001-60T30
|
Executed
|
05/26/2021
|
2 / 1 |
2 |
1
|
1
|
Will
|
|
Intersection Reconstruction (Channelization, Widening, Traffic Signal Modernization, Drainage Improvements); Location: FAU 381: IL Route 129 at Coal City Road, in the City of Braidwood, City of Wilmington, and Unincorporated areas in Will County.
|
002-60V39
|
Executed
|
05/17/2021
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
This traffic signal installation and channelization project begins about 652.5 feet (0.12 miles) west of the intersection of IL 173 (FAP 303) and North Lake Avenue and proceeds in a southerly/easterly direction for 1462.3 feet (0.28 miles). This project also begins at the center of the intersection of IL 173 (FAP 303) and North Lake Avenue.
|
003-60X72
|
Executed
|
05/20/2021
|
1 / 0 |
|
1
|
1
|
Cook
|
|
The improvement consists of the construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted frame and ltd. The work is located on IL 64 (North Ave.) at pump station #12 in Melrose Park.
|
004-61G09
|
Executed
|
05/21/2021
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Park Boulevard from Irving Park Road to Schaumburg Road in Streamwood.
|
005-61G91
|
Executed
|
05/20/2021
|
|
1 |
1
|
1
|
Kane
|
|
Traffic Signal modernization at three intersections, sidewalk improvements, and pavement markings at Fabyan Parkway and IL 131, Orchard Road at Acutt Road and Rochester Drive, and Orchard Road from US 30 to Jericho Road in Batavia, Montgomery and unincorporated Kane County.
|
006-61G94
|
Executed
|
05/20/2021
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
Remove existing box culvert, construct single-span CIP slab bridge, and reconstruct approach pavement on Kishwaukee Valley Road over a tributary of Rush Creek, 0.2 miles east of Root Road.
|
007-61G96
|
Executed
|
06/03/2021
|
|
|
1
|
1
|
Will
|
|
Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on West Street from Corning Avenue to Joliet Road in Peotone.
|
008-61G99
|
Executed
|
05/27/2021
|
|
|
1
|
1
|
Cook
|
|
Concrete Sidewalk, curb and gutter replacement, tree removal, and landscaping on US 30 from Orchard Drive to the east village limits on Rockwell Street in Park Forest.
|
009-61G97
|
Executed
|
05/17/2021
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Eola Road from Oakhurst Drive to US 34 in Aurora.
|
010-61H00
|
Executed
|
05/25/2021
|
|
|
1
|
1
|
Will
|
|
Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Court Street from Elder Lane to Eastgate Avenue in Monee.
|
011-61H01
|
Executed
|
05/20/2021
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Resurfacing, HMA pavement patching, curb and gutter repairs on Old Willow Road from South Wolf Road to US 45 in Prospect Heights.
|
012-61H02
|
Executed
|
05/17/2021
|
|
1 |
1
|
1
|
DuPage
|
|
Resurfacing, curb and gutter, traffic signals, sidewalks and pavement markings on Grand Avenue, from US 20 to County Line Road in Elmhurst and Bensenville.
|
013-61H03
|
Executed
|
05/25/2021
|
2 / 0 |
|
1
|
1
|
McHenry
|
|
Resurfacing Haligus Road from north of Ballard Road to Lakewood Road in Lakewood.
|
014-61H04
|
Executed
|
06/23/2021
|
|
|
1
|
1
|
McHenry
|
|
Resurfacing Valley View Road from Nish Road to south of IL 176 in Prairie Grove
|
015-61H06
|
Executed
|
07/08/2021
|
|
|
1
|
1
|
Cook
|
|
Streetscape improvements on St. Charles Road from Mannheim Road to 25th Avenue in Bellwood.
|
016-61H08
|
Executed
|
05/26/2021
|
|
|
1
|
1
|
Cook
|
|
Resurfcing, curb and gutter, sidewalk replacement, detector loops and pavement markings on Kensington Road from Dryden Place to Regency Drive West in Arlington Heights.
|
017-61H09
|
Executed
|
05/21/2021
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Salem Drive from the village limits to Bode Road, Jones Road from Highland Boulevard to Hassel Road, and Hassell Road from Rosedale to Jones Road in Hoffman Estates.
|
018-62N30
|
Executed
|
06/10/2021
|
|
|
1
|
1
|
Cook
|
|
(0.102-Mile) Improvement on I-94 at IL 50 (Cicero Ave.), II 58 (Dempster Ave.) and Lake Ave. consist of a Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships of New Trier, Jefferson and Niles.
|
019-64G99
|
Executed
|
05/17/2021
|
|
|
2
|
2
|
Ogle
|
|
Cold milling, Cold In-Place (CIP) Recycling, HMA resurfacing on IL Route 64 from 0.1 mile East of US 52 to 0.04 mile West of IL 26.
|
020-64J97
|
Executed
|
05/17/2021
|
|
|
2
|
2
|
Henry
|
|
6.27 MILES, Resurfacing from Galva - Atkinson Road to West Street in Kewanee.
|
021-64P29
|
Executed
|
05/25/2021
|
1 / 1 |
|
2
|
2
|
Winnebago
|
|
Milling, patching, and hot-mix asphalt resurfacing on IL Route 70 from Pecatonica River to 0.1 mile west of Safford Road in Rockford.
|
022-64P30
|
Executed
|
05/21/2021
|
3 / 3 |
1 |
2
|
2
|
Lee
|
|
Cold milling, pavement patching and hot-mix asphalt resurfacing along US 52 from Water Street in Amboy to North of Henkle Road.
|
023-64P65
|
Executed
|
05/28/2021
|
1 / 1 |
|
2
|
2
|
Whiteside
|
|
Removal and replacement of existing expansion joints on SN 098-0032 carrying US 30 over Elkhorn Creek.
|
024-64P66
|
Executed
|
05/28/2021
|
1 / 1 |
1 |
2
|
2
|
Carroll
|
|
Removal and replacement of existing expansion joints, along with partial replacement of the South bridge approach slab and the adjacent sidewalk on SN 008-0041 carrying IL 84 over the SOO line RR.
|
025-64P68
|
Executed
|
06/04/2021
|
|
|
2
|
2
|
Various
|
|
Installing signs and posts along State maintained routes.
