| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 16.00 | 0.00 | NHPPG4DQ(565) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 50 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 50102400 | CU YD | CONCRETE REMOVAL | Base items | 1.200 | |||
| 50300255 | CU YD | CONCRETE SUPERSTRUCTURE | Base items | 1.200 | |||
| 50300300 | SQ YD | PROTECTIVE COAT | Base items | 21.000 | |||
| 50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 50.000 | |||
| 52000030 | FOOT | PREFORMED JOINT SEAL 2 1/2" | Base items | 76.000 | |||
| 67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 6.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70102630 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701601 | Base items | 1.000 | |||
| 70102640 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 | Base items | 1.000 | |||
| 70200100 | L SUM | NIGHTTIME WORK ZONE LIGHTING | Base items | 1.000 | |||
| X0322215 | EACH | CLEANING BRIDGE SCUPPERS AND DOWNSPOUTS | Base items | 513.000 | |||
| X0900022 | FOOT | BRIDGE DRAINAGE SYSTEM REPAIR | Base items | 2,100.000 | |||
| X0900046 | FOOT | PREFORMED JOINT SEAL, 1" | Base items | 384.000 | |||
| X0900047 | FOOT | PREFORMED JOINT SEAL 3" | Base items | 477.500 | |||
| X0900058 | FOOT | PREFORMED JOINT SEAL 2" | Base items | 303.000 | |||
| X1200201 | FOOT | STRIP SEAL GLAND REPLACEMENT | Base items | 799.000 | |||
| X2200018 | FOOT | ORNAMENTAL FENCE | Base items | 2,700.000 | |||
| X7010410 | CAL MO | SPEED DISPLAY TRAILER | Base items | 1.000 | |||
| X7011015 | L SUM | TRAFFIC CONTROL AND PROTECTION (EXPRESSWAYS) | Base items | 1.000 | |||
| Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 8.000 | |||
| Z0016200 | SQ YD | DECK SLAB REPAIR (PARTIAL) | Base items | 10.000 | |||
| Z0048665 | L SUM | RAILROAD PROTECTIVE LIABILITY INSURANCE | Base items | 1.000 | |||
| Z0073200 | EACH | TEMPORARY SHORING AND CRIBBING | Base items | 1.000 | |||
| No More Pay Items | |||||||