Home > Notice of Letting

April 23, 2021 Letting 12:00 PM
Notice of Letting
Volume 024, No. 012

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-60T30 Executed 05/26/2021 2 / 1 2 1 1 Will Intersection Reconstruction (Channelization, Widening, Traffic Signal Modernization, Drainage Improvements); Location: FAU 381: IL Route 129 at Coal City Road, in the City of Braidwood, City of Wilmington, and Unincorporated areas in Will County.
002-60V39 Executed 05/17/2021 1 / 1 1 1 1 Lake This traffic signal installation and channelization project begins about 652.5 feet (0.12 miles) west of the intersection of IL 173 (FAP 303) and North Lake Avenue and proceeds in a southerly/easterly direction for 1462.3 feet (0.28 miles). This project also begins at the center of the intersection of IL 173 (FAP 303) and North Lake Avenue.
003-60X72 Executed 05/20/2021 1 / 0 1 1 Cook The improvement consists of the construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted frame and ltd. The work is located on IL 64 (North Ave.) at pump station #12 in Melrose Park.
004-61G09 Executed 05/21/2021 1 1 Cook Resurfacing Park Boulevard from Irving Park Road to Schaumburg Road in Streamwood.
005-61G91 Executed 05/20/2021 1 1 1 Kane Traffic Signal modernization at three intersections, sidewalk improvements, and pavement markings at Fabyan Parkway and IL 131, Orchard Road at Acutt Road and Rochester Drive, and Orchard Road from US 30 to Jericho Road in Batavia, Montgomery and unincorporated Kane County.
006-61G94 Executed 05/20/2021 1 / 1 1 1 1 McHenry Remove existing box culvert, construct single-span CIP slab bridge, and reconstruct approach pavement on Kishwaukee Valley Road over a tributary of Rush Creek, 0.2 miles east of Root Road.
007-61G96 Executed 06/03/2021 1 1 Will Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on West Street from Corning Avenue to Joliet Road in Peotone.
008-61G99 Executed 05/27/2021 1 1 Cook Concrete Sidewalk, curb and gutter replacement, tree removal, and landscaping on US 30 from Orchard Drive to the east village limits on Rockwell Street in Park Forest.
009-61G97 Executed 05/17/2021 1 1 DuPage Resurfacing Eola Road from Oakhurst Drive to US 34 in Aurora.
010-61H00 Executed 05/25/2021 1 1 Will Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Court Street from Elder Lane to Eastgate Avenue in Monee.
011-61H01 Executed 05/20/2021 1 / 1 1 1 Cook Resurfacing, HMA pavement patching, curb and gutter repairs on Old Willow Road from South Wolf Road to US 45 in Prospect Heights.
012-61H02 Executed 05/17/2021 1 1 1 DuPage Resurfacing, curb and gutter, traffic signals, sidewalks and pavement markings on Grand Avenue, from US 20 to County Line Road in Elmhurst and Bensenville.
013-61H03 Executed 05/25/2021 2 / 0 1 1 McHenry Resurfacing Haligus Road from north of Ballard Road to Lakewood Road in Lakewood.
014-61H04 Executed 06/23/2021 1 1 McHenry Resurfacing Valley View Road from Nish Road to south of IL 176 in Prairie Grove
015-61H06 Executed 07/08/2021 1 1 Cook Streetscape improvements on St. Charles Road from Mannheim Road to 25th Avenue in Bellwood.
016-61H08 Executed 05/26/2021 1 1 Cook Resurfcing, curb and gutter, sidewalk replacement, detector loops and pavement markings on Kensington Road from Dryden Place to Regency Drive West in Arlington Heights.
017-61H09 Executed 05/21/2021 1 1 Cook Resurfacing Salem Drive from the village limits to Bode Road, Jones Road from Highland Boulevard to Hassel Road, and Hassell Road from Rosedale to Jones Road in Hoffman Estates.
018-62N30 Executed 06/10/2021 1 1 Cook (0.102-Mile) Improvement on I-94 at IL 50 (Cicero Ave.), II 58 (Dempster Ave.) and Lake Ave. consist of a Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships of New Trier, Jefferson and Niles.
019-64G99 Executed 05/17/2021 2 2 Ogle Cold milling, Cold In-Place (CIP) Recycling, HMA resurfacing on IL Route 64 from 0.1 mile East of US 52 to 0.04 mile West of IL 26.
020-64J97 Executed 05/17/2021 2 2 Henry 6.27 MILES, Resurfacing from Galva - Atkinson Road to West Street in Kewanee.
021-64P29 Executed 05/25/2021 1 / 1 2 2 Winnebago Milling, patching, and hot-mix asphalt resurfacing on IL Route 70 from Pecatonica River to 0.1 mile west of Safford Road in Rockford.
022-64P30 Executed 05/21/2021 3 / 3 1 2 2 Lee Cold milling, pavement patching and hot-mix asphalt resurfacing along US 52 from Water Street in Amboy to North of Henkle Road.
023-64P65 Executed 05/28/2021 1 / 1 2 2 Whiteside Removal and replacement of existing expansion joints on SN 098-0032 carrying US 30 over Elkhorn Creek.