|
026-64P69
|
Executed
|
06/03/2021
|
|
|
2
|
2
|
Henry
|
|
Cleaning and painting structural steel on SN's 037-0029 and 037-0030 carrying 1-80 over Mineral Creek located 0.7 mile North of US 6, and SN 037-0079 carrying US 6 over 1-80.
|
027-64P70
|
Executed
|
06/03/2021
|
1 / 1 |
1 |
2
|
2
|
Henry
|
|
Cleaning and painting structural steel on SN 037-0112 carrying TR 196-D over 1-80 located 0.9 mile southeast of IL 82, SN 037-0113 carrying TR 216 over 1-80 located 2.0 miles southeast of IL 82 and SN 037-0118 carrying TR 468 over 1-80 located 1.5 miles east of IL 78.
|
028-64P71
|
Executed
|
06/03/2021
|
1 / 1 |
|
2
|
2
|
Rock Island
|
|
Cleaning and painting structural steel SN's 081-0030 and 081-0031 carrying I-280 over Case Creek located 2.0 miles west of I-74.
|
029-64P72
|
Executed
|
06/03/2021
|
|
1 |
2
|
2
|
Lee
|
|
Cleaning and painting structural steel on SN 052-0059 carrying Welland Road over 1-39.
|
030-64P74
|
Executed
|
05/28/2021
|
1 / 1 |
1 |
2
|
2
|
Whiteside
|
|
Milling and resurfacing on US 30 from Jackson Street to French Creek East of Morrison.
|
031-66E14
|
Executed
|
05/21/2021
|
|
|
2
|
3
|
Bureau
|
|
3P mill and resurface.
|
032-66H91
|
Withdrawn
|
03/19/2021
|
|
|
2
|
3
|
LaSalle
|
|
This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. , This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items.
|
033-66K60
|
Executed
|
05/21/2021
|
|
|
2
|
3
|
Bureau
|
|
7.3 miles of milling and resurfacing, ADA improvements.
|
034-66L01
|
Executed
|
05/26/2021
|
|
|
2
|
3
|
LaSalle
|
|
0.71 mile. Latex overlay, cleaning and painting of structural steel and expansion joint replacement. SN 050-0200 IL 251 over 1-39; 0.5 Miles north of IL 71.
|
035-66L22
|
Executed
|
05/27/2021
|
|
|
2
|
3
|
Iroquois
|
|
This work is located at Structure No. 038-0130, TR 95 over 1-57, approximately 3.48 miles South of IL 116 and Structure No. 038-0131 carrying TR 109 over 1-57, approximately 5.59 miles South of IL 116 in Iroquois. This work consists of bridge painting.
|
036-66L28
|
Executed
|
05/25/2021
|
|
|
2
|
3
|
Kankakee
|
|
Signal Mast Arm Removal and Replacement - at River St and Station St in Kankakee.
|
037-66L30
|
Executed
|
05/25/2021
|
|
|
2
|
3
|
Iroquois, Kankakee
|
|
This project consists of 3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd in Iroquois County.
|
038-66L32
|
Executed
|
05/21/2021
|
2 / 2 |
|
2
|
3
|
Bureau
|
|
This project consists of the installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd.
|
039-66L33
|
Executed
|
05/21/2021
|
2 / 2 |
|
2
|
3
|
LaSalle
|
|
This project consists of the installation of approximately 5.92 miles of high tension cable median barrier from 1.09 miles South of N 36th Rd to 0.88 miles South of N 42nd Rd in LaSalle County.
|
040-66L54
|
Executed
|
05/28/2021
|
1 / 1 |
|
2
|
3
|
DeKalb
|
|
This work is located at FAP 573 on US 30 on SN 019-0036 at Little Rock Creek 0.5 miles West of Hinckley in Dekalb County. This work consists of the removal and replacement of expansion joints and deck patching on SN 019-0036.
|
041-66L65
|
Executed
|
05/24/2021
|
|
|
2
|
3
|
Iroquois, Kankakee
|
|
The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kankakee and Iroquois Counties.
|
042-66L66
|
Executed
|
05/20/2021
|
|
|
2
|
3
|
DeKalb
|
|
The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in DeKalb County.
|
043-66L70
|
Executed
|
05/25/2021
|
|
|
2
|
3
|
Bureau
|
|
This project is located along FAI 80 (I-80) in Bureau county. The work consists of weed spraying to aid in weed control.
|
044-68F76
|
Executed
|
06/24/2021
|
2 / 2 |
|
3
|
4
|
Various
|
|
Crack and joint sealing at various locations in Knox, Peoria, and Tazewell Counties.
|
045-68G09
|
Executed
|
05/28/2021
|
2 / 2 |
|
3
|
4
|
Marshall
|
|
Rout and seal along Interstate 39 from 2 mile south of IL Route 17 to LaSalle County line and IL Route 18 from IL Route 29 in Henry to the Illinois River.
|
046-68G22
|
Executed
|
05/24/2021
|
2 / 2 |
1 |
3
|
4
|
Woodford
|
|
Removal of existing high mast towers and installation of new lighting system at Interstate 39 at the Minonk interchange and replacement of light towers at Interstate 74 Mackinaw Dells rest areas.
|
047-68G23
|
Executed
|
05/24/2021
|
1 / 1 |
|
3
|
4
|
Tazewell
|
|
Installation of overhead light poles, luminaires, flashing beacons, signs, pavement markings, rumble strips on IL Route 9 in Woodford County.
|
048-68G24
|
Executed
|
05/24/2021
|
|
|
3
|
4
|
Various
|
|
Electrical maintenance contract (maintenance and repair 04 traffic signals, overhead lighting, and ITS facilities).
|
049-70947
|
Executed
|
05/21/2021
|
1 / 1 |
1 |
3
|
5
|
Vermilion
|
|
3P Policy (Standard Overlay) Resurfacing from S OF TILTON TO S OF CATLIN.
|
050-70D99
|
Executed
|
05/24/2021
|
2 / 2 |
|
3
|
5
|
Champaign
|
|
5.3 miles of micro-surfacing joint repair of center line on us 45, from Curtis Rd in savoy to N of Tolono.
|
051-70E18
|
Executed
|
05/25/2021
|
|
1 |
3
|
5
|
McLean
|
|
Designed Overlay on Old Rte. 66 from Logan Co. line to Shirley for a net length of 9.57 miles.
