Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 2 | 5.00 | 0.00 | 317SBGP111/120 |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
RPJ 4515 | Rochelle Municipal | City of Rochelle | Rochelle |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting. |
55 Calendar Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AR150530 | L SUM | TRAFFIC MAINTENANCE | Base items | 1.000 | |||
AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 1,504.000 | |||
AR152540 | SQ YD | SOIL STABILIZATION FABRIC | Base items | 2,971.000 | |||
AR154606 | SQ YD | GRANULAR DRAINAGE SUBBASE - 6" | Base items | 4,122.000 | |||
AR156510 | FOOT | SILT FENCE | Base items | 595.000 | |||
AR156513 | SQ YD | SEPARATION FABRIC | Base items | 1,229.000 | |||
AR156531 | SQ YD | EROSION CONTROL BLANKET | Base items | 1,551.000 | |||
AR156533 | ACRE | TEMPORARY SEED AND MULCH | Base items | 0.210 | |||
AR208515 | CU YD | POROUS GRANULAR EMBANKMENT | Base items | 417.000 | |||
AR209608 | SQ YD | CRUSHED AGG. BASE COURSE - 8" | Base items | 112.000 | |||
AR401613 | TON | BIT. SURF. CSE.-METHOD I, SUPERPAVE | Base items | 25.000 | |||
AR401650 | SQ YD | BITUMINOUS PAVEMENT MILLING | Base items | 161.000 | |||
AR401660 | FOOT | SAW & SEAL BIT. JOINTS | Base items | 595.000 | |||
AR401665 | FOOT | BITUMINOUS PAVEMENT SAWING | Base items | 1,189.000 | |||
AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 4,264.000 | |||
AR401910 | SQ YD | REMOVE & REPLACE BIT. PAVEMENT | Base items | 19.000 | |||
AR403613 | TON | BIT. BASE CSE.-METHOD I, SUPERPAVE | Base items | 11.000 | |||
AR501506 | SQ YD | 6" PCC PAVEMENT | Base items | 4,011.000 | |||
AR501530 | EACH | PCC TEST BATCH | Base items | 1.000 | |||
AR510510 | EACH | TIE DOWN | Base items | 24.000 | |||
AR510515 | EACH | GROUND ROD | Base items | 4.000 | |||
AR510900 | EACH | REMOVE TIE DOWN | Base items | 24.000 | |||
AR510905 | EACH | REMOVE GROUND ROD | Base items | 4.000 | |||
AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 34.000 | |||
AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 41.000 | |||
AR620525 | SQ FT | PAVEMENT MARKING-BLACK BORDER | Base items | 348.000 | |||
AR620530 | SQ FT | PAVEMENT MARKING-EPOXY | Base items | 332.000 | |||
AR705506 | FOOT | 6" PERFORATED UNDERDRAIN | Base items | 626.000 | |||
AR705630 | EACH | UNDERDRAIN INSPECTION HOLE | Base items | 1.000 | |||
AR705640 | EACH | UNDERDRAIN CLEANOUT | Base items | 2.000 | |||
AR901510 | ACRE | SEEDING | Base items | 0.320 | |||
AR905520 | CU YD | TOPSOILING (FROM OFF SITE) | Base items | 173.000 | |||
No More Pay Items |