024-64P66 Executed 05/28/2021 1 / 1 1 2 2 Carroll Removal and replacement of existing expansion joints, along with partial replacement of the South bridge approach slab and the adjacent sidewalk on SN 008-0041 carrying IL 84 over the SOO line RR.
025-64P68 Executed 06/04/2021 2 2 Various Installing signs and posts along State maintained routes.
026-64P69 Executed 06/03/2021 2 2 Henry Cleaning and painting structural steel on SN's 037-0029 and 037-0030 carrying 1-80 over Mineral Creek located 0.7 mile North of US 6, and SN 037-0079 carrying US 6 over 1-80.
027-64P70 Executed 06/03/2021 1 / 1 1 2 2 Henry Cleaning and painting structural steel on SN 037-0112 carrying TR 196-D over 1-80 located 0.9 mile southeast of IL 82, SN 037-0113 carrying TR 216 over 1-80 located 2.0 miles southeast of IL 82 and SN 037-0118 carrying TR 468 over 1-80 located 1.5 miles east of IL 78.
028-64P71 Executed 06/03/2021 1 / 1 2 2 Rock Island Cleaning and painting structural steel SN's 081-0030 and 081-0031 carrying I-280 over Case Creek located 2.0 miles west of I-74.
029-64P72 Executed 06/03/2021 1 2 2 Lee Cleaning and painting structural steel on SN 052-0059 carrying Welland Road over 1-39.
030-64P74 Executed 05/28/2021 1 / 1 1 2 2 Whiteside Milling and resurfacing on US 30 from Jackson Street to French Creek East of Morrison.
031-66E14 Executed 05/21/2021 2 3 Bureau 3P mill and resurface.
032-66H91 Withdrawn 03/19/2021 2 3 LaSalle This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. , This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items.
033-66K60 Executed 05/21/2021 2 3 Bureau 7.3 miles of milling and resurfacing, ADA improvements.
034-66L01 Executed 05/26/2021 2 3 LaSalle 0.71 mile. Latex overlay, cleaning and painting of structural steel and expansion joint replacement. SN 050-0200 IL 251 over 1-39; 0.5 Miles north of IL 71.
035-66L22 Executed 05/27/2021 2 3 Iroquois This work is located at Structure No. 038-0130, TR 95 over 1-57, approximately 3.48 miles South of IL 116 and Structure No. 038-0131 carrying TR 109 over 1-57, approximately 5.59 miles South of IL 116 in Iroquois. This work consists of bridge painting.
036-66L28 Executed 05/25/2021 2 3 Kankakee Signal Mast Arm Removal and Replacement - at River St and Station St in Kankakee.
037-66L30 Executed 05/25/2021 2 3 Iroquois, Kankakee This project consists of 3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd in Iroquois County.
038-66L32 Executed 05/21/2021 2 / 2 2 3 Bureau This project consists of the installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd.
039-66L33 Executed 05/21/2021 2 / 2 2 3 LaSalle This project consists of the installation of approximately 5.92 miles of high tension cable median barrier from 1.09 miles South of N 36th Rd to 0.88 miles South of N 42nd Rd in LaSalle County.
040-66L54 Executed 05/28/2021 1 / 1 2 3 DeKalb This work is located at FAP 573 on US 30 on SN 019-0036 at Little Rock Creek 0.5 miles West of Hinckley in Dekalb County. This work consists of the removal and replacement of expansion joints and deck patching on SN 019-0036.
041-66L65 Executed 05/24/2021 2 3 Iroquois, Kankakee The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kankakee and Iroquois Counties.
042-66L66 Executed 05/20/2021 2 3 DeKalb The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in DeKalb County.
043-66L70 Executed 05/25/2021 2 3 Bureau This project is located along FAI 80 (I-80) in Bureau county. The work consists of weed spraying to aid in weed control.
044-68F76 Executed 06/24/2021 2 / 2 3 4 Various Crack and joint sealing at various locations in Knox, Peoria, and Tazewell Counties.
045-68G09 Executed 05/28/2021 2 / 2 3 4 Marshall Rout and seal along Interstate 39 from 2 mile south of IL Route 17 to LaSalle County line and IL Route 18 from IL Route 29 in Henry to the Illinois River.
046-68G22 Executed 05/24/2021 2 / 2 1 3 4 Woodford Removal of existing high mast towers and installation of new lighting system at Interstate 39 at the Minonk interchange and replacement of light towers at Interstate 74 Mackinaw Dells rest areas.
047-68G23 Executed 05/24/2021 1 / 1 3 4 Tazewell Installation of overhead light poles, luminaires, flashing beacons, signs, pavement markings, rumble strips on IL Route 9 in Woodford County.
048-68G24 Executed 05/24/2021 3 4 Various Electrical maintenance contract (maintenance and repair 04 traffic signals, overhead lighting, and ITS facilities).
049-70947 Executed 05/21/2021 1 / 1 1 3 5 Vermilion 3P Policy (Standard Overlay) Resurfacing from S OF TILTON TO S OF CATLIN.
050-70D99 Executed 05/24/2021 2 / 2 3 5 Champaign 5.3 miles of micro-surfacing joint repair of center line on us 45, from Curtis Rd in savoy to N of Tolono.