|
052-70E92
|
Executed
|
05/17/2021
|
|
|
3
|
5
|
Douglas, Edgar
|
|
12.579 Miles of Cape Seal Operations from ILL 130 South to ILL 49.
|
053-70F13
|
Executed
|
05/28/2021
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
Partial width resurfacing 0.216 Mi on US 150, between Elm St to Main St; 0.089 Mi on IL US 150; 0.033 Mi on ILL 49, just N of US 150.
|
054-72D40
|
Withdrawn
|
04/21/2021
|
|
|
4
|
6
|
Scott
|
|
Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston. , Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston.
|
055-72M53
|
Rejected
|
09/08/2022
|
|
|
4
|
6
|
Macoupin
|
|
Painting SN 059-0009 carrying IL 4 over Union Pacific Railroad, 0.9 miles north of Staunton.
|
056-72M57
|
Executed
|
06/03/2021
|
|
|
4
|
6
|
Sangamon
|
|
Traffic signal modernization at the intersection along IL 29 at Walnut Street, State Street and Cardinal Hill in Rochester.
|
057-74181
|
Deleted
|
03/20/2021
|
|
|
4
|
7
|
Crawford
|
|
Replacement of SN 017-0003 and SN 017-0004 on IL 1, 2.5 and 0.3 miles north of IL 33.
|
058-74364
|
Withdrawn
|
04/05/2021
|
3 / 3 |
|
4
|
7
|
Cumberland
|
|
Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road.
|
059-74760
|
Executed
|
05/28/2021
|
1 / 1 |
|
4
|
7
|
Shelby
|
|
Patching, overlay and replacement of 2 box culverts on IL 128 from Findlay Road to 0.2 miles north of 6th Street in Shelbyville.
|
060-74916
|
Executed
|
05/20/2021
|
|
|
4
|
7
|
Effingham
|
|
2 miles of crack and joint sealing on I-57/70 from the Little Wabash River to US 40 and 2.75 miles on I-57/70 from 4th Street overpass to the North Tri- Level including exit and entrance ramps.
|
061-74973
|
Executed
|
05/17/2021
|
1 / 1 |
1 |
4
|
7
|
Cumberland
|
|
Expansion joints, bridge deck overlay, new approach slab, guardrail and HMA resurfacing on SN 018-0009 and SN 018-0010 on US 40 in Greenup.
|
062-74991
|
Executed
|
06/08/2021
|
|
|
4
|
7
|
Shelby
|
|
Bridge deck overlay, bridge joint replacement/repair and bridge deck repairs SN 087-0022 carrying IL 128 over Robinson Creek, 2 miles southwest of Shelbyville.
|
063-74994
|
Executed
|
06/09/2021
|
3 / 3 |
1 |
4
|
7
|
Macon
|
|
Replacing expansion joints, bearing replacement, steel beam structure repair, curb repair, parapet repair, full deck pavement patching, scarification and bridge deck concrete overlay on SN 058-0020 on US 36 over Lake Decatur in Decatur.
|
064-76G57
|
Withdrawn
|
04/16/2021
|
11 / 8 |
1 |
5
|
8
|
Madison
|
|
4.8 miles of resurfacing and ADA improvements on IL 111/3 from Alby Street to Broadway in Alton. , 4.8 miles of resurfacing and ADA improvements on IL 111/3 from Alby Street to Broadway in Alton.
|
065-76L89
|
Executed
|
05/17/2021
|
|
|
5
|
8
|
St. Clair
|
|
Electrical upgrades at the Bowman Pump Station on Exchange Avenue in East St. Louis.
|
066-76N39
|
Executed
|
05/27/2021
|
2 / 1 |
1 |
5
|
8
|
St. Clair
|
|
Bridge joint repair and HMA overlay with bridge repairs on St. Clair Avenue over Harding Ditch (SN 082-0033, 082-0034).
|
067-76N80
|
Executed
|
05/27/2021
|
|
|
5
|
8
|
Madison
|
|
Lighting improvements on I-55 at IL 143.
|
068-76P09
|
Executed
|
06/10/2021
|
|
|
5
|
8
|
Madison
|
|
Painting of the structure carrying IL 143 over I-55 (SN 060-0148).
|
069-76P10
|
Executed
|
05/19/2021
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
Bridge painting at 3 locations: 1) I-64 over St. Clair Avenue SN 82-0001, 2) I-55/64 over IC RR SN 082-0141, 3) I-55 WB over St. Clair Avenue SN 082-0015.
|
070-76P26
|
Executed
|
06/09/2021
|
1 / 1 |
|
5
|
8
|
Various
|
|
Installation, maintenance, and pickup/removal of Smart Traffic Monitoring Systems or Real-Time Traffic Control Systems on a work order basis for repair and maintenance activities at various locations within District 8.
|
071-76P27
|
Executed
|
05/20/2021
|
|
|
5
|
8
|
Madison
|
|
Flood repair at the Grey-s Farm Pump Station; Frontage Road A, west of I-255 and north of Horseshoe Lake Road.
|
072-76P35
|
Executed
|
05/28/2021
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
0.49 miles of patching on I-55/70 at the Maryville Weigh Station westbound on and off ramps, and on eastbound I-55/70 near IL 159.
|
073-76P44
|
Executed
|
05/25/2021
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
Bridge joint repair on SN 082-0319, westbound I-70 Illinois approach over the Mississippi River.
|
074-78151
|
Executed
|
05/25/2021
|
5 / 5 |
1 |
5
|
9
|
Saline
|
|
Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032)
|
075-78622
|
Executed
|
05/25/2021
|
|
|
5
|
9
|
Hamilton
|
|
Removal and replacement of a box culvert (SN 033-2000) carrying IL 242 over an unnamed stream, 3.5 miles north of McLeansboro.
|
076-78660
|
Deleted
|
03/13/2021
|
|
|
5
|
9
|
Jackson
|
|
Conversion of 2 intersections to Restricted Crossing U-Turn intersections: 1) IL 13/127 and Ava Road; 2) IL 13/127 and Grange Hall Road.
