| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 2 | 3 | 0.00 | 0.00 | N/A |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 15 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 40400001 | FOOT | FIBER-MODIFIED ASPHALT CRACK SEALING | Base items | 53,308.000 | |||
| 40400114 | SQ YD | MICRO-SURFACING, SINGLE PASS, TYPE II, MIXTURE D | Base items | 11,846.000 | |||
| 40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 2,666.000 | |||
| 40600400 | TON | MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS | Base items | 3.600 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70100700 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 | Base items | 1.000 | |||
| 70300240 | FOOT | TEMPORARY PAVEMENT MARKING - LINE 6" | Base items | 16,284.000 | |||
| 78008210 | FOOT | POLYUREA PAVEMENT MARKING TYPE I - LINE 4" | Base items | 130,256.000 | |||
| 78008230 | FOOT | POLYUREA PAVEMENT MARKING TYPE I - LINE 6" | Base items | 16,284.000 | |||
| 78100100 | EACH | RAISED REFLECTIVE PAVEMENT MARKER | Base items | 1,630.000 | |||
| 78300200 | EACH | RAISED REFLECTIVE PAVEMENT MARKER REMOVAL | Base items | 1,630.000 | |||
| X0326880 | HOUR | MESSAGE BOARD VEHICLE DRIVER | Base items | 30.000 | |||
| X0326907 | CAL MO | PORTABLE, VEHICLE MOUNTED, CHANGEABLE MESSAGE SIGN | Base items | 0.500 | |||
| X0327980 | SQ FT | PAVEMENT MARKING REMOVAL - WATER BLASTING | Base items | 16,284.000 | |||
| X7015005 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 28.000 | |||
| No More Pay Items | |||||||