051-70E18 Executed 05/25/2021 1 3 5 McLean Designed Overlay on Old Rte. 66 from Logan Co. line to Shirley for a net length of 9.57 miles.
052-70E92 Executed 05/17/2021 3 5 Douglas, Edgar 12.579 Miles of Cape Seal Operations from ILL 130 South to ILL 49.
053-70F13 Executed 05/28/2021 1 / 1 3 5 Champaign Partial width resurfacing 0.216 Mi on US 150, between Elm St to Main St; 0.089 Mi on IL US 150; 0.033 Mi on ILL 49, just N of US 150.
054-72D40 Withdrawn 04/21/2021 4 6 Scott Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston. , Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston.
055-72M53 Rejected 09/08/2022 4 6 Macoupin Painting SN 059-0009 carrying IL 4 over Union Pacific Railroad, 0.9 miles north of Staunton.
056-72M57 Executed 06/03/2021 4 6 Sangamon Traffic signal modernization at the intersection along IL 29 at Walnut Street, State Street and Cardinal Hill in Rochester.
057-74181 Deleted 03/20/2021 4 7 Crawford Replacement of SN 017-0003 and SN 017-0004 on IL 1, 2.5 and 0.3 miles north of IL 33.
058-74364 Withdrawn 04/05/2021 3 / 3 4 7 Cumberland Removal and replacement of SN 018-0028 carrying IL 121 over Long Point Branch Creek, 1.3 miles east of Montrose Road.
059-74760 Executed 05/28/2021 1 / 1 4 7 Shelby Patching, overlay and replacement of 2 box culverts on IL 128 from Findlay Road to 0.2 miles north of 6th Street in Shelbyville.
060-74916 Executed 05/20/2021 4 7 Effingham 2 miles of crack and joint sealing on I-57/70 from the Little Wabash River to US 40 and 2.75 miles on I-57/70 from 4th Street overpass to the North Tri- Level including exit and entrance ramps.
061-74973 Executed 05/17/2021 1 / 1 1 4 7 Cumberland Expansion joints, bridge deck overlay, new approach slab, guardrail and HMA resurfacing on SN 018-0009 and SN 018-0010 on US 40 in Greenup.
062-74991 Executed 06/08/2021 4 7 Shelby Bridge deck overlay, bridge joint replacement/repair and bridge deck repairs SN 087-0022 carrying IL 128 over Robinson Creek, 2 miles southwest of Shelbyville.
063-74994 Executed 06/09/2021 3 / 3 1 4 7 Macon Replacing expansion joints, bearing replacement, steel beam structure repair, curb repair, parapet repair, full deck pavement patching, scarification and bridge deck concrete overlay on SN 058-0020 on US 36 over Lake Decatur in Decatur.
064-76G57 Withdrawn 04/16/2021 11 / 8 1 5 8 Madison 4.8 miles of resurfacing and ADA improvements on IL 111/3 from Alby Street to Broadway in Alton. , 4.8 miles of resurfacing and ADA improvements on IL 111/3 from Alby Street to Broadway in Alton.
065-76L89 Executed 05/17/2021 5 8 St. Clair Electrical upgrades at the Bowman Pump Station on Exchange Avenue in East St. Louis.
066-76N39 Executed 05/27/2021 2 / 1 1 5 8 St. Clair Bridge joint repair and HMA overlay with bridge repairs on St. Clair Avenue over Harding Ditch (SN 082-0033, 082-0034).
067-76N80 Executed 05/27/2021 5 8 Madison Lighting improvements on I-55 at IL 143.
068-76P09 Executed 06/10/2021 5 8 Madison Painting of the structure carrying IL 143 over I-55 (SN 060-0148).
069-76P10 Executed 05/19/2021 1 / 1 1 5 8 St. Clair Bridge painting at 3 locations: 1) I-64 over St. Clair Avenue SN 82-0001, 2) I-55/64 over IC RR SN 082-0141, 3) I-55 WB over St. Clair Avenue SN 082-0015.
070-76P26 Executed 06/09/2021 1 / 1 5 8 Various Installation, maintenance, and pickup/removal of Smart Traffic Monitoring Systems or Real-Time Traffic Control Systems on a work order basis for repair and maintenance activities at various locations within District 8.
071-76P27 Executed 05/20/2021 5 8 Madison Flood repair at the Grey-s Farm Pump Station; Frontage Road A, west of I-255 and north of Horseshoe Lake Road.
072-76P35 Executed 05/28/2021 2 / 2 1 5 8 Madison 0.49 miles of patching on I-55/70 at the Maryville Weigh Station westbound on and off ramps, and on eastbound I-55/70 near IL 159.
073-76P44 Executed 05/25/2021 1 / 1 1 5 8 St. Clair Bridge joint repair on SN 082-0319, westbound I-70 Illinois approach over the Mississippi River.
074-78151 Executed 05/25/2021 5 / 5 1 5 9 Saline Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032)
075-78622 Executed 05/25/2021 5 9 Hamilton Removal and replacement of a box culvert (SN 033-2000) carrying IL 242 over an unnamed stream, 3.5 miles north of McLeansboro.