|
077-78681
|
Executed
|
05/25/2021
|
2 / 2 |
|
5
|
9
|
Johnson
|
|
Replacing the existing 3-span deck beam bridge (SN 044-0053) with a new 3-span bridge carrying IL 146 over Little Cache Creek in Vienna.
|
078-78819
|
Executed
|
05/25/2021
|
1 / 1 |
1 |
5
|
9
|
Franklin
|
|
6 miles of pcc pavement, milling, surfacing, HMA shoulders, aggregate shoulders and patching on IL 148 from one mile south of IL 154 to IL 14.
|
079-78820
|
Executed
|
05/25/2021
|
4 / 4 |
2 |
5
|
9
|
Jackson
|
|
3.7 miles of patching, surface removal, surfacing and ADA ramp improvements on 14th and 11th Streets in Murphysboro.
|
080-78837
|
Executed
|
05/25/2021
|
|
|
5
|
9
|
Massac
|
|
Removing and replacing PCC pavement, ADA ramp improvements and pavement marking at the intersection of US 45 / Ferry Street and 10th Street in Metropolis.
|
081-78839
|
Executed
|
05/25/2021
|
|
|
5
|
9
|
White
|
|
1.9 miles of patching, surface removal, surfacing, raised pavement markers and ADA ramp improvements on IL 1 northeast of Locust Street to Commerce Street in Carmi.
|
082-78840
|
Executed
|
05/25/2021
|
|
|
5
|
9
|
Jefferson
|
|
0.9 miles of patching, milling and resurfacing on IL 15 from west of Sparrow Lane (west of I-57) to west of Davidson Avenue.
|
083-78851
|
Executed
|
05/25/2021
|
1 / 1 |
1 |
5
|
9
|
Jackson
|
|
Pavement patching on North 6th Street from IL 13/127 to Lucier Street in Murphysboro.
|
084-78853
|
Executed
|
05/25/2021
|
|
|
5
|
9
|
Jackson
|
|
Pavement patching at the intersection of IL 13 and Streigel Road in Carbondale.
|
085-78860
|
Executed
|
05/25/2021
|
|
|
5
|
9
|
Alexander
|
|
Bridge preventative maintenance on SN 002-0001 carrying I-57 northbound over Golden Lilly Road (TR 163B), 0.3 miles south of the Pulaski County line.
|
086-85705
|
Executed
|
05/25/2021
|
|
|
2
|
2
|
Whiteside
|
|
Cold-In-Place Recycling and resurfacing on Lyndon Road from US 30 to Commercial Street.
|
087-87660
|
Rejected
|
05/04/2021
|
|
|
2
|
3
|
Ford
|
|
Replace the bridge carrying CH 23 over Crane Creek, 0.75 mile east of Cabery.
|
088-87739
|
Executed
|
06/03/2021
|
1 / 1 |
1 |
2
|
3
|
DeKalb
|
|
Replace the bridge carrying TR 175 over Battle Creek, 0.3 mile east of Hinckley Road.
|
089-87740
|
Rejected
|
05/04/2021
|
|
1 |
2
|
3
|
Ford
|
|
Replace the bridge carrying CH 18 over the West Branch of Horse Creek, 2 miles southeast of Cabery.
|
090-87746
|
Executed
|
05/25/2021
|
3 / 1 |
|
2
|
3
|
DeKalb
|
|
Resurfacing Suydam Road from IL 23 to the city limits of Sandwich.
|
091-87757
|
Executed
|
06/04/2021
|
|
|
2
|
3
|
Kankakee
|
|
Resurfacing CH9 from 5000 West Road to US 45.
|
092-87764
|
Executed
|
05/26/2021
|
|
|
2
|
3
|
Bureau
|
|
Replace the bridge carrying CH 24 over a branch of Pond Creek, 2 miles south of Wyanet.
|
093-87766
|
Executed
|
06/23/2021
|
|
|
2
|
3
|
LaSalle
|
|
Resurfacing Crosat Street from 11th Street to US 6 in the City of LaSalle.
|
094-89723
|
Executed
|
07/09/2021
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
Construction of Rock Island Trail Extension within the City of Peoria, along Park Avenue, from NE Perry Avenue to the old railroad crossing, and along the former Peoria and Peoria Heights railroad bed from Park Avenue to Harvard Avenue, including rehabilitation of the abandoned railroad bridge over War Memorial Drive.
|
095-89777
|
Executed
|
05/21/2021
|
1 / 1 |
|
3
|
4
|
Fulton
|
|
Replace the culvert carrying CH 15 over an unnamed tributary located 0.4 mile west of CH 38.
|
096-89783
|
Executed
|
05/28/2021
|
3 / 3 |
1 |
3
|
4
|
Mercer
|
|
Full Depth Reclamation, bituminous surface treatment, aggregate shoulders and guardrail replacement on CH 9 from the north village limits of Joy to 110th Street.
|
097-89799
|
Rejected
|
05/04/2021
|
1 / 1 |
1 |
3
|
4
|
Fulton
|
|
Remove and replace guardrail at various locations in Fulton County.
|
098-91592
|
Executed
|
06/03/2021
|
2 / 2 |
1 |
3
|
5
|
Champaign
|
|
Pavement reconstruction including widening, Cold-in-Place recycling, HMA pavement and shoulder, box and pipe culverts, and ditch widening. Project is on CH 15 from IL 130 to Sidney.
|
099-91600
|
Executed
|
05/27/2021
|
|
|
3
|
5
|
Piatt
|
|
Replace the bridge carrying TR 51 over a tributary to the Sangamon River, 2 miles north of White Heath.
|
100-91601
|
Executed
|
06/04/2021
|
5 / 5 |
2 |
3
|
5
|
Champaign
|
|
Replace the bridge carrying CH 17 over Kaskaskia Ditch, 1.1 miles west of Sadorus.
|
101-91603
|
Executed
|
05/28/2021
|
2 / 2 |
|
3
|
5
|
McLean
|
|
Cold-in-Place recycling with HMA binder and surface course on CH 39 from White Oak Road to Ziebarth Road.
|
102-93671
|
Deleted
|
03/18/2021
|
|
|
4
|
6
|
Sangamon
|
|
Construction of two structures; one to carry Iron Bridge Road over the Union Pacific Railroad, the other to carry Union Pacific Railroad over Woodside Road. Includes the construction of a pedestrian truss bridge over Woodside Road, reconstructing the intersection of Iron Bridge Road at Woodside Road, and the relocation of the Interurban Trail.
