE
|
Additive 1
|
375.000
|
|
AS108706
|
L.F.
|
1/C #6 COUNTERPOISE
|
Additive 1
|
340.000
|
|
AS108960
|
L.F.
|
REMOVE CABLE
|
Additive 1
|
500.000
|
|
AS125411
|
EACH
|
MITL-STAKE MOUNTED-LED
|
Additive 1
|
2.000
|
|
AS125902
|
EACH
|
REMOVE BASE MOUNTED LIGHT
|
Additive 1
|
2.000
|
|
AS152480
|
SQ YD
|
SHOULDER ADJUSTMENT
|
Additive 1
|
170.000
|
|
AS156520
|
EACH
|
INLET PROTECTION
|
Additive 1
|
1.000
|
|
AS201660
|
L.F.
|
BITUMINOUS CRACK REPAIR
|
Additive 1
|
175.000
|
|
AS201670
|
SQ YD
|
CRACK CONTROL FABRIC
|
Additive 1
|
80.000
|
|
AS401610
|
TON
|
BITUMINOUS SURFACE COURSE
|
Additive 1
|
90.000
|
|
AS401650
|
SQ YD
|
BITUMINOUS PAVEMENT MILLING
|
Additive 1
|
975.000
|
|
AS401900
|
SQ YD
|
REMOVE BITUMINOUS PAVEMENT
|
Additive 1
|
670.000
|
|
AS403610
|
TON
|
BITUMINOUS BASE COURSE
|
Additive 1
|
150.000
|
|
AS603510
|
GALLON
|
BITUMINOUS TACK COAT
|
Additive 1
|
150.000
|
|
AS620520
|
SQ FT
|
PAVEMENT MARKING-WATERBORNE
|
Additive 1
|
300.000
|
|
AS620525
|
SQ FT
|
PAVEMENT MARKING-BLACK BORDER
|
Additive 1
|
300.000
|
|
AS705524
|
FOOT
|
4" PERFORATED UNDERDRAIN W/SOCK
|
Additive 1
|
478.000
|
|
AS705640
|
EACH
|
UNDERDRAIN CLEANOUT
|
Additive 1
|
1.000
|
|
AS705645
|
EACH
|
UNDERDRAIN CONNECTION
|
Additive 1
|
1.000
|
|
AS901510
|
ACRE
|
SEEDING
|
Additive 1
|
0.200
|
|
AS904510
|
SQ YD
|
SODDING
|
Additive 1
|
270.000
|
|
AS908510
|
ACRE
|
MULCHING
|
Additive 1
|
0.200
|
|
AT108108
|
L.F.
|
1/C #8 5 KV UG CABLE
|
Additive 2
|
375.000
|
|
AT108706
|
L.F.
|
1/C #6 COUNTERPOISE
|
Additive 2
|
340.000
|
|
AT108960
|
FOOT
|
REMOVE CABLE
|
Additive 2
|
400.000
|
|
AT125411
|
EACH
|
MITL-STAKE MOUNTED-LED
|
Additive 2
|
2.000
|
|
AT125902
|
EACH
|
REMOVE BASE MOUNTED LIGHT
|
Additive 2
|
2.000
|
|
AT152480
|
SQ YD
|
SHOULDER ADJUSTMENT
|
Additive 2
|
135.000
|
|
AT201660
|
L.F.
|
BITUMINOUS CRACK REPAIR
|
Additive 2
|
200.000
|
|
AT201670
|
SQ YD
|
CRACK CONTROL FABRIC
|
Additive 2
|
200.000
|
|
AT401610
|
TON
|
BITUMINOUS SURFACE COURSE
|
Additive 2
|
70.000
|
|
AT401650
|
SQ YD
|
BITUMINOUS PAVEMENT MILLING
|
Additive 2
|
780.000
|
|
AT401900
|
SQ YD
|
REMOVE BITUMINOUS PAVEMENT
|
Additive 2
|
540.000
|
|
AT403610
|
TON
|
BITUMINOUS BASE COURSE
|
Additive 2
|
120.000
|
|
AT603510
|
GALLON
|
BITUMINOUS TACK COAT
|
Additive 2
|
120.000
|
|
AT620520
|
SQ FT
|
PAVEMENT MARKING-WATERBORNE
|
Additive 2
|
200.000
|
|
AT620525
|
SQ FT
|
PAVEMENT MARKING-BLACK BORDER
|
Additive 2
|
150.000
|
|
AT705524
|
FOOT
|
4" PERFORATED UNDERDRAIN W/SOCK
|
Additive 2
|
200.000
|
|
AT705640
|
EACH
|
UNDERDRAIN CLEANOUT
|
Additive 2
|
1.000
|
|
AT901510
|
ACRE
|
SEEDING
|
Additive 2
|
0.200
|
|
AT904510
|
SQ YD
|
SODDING
|
Additive 2
|
180.000
|
|
AT908510
|
ACRE
|
MULCHING
|
Additive 2
|
0.200
|
|
AU108108
|
L.F.
|
1/C #8 5 KV UG CABLE
|
Additive 3
|
375.000
|
|
AU108706
|
L.F.
|
1/C #6 COUNTERPOISE
|
Additive 3
|
340.000
|
|
AU108960
|
L.F.
|
REMOVE CABLE
|
Additive 3
|
300.000
|
|
AU125411
|
EACH
|
MITL-STAKE MOUNTED-LED
|
Additive 3
|
4.000
|
|
AU125902
|
EACH
|
REMOVE BASE MOUNTED LIGHT
|
Additive 3
|
2.000
|
|
AU152480
|
SQ YD
|
SHOULDER ADJUSTMENT
|
Additive 3
|
100.000
|
|
AU156520
|
EACH
|
INLET PROTECTION
|
Additive 3
|
1.000
|
|
AU201660
|
L.F.
|
BITUMINOUS CRACK REPAIR
|
Additive 3
|
130.000
|
|
AU201670
|
SQ YD
|
CRACK CONTROL FABRIC
|
Additive 3
|
60.000
|
|
AU401610
|
TON
|
BITUMINOUS SURFACE COURSE
|
Additive 3
|
60.000
|
|
AU401650
|
SQ YD
|
BITUMINOUS PAVEMENT MILLING
|
Additive 3
|
640.000
|
|
AU401900
|
S.Y.
|
REMOVE BITUMINOUS PAVEMENT
|
Additive 3
|
360.000
|
|
AU403610
|
TON
|
BITUMINOUS BASE COURSE
|
Additive 3
|
100.000
|
|
AU603510
|
GALLON
|
BITUMINOUS TACK COAT
|
Additive 3
|
100.000
|
|
AU620520
|
SQ FT
|
PAVEMENT MARKING-WATERBORNE
|
Additive 3
|
150.000
|
|
AU620525
|
SQ FT
|
PAVEMENT MARKING-BLACK BORDER
|
Additive 3
|
120.000
|
|
AU705524
|
L.F.
|
4" PERFORATED UNDERDRAIN W/SOCK
|
Additive 3
|
150.000
|
|
AU901510
|
ACRE
|
SEEDING
|
Additive 3
|
0.100
|
|
AU904510
|
S.Y.
|
SODDING
|
Additive 3
|
90.000
|
|
AU908510
|
ACRE
|
MULCHING
|
Additive 3
|
0.100
|
|