076-78660 Deleted 03/13/2021 5 9 Jackson Conversion of 2 intersections to Restricted Crossing U-Turn intersections: 1) IL 13/127 and Ava Road; 2) IL 13/127 and Grange Hall Road.
077-78681 Executed 05/25/2021 2 / 2 5 9 Johnson Replacing the existing 3-span deck beam bridge (SN 044-0053) with a new 3-span bridge carrying IL 146 over Little Cache Creek in Vienna.
078-78819 Executed 05/25/2021 1 / 1 1 5 9 Franklin 6 miles of pcc pavement, milling, surfacing, HMA shoulders, aggregate shoulders and patching on IL 148 from one mile south of IL 154 to IL 14.
079-78820 Executed 05/25/2021 4 / 4 2 5 9 Jackson 3.7 miles of patching, surface removal, surfacing and ADA ramp improvements on 14th and 11th Streets in Murphysboro.
080-78837 Executed 05/25/2021 5 9 Massac Removing and replacing PCC pavement, ADA ramp improvements and pavement marking at the intersection of US 45 / Ferry Street and 10th Street in Metropolis.
081-78839 Executed 05/25/2021 5 9 White 1.9 miles of patching, surface removal, surfacing, raised pavement markers and ADA ramp improvements on IL 1 northeast of Locust Street to Commerce Street in Carmi.
082-78840 Executed 05/25/2021 5 9 Jefferson 0.9 miles of patching, milling and resurfacing on IL 15 from west of Sparrow Lane (west of I-57) to west of Davidson Avenue.
083-78851 Executed 05/25/2021 1 / 1 1 5 9 Jackson Pavement patching on North 6th Street from IL 13/127 to Lucier Street in Murphysboro.
084-78853 Executed 05/25/2021 5 9 Jackson Pavement patching at the intersection of IL 13 and Streigel Road in Carbondale.
085-78860 Executed 05/25/2021 5 9 Alexander Bridge preventative maintenance on SN 002-0001 carrying I-57 northbound over Golden Lilly Road (TR 163B), 0.3 miles south of the Pulaski County line.
086-85705 Executed 05/25/2021 2 2 Whiteside Cold-In-Place Recycling and resurfacing on Lyndon Road from US 30 to Commercial Street.
087-87660 Rejected 05/04/2021 2 3 Ford Replace the bridge carrying CH 23 over Crane Creek, 0.75 mile east of Cabery.
088-87739 Executed 06/03/2021 1 / 1 1 2 3 DeKalb Replace the bridge carrying TR 175 over Battle Creek, 0.3 mile east of Hinckley Road.
089-87740 Rejected 05/04/2021 1 2 3 Ford Replace the bridge carrying CH 18 over the West Branch of Horse Creek, 2 miles southeast of Cabery.
090-87746 Executed 05/25/2021 3 / 1 2 3 DeKalb Resurfacing Suydam Road from IL 23 to the city limits of Sandwich.
091-87757 Executed 06/04/2021 2 3 Kankakee Resurfacing CH9 from 5000 West Road to US 45.
092-87764 Executed 05/26/2021 2 3 Bureau Replace the bridge carrying CH 24 over a branch of Pond Creek, 2 miles south of Wyanet.
093-87766 Executed 06/23/2021 2 3 LaSalle Resurfacing Crosat Street from 11th Street to US 6 in the City of LaSalle.
094-89723 Executed 07/09/2021 1 / 1 3 4 Peoria Construction of Rock Island Trail Extension within the City of Peoria, along Park Avenue, from NE Perry Avenue to the old railroad crossing, and along the former Peoria and Peoria Heights railroad bed from Park Avenue to Harvard Avenue, including rehabilitation of the abandoned railroad bridge over War Memorial Drive.
095-89777 Executed 05/21/2021 1 / 1 3 4 Fulton Replace the culvert carrying CH 15 over an unnamed tributary located 0.4 mile west of CH 38.
096-89783 Executed 05/28/2021 3 / 3 1 3 4 Mercer Full Depth Reclamation, bituminous surface treatment, aggregate shoulders and guardrail replacement on CH 9 from the north village limits of Joy to 110th Street.
097-89799 Rejected 05/04/2021 1 / 1 1 3 4 Fulton Remove and replace guardrail at various locations in Fulton County.
098-91592 Executed 06/03/2021 2 / 2 1 3 5 Champaign Pavement reconstruction including widening, Cold-in-Place recycling, HMA pavement and shoulder, box and pipe culverts, and ditch widening. Project is on CH 15 from IL 130 to Sidney.
099-91600 Executed 05/27/2021 3 5 Piatt Replace the bridge carrying TR 51 over a tributary to the Sangamon River, 2 miles north of White Heath.
100-91601 Executed 06/04/2021 5 / 5 2 3 5 Champaign Replace the bridge carrying CH 17 over Kaskaskia Ditch, 1.1 miles west of Sadorus.
101-91603 Executed 05/28/2021 2 / 2 3 5 McLean Cold-in-Place recycling with HMA binder and surface course on CH 39 from White Oak Road to Ziebarth Road.