|
103-93736
|
Executed
|
05/28/2021
|
3 / 3 |
1 |
4
|
6
|
Menard
|
|
Reconstruct and resurface CH 2 from east of IL 97/123 for 1.05 miles.
|
104-93761
|
Executed
|
05/28/2021
|
2 / 1 |
|
4
|
6
|
Logan
|
|
Remove and replace guardrail at various locations in Logan County.
|
105-93767
|
Executed
|
05/28/2021
|
|
|
4
|
6
|
Schuyler
|
|
Resurfacing approaches to the bridge carrying CH 5 over the Lamoine River Slough, Cape Seal resufacting of CH 5 from County Road 3100E to the Rushville Corporate Limits, and on CH 1 from IL 103 to the Rushville Corporate limits.
|
106-93768
|
Executed
|
05/28/2021
|
|
|
4
|
6
|
Pike
|
|
Bituminous surface treatment at various locatinos in Pike County.
|
107-93769
|
Executed
|
05/28/2021
|
|
|
4
|
6
|
Hancock
|
|
Micrtosurfacing CH 24 from IL 96 to CH 29.
|
108-94519
|
Executed
|
06/16/2021
|
2 / 2 |
|
4
|
7
|
Fayette
|
|
Complete replacement of an existing bridge with a double barrel box culvert on US 51, 3.25 miles south of Vandalia. (SN 026-0088)
|
109-97748
|
Executed
|
05/28/2021
|
|
|
5
|
8
|
Monroe
|
|
Resurfacing Hanover Road from D Road to 0.2 mile east of FF Road.
|
110-97750
|
Executed
|
06/03/2021
|
|
|
5
|
8
|
Madison
|
|
Resurfacing Serento Road from Main Street to the Madison/Bond County Line.
|
111-60T17
|
Executed
|
05/28/2021
|
|
|
1
|
1
|
Cook
|
|
Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson. Location: Village of Franklin Park in Cook County.
|
112-62633
|
Executed
|
05/25/2021
|
|
1 |
1
|
1
|
Cook
|
|
(4,391-Ft) Intersection improvement including channelization, traffic signal modernization and resurfacing of IL 58 at Niles Center Rd. and at US 41 (Skokie Blvd.) in the Village of Skokie.
|
113-62L89
|
Executed
|
05/27/2021
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(1.73-Mile) SMART overlay (resurfacing) and ADA improvement project on Dempster St. from east of Skokie Blvd. to McCormick Ave. within the Village of Skokie in Cook County.
|
114-62M04
|
Executed
|
05/28/2021
|
|
|
1
|
1
|
Cook
|
|
(3.553-Mile) Crack and Joint Sealing pavement preservation project. Includes renewal of pavement markings. Location: FAP 344: IL 83 from S. of Weiland Rd to Palatine Rd in the City of Prospect Heights and the Village
|
115-62M15
|
Executed
|
05/25/2021
|
|
1 |
1
|
1
|
Will
|
|
(1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 112: IL 53 from South of I-55 to Joliet Road, in the Village of Bolingbrook and Romeoville.
|
116-62M36
|
Executed
|
05/27/2021
|
2 / 2 |
1 |
1
|
1
|
DuPage
|
|
This project is located on IL.83 over the Salt Creek within the Village of Villa Park in DuPage County. This work consists of a full and partial depth deck and approach slab repairs, bridge deck scarification, a new latex concrete overlay, deck drain adjustments and pavement marking.
|
117-62M40
|
Executed
|
06/03/2021
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Bridge Preservation Project, including bridge deck overlay (scarification and latex concrete overlay), deck repairs, reconstructing transverse joints. Location: Bridge carrying Roosevelt Rd over Des Plaines River, East of IL 171 in the Village of Forest Park in Cook County.
|
118-64M91
|
Executed
|
05/28/2021
|
1 / 1 |
1 |
2
|
2
|
Lee
|
|
0.80 miles, Cold milling, pavement patching, HMA resurfacing, ADA improvement and traffic signal modernization from West of Page drive to US 52/IL 26 in Dixon.
|
119-66L41
|
Executed
|
05/25/2021
|
1 / 1 |
|
2
|
3
|
Iroquois
|
|
This work is located at the Illinois Department of Transpiration, District 3, Buckley Maintenance Facility in Iroquois County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a polymer HMA asphalt binder cse. (2¼" lift) and a polymer HMA surface *See Remarks*.
|
120-66L52
|
Executed
|
05/17/2021
|
4 / 4 |
1 |
2
|
3
|
Grundy
|
|
This pollinator project is located at Three Rivers Rest Areas on I-80 west of Minooka. This work will include herbicide, seeding, planting, landscaping and maintenance.
|
121-68G18
|
Executed
|
05/21/2021
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
Longitudinal joint repair and partial depth patching along US 150 (War Memorial Drive) from West of Brandywine Drive to IL 29 (Adams St) in Peoria.
|
122-70990
|
Executed
|
05/28/2021
|
4 / 4 |
1 |
3
|
5
|
DeWitt
|
|
3P Resurfacing Standard overlay, ADA improvements from Logan Co. line to Van Buren St. in Clinton. Project length 9.48 miles.
|
123-70C16
|
Executed
|
05/28/2021
|
1 / 1 |
1 |
3
|
5
|
DeWitt
|
|
3P Resurfacing Standard overlay from Logan Co. line to 0.3 miles W. of US 51 at Clinton. Project length 9.91 miles.
|
124-70E49
|
Executed
|
05/25/2021
|
|
|
3
|
5
|
McLean
|
|
Interstate Bridge Preservation/ Bridge Deck Overlay at I-39/US 51 Over Mackinaw River North of Hudson.
|
125-70E83
|
Executed
|
05/28/2021
|
|
1 |
3
|
5
|
DeWitt
|
|
5.601 Miles. SMART Resurfacing, ILL 54 to ILL 10 N of Weldon.
|
126-72K08
|
Withdrawn
|
04/21/2021
|
1 / 1 |
|
4
|
6
|
Schuyler
|
|
Bridge replacement (SN 085-0002) carrying US 67 over Bluff Ditch, 1.8 miles northwest of IL 100. , Bridge replacement (SN 085-0002) carrying US 67 over Bluff Ditch, 1.8 miles northwest of IL 100.