102-93671 Deleted 03/18/2021 4 6 Sangamon Construction of two structures; one to carry Iron Bridge Road over the Union Pacific Railroad, the other to carry Union Pacific Railroad over Woodside Road. Includes the construction of a pedestrian truss bridge over Woodside Road, reconstructing the intersection of Iron Bridge Road at Woodside Road, and the relocation of the Interurban Trail.
103-93736 Executed 05/28/2021 3 / 3 1 4 6 Menard Reconstruct and resurface CH 2 from east of IL 97/123 for 1.05 miles.
104-93761 Executed 05/28/2021 2 / 1 4 6 Logan Remove and replace guardrail at various locations in Logan County.
105-93767 Executed 05/28/2021 4 6 Schuyler Resurfacing approaches to the bridge carrying CH 5 over the Lamoine River Slough, Cape Seal resufacting of CH 5 from County Road 3100E to the Rushville Corporate Limits, and on CH 1 from IL 103 to the Rushville Corporate limits.
106-93768 Executed 05/28/2021 4 6 Pike Bituminous surface treatment at various locatinos in Pike County.
107-93769 Executed 05/28/2021 4 6 Hancock Micrtosurfacing CH 24 from IL 96 to CH 29.
108-94519 Executed 06/16/2021 2 / 2 4 7 Fayette Complete replacement of an existing bridge with a double barrel box culvert on US 51, 3.25 miles south of Vandalia. (SN 026-0088)
109-97748 Executed 05/28/2021 5 8 Monroe Resurfacing Hanover Road from D Road to 0.2 mile east of FF Road.
110-97750 Executed 06/03/2021 5 8 Madison Resurfacing Serento Road from Main Street to the Madison/Bond County Line.
111-60T17 Executed 05/28/2021 1 1 Cook Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson. Location: Village of Franklin Park in Cook County.
112-62633 Executed 05/25/2021 1 1 1 Cook (4,391-Ft) Intersection improvement including channelization, traffic signal modernization and resurfacing of IL 58 at Niles Center Rd. and at US 41 (Skokie Blvd.) in the Village of Skokie.
113-62L89 Executed 05/27/2021 2 / 2 1 1 1 Cook (1.73-Mile) SMART overlay (resurfacing) and ADA improvement project on Dempster St. from east of Skokie Blvd. to McCormick Ave. within the Village of Skokie in Cook County.
114-62M04 Executed 05/28/2021 1 1 Cook (3.553-Mile) Crack and Joint Sealing pavement preservation project. Includes renewal of pavement markings. Location: FAP 344: IL 83 from S. of Weiland Rd to Palatine Rd in the City of Prospect Heights and the Village
115-62M15 Executed 05/25/2021 1 1 1 Will (1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 112: IL 53 from South of I-55 to Joliet Road, in the Village of Bolingbrook and Romeoville.
116-62M36 Executed 05/27/2021 2 / 2 1 1 1 DuPage This project is located on IL.83 over the Salt Creek within the Village of Villa Park in DuPage County. This work consists of a full and partial depth deck and approach slab repairs, bridge deck scarification, a new latex concrete overlay, deck drain adjustments and pavement marking.
117-62M40 Executed 06/03/2021 1 / 1 1 1 1 Cook Bridge Preservation Project, including bridge deck overlay (scarification and latex concrete overlay), deck repairs, reconstructing transverse joints. Location: Bridge carrying Roosevelt Rd over Des Plaines River, East of IL 171 in the Village of Forest Park in Cook County.
118-64M91 Executed 05/28/2021 1 / 1 1 2 2 Lee 0.80 miles, Cold milling, pavement patching, HMA resurfacing, ADA improvement and traffic signal modernization from West of Page drive to US 52/IL 26 in Dixon.
119-66L41 Executed 05/25/2021 1 / 1 2 3 Iroquois This work is located at the Illinois Department of Transpiration, District 3, Buckley Maintenance Facility in Iroquois County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a polymer HMA asphalt binder cse. (2¼" lift) and a polymer HMA surface *See Remarks*.
120-66L52 Executed 05/17/2021 4 / 4 1 2 3 Grundy This pollinator project is located at Three Rivers Rest Areas on I-80 west of Minooka. This work will include herbicide, seeding, planting, landscaping and maintenance.
121-68G18 Executed 05/21/2021 1 / 1 3 4 Peoria Longitudinal joint repair and partial depth patching along US 150 (War Memorial Drive) from West of Brandywine Drive to IL 29 (Adams St) in Peoria.
122-70990 Executed 05/28/2021 4 / 4 1 3 5 DeWitt 3P Resurfacing Standard overlay, ADA improvements from Logan Co. line to Van Buren St. in Clinton. Project length 9.48 miles.
123-70C16 Executed 05/28/2021 1 / 1 1 3 5 DeWitt 3P Resurfacing Standard overlay from Logan Co. line to 0.3 miles W. of US 51 at Clinton. Project length 9.91 miles.
124-70E49 Executed 05/25/2021 3 5 McLean Interstate Bridge Preservation/ Bridge Deck Overlay at I-39/US 51 Over Mackinaw River North of Hudson.