|
127-72L67
|
Executed
|
05/13/2021
|
1 / 1 |
1 |
4
|
6
|
Sangamon
|
|
Bridge deck repairs on I-55 over the Sangamon River (2.7 miles north of IL 54/ Sangamon Avenue); I-55 over IL 54 / Sangamon Avenue; I-55 over the IC Railroad (0.3 miles north of IL 54 / Sangamon Avenue). (SN 084-0014, 084-0015, 084-0016, 084-0017, 084-0018, 084-0019)
|
128-72M06
|
Executed
|
05/27/2021
|
1 / 1 |
|
4
|
6
|
Adams
|
|
Parking improvements at the Quincy Maintenance Yard/Sign Shop parking lot.
|
129-72M58
|
Executed
|
05/25/2021
|
|
|
4
|
6
|
Montgomery
|
|
150 feet of paved ditch repair on IL 16, 0.2 miles east of Lake Litchfield Road in Litchfield and culvert removal and replacement east of Hillsboro.
|
130-74550
|
Executed
|
06/04/2021
|
|
|
4
|
7
|
Wayne
|
|
11.2 miles of patching, milling, resurfacing and replacing 3 culverts on IL 15 from Fairfield to the Edwards County line.
|
131-74939
|
Executed
|
06/04/2021
|
1 / 1 |
|
4
|
7
|
Wabash
|
|
12.2 miles of surface removal, patching, pipe and culvert replacement, deck patching, joint repair and concrete wearing surface on SN 093-0020 on IL 1 from Greathouse Creek in Mt. Carmel to the Edwards County line.
|
132-46562
|
Executed
|
06/08/2021
|
|
|
1
|
1
|
Will
|
|
(11.40-Mile) Pavement marking installation project on Interstate 80 (I-80) between IL 43 (Harlem Ave.) and US 30 (Lincoln Hwy located within the Village of New Lenox and Makena in Will County.
|
133-60T06
|
Executed
|
05/28/2021
|
13 / 13 |
1 |
1
|
1
|
Cook
|
|
Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 , Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314
|
134-60T11
|
Executed
|
05/26/2021
|
2 / 2 |
2 |
1
|
1
|
Lake
|
|
Intersection Reconstruction, Channelization, Traffic Signal Modernization, Location: FAP 344: US 45 (Lake Street) at IL 173 (Rosecrans Road) within unincorporated Antioch Township in Lake County.
|
135-61G58
|
Executed
|
05/27/2021
|
2 / 2 |
|
1
|
1
|
Kane
|
|
Roadway reconstruction, lighting, water main, landscaping, pavement markings, on East New York Street from Farnsworth Avenue to Welsh Drive in Aurora.
|
136-61G95
|
Executed
|
05/28/2021
|
|
2 |
1
|
1
|
Will
|
|
Resurfacing, curb and gutter, sidewalk replacement, ornamental lighting, brick paver sidewalk, landscaping and pavement markings on IL 171 from 11th Street to 10th Street and on IL 7 from IL 171 to Hamilton Street in Lockport.
|
137-62K80
|
Executed
|
05/12/2021
|
4 / 4 |
2 |
1
|
1
|
Cook, Will
|
|
Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements.
|
138-62L52
|
Executed
|
05/28/2021
|
|
|
1
|
1
|
Cook
|
|
(1.762-Mile) Cleaning and sealing longitudinal joints in the existing HMA pavement between traffic lanes and curb and gutter, restriping pavement marking in the City of Chicago, Lake and North Chicago Townships.
|
139-62M13
|
Executed
|
05/27/2021
|
|
|
1
|
1
|
Cook
|
|
SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAU 3520: Gross Point Road from N of Oakton St to Howard St in the Village of Morton Grove and Skokie.
|
140-62M16
|
Executed
|
05/26/2021
|
|
|
1
|
1
|
Will
|
|
(2.78-Mile) Smart Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 607: US 52/ 6/ 30 Jefferson St. from Joyce Rd.to Bluff St., within the City of Joliet.
|
141-62M26
|
Executed
|
05/27/2021
|
2 / 1 |
1 |
1
|
1
|
Cook
|
|
The improvement of McHenry Road over Wheeling Drainage Ditch consists of bridge deck overlay and joint repair. The improvement is located in the Village of Wheeling in Cook County, IL.
|
142-62M27
|
Executed
|
05/24/2021
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
This improvement consists of Bridge Deck and Approach repairs. Structural repair of Concrete, deck scarification, deck latex concrete overlay, approach HMA overlay, bridge deck grooving in Green Garden Township.
|
143-62M31
|
Executed
|
05/20/2021
|
|
|
1
|
1
|
Cook
|
|
This is a bridge repair project that includes bridge deck overlay, partial depth approach reconstruction, joint reconstruction, concrete bridge deck repair, full depth bridge deck repair. Located: IL Route 7 at 86th Ave. within within the Village of Palos Park.
|
144-62N01
|
Executed
|
06/01/2021
|
|
1 |
1
|
1
|
Lake
|
|
Cleaning(sweeping) various arterial highways in District One throughout Lake County.
|
145-62N18
|
Rejected
|
09/16/2021
|
1 / 1 |
|
1
|
1
|
Various
|
|
Expressway mowing north.
|
146-66L61
|
Executed
|
05/20/2021
|
|
|
2
|
3
|
Kendall, LaSalle
|
|
The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties.
|
147-66L63
|
Executed
|
05/24/2021
|
|
|
2
|
3
|
Grundy
|
|
The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Grundy County.
|
148-66L64
|
Executed
|
05/25/2021
|
1 / 1 |
|
2
|
3
|
Various
|
|
The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Livingston, Ford, Grundy, and Iroquois Counties.
|
149-68F68
|
Executed
|
06/04/2021
|
2 / 2 |
|
3
|
4
|
Various
|
|
Bridge deck sealing at various structures throughout District Four.
|
150-68F95
|
Executed
|
05/26/2021
|
|
|
3
|
4
|
Various
|
|
Pavement markings on various routes in various counties throughout District Four.
|
151-70E81
|
Executed
|
06/03/2021
|
1 / 1 |
|
3
|
5
|
Vermilion
|
|
12.963 Miles of Smart Resurfacing from Ford County Line to IL Rte. 1 at Hoopeston.
|
152-70F02
|
Executed
|
05/25/2021
|
|
|
3
|
5
|
DeWitt, Piatt
|
|
Bridge beam replacement and bridge repair at SN 074-0076 and 020-0045.
|
153-70F04
|
Executed
|
05/24/2021
|
3 / 3 |
|
3
|
5
|
DeWitt
|
|
5.179 miles of micro surfacing joint repair from Mclean/Dewitt co line to the Dewitt/Piatt Co. line.
|
154-74A34
|
Active
|
03/13/2021
|
|
|
4
|
7
|
Moultrie
|
|
3.4 miles of underdrains at various locations in District 7.
|
155-74A35
|
Executed
|
05/28/2021
|
|
1 |
4
|
7
|
Moultrie
|
|
4.79 miles of shoulder repairs on IL 133 from Cadwell Road to Vine Street in Arthur and on Cadwell Road from CR 1900N to 1200' north of CR 1700N.
|
156-74A36
|
Rejected
|
05/04/2021
|
|
|
4
|
7
|
Effingham, Shelby
|
|
1.56 miles of partial depth resurfacing at various locations on US 40, IL 32 and IL 33.
|
157-74A37
|
Executed
|
05/28/2021
|
|
|
4
|
7
|
Macon
|
|
0.6 miles of milling with inlay of surface course on IL 105 from east of IL 121 to 0.1 miles east of 26th Street.
|
158-74A44
|
Executed
|
05/24/2021
|
|
|
4
|
7
|
Various
|
|
Cleaning and painting 6 bridges on I-57 in various counties of District 7.
|
159-74A48
|
Executed
|
05/25/2021
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems within Fayette, Effingham, Jasper, Crawford, Lawrence, Richland, Clay, Wayne, Edwards and Wabash Counties.
|
160-74A49
|
Executed
|
05/25/2021
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems within Clark, Cumberland, Macon, Moultrie, Shelby and Coles Counties.
|
161-85711
|
Executed
|
05/26/2021
|
|
|
2
|
2
|
Stephenson
|
|
Replace the bridge carrying North Hulbert Road over Muddy Creek, 0.5 mile nort of McConnell.
|
162-87662
|
Executed
|
05/28/2021
|
4 / 3 |
|
2
|
3
|
DeKalb
|
|
Replace the bridge carrying Suydam Road over Indian Creek, 7 miles south of Shabbona.
|
163-87743
|
Executed
|
06/03/2021
|
|
|
2
|
3
|
LaSalle
|
|
Replace the bridge carrying N. 33rd Road over Pecumsaugan Creek, 0.2 mile east of E. 9th Road.
|
164-95822
|
Rejected
|
06/07/2021
|
3 / 2 |
1 |
4
|
7
|
Effingham
|
|
Trailhead parking improvements, sidewalk crossing improvements, pedestrian path signals and lighting, sigage and pavement markings at various loactions in Effingham.
|
165-95891
|
Executed
|
05/25/2021
|
5 / 4 |
1 |
4
|
7
|
Clark
|
|
Guardrail removal and replacement with terminals, box culvert extensions, precast box culverts, pipe culverts and riprap at various locations in Clark County.
|
166-95895
|
Executed
|
07/14/2021
|
|
|
4
|
7
|
Shelby
|
|
Replace the bridge carrying TR 112 over Flat Branch Tributary, 4.8 miles southeast of Moweaqua.
|
167-97487
|
Executed
|
05/28/2021
|
|
|
5
|
8
|
Monroe
|
|
Pavement removal, sub and aggregate base, HMA Pavement and shoulders with rumble strips, storm sewer, guardrail and pavement markings on TR 47 (HH Road) from 0.15 mile west of Waterloo City Limits to 0.3 mile west.
|
168-97719
|
Executed
|
05/28/2021
|
|
|
5
|
8
|
Monroe
|
|
Pedestrian path alogn South Market Street from IL 3 to Bulldog Boulevard in Waterloo.
|
169-46928
|
Executed
|
05/27/2021
|
3 / 3 |
1 |
4
|
7
|
Lawrence
|
|
Resurfacing internal park roads and parking lots, aggregate resurfacing of camp sites, drainage improvements, box culvert installation and lighting at the IDNR Red Fills State Park.
|
170-62N02
|
Executed
|
06/01/2021
|
|
|
1
|
1
|
Kane, McHenry
|
|
Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties.
|
171-74A45
|
Executed
|
05/19/2021
|
|
2 |
4
|
7
|
Various
|
|
Steel plate beam guardrail repair/replacement throughout District 7.
|
172-76N73
|
Executed
|
06/03/2021
|
|
|
5
|
8
|
Jersey, Madison
|
|
8.2 miles of crack and joint sealing on IL 3 from 0.04 miles north of Pierce Lane to IL 109.
|
173-76N78
|
Executed
|
05/28/2021
|
|
|
5
|
8
|
Clinton
|
|
Crack and joint sealing on IL 127 from the Bond County line to 0.2 miles north of Williams Road.
|
174-78550
|
Withdrawn
|
03/25/2021
|
|
|
5
|
9
|
Jefferson
|
|
Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange. , Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange.
|
175-85686
|
Executed
|
05/26/2021
|
2 / 2 |
1 |
2
|
2
|
Jo Daviess
|
|
Replace the bridge carrying South Apple Road over the Apple River, 1.5 miles northwest of Woodbine.
|
176-93747
|
Executed
|
05/28/2021
|
30 / 29 |
1 |
4
|
6
|
Sangamon
|
|
Remove the structures carrying the Norfolk Southern Railroad over Cook Street and South Grand Avenue, Construction of two railroad structures over Cook Street, construction of two railroad structures over South Grand Avenue, track removal, approach roadways, storm sewer, sanitary sewer, pump stations, curb and gutter, sidewalks, lighting, fencing and pavement markings all in the city of Springfield.
|
177-46563
|
Rejected
|
05/04/2021
|
|
|
2
|
2
|
Various
|
|
Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown on the plans.
|
178-46565
|
Executed
|
05/20/2021
|
|
|
2
|
2
|
Various
|
|
Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order.