125-70E83 Executed 05/28/2021 1 3 5 DeWitt 5.601 Miles. SMART Resurfacing, ILL 54 to ILL 10 N of Weldon.
126-72K08 Withdrawn 04/21/2021 1 / 1 4 6 Schuyler Bridge replacement (SN 085-0002) carrying US 67 over Bluff Ditch, 1.8 miles northwest of IL 100. , Bridge replacement (SN 085-0002) carrying US 67 over Bluff Ditch, 1.8 miles northwest of IL 100.
127-72L67 Executed 05/13/2021 1 / 1 1 4 6 Sangamon Bridge deck repairs on I-55 over the Sangamon River (2.7 miles north of IL 54/ Sangamon Avenue); I-55 over IL 54 / Sangamon Avenue; I-55 over the IC Railroad (0.3 miles north of IL 54 / Sangamon Avenue). (SN 084-0014, 084-0015, 084-0016, 084-0017, 084-0018, 084-0019)
128-72M06 Executed 05/27/2021 1 / 1 4 6 Adams Parking improvements at the Quincy Maintenance Yard/Sign Shop parking lot.
129-72M58 Executed 05/25/2021 4 6 Montgomery 150 feet of paved ditch repair on IL 16, 0.2 miles east of Lake Litchfield Road in Litchfield and culvert removal and replacement east of Hillsboro.
130-74550 Executed 06/04/2021 4 7 Wayne 11.2 miles of patching, milling, resurfacing and replacing 3 culverts on IL 15 from Fairfield to the Edwards County line.
131-74939 Executed 06/04/2021 1 / 1 4 7 Wabash 12.2 miles of surface removal, patching, pipe and culvert replacement, deck patching, joint repair and concrete wearing surface on SN 093-0020 on IL 1 from Greathouse Creek in Mt. Carmel to the Edwards County line.
132-46562 Executed 06/08/2021 1 1 Will (11.40-Mile) Pavement marking installation project on Interstate 80 (I-80) between IL 43 (Harlem Ave.) and US 30 (Lincoln Hwy located within the Village of New Lenox and Makena in Will County.
133-60T06 Executed 05/28/2021 13 / 13 1 1 1 Cook Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 , Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314
134-60T11 Executed 05/26/2021 2 / 2 2 1 1 Lake Intersection Reconstruction, Channelization, Traffic Signal Modernization, Location: FAP 344: US 45 (Lake Street) at IL 173 (Rosecrans Road) within unincorporated Antioch Township in Lake County.
135-61G58 Executed 05/27/2021 2 / 2 1 1 Kane Roadway reconstruction, lighting, water main, landscaping, pavement markings, on East New York Street from Farnsworth Avenue to Welsh Drive in Aurora.
136-61G95 Executed 05/28/2021 2 1 1 Will Resurfacing, curb and gutter, sidewalk replacement, ornamental lighting, brick paver sidewalk, landscaping and pavement markings on IL 171 from 11th Street to 10th Street and on IL 7 from IL 171 to Hamilton Street in Lockport.
137-62K80 Executed 05/12/2021 4 / 4 2 1 1 Cook, Will Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements.
138-62L52 Executed 05/28/2021 1 1 Cook (1.762-Mile) Cleaning and sealing longitudinal joints in the existing HMA pavement between traffic lanes and curb and gutter, restriping pavement marking in the City of Chicago, Lake and North Chicago Townships.
139-62M13 Executed 05/27/2021 1 1 Cook SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAU 3520: Gross Point Road from N of Oakton St to Howard St in the Village of Morton Grove and Skokie.
140-62M16 Executed 05/26/2021 1 1 Will (2.78-Mile) Smart Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 607: US 52/ 6/ 30 Jefferson St. from Joyce Rd.to Bluff St., within the City of Joliet.
141-62M26 Executed 05/27/2021 2 / 1 1 1 1 Cook The improvement of McHenry Road over Wheeling Drainage Ditch consists of bridge deck overlay and joint repair. The improvement is located in the Village of Wheeling in Cook County, IL.
142-62M27 Executed 05/24/2021 1 / 1 1 1 1 Will This improvement consists of Bridge Deck and Approach repairs. Structural repair of Concrete, deck scarification, deck latex concrete overlay, approach HMA overlay, bridge deck grooving in Green Garden Township.
143-62M31 Executed 05/20/2021 1 1 Cook This is a bridge repair project that includes bridge deck overlay, partial depth approach reconstruction, joint reconstruction, concrete bridge deck repair, full depth bridge deck repair. Located: IL Route 7 at 86th Ave. within within the Village of Palos Park.
144-62N01 Executed 06/01/2021 1 1 1 Lake Cleaning(sweeping) various arterial highways in District One throughout Lake County.
145-62N18 Rejected 09/16/2021 1 / 1 1 1 Various Expressway mowing north.
146-66L61 Executed 05/20/2021 2 3 Kendall, LaSalle The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties.
147-66L63 Executed 05/24/2021 2 3 Grundy The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Grundy County.
148-66L64 Executed 05/25/2021 1 / 1 2 3 Various The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Livingston, Ford, Grundy, and Iroquois Counties.
149-68F68 Executed 06/04/2021 2 / 2 3 4 Various Bridge deck sealing at various structures throughout District Four.