|
179-46566
|
Executed
|
05/26/2021
|
2 / 2 |
|
2
|
2
|
Various
|
|
Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order.
|
180-62K45
|
Rejected
|
09/16/2021
|
1 / 1 |
|
1
|
1
|
Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line.
|
181-62K48
|
Executed
|
05/25/2021
|
6 / 6 |
|
1
|
1
|
Will
|
|
The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd.
|
182-62N92
|
Executed
|
05/25/2021
|
|
|
1
|
1
|
Cook, DuPage
|
|
(150-Mile) Improvement consists of Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 43 (Harlem Ave.) to I-355.
|
183-66B52
|
Executed
|
05/12/2021
|
|
|
2
|
3
|
LaSalle
|
|
The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles.
|
184-66L56
|
Executed
|
05/20/2021
|
|
|
2
|
3
|
LaSalle, Livingston
|
|
This work is located on FAP 786 (IL 170) beginning at the intersection of IL 170 and N 21st Rd in LaSalle County and ending at the intersection of IL 170 and IL 17 in Livingston County (+/- 12.0 miles). This work consists of placing aggregate wedge shoulder.
|
185-68G19
|
Executed
|
05/24/2021
|
1 / 1 |
1 |
3
|
4
|
Various
|
|
Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four.
|
186-68G20
|
Executed
|
05/21/2021
|
|
|
3
|
4
|
Marshall, McLean, Woodford
|
|
Installation of communications duct, communications vaults, and fiber optic cable along Interstate 39 from the Interstate 55 interchange to Illinois Route 17 in District Four.
|
187-68G21
|
Executed
|
05/24/2021
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four.
|
188-70F05
|
Executed
|
05/24/2021
|
|
|
3
|
5
|
McLean
|
|
Class a special patching on nearly 2 miles of Eb/Wb 1-74 near Carlock.
|
189-70F06
|
Executed
|
05/28/2021
|
|
|
3
|
5
|
McLean
|
|
.245 Miles of Partial Width Resurfacing Under Veterans Parkway and Under I-55B in Bloomington.
|
190-70F08
|
Executed
|
05/27/2021
|
|
|
3
|
5
|
Douglas
|
|
11.36 MI of patching along FAI 57 from S of Arcola to N of Tuscola.
|
191-70F09
|
Executed
|
05/27/2021
|
|
|
3
|
5
|
Champaign
|
|
0.253 miles, patching, at 1-74 North of Mahomet on ILL 47.
|
192-70F10
|
Executed
|
05/27/2021
|
|
|
3
|
5
|
Vermilion
|
|
3.072 Ml of patching on FAS 331 from US 150 to Homer/Catlin Rd.
|
193-70F11
|
Executed
|
05/27/2021
|
|
|
3
|
5
|
Vermilion
|
|
1.36 Mi of patching on FAI 74 from L Street in Tilton to E of IL 1 in Danville.
|
194-70F12
|
Executed
|
05/26/2021
|
|
|
3
|
5
|
Champaign
|
|
0.425 Miles, Longitudinal joint repair, Guardian Dr. to 1-74 Ramps in Urbana.
|
195-62L82
|
Executed
|
05/28/2021
|
|
|
1
|
1
|
DuPage
|
|
(3.9-Mile) Crack and joint sealing on US 20 (Lake Street) from I-355 to IL 83 (Kingery Highway) within the Village of Addison.
|
196-74A46
|
Rejected
|
05/04/2021
|
|
|
4
|
7
|
Macon
|
|
Milling and resurfacing at 3 locations: 1) US 51 at IL 48; 2) I-72 at SN 058-0063/64; 3) US 51, 2 miles south of Maroa.
|
197-76M33
|
Executed
|
05/27/2021
|
|
|
5
|
8
|
St. Clair
|
|
Cleaning of the Missouri Avenue Pump Station on I-55/I-64.
|
198-62N25
|
Executed
|
06/03/2021
|
|
1 |
1
|
1
|
Various
|
|
The improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties.
|
199-66L62
|
Executed
|
05/24/2021
|
|
1 |
2
|
3
|
Bureau, LaSalle
|
|
The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties.
|
200-64P96
|
Executed
|
05/26/2021
|
|
|
2
|
2
|
Various
|
|
Removal of dead trees along state maintained routes.
|
201-64P79
|
Withdrawn
|
04/15/2021
|
1 / 1 |
|
2
|
2
|
Henry
|
|
Pavement patching on 1-74 from the 1-74/1-80/1-280 Interchange to IL 81.
|
202-64P82
|
Executed
|
06/23/2021
|
|
|
2
|
2
|
Various
|
|
"On-call" maintenance for traffic signals, flashing beacons, and roadway lighting along State maintained routes in Boone, Jo Daviess, Lee, Ogle, Stephenson, and Winnebago counties.
|
203-76M78
|
Withdrawn
|
04/13/2021
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Chemical treatment of deep wells at various locations in East St. Louis. , Deep well treatment at various locations in East St. Louis.
|
01A-TA007
|
Executed
|
07/14/2022
|
2 / 2 |
1 |
4
|
6
|
Christian
|
|
Rehabilitate Taxiway A Pavement and Lighting, Phase 1; Install New Airport Rotating Beacon and Tower
|
02A-DU087
|
Executed
|
09/09/2021
|
|
|
1
|
1
|
DuPage
|
|
Phase II - Upgrade Wildlife Hazard Fencing on Southern and Western Boundaries
|
03A-SR094
|
Executed
|
01/03/2022
|
|
1 |
5
|
8
|
Madison
|
|
Reconstruct Bituminous T-Hangar Taxilanes (West)
|
04A-MB033
|
Executed
|
11/03/2021
|
|
|
3
|
4
|
McDonough
|
|
Rehabilitate Parallel Taxiway to Runway 9/27
|
05A-DU088
|
Executed
|
01/03/2022
|
1 / 0 |
|
1
|
1
|
DuPage
|
|
Elevated Fixture Grounding Updates
|
1LR-M2002
|
Active
|
03/12/2021
|
|
2 |
0
|
0
|
Knox
|
Voluntary
|
Stabilization of dangerous embankments at the Corn Crib Lake and Little John T.R. 1950N abandoned mine sites by the Illinois Department of Natural Resources using federal Abandoned Mined Lands funds.
|