150-68F95 Executed 05/26/2021 3 4 Various Pavement markings on various routes in various counties throughout District Four.
151-70E81 Executed 06/03/2021 1 / 1 3 5 Vermilion 12.963 Miles of Smart Resurfacing from Ford County Line to IL Rte. 1 at Hoopeston.
152-70F02 Executed 05/25/2021 3 5 DeWitt, Piatt Bridge beam replacement and bridge repair at SN 074-0076 and 020-0045.
153-70F04 Executed 05/24/2021 3 / 3 3 5 DeWitt 5.179 miles of micro surfacing joint repair from Mclean/Dewitt co line to the Dewitt/Piatt Co. line.
154-74A34 Active 03/13/2021 4 7 Moultrie 3.4 miles of underdrains at various locations in District 7.
155-74A35 Executed 05/28/2021 1 4 7 Moultrie 4.79 miles of shoulder repairs on IL 133 from Cadwell Road to Vine Street in Arthur and on Cadwell Road from CR 1900N to 1200' north of CR 1700N.
156-74A36 Rejected 05/04/2021 4 7 Effingham, Shelby 1.56 miles of partial depth resurfacing at various locations on US 40, IL 32 and IL 33.
157-74A37 Executed 05/28/2021 4 7 Macon 0.6 miles of milling with inlay of surface course on IL 105 from east of IL 121 to 0.1 miles east of 26th Street.
158-74A44 Executed 05/24/2021 4 7 Various Cleaning and painting 6 bridges on I-57 in various counties of District 7.
159-74A48 Executed 05/25/2021 4 7 Various Repairing, replacing, servicing and maintaining the electrical systems within Fayette, Effingham, Jasper, Crawford, Lawrence, Richland, Clay, Wayne, Edwards and Wabash Counties.
160-74A49 Executed 05/25/2021 4 7 Various Repairing, replacing, servicing and maintaining the electrical systems within Clark, Cumberland, Macon, Moultrie, Shelby and Coles Counties.
161-85711 Executed 05/26/2021 2 2 Stephenson Replace the bridge carrying North Hulbert Road over Muddy Creek, 0.5 mile nort of McConnell.
162-87662 Executed 05/28/2021 4 / 3 2 3 DeKalb Replace the bridge carrying Suydam Road over Indian Creek, 7 miles south of Shabbona.
163-87743 Executed 06/03/2021 2 3 LaSalle Replace the bridge carrying N. 33rd Road over Pecumsaugan Creek, 0.2 mile east of E. 9th Road.
164-95822 Rejected 06/07/2021 3 / 2 1 4 7 Effingham Trailhead parking improvements, sidewalk crossing improvements, pedestrian path signals and lighting, sigage and pavement markings at various loactions in Effingham.
165-95891 Executed 05/25/2021 5 / 4 1 4 7 Clark Guardrail removal and replacement with terminals, box culvert extensions, precast box culverts, pipe culverts and riprap at various locations in Clark County.
166-95895 Executed 07/14/2021 4 7 Shelby Replace the bridge carrying TR 112 over Flat Branch Tributary, 4.8 miles southeast of Moweaqua.
167-97487 Executed 05/28/2021 5 8 Monroe Pavement removal, sub and aggregate base, HMA Pavement and shoulders with rumble strips, storm sewer, guardrail and pavement markings on TR 47 (HH Road) from 0.15 mile west of Waterloo City Limits to 0.3 mile west.
168-97719 Executed 05/28/2021 5 8 Monroe Pedestrian path alogn South Market Street from IL 3 to Bulldog Boulevard in Waterloo.
169-46928 Executed 05/27/2021 3 / 3 1 4 7 Lawrence Resurfacing internal park roads and parking lots, aggregate resurfacing of camp sites, drainage improvements, box culvert installation and lighting at the IDNR Red Fills State Park.
170-62N02 Executed 06/01/2021 1 1 Kane, McHenry Cleaning(sweeping) various arterial highways in District One throughout Kane and McHenry counties.
171-74A45 Executed 05/19/2021 2 4 7 Various Steel plate beam guardrail repair/replacement throughout District 7.
172-76N73 Executed 06/03/2021 5 8 Jersey, Madison 8.2 miles of crack and joint sealing on IL 3 from 0.04 miles north of Pierce Lane to IL 109.
173-76N78 Executed 05/28/2021 5 8 Clinton Crack and joint sealing on IL 127 from the Bond County line to 0.2 miles north of Williams Road.
174-78550 Withdrawn 03/25/2021 5 9 Jefferson Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange. , Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange.
175-85686 Executed 05/26/2021 2 / 2 1 2 2 Jo Daviess Replace the bridge carrying South Apple Road over the Apple River, 1.5 miles northwest of Woodbine.
176-93747 Executed 05/28/2021 30 / 29 1 4 6 Sangamon Remove the structures carrying the Norfolk Southern Railroad over Cook Street and South Grand Avenue, Construction of two railroad structures over Cook Street, construction of two railroad structures over South Grand Avenue, track removal, approach roadways, storm sewer, sanitary sewer, pump stations, curb and gutter, sidewalks, lighting, fencing and pavement markings all in the city of Springfield.
177-46563 Rejected 05/04/2021 2 2 Various Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown on the plans.
178-46565 Executed 05/20/2021 2 2 Various Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order.
179-46566 Executed 05/26/2021 2 / 2 2 2 Various Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order.
180-62K45 Rejected 09/16/2021 1 / 1 1 1 Will The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-80 Expwy from I-355 to Kendall County Line.
181-62K48 Executed 05/25/2021 6 / 6 1 1 Will The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian barrier on I-55 expwy from I-355 to Reed Rd.
182-62N92 Executed 05/25/2021 1 1 Cook, DuPage (150-Mile) Improvement consists of Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 43 (Harlem Ave.) to I-355.
183-66B52 Executed 05/12/2021 2 3 LaSalle The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles.
184-66L56 Executed 05/20/2021 2 3 LaSalle, Livingston This work is located on FAP 786 (IL 170) beginning at the intersection of IL 170 and N 21st Rd in LaSalle County and ending at the intersection of IL 170 and IL 17 in Livingston County (+/- 12.0 miles). This work consists of placing aggregate wedge shoulder.
185-68G19 Executed 05/24/2021 1 / 1 1 3 4 Various Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four.
186-68G20 Executed 05/21/2021 3 4 Marshall, McLean, Woodford Installation of communications duct, communications vaults, and fiber optic cable along Interstate 39 from the Interstate 55 interchange to Illinois Route 17 in District Four.
187-68G21 Executed 05/24/2021 3 4 Peoria, Tazewell Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four.
188-70F05 Executed 05/24/2021 3 5 McLean Class a special patching on nearly 2 miles of Eb/Wb 1-74 near Carlock.
189-70F06 Executed 05/28/2021 3 5 McLean .245 Miles of Partial Width Resurfacing Under Veterans Parkway and Under I-55B in Bloomington.
190-70F08 Executed 05/27/2021 3 5 Douglas 11.36 MI of patching along FAI 57 from S of Arcola to N of Tuscola.
191-70F09 Executed 05/27/2021 3 5 Champaign 0.253 miles, patching, at 1-74 North of Mahomet on ILL 47.
192-70F10 Executed 05/27/2021 3 5 Vermilion 3.072 Ml of patching on FAS 331 from US 150 to Homer/Catlin Rd.
193-70F11 Executed 05/27/2021 3 5 Vermilion 1.36 Mi of patching on FAI 74 from L Street in Tilton to E of IL 1 in Danville.
194-70F12 Executed 05/26/2021 3 5 Champaign 0.425 Miles, Longitudinal joint repair, Guardian Dr. to 1-74 Ramps in Urbana.
195-62L82 Executed 05/28/2021 1 1 DuPage (3.9-Mile) Crack and joint sealing on US 20 (Lake Street) from I-355 to IL 83 (Kingery Highway) within the Village of Addison.
196-74A46 Rejected 05/04/2021 4 7 Macon Milling and resurfacing at 3 locations: 1) US 51 at IL 48; 2) I-72 at SN 058-0063/64; 3) US 51, 2 miles south of Maroa.
197-76M33 Executed 05/27/2021 5 8 St. Clair Cleaning of the Missouri Avenue Pump Station on I-55/I-64.
198-62N25 Executed 06/03/2021 1 1 1 Various The improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties.
199-66L62 Executed 05/24/2021 1 2 3 Bureau, LaSalle The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties.
200-64P96 Executed 05/26/2021 2 2 Various Removal of dead trees along state maintained routes.
201-64P79 Withdrawn 04/15/2021 1 / 1 2 2 Henry Pavement patching on 1-74 from the 1-74/1-80/1-280 Interchange to IL 81.
202-64P82 Executed 06/23/2021 2 2 Various "On-call" maintenance for traffic signals, flashing beacons, and roadway lighting along State maintained routes in Boone, Jo Daviess, Lee, Ogle, Stephenson, and Winnebago counties.
203-76M78 Withdrawn 04/13/2021 5 8 Madison, St. Clair Chemical treatment of deep wells at various locations in East St. Louis. , Deep well treatment at various locations in East St. Louis.
01A-TA007 Executed 07/14/2022 2 / 2 1 4 6 Christian Rehabilitate Taxiway A Pavement and Lighting, Phase 1; Install New Airport Rotating Beacon and Tower
02A-DU087 Executed 09/09/2021 1 1 DuPage Phase II - Upgrade Wildlife Hazard Fencing on Southern and Western Boundaries
03A-SR094 Executed 01/03/2022 1 5 8 Madison Reconstruct Bituminous T-Hangar Taxilanes (West)
04A-MB033 Executed 11/03/2021 3 4 McDonough Rehabilitate Parallel Taxiway to Runway 9/27
05A-DU088 Executed 01/03/2022 1 / 0 1 1 DuPage Elevated Fixture Grounding Updates
1LR-M2002 Active 03/12/2021 2 0 0 Knox Voluntary Stabilization of dangerous embankments at the Corn Crib Lake and Little John T.R. 1950N abandoned mine sites by the Illinois Department of Natural Resources using federal Abandoned Mined Lands funds.
